Loading...
38A-049 (5) BP-2024-0311 23 LAUREL ST COMMONWEALTH OF MASSACHUSETTS Map:Block:Lot: 38A-049-001 CITY OF NORTHAMPTON Permit: New Build PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) BUILDING PERMIT Permit# BP-2024-0311 PERMISSION IS HEREBY GRANTED TO: Project# NEW TOWNHOUSES 2024 Contractor: License: ALLEGRONE CONSTRUCTION CO Est. Cost: 9082487 INC 044994 Const.Class: Exp.Date: 05/01/2024 Use Group: Owner: LLC 23 LAUREL STREET Lot Size (sq.ft.) Zoning: PV Applicant: ALLEGRONE CONSTRUCTION CO INC Applicant Address Phone: Insurance: 150 PITTSFIELD RD 413-997-9200 XWS56048388 LENOX, MA 01240 ISSUED ON: 03/27/2024 TO PERFORM THE FOLLOWING WORK: 20 TOWNHOUSE STYLE NEW CONSTRUCTION POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Final: Final: Final: Rough Frame: Gas: Fire Department Driveway Final: Fireplace/Chimney: Rough: Oil: Insulation: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Signature: 01004 gaw Fees Paid: $12,039.00 212 Main Street,Phone(413)587-1240,Fax: (413)587-1272 Office of the Building Commissioner l'qR 2 . NT 2 e0�4 The Commonwealth of Massachusetts I ' �.tio;°F�Uic , Office of Public Safetyand Inspections �l �yq rn�Nr,�NSp,;,� .' Massachusetts State Building Code(780p CMR) Build ti 1-uit Application for any Building other than a One-or Two-Family Dwelling (This Section For Official Use Only) Building Permit Number:,. 4-3// Date Applied: 3[u12- Building Official: 1-6,1413 14d5I7v-0'Ac - SECTION 1:LOCATION 23 Laurel Street Northampton 01060 23 Laurel Street No.and Street Si yp/Ton Zip Code Name of Building(if applicable) 77 9 Assessors Map# Block#and/or Lot # SECTION 2:PROPOSED WORK Edition of MA State Code used 2015 IBC If New Construction check here®or check all that apply in the two rows below Existing Building 0 Repair 0 Alteration ❑ Addition 0 Demolition 0 (Please fill out and submit Appendix 2) Change of Use 0 Change of Occupancy 0 Other ® Specify: New construction Are building plans and/or construction documents being supplied as part of this permit application? Yes El No 0 Is an Independent Structural Engineering Peer Review required? Yes 0 No El Brief Description of Proposed Work: 20 townhouse style new construction apartments located on a vacant 1.62 acre parcel at 23 Laurel Street.All apartments will be affordable to future tenants.The project consists of 7 unique buildings,each containing between 2-4 apartments.The project includes 8 one-bedroom, 10 two-bedroom and 2 three-bedroom units. SECTION 3:COMPLETE THIS SECTION IF EXISTING BUILDING UNDERGOING RENOVATION,ADDITION,OR CHANGE IN USE OR OCCUPANCY Check here if an Existing Building Investigation and Evaluation is enclosed(See 780 CMR 34) El Existing Use Group(s): NA Proposed Use Group(s): R2,R3 SECTION 4:BUILDING HEIGHT AND AREA Existing Proposed No.of Floors/Stories(include basement levels)&Area Per Floor(sq.ft) NA NA 2 floors 1,12ysf to 1,yyU sf per floor Total Area(sq.ft.)and Total Height(ft) NA NA 1,966 sf- 26'-4" 3 498 sf SECTION 5:USE GROUP(Check as applicable) A: Assembly A-1 0 A-2 0 Nightclub 0 A-3 0 A-4 0 A-5 0 B: Business 0 E: Educational 0 F: Factory F-1 0 F2 0 H: High Hazard H-1 0 H-2 0 H-3 0 H-4 0 H-5 0 I: Institutional I-1 0 I-2❑ I-3 0 I-4 0 M: Mercantile 0 R: Residential R-10 R-2 El R-3 II R-4 0 S: Storage S-1 0 S-2 0 U: Utility 0 Special Use 0 and please describe below: Special Use Description: SECTION 6:CONSTRUCTION TYPE(Check as applicable) IA 0 IB CI IIAD IIB 0 IIIAD IIIB CI IV El VA CI VB El SECTION 7:SITE INFORMATION(refer to 780 CMR 105.3 for details on each item) Water Supply: Flood Zone Information: Sewage Disposal: Trench Permit: Debris Removal: Public ElCheck if outside Flood Zone El Indicate municipal A trench will not be Licensed Disposal Site Private 0 or indentify Zone: or on site system 0 required 0 or trench or specify: permit is enclosed Railroad right-of-way: Hazards to Air Navigation: MA Historic Commission Review Process: Not Applicable XI Is Structure within airport approach area? Is their review completed? or Consent to Build enclosed 0 Yes 0 or No El Yes 0 No SECTION 8:CONTENT OF CERTIFICATE OF OCCUPANCY Edition of Code: 2015 IBC Use Group(s): R-2.R-3 Type of Construction: VB Does the building contain an Sprinkler System?: Yes Special Stipulations: NA Design Occupant Load per Floor and Assembly space: 40 psf SECTION 9: PROPERTY OWNER AUTHORIZATION Name and Address of Property Owner Laura Baker 256 Pleasant Street,Suite A Northampton,MA 01060 Name(Print) No.and Street City/Town Zip Property Owner Contact Information Real Estate Development Director 413 - 586 - 5855 x100 413- 461 - 8876 Ib@valleycdc.org Title Telephone No.(business) Telephone No. (cell) e-mail address If applicable,the property owner hereby authorizes: Bryan Culliton 150 Pittsfield Road Lenox MA 01240 Name Street Address City/Town State Zip to apply for and act on the property owner's behalf,in all matters relative to work authorized by this building permit application. SECTION 10:CONSTRUCTION CONTROL(Please fill out Appendix 1) If a building is less than 35,000 cu.ft.of enclosed space and/or not under Construction Control then check here D. Otherwise provide construction control forms(see section 107 in the code)as required. 10.1 Registered Professional Responsible for Construction Control(the professional coordinating document submittals) Thomas C Chalmers 617- 538 - 7886 tom@austin.design No.8317 Name(Registrant) Telephone No. e-mail address Registration Number 162 Main Street,Suite 302 Brattleboro VT Architecture 08/31/2024 Street Address City/Town State Zip Discipline Expiration Date 10.2 General Contractor Allegrone Construction Company Name James W Culliton,Jr. CS-044994 Name of Person Responsible for Construction license No. and Type if Applicable 107 Anthony Road Dalton MA 01226 Street Address City/Town State Zip 413-997-9223 413- 281 - 2374 jwculliton@allegrone.com Telephone No.(business) Telephone No.(cell) e-mail address SECTION 11:WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L c.152§25C(6)) A Workers'Compensation Insurance Affidavit from the MA Department of Industrial Accidents must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Is a signed Affidavit submitted with this application? Yes CI No D SECTION 12:CONSTRUCTION COSTS AND PERMIT FEE Item Estimated Costs:(Labor and Materials) Total Construction Cost(from Item 6)=$ $9,082,487 1.Building $ $7,043,087 NA Building Permit Fee=Total Construction Cost x (Insert here 2.Electrical $ $796,500 appropriate municipal factor)=$ NA,see below. 3.Plumbing $ $655,000 20,065 gross sf x$0.60/sf=$12,039 I 4.Mechanical (HVAC) $ $495,000 Note:Minimum fee=$ (contact municipality) 5.Mechanical (Other)(Sprinkler) $ $92,900 Enclose check payable to �� �/ 6.Total Cost $ $9,082,487 (contact municipality)and write check number here SECTION 13:SIGNATURE OF BUILDING PERMIT APPLICANT By entering my name below,I hereby attest under the pains and penalties of perjury that all of the information contained in this application is true and accurate to the best of my knowledge and understanding. Bryan Culltion s G""r_ Project Manager 413 - 207 - 1566 01/26/24 Please print and sign named Title Telephone No. Date 150 Pittsfield Road Lenox MA 01240 brculliton@allegrone.com Street Address City/Town State Zip Email Address Municipal Inspector to fill out this section upon application approval: `Xo-u.A-c'J t`a. A.i2.., 3)271 L`1 - Name Date ( Northampton Louis Hasbrouck <Iasbrouck@northamptonma.gov> 23 Laurel Street Louis Hasbrouck<Hasbrouck@northamptonma.gov> Wed, Mar 27, 2024 at 11:21 AM Draft To: "Bryan R. Culliton"<brculliton@allegrone.com> Cc: Kevin Ross <kross@northamptonma.gov>, Kim Carson<kcarson@northamptonma.gov>, Laura Baker<Ib@valleycdc.org>, Carolyn Misch <cmisch@northamptonma.gov>,Tom Chalmers<tom@austin.design> Br6yan, The permit for the project at 23 Laurel Street is approved. Copy is attached. I've separated the plans into sets; site work and each building.They're signed off; I'I send them one at a time. There are a few notes;we don't yet have sprinkler plans, and smoke detector locations aren't correct in some units. Also, NO site work can start until the tree protection is in place. Let me know if you have any questions. Louis Hasbrouck Intermittent Building Inspector City of Northampton Town of Williamsburg (413)587-1240 office (413)587-1272 fax City of Northampton ?oat. M o s`s s,` Q�"� Massachusetts 4? .i._ 'e l�' �• '` w �At 0 DEPARTMENT OF BUILDING INSPECTIONS �' i.. " , 212 Main Street • Municipal Building yvd Q. Northampton, MA 01060 41I `10 CONSTRUCTION DEBRIS AFFIDAVIT (FOR ALL DEMOLITION AND RENOVATION PROJECTS) In accordance of the provisions of MGL c 40, S54, a condition of Building Permit Number is that all debris resulting from this work shall be disposed of in a properly licensed waste disposal facility, as defined by MGL c 111, S 150A. The debris will be disposed of in: Location of Facility: Covanta B/3 in Canaan,NY The debris will be transported by: Name of Hauler: Allied Waste Services Signature of Applicant: 4 ,/ 4 Date: 1/26/24 The Commonwealth of Massachusetts Department of Industrial Accidents Office of Investigations = Lafayette City Center s 2 Avenue de Lafayette, Boston,MA 02111-1750 • www.mass.gov/dia Workers'Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name (Business/Organization/Individual): Allegrone Construction Co., Inc. Address: 150 Pittsfield Road City/State/Zip:Lenox, MA 01240 Phone#:413-997-9200 Are you an employer?Check the appropriate box: Type of project(required): 1.❑� I am a employer with 50 4. ❑ I am a general contractor and I employees(full and/or part-time).* have hired the sub-contractors 6. ❑■ New construction 2.❑ I am a sole proprietor or partner- listed on the attached sheet. 7. El Remodeling ship and have no employees These sub-contractors have 8. ❑ Demolition workingfor me in anycapacity. employees and have workers' P h 9. El Building addition [No workers' comp. insurance comp. insurance.: required.] 5. ❑ We are a corporation and its I t>.❑ Electrical repairs or additions 3.❑ I am a homeowner doing all work officers have exercised their I I.111 Plumbing repairs or additions myself. [No workers' comp. right of exemption per MGL 12.0 Roof repairs insurance required.] t c. 152, §1(4),and we have no 13.0 Other employees. [No workers' comp. insurance required.] *Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. :Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: Liberty Mutual Insurance Company Policy#or Self-ins. Lic. #:XWS56048388 Expiration Date: 12/31/2024 Job Site Address: 23 Laurel Street City/State/Zip:Northampton, MA Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify under the pains and penalties of perjury that the information provided above is true and correct. Bryan Culliton 6ne".tee,Bryan 01/26/24 Signature: Date: Phone#: 413-207-1566 Official use only. Do not write in this area,to be completed by city or town official. City or Town: Permit/License# Issuing Authority(check one): 11:1Board of Health 20 Building Department 3❑City/Town Clerk 4.0 Electrical Inspector S.EI'lunthing Inspector 6.0Other Contact Person: Phone#: Information and Instructions Massachusetts General Laws chapter 152 requires all employers to provide workers' compensation for their employees. Pursuant to this statute, an employee is defined as"...every person in the service of another under any contract of hire, express or implied,oral or written." An employer is defined as"an individual, partnership,association, corporation or other legal entity, or any two or more of the foregoing engaged in a joint enterprise, and including the legal representatives of a deceased employer, or the receiver or trustee of an individual,partnership, association or other legal entity,employing employees. However the owner of a dwelling house having not more than three apartments and who resides therein, or the occupant of the dwelling house of another who employs persons to do maintenance, construction or repair work on such dwelling house or on the grounds or building appurtenant thereto shall not because of such employment be deemed to be an employer." MGL chapter 152, §25C(6)also states that"every state or local licensing agency shall withhold the issuance or renewal of a license or permit to operate a business or to construct buildings in the commonwealth for any applicant who has not produced acceptable evidence of compliance with the insurance coverage required." Additionally, MGL chapter 152, §25C(7)states"Neither the commonwealth nor any of its political subdivisions shall enter into any contract for the performance of public work until acceptable evidence of compliance with the insurance requirements of this chapter have been presented to the contracting authority." Applicants Please fill out the workers' compensation affidavit completely, by checking the boxes that apply to your situation and, if necessary, supply sub-contractor(s)name(s), address(es)and phone number(s) along with their certificate(s) of insurance. Limited Liability Companies(LLC)or Limited Liability Partnerships(LLP)with no employees other than the members or partners,are not required to carry workers' compensation insurance. If an LLC or LLP does have employees, a policy is required. Be advised that this affidavit may be submitted to the Department of Industrial Accidents for confirmation of insurance coverage. Also be sure to sign and date the affidavit. The affidavit should be returned to the city or town that the application for the permit or license is being requested, not the Department of Industrial Accidents. Should you have any questions regarding the law or if you are required to obtain a workers' compensation policy,please call the Department at the number listed below. Self-insured companies should enter their self-insurance license number on the appropriate line. City or Town Officials Please be sure that the affidavit is complete and printed legibly. The Department has provided a space at the bottom of the affidavit for you to fill out in the event the Office of Investigations has to contact you regarding the applicant. Please be sure to fill in the permit/license number which will be used as a reference number. In addition,an applicant that must submit multiple permit/license applications in any given year, need only submit one affidavit indicating current policy information(if necessary)and under"Job Site Address"the applicant should write"all locations in (city or town)."A copy of the affidavit that has been officially stamped or marked by the city or town may be provided to the applicant as proof that a valid affidavit is on file for future permits or licenses. A new affidavit must be filled out each year. Where a home owner or citizen is obtaining a license or permit not related to any business or commercial venture (i.e.a dog license or permit to burn leaves etc.)said person is NOT required to complete this affidavit. The Office of Investigations would like to thank you in advance for your cooperation and should you have any questions, please do not hesitate to give us a call. The Department's address,telephone and fax number: The Commonwealth of Massachusetts Department of Industrial Accidents Office of Investigations Lafayette City Center, 2 Avenue de Lafayette Boston, MA 02111-1750 Tel. (617) 727-4900 or 1-877-MASSAFE Fax (617) 727-7749 Revised 7-2019 www.mass.gov/dia - Commonwealth of Massachusetts k.,, Division of Occupational Licensure �. ,f Board of Building Re ulations and Standards Con T rvisor CS-044994 l' I [ pires: 05/01 /2024 JAMES W CI LITON, JR, , '1 ' 107 ANTHONY RD , `T DALTON MAf 1226 ' / , . *` e" .N*V. N i / .$ 1 ilr . ' .r t,. Air;tite -- '• /b . 0 ., ny/yr- VV.isis JJeveet.' L/jar-4. I ). %-vI7 . Construction Supervisor Unrestricted - Buildings of any use group which contain less than 35,000 cubic feet (991 cubic meters) of enclosed space. Failure to possess a current edition of the Massachusetts State Building Code is cause for revocation of this license. Cyr infen-nritinn a$he"it this license Call (617) 727-3200 or visit www.mass.gov/dpl �J CENTER FOR U EcoTechnology we make green make sense- PRELIMINARY ENERGY ANALYSIS - 2/21/2024 Project: 23 Laurel St, Northampton MA Building Type Multifamily with 2-4 units per building (20 units total) Bedrooms 1-3 per dwelling unit Assumptions for Preliminary Home Energy Rating CET has completed a Preliminary Home Energy Rating based on the construction plans you have provided. Any energy features not listed below are assumed to meet the prescriptive requirements of the IECC 2021. Building Envelope Specifications Used in Analysis 5" EPS underneath entire slab (R-20) Slab 3.5" polyiso exterior insulation around perimeter(R-21) (EPS below grade) Foundation Stem Walls 3.5"exterior polyiso rigid insulation (R-21) Rim and Band Joists 3"closed cell spray foam (R-21) + 3.5" exterior polyiso rigid insulation (R-21) Floor Overhangs 12"densepack cellulose between TJIs (R-44) 3.5 continuous polyiso on exterior(R-21) Exterior Walls 5.5"cellulose in 2x6 walls (R-21) 3.5" exterior polyiso rigid insulation (R-21) Triple glazed Intus casement windows, U-0.19, SHGC-0.20 Windows Door sidelights U-0.22, SHGC-0.09 Pella fiberglass sidelight panel with 1" IG low-E glass Exterior Doors Entry doors & balcony doors: U0.25, SHGC 0.16 Pella full light fiberglass entry door with 1" IG Low-E S2 glass Attic 22" loose blown cellulose(R-80) R-30 attic hatch Mechanical Attic 4" (R-24) continuous polyiso on walls (single story one bedroom units only) 22" loose blown cellulose (R-80) on ceiling Dwelling Unit Compartmentalization 1.0 ACH50 or better Will require AeroBarrier application to approximately 0.5 ACH50 Enclosure Checklist Meet all Checklist Requirements as verified by a HERS rater at pre- Thermaldrywall and final inspection Center for EcoTechnology • 320 Riverside Drive, 1A • Northampton, MA 01062 Please call 888-452-8805 or email highperformance@cetonline.org with any questions or for additional assistance. PRELIMINARY ENERGY ANALYSIS Mechanical Systems Specifications Used in Analysis 2 & 3 bedroom units: Ducted mini-split ASHP 11.6 HSPF, 19 SEER Heating &Cooling Equipment Basis: Mitsubishi SUZKA15NA2 1 bedroom units: Ductless mini-split ASHP 12.5 HSPF, 33.1 SEER Basis: Mitsubishi MUZ-FSO6NAH Ducts 100%within conditioned space-0 leakage to outside Total leakage <0.04 CFM/SF CFA, tested at rough-in Thermostats Programmable Energy Recovery Ventilators 25 CFM from each bathroom + kitchen Mechanical Ventilation 2 & 3 bedroom units: 75 CFM, 81.3 ASRE, 55.8 watts 1 bedroom units: 50 CFM, 84.4 ASRE, 25.3 watts Basis: Panasonic FV-10 VEC2 Plumbing Systems Specifications Used in Analysis Shared heat pump water heaters, 2.03-2.06 EF, average 60 gallons of Water Heating Equipment storage per unit Hubbell PBX120SL (120 gal) & PBX5OSL(50 gal) Domestic Hot Water Pipes insulated to R-3 or greater Hot Water Recirculation "Smart"demand controlled recirculation pump Units 3.3, 5.3, 5.4 Plumbing Fixtures Low-flow Lighting & Appliances Specifications Used in Analysis Interior and Exterior Lighting 100% LED Refrigerator Units 1.2, 4.1, 4.2, 5.3, 6.2—GE GSE23GGP/GYP, 615 kWh/year All other units—GE GTE19JTN/JSN, 379 kWh/year Dishwasher GE GDF535PSR-240 kWh/year Oven/Range Electric Clothes Washer ENERGY STAR certified Clothes Dryer electric heat pump dryer Electric Vehicle Charging Specifications Used in Analysis 20% of parking spaces EV Ready Electric Vehicle Charging Pre-wired with conduit, electrical box, and panel circuit with 240v, AC Level II EV charging capability Center for EcoTechnology • 320 Riverside Drive, 1A • Northampton, MA 01062 Please call 888-452-8805 or email highperformance@cetonline.org with any questions or for additional assistance. PRELIMINARY ENERGY ANALYSIS Preliminary Home Energy Rating Results Based on the assumptions described above, we have calculated the following Preliminary Home Energy Rating results. Unit HERS Index 1.1 36 1.2 37 1.3 35 2.1 37 2.2 38 3.1 38 3.2 39 3.3 39 4.1 37 4.2 38 4.3 35 4.4 35 5.1 39 5.2 37 5.3 36 5.4 34 6.1 35 6.2 37 7.1 37 7.2 38 Note that Confirmed Home Energy Rating results may vary from the Preliminary Home Energy Rating results due to changes in building plans, energy features installed in the home, RESNET standards, software changes, and other factors. Preliminary Rater:Lia Douillet Date: 2/21/2024 Job#: 22-07473 Center for EcoTechnology • 320 Riverside Drive, 1A • Northampton, MA 01062 Please call 888-452-8805 or email highperformance@cetonline.org with any questions or for additional assistance. Initial Construction Control Document ,l v /, To be submitted with the building permit application by a 111 Registered Design Professional • t for work per the ninth edition of the ‘44,1.1 Massachusetts State Building Code, 780 CMR, Section 107 Project Title: 23 Laurel Street Date:01-30-2024 Property Address: 23 Laurel Street, Northampton, MA 01002 Project: Check (x) one or both as applicable: X New construction Existing Construction Project description: The proposed development consists of 20 townhouse style new construction apartments in 7 buildings, located on a vacant 1.62-acre parcel at 23 Laurel Street, Northampton. I Thomas C Chalmers MA Registration Number: MA 8317 Expiration date: 08/31/2024 , am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning': X Architectural X Structural Mechanical Fire Protection Electrical Other: for the above named project and that to the best of my knowledge, information, and belief such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code,(780 CMR), and accepted engineering practices for the proposed project. I understand and agree that I (or my designee)shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to: 1. Review, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Perform the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. When required by the building official,I shall submit field/progress reports(see item 3.)together with pertinent comments,in a form acceptable to the building official. Upon completion of the work,I shall submit to the building official a'Final Construction Control Document'. Enter in the space to the right a"wet"or /5�� � , electronic signature and seal: R.- 41 o4, , CHuserrs Phone number: 802-451-5966 Email: tom@austin.design 'i OF�, Building Official Use Only Building Official Name: Permit No.: Date: Note 1. Indicate with an 'x' project design plans, computations and specifications that you prepared or directly supervised. If'other' is chosen, provide a description. Version 01 01 2018 Initial Construction Control Document ' Atin, #c To be submitted with the building permit application by a �l Registered Design Professional t f for work per the ninth edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title: 23 Laurel Street Date:01-30-2024 Property Address: 23 Laurel Street, Northampton, MA 01002 Project: Check (x) one or both as applicable: X New construction Existing Construction Project description: The proposed development consists of 20 townhouse style new construction apartments in 7 buildings, located on a vacant 1.62-acre parcel at 23 Laurel Street, Northampton. I Christopher Chamberland, MA Registration Number: 51074 Expiration date: 6/30/2024, am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning': Architectural Structural Mechanical Fire Protection Electrical X Other: Civil for the above named project and that to the best of my knowledge, information, and belief such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code,(780 CMR), and accepted engineering practices for the proposed project. I understand and agree that I (or my designee)shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to: 1. Review, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Perform the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. When required by the building official,I shall submit field/progress reports(see item 3.)together with pertinent comments,in a form acceptable to the building official. Upon completion of the work, I shall submit to the building official a'Final Construction Control Document'. Enter in the space to the right a"wet"or /H OF Bliss electronic signature and seal: 2 CHRISTOPHER M :I Phone number: (413) 582-7000 Email: chrisc@berkshiredesign.com Og CH . 510 4 NO51074 j f. ,,yh Building Official Use Only ASS/oNA E��"c laaa Building Official Name: Permit No.: Date: Note 1. Indicate with an 'x' project design plans, computations and specifications that you prepared or directly supervised. If'other' is chosen, provide a description. Version O1 01 2018 Initial Construction Control Document To be submitted with the building permit application by a Registered Design Professional for work per the ninth edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title: 23 Laurel Street Date:01-30-2024 Property Address: 23 Laurel Street, Northampton, MA 01002 Project: Check (x) one or both as applicable: X New construction Existing Construction Project description: The proposed development consists of 20 townhouse style new construction apartments in 7 buildings, located on a vacant 1.62-acre parcel at 23 Laurel Street, Northampton. I Wilbur H. Horton Jr. MA Registration Number: 43250 Expiration date: 6/30/2024 , am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning': Architectural Structural Mechanical Fire Protection X Electrical Other: for the above named project and that to the best of my knowledge, information, and belief such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code,(780 CMR), and accepted engineering practices for the proposed project. I understand and agree that I (or my designee)shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to: 1. Review, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Perform the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. When required by the building official,I shall submit field/progress reports(see item 3.)together with pertinent comments,in a form acceptable to the building official. Upon completion of the work,I shall submit to the building official a'Final Construction Control D:c ment'. Enter in the space to the right a"wet"orb-,µ j OF 8, k electronic signature and seal: o� �: yG (et eA o ELE 1v RICAL4i Phone number: (802) 885-8060 Email: whorton@dubois-king.com aazso ti �t; Q/sTeP , Building Official Use Only Building Official Name: Permit No.: Date: Note 1. Indicate with an 'x' project design plans, computations and specifications that you prepared or directly supervised. If'other' is chosen, provide a description. Version 01 01 2018 Initial Construction Control Document *ritr To be submitted with the building permit application by a Registered Design Professional for work per the ninth edition of the mtY Massachusetts State Building Code, 780 CMR, Section 107 Project Title: 23 Laurel Street Date:01-30-2024 Property Address: 23 Laurel Street, Northampton, MA 01002 Project: Check (x) one or both as applicable: X New construction Existing Construction Project description: The proposed development consists of 20 townhouse style new construction apartments in 7 buildings, located on a vacant 1.62-acre parcel at 23 Laurel Street, Northampton. I Rachel Loeffler, MA Registration Number: 1617 Expiration date: 01/31/2025 , am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning': Architectural Structural Mechanical Fire Protection Electrical x Other: Landscape Architectural for the above named project and that to the best of my knowledge, information, and belief such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code,(780 CMR), and accepted engineering practices for the proposed project. I understand and agree that I (or my designee)shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to: 1. Review, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Perform the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. When required by the building official,I shall submit field/progress reports(see item 3.)together with pertinent comments,in a form acceptable to the building official. Upon completion of the work,I shall submit to the building official a'Final Construction Conwi lDocµ} ent'. Enter in the space to the right a"wet"or • % A,• •(SI electronic signature and seal: / '4' <,,• . Phone number: 413-582-7000 x 119 Email: rachel@berkshiredesign.com ��. M :• ��' Building Official Use Only ///fAlA;okAP1\\\\< Building Official Name: Permit No.: Date: Note 1. Indicate with an 'x' project design plans, computations and specifications that you prepared or directly supervised. If'other' is chosen,provide a description. Version 01 01 2018 Initial Construction Control Document A. t To be submitted with the building permit application by a V1111 Registered Design Professional f { for work per the ninth edition of the 'r Massachusetts State Building Code, 780 CMR, Section 107 I. Project Title: 23 Laurel Street Date:01-30-2024 Property Address: 23 Laurel Street, Northampton, MA 01002 Project: Check (x) one or both as applicable: X New construction Existing Construction Project description: The proposed development consists of 20 townhouse style new construction apartments in 7 buildings, located on a vacant 1.62-acre parcel at 23 Laurel Street, Northampton. I John Penney MA Registration Number: 52080 Expiration date: 06/30/2024 , am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning': Architectural Structural X Mechanical Fire Protection Electrical Other: for the above named project and that to the best of my knowledge, information, and belief such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code,(780 CMR), and accepted engineering practices for the proposed project. I understand and agree that I (or my designee)shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to: 1. Review, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Perform the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. When required by the building official,I shall submit field/progress reports(see item 3.)together with pertinent comments,in a form acceptable to the building official. Upon completion of the work,I shall submit to the building official a'Final Construction Control Document'. Enter in the space to the right a"wet"or PiH OF 444ss\ Dipitefy signed by John F.Penney /2y�F' 'qCy electronic signature and seal: DN:C-US,E-ipenney@itpce.com, O JOHN F. e.\ CNdohn F.Penney /g PENNEV m4 i John F. Penney Reaeon:l am._authot of this mi documentMECHANICAL Dote'2024.02.02 10:2221-05'00' No.52080 Phone number: 802.875.2010 Email: jpenney@jfpcs.com K-', °9o�'9FGISTEP�,$) ,e 'TONAL E_ z Building Official Use Only Building Official Name: Permit No.: Date: Note 1. Indicate with an 'x' project design plans, computations and specifications that you prepared or directly supervised. If'other' is chosen, provide a description. Version O1 O1 2018 EXHIBIT D 11111 I 01111 HIHHIJI 2022 00020552 Bk: 14694Pg: 182 Page: 1 of 3 Recorded: 10/03/2022 03:11 PM 5.4479 CITY OF NORTHAMPTON PERMIT DECISION r DATES I PROJECT INFORMATION Submitted 7/6/2022 Owner Name/Address Valley CDC 256 Pleasant St-A MA ( 01060 Northampton Hearing 8/25/2022 Applicant Name/ Address(if different) Extension Applicant Contact Laura Baker 413-586-5855 LB@valleycdc.org Hearing 8/25/2022 Site Address 23 Laurel St Northampton MA 01060 Closed Decision 8/25/2022 Site Assessor Map ID 38A-49 PB 13985 P14 _ Zoning District I Planned Village,Smart Growth Overlay c Filed with 8/30/2022 Permit Type 40R with Planning Board Site Plan Clerk Appeal 9/19/2022 Project Description 20 new affordable rental units. Deadline An appeal of this decision by the Planning Board may be made by any person within 20 days after the date of the filing of this decision with the City Clerk,as shown.Appeals by any aggrieved party must be pursuant to MGL Chapter 40A,Section 17 as amended and may be made to the Hampshire Superior Court with a certified copy of the appeal sent to the City Clerk of the City of Northampton. Plan Sheets/Supporting Documents by Map ID: 1. Site Plan of Land for Valley Community Development by The Berkshire Design Group,Survey. 2. Site Layout&Materials, Demolition and Erosion Control, Site Planting Plan, Grading/Utilities, Drainage, Photometric, Details dated June 2022 by The Berkshire Design Group. 3. Lighting Cut Sheets 4. Traffic Generation Report dated June 2022,The Berkshire Design Group 5. Architectural Design&Renderings Austin Design,July 1,2022 BOARD MEMBER PRESENT FAVOR OPPOSED ABSTAIN/NO COUNT .VOTE TALLY (Favor-Opposed) George Kohout,Chair ✓ ✓ ❑ ❑ _ Janna White,Vice Chair ✓ 0 ❑ _ Chris Tait ✓ ✓ ❑ ❑ David Whitehill ✓ ✓ ❑ 0 ❑ 0 ❑ 0 0 Sam Taylor V ❑ ❑ Melissa Fowler ✓ ✓ ❑ 0 ,Assoc. ❑ 0 0 ❑ ,Assoc ❑ ❑ 0 0 6-0 pg. 1 M. ti Ip1,1' _ CITY OF NORTHAMPTON PERMIT DECISION '1/4"'�" - ` -'`' APPLICABLE ' APPROVAL CRITERIA/BOARD FINDINGS ZONING ., .,. , a� a - en'�'��:d✓:� .: . � ...=���'`' rAH�wib`�b. .�, y�x.. .:a. .sc: 350 -20.0-18 The Planning Board approved the request under 40R for the development of 20 affordable rental units at 23 Laurel St based upon the plans and documents submitted along the required fees and information as set forth in the PAA regulations; and The Board determined that the project consisting of 100% affordable housing and site plan meet the requirements and standards set forth in this § 350-20, and the Board granted a reduction in total number of required parking spaces to 20 spaces with conditions herein; and No extraordinary adverse potential impacts of the project were found. Landscaping along the edges of the property has addressed transitional areas between the site and the abutting parcels. i — — — — IITi:OW _•N` ''. z,.',4. :'£rc ut ti Prior to Commencing work 1. The tree protection as shown in the plans shall be 2. The applicant shall build the additional four installed reserve parking spaces shown on the plan when the following conditions exist: -parking passes for all 20 parking spaces are distributed to tenants continuously for 18 months. 3. Lighting for the pavilion shall be timed to turn to motion sensor activation at 9 PM. Prior to Certificate of Occupancy 4. The applicant shall show compliance with the lighting ordinance with a maximum light level of 5 foot candles and light temperature not exceeding 3000K Minutes Available at WWW.NorthamptonMa.Gov I, Carolyn Misch,as agent to the Planning Board certify that this is an accurate and true decision made by the Planning Board and certify that a copy of this and all plans have been filed with the Board and the City Clerk and that a copy of this decision has been mailed to the Owner,Applicant. i, AUG , 2022 _1 __ cii✓- 4.;OF':CEO NOT. i•:,4 f4 `I000 pg. 2