Loading...
2023-11-16 SWM LETTER - BURT'S BOG 4 Allen Place, Northampton, MA 01060 (413) 582-7000 bdg@berkshiredesign.com Berkshire Design Group November 16, 2023 Doug McDonald Stormwater Manager Northampton Department of Public Works RE: Burt’s Bog Conservation and Limited Development Project Stormwater Management System Status Dear Doug: The Burt’s Bog Conservation and Limited Development Project was issued a stormwater permit on 4/20/2017 and an amendment to that permit was issued on 9/11/2019. The stormwater improvements required are shown on the Burt’s Bog Conservation and Limited Development Project plans dated September 9, 2019, and last revised 8/10/2020. Impervious areas for each lot are summarized in an updated Summary of Stormwater-Related Elements dated 6/7/2022. Stormwater elements on the plans include stormwater piping, gravel diaphragms, permeable concrete pavers, and detention basins with controlled outlets. The site impervious area constructed is in substantial conformance with the approved impervious budget. Note that at this time Lots 1, 2 and 3 have not been built out. All stormwater elements, with the exception of the Lot 10 detention basin were constructed in substantial conformance with the plan design. Survey of the detention basin on Lot 10 (see attached) indicates that this basin was not constructed in conformance with the design plans and does not have the volume provided in the design. In summary, the stormwater improvements on lots 4, 5, 6, 7, 8 and 9 are substantially in conformance with the plan design. Sincerely, Berkshire Design Group Christopher Chamberland, P.E. Principal