Loading...
32C-141 (69) • Carlson&Schmitt Architects,Inc. FAX COVER SHEET TO: Joanne Campbeii, Valley CDC (413) 586-752 i Patrick McCarthy, Valley CDC; (413) 586-7521 Tilman Lukas, MBL Housing & Development (413) 747-8515 Karen Leveille, HAP, Inc. (413) 731-8723 17ob nesro ers Desro rs & �S.' (d13) 593_3335 .,,. �..�,...,,.,,.,, ., ....,..,e.., .� or, Inc. ,., .,.,., �a-,,.... 1/..I,..,..:�V ItI%t 1 IAA') rn� nnna VIGVc v� nA/vIt,,11, I VVI `Y IJ) JVI-VVJ I UCICR l.dVdl lduyl1, IVIfR.. (O I !) OOV-I I VO Anthony Patiiio, Northampton tsiag. C,om. (4-13) 50 -1z(L Andy Pavlica, Lngineering Design Associates (413) 788-0967 Sandy Lake, Robert W. Hall Consulting Enq. (413) 789-3295 Emily Holmberg, E.B. Holmberg & Associates (413) 529-2237 VICyuly rwredndyiuw, E.D. iioilnuery of Abut; (4I3) 534-uo6't Andrew vv lnter, iviass mousing col I J 0D4-1 uzrs FROM: Kevin Rothschild-Shea RE: Milibank Affordable Housing JVU Ivittlll ly — Jai lull y 1 V, £UU9- rieTc• 1..,.,�,., 'n ',AAA o.,,,.,,.. '1 _ • r-Vt e.:d a eirde Agawam.Massachusetts 01001 (413)7865556 telephone (413)786-6130 fax www.cartsonschmitt.aem r fia4"- Carison&Schmitt Architects,Inc. JAN 2 0 2004 Millbank Affordable Housing Job Meeting —January 16, 2004 Attendees: Joanne Campbell, Valley Community Development Corporation Patrick McCarthy, Valley Community Development Corporation Robert A. Desrosiers, Desrosiers & Son, Inc. Tilman Lukas, MBL Housing & Development Kevin Rothschild-Shea, Carlson & Schmitt Architects, Inc. Progress: 18 Michelman • Plumbing rough started today; HVAC to begin; will require access to apartments for coordination purposes. • Masonry complete except for foundation repair at west end. • Existing units to be master keyed by owner, less doors already included in this contract. Owner/contractor to coordinate. • Fire alarm upgrade to start after 79 is completed. 34 Michelman • Possible questions regarding venting; Carlson & Schmitt Architects/ Robert W. Hall to pursue. • Revised fire protection shop drawings not submitted. • Desrosiers to submit price for two evergreens at north lot. • Robert W. Hall to revisit bath venting installation corrective work. • Verizon has located poles on site, Desrosiers has submitted price for excavation from the last pole (behind dumpster) to the building. Carlson & Schmitt Architects to contact Verizon regarding temporary overhead feed. 79 Michelman • Inspections moving ahead, fire alarm set for inspection next Tuesday. Occupancy required for January 24, 2004. • Millbank to deliver hardware for unit doors. 1 South End Bridge Circle Agawam,Maaaaehuaetta 01001 (418)786-5556 tele,ohone (413)786.6130 faz www.carlsonachmitt.com Ell ' d EEfifi •°N 0E19-981 11l01HOS 9 NOS1Hd0 Old1O: 1 tOOZ Ol•UEr 4 General • Millbank to forward gas heat invoicing to Desrosiers for payment under the temporary heat allowance (for 34 Michelman). • Condo doc's under review. Next Meeting: January 23rd 9:00 a.m. Pencil Requisition Meeting: January 30th 10:00 a.m. JAN 2 0 2004 cc: Attendees Derek Cavanaugh, MHIC Andrew Winter, Mass Housing Anthony Patillo, Northampton Building Commissioner Andy Pavlica, Engineering Design Associates Sandy Lake, Robert W. Hall Consulting Engineers Emily Holmberg, E.B. Holmberg & Associates Gregory Kereakaglow, E.B. Holmberg & Associates Steve Vukovich, PDSI Karen Leveille, HAP, Inc. 2 E/E EE66'ON OE, 19-991 IIIWHDS R NOS18VD VHlO: 1 tOOl 'Ol'Uef v vs (ac -id9/ Carlson&Schmitt Architects,Inc. FAX COVER SHEET TO: Joanne Campbell, Valley CDC (413) 586-7521 Patrick McCarthy, Valle,COC (413) 586_7521 Tilman Lukas, ukas, RVAOL Housing u Development ( 13) 7A7-851J Ir.dI eI I Luveiiie, HAP, ` t 1 3) !3 1-3 t 23 Bob Desrosiers, Desrosiers 61 Son, inc. (4 i3) 593-3335 Steve VUKOVICh, F L) i (413) 5$!-UU31 Derek Cavanaugh, MHIC (617) 850-1106 Anthony Patillo, Northampton Bldg. Com. (413) 587-1272 Andy Pm/lice, Engineering Design Associates (413) 788-0967 1 _1._ r\_1__.i IA1 1 1_.1 /1___..Il'__-. (� rl\ -1QI', r1 lln�' Ja11VY Late, rwuCI l vv. I IaII �VI IJUIIII Iy I_I ig. (4 13) J 33-3295 Emily riUlrrliJery, C.D. riuirnuery OI ilssuciaies ('+i 3)529-22J l Gregory KereaKaglow, t.ti. tioimoerg 6, Assoc (41i) iJ4-UtbtS4 Andrew Winter, Mass Housing (617) 854-1028 FROM: Kevin Rothschild-Shea RE: Millbank Affordable Housing 1 1_ ., . _,•_.._ 1,_...�_ nn nnn A JVV IVIGVl111U—aJQI1UP1Y LV, LVV'T fATF• .lantii nr 71 7nn4 Panpc• z I cam•_.,-_r_rt.J a-d.,e Circle Arawam,Ma,sichwetu 01001 (413)786+5556 telephone (413)786.6130 fax www.carlsonschmin.00m i i� � n inn11 ii I nn n1I n I t.. �( 1., dN� �_ _ _ h 7 i P Carlson&Schmitt Architects,Inc. Mil!bank Affordable Housing Job Meeting - January 23, 2004 Attendees: Patrick McCarthy, Valley Community Development Corporation Robert A. Desrosiers, Desrosiers & Son, Inc. Kevin Rothschild-Shea, Carlson & Schmitt Architects, Inc. Progress: 18 Michelman • HVAC rough to start in two weeks plus or minus. • Keying/coordinating with fire alarm; Carlson & Schmitt Architects to review door schedule. • Fire alarm upgrade to start next week. 34 Michelman • Boiler venting; Carlson & Schmitt Architects/ Robert W. Hall to resolve; gypsum schedule requires resolution ASAP. • Evergreens to be scheduled on change order log. • Verizon pole locations accepted; Carlson & Schmitt Architects to contact Verizon to verify number of lines to be brought to the site. • Telephone feed to be overhead, underground and temporary feed not accepted. • Insulation Review - Apartments: General contractor to ensure batt is secure above sprinkler; minimize gaps at cavity sidewall. • Hold back insulation (blown-in) at 2 foot band near access scuttle for viewing purposes. • Townhouses - General contractor to review insulation levels above ceiling joists, gaps at each may expose 1'/2" of sprinkler line at each gap. • Gypsum installation underway at apartments - third floor, ceilings complete, one unit walls complete. 1 South End Bridge Carle Agawam,Masaachuaetta 01001 (413)7865556 telephone (413)786-6130 fax www.carlaonachmitt.com E/Z 'd PIPS -ON 0219-98L 111WHOS '9 NOS18V0 Wdbl ll b001 £l Uel 79 Michelman • Fire alarm inspection near complete, reinspection today, Desrosiers to contact Building Inspector for immediate follow-up. Next Meeting: January 30th 10:00 a.m. on site; Desrosiers to provide heated room, table and ten chairs. cc: Attendees Derek Cavanaugh, MHIC Andrew Winter, Mass Housing Anthony Patillo, Northampton Building Commissioner Andy Paviice, Engineering Design Associates Sandy Lake, Robert W. Hall Consulting Engineers Emily Holmberg, E.B. Holmberg & Associates Gregory Kereakaglow, E.B. Holmberg & Associates Steve Vukovich, PDSI Karen Leveille, HAP, Inc. Joanne Campbell, Valley Community Development Corporation Tilman Lukas, MBL Housing & Development 2 £/£ 'd 9166 '0N CE19-98L 1lIWHOS '9 NOS1dVD Wdtil:ll tOIN .El.Uel"