38B-112 (7) BP-2024-0204
39 MUNROE ST COMMONWEALTH OF MASSACHUSETTS
Map:Block:Lot:
38B-112-001 CITY OF NORTHAMPTON
Permit: Exterior Res
PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS
DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A)
BUILDING PERMIT
Permit# BP-2024-0204 PERMISSION IS HEREBY GRANTED TO:
Project# ROOF 2024 Contractor: License:
PEAK PERFORMANCE ROOFING
Est. Cost: 17900 LLC CS-103061
Const.Class: Exp.Date: 09/21/2024
Use Group: Owner: J LOMBARD JOHN& ELIZABETH
Lot Size (sq.ft.)
Zoning: URB Applicant: PEAK PERFORMANCE ROOFING LLC
Applicant Address Phone: Insurance:
1 LOVEFIELD ST 413-203-5888 R2WC342657
EASTHAMPTON, MA 01027
ISSUED ON: 02/28/2024
TO PERFORM THE FOLLOWING WORK:
STRIP AND REROOF -REPAIRS TO SLATE
POST THIS CARD SO IT IS VISIBLE FROM THE STREET
Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector
Underground: Service: Meter: Footings:
Rough: Rough: House # Foundation:
Final: Final: Final: Rough Frame:
Gas: Fire Department Driveway Final: Fireplace/Chimney:
Rough: Oil: Insulation:
Smoke: Final:
THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF
ANY OF ITS RULES AND REGULATIONS.
Signature: Ili r
•
II
Fees Paid: $40.00
212 Main Street,Phone(413)587-1240,Fax: (413)587-1272
Office of the Building Commissioner
DocuSign Envelope ID:69AD5178-278B-48D9-A46B-14885A7E160E l t C (j'
(Ef'a 1„'.,
IThe Commonwealth of MassarKhus U/l11,T t¢ FOR
f Board of Building Regulations and Stan a furor iNspEcri
Massachusetts State Building Code,780 Cv1R" --o,os S �Mt7NICII'ALITY
��m USE
Building Permit Application To Construct,Repair,Renovate Or Demolish a Revised Mar 2011
One- or Two-Family Dwelling
This Section For Official Use Only
Building Pe 't Number: ( A OA a V -01 Date Applied:
I
vim //�Z 2-Z7 Zozy
Building Official(Print Name) Signature Date
SECTION 1: SITE INFORMATION
1.1 Pro erti Address: 1.2 Assessors Map&Parcel Numbers
39Munroe St. , Northampton
1.1 a Is this an accepted street?yes no Map Number Parcel Number
1.3 Zoning Information: 1.4 Property Dimensions:
Zoning District Proposed Use Lot Area(sq ft) — Frontage(fr}
1.5 Building Setbacks(ft)
Front Yard Side Yards Rear Yard
Required Provided Required Provided Required Provided 1
i
1.6 Water Supply:(M.G.L c.40,§54) 1.7 Flood Zone Information: 1.8 Sewage Disposal System:
Public❑ Private 0 Zone: — Outside Flood"Gone? Municipal❑ On site disposal system 0
Check ifyes❑
SECTION 2: PROPERTY OWNERSHIP
2.1 Owner'of Record:
Lilly Lombard Northampton
:Name(Prim) City,State.ZIP
39 Munroe St. 413-207-5899 _jollyforager@gmail.com
No.and Street Telephone Email Address
SECTION 3:DESCRIPTION OF PROPOSED WORK2(check all that apply)
New Construction Cl Existing Building 0 Owner-Occupied 0 Repairs(s) 0 Alteration(s) 0 Addition 0
Demolition 0 I Accessory Bldg.0 Number of Units ( Other CI Specify:
Brief Description of Proposed Work2:` Strip roof and replace with Ecostar roofing
system.
Repair slate shingles..on gpecifiPd areas
SECTION 4:ESTIMATED CONSTRUCTION COSTS
Item Estimated Costs:
(Labor and Materials) Official Use Only
1.Building S 17900 1. Building Permit Fee: $ Indicate how fee is determined:
2.Electrical S 0 Standard City/Town Application Fee
O Total Project Cost'(Item 6)x multiplier x
3.Plumbing S 2. Other Fees: $
4.Mechanical (HVAC) j 5 List:
5.Mechanical (Fire $ Total All Fees:S
Suppression)
Check No.11 Check Amount:161V Cash Amount:
6.Total Project Cost: $ 17900 0 Paid in Full 0 Outstanding Balance Due:
DocuSign Envelope ID:B9AD5178-278B-48D9-A46B-14885A7E1BOE
SECTION 5: CONSTRUCTION SERVICES
5.1 Construction Supervisor License(CSL) CS-103061 09/21/2024
James Flannery License Number Expiration Date
Name oj'CSL Holder
• List CSL Type(see below)
1 Lovefield St.
No.and Street Type Description
t U Unrestricted(Buildings up to 35,000 cu.ft.)
Easthampton. MA 010 7 ; R F Restricted l&2 Family Dwelling
City/Town,State,ZIP • M Masonry.
RC Roofing Covering
WS Window and Siding
SF Solid Fuel Burning Appliances
413-203-5888 peakperformanceroofinglIc@gmail.com I Insulation
Telephone Email address ! D Demolition
5.2 Registered Home Improvement Contractor(HIC) 183698 11/03/2025
James Flannery/ Peak Performance Roofing LLC I11C Registration Number Expiration Date
HIC Compa,yi.a e or HIC Registrant Name
1 Lovefield�St. peakperformanceroofinglIc@gmail.com
No.and Street Email address
Easthampton, MA 01027 413-203-5888
City,Town,State,ZIP Telephone
SECTION 6:WORIERS'COMPENSATION INSURANCE AFFIDAtiIT(M.G.L.c.152.§ 25C(6))
Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide
this affidavit will result in the denial of the Issuance of the building permit.
Signed Affidavit Attached? Yes ........... No 0
SECTION 7a: OWNER AUTHORIZATION TO BE COMPLETED WHEN
OWNER'S AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT
I,as Owner ofthe subject property,hereby authorizeJameS Flannery/Peak Performance Roofing LLC
to act on my behalf,in ail matters relative to work authorized by this building permit application.
000srooea ey: .
2/14/2024
ririi`Ow-ner's Name(Electronic Signature) Date
SECTION 7b:OWNER'OR AUTHORIZED AGENT DECLARATION
By entering my name below,I hereby attest under the pains and penalties of perjury that all of the information
contained in this application is true and accurate to the best of my knowledge and understanding.
James Flannery Rar.vwAr . 2/13/2024
Print Owner's or Authorized Agent's Name(Electronic Signature) Date
NOTES:
I. An Owner who obtains a building permit to do his/her own work,or an owner who hires an unregistered contractor
(not registered in the Home Improvement Contractor(HIC)Program),will not have access to the arbitration
program or guaranty find under M.G.L.c. 142A.Other important information on the HIC Program can be found at
www.rnass.novioca Information on the Construction Supervisor License can be found at www.mass.tov./dps
2. When substantial work is planned,provide the information below:
Total floor area(sq.fr.) (including garage,finished basement/attics,decks or porch)
Gross living area(sq. ft.) Habitable room count
Number of fireplaces Number of bedrooms
Number of bathrooms Number of half/baths
Type of heating system Number of decks/porches
Type of cooling system Enclosed Open
3. '`Total Project Square Footage"may be substituted for"Total Project Cost"
DocuSign Envelope ID: B9AD5178-278B-48D9-A46B-14885A7E1BOE
DESCRIPTION
Remove all debris from premises, and throughout the job, continue cleanup and keep the premises
undamaged. WE ARE NOT RESPONSIBLE FOR DEBRIS THAT MAY FALL INTO
ATTIC/INTERIOR.
Please use reasonable caution during the installation process: do not walk or drive under active work or on
areas of potential roofing debris. Installations are weather permitting; inclement weather will cause
scheduling delays.
•
Peak Performance Roofing LLC will obtain the building permit.
Warranty confirmation shall be provided upon final payment. Installation and manufacturer warranties
are not in effect until Paid In Full.
Total: $17,900 (all 4 areas)
***If Full Plywood Installation is Necessary: +$550 EACH AREA
A one-third deposit of$5966 will secure contract, permitting, material order, and priority scheduling.
The balance shall be due upon completion, within 10 days of invoice. Accounts outstanding over 30 days
subject to 2% finance charge monthly.
NOTE:
MAIN HOUSE EXISTING SLATE REPAIRS TO BE INVOICED SEPARATELY.
Replacement of hip and ridge caps, as well as missing slates,by two workers, is estimated to take two
days at $100 per hour, totaling $3200 plus materials. Please note,this is an estimated timeframe, and the
project may be completed sooner or later depending on various factors.
TOTAL $17,900.00
c—DocuSigned by:
2/14/2024
Accepted By `-282D7C3B5AD248F Accepted Date
DocuSign Envelope ID: B9AD5178-278B-48D9-A46B-14885A7E1BOE
Peak Performance Roofing LLC
1 Lovefield St. P E i<
Easthampton, MA 01027
413-203-5888 P E R F U R C E
peakperformanceroofingllc@gmail.com ROOFING
MA HIC#183698 MA CSL#103061
Contract
ADDRESS CONTRACT# 11157
Lilly Lombard DATE 02/13/2024
39 Munroe St
Northampton
413-207-5899
jollyforager@gmail.com
JOB LOCATION
39 Munroe St, Northampton
DESCRIPTION
SEE EMAIL FOR VISUAL
PARTIAL REPLACEMENT
HIGHLIGHTED AREAS ONLY-ALL 4
Peak Performance Roofing will provide the labor and materials to perform the following:
1. Remove the existing roof materials.
2. Inspect the sheathing for any rot or deterioration. Any new plywood necessary will be $60 per sheet
installed. Any new roofing boards will be $6 per foot installed. (Wood prices subject to change based on
market fluctuations).
3. Install 3' of CertainTeed Winterguard HT (High Temperature) ice&water shield at the eaves, and any
applicable valleys. 2' at any applicable transitions/chimneys/skylights.
4. Install synthetic underlayment on all remaining areas of the roof.
5. Install Synthetic Slate Shingles from Ecostar.
COLOR: GREEN& SOME TAN SHINGLES MIXED IN.
Further details, including width and the style of weathering, will be provided closer to the job date.
6. Ensure the sheathing is cut at the ridge to allow for proper exhaust ventilation. Install vented "z"
enclosures and fasten ridge cap to "z" enclosures.
https://www.standingseamroofvent.com/roof-vent-products
7. Fabricate and install Copper Drip Edge& Copper Flashing for all necessary areas.
City of Northampton 212 Main Street, Northampton, MA 01060
Solid Waste Disposal Affidavit
In accordance of the provisions of MGL c 40, S54, I acknowledge that as
a condition of the building permit all debris resulting from the construction
activity governed by this Building Permit shall be disposed of in a properly
licensed solid waste disposal facility, as defined by MGL c 111 , S 150A.
Address of the work: 39 MUNROE ST.
The debris will be transported by: Aaron's 24/7 Towing and Roll-On
The debris will be received by: Valley Recycling
Building permit number:
Name of Permit Applicant Peak Performance Roofing LLC/James Flannery
2/19/2024 James Flannery
Date Signature of Permit Applicant
The Commonwealth of Massachusetts
Department of Industrial Accidents
•''';r":.-11- '7 4 Office of Investigations
600 Washington Street
.a...
.‘ 47 a,„,t, --•1---, ki,
Boston,MA 02111
••,7 47::= www.mass.govIdia
Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers
Applicant Information Please Print Legibly
Name (BusinessiOrganizationlInclividual): Peak Performance Roofing. LLC
Address: 1 Love-field St.
City/State/Zip:
Easthampton, MA 01027 Phone :
413-203-5888
#
Are you an employer? Check the appropriate box: Type of project(required):
I.VI am a employer with_ 4 4. rn I am a general contractor and I
6. ri New construction
employees(full and/or part-time).* have hired the sub-contractors
2.ri I am a sole proprietor or partner- listed on the attached sheet. 7. [1 Remodeling
ship and have no employees These sub-contractors have 8. D Demolition
working for me in any capacity. employees and have workers"
0 Building addition
[No workers comp.insurance comp.insurance.*
required] 5. ri, We arc a corporation and its 10.[I] Electrical repairs or additions
3.n I am a homeowner doing all work officers have exercised their 1 1.F1 Plumbing repairs or additions
myself. [No workers' comp. right of exemption per MG!,
12Roof repairs
insurance required.]
c. 152.§1(4),and we have no
'
employees. [No workers' 13.n Other
comp.insurance required.] 1
*Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information.
Homeowners who submit this affida.it indicating the are don'e all work and then hire outside contractors must submit a new affidavit indicating such.
'Contractors that cheek this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have
employees. If the sub-contractors have employees.they must provide their workers'comp.pone!, number.
1 am an employer that is providing workers'compensation insurance for my employees'. Below is the policy and fob site
information.
Berkshire Hathaway Guard
insurance Company Name:
Policy #or Self-ins.Lie. #:__R2WC202869 Expiration Date: 04/27/2024
.....
Job Site Address: 39 MUNROE ST. city/state/zip NORTHAMPTON , MA
Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date).
Failure to secure coverage as required under Section 25A of MCL c. 152 can lead to the imposition of criminal penalties of a
fine up to$1500.00 and/or one-year imprisonment.as well as civil penalties in the form of a STOP WORK ORDER and a fine
of up to S250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of
Investigations of the DIA for insurance coverage verification_
1 do hereby certify under the pains and penalties of perjury that the information provided above is true and correct,
$. 11 igriangei .1 .it--,,,,,,i .44-
, Y-t• — Date: 2/19/2024
......_,.. .
413-203-5888
Phone ii:
Official use only. Do not write in this area,to be completed by city or town official.
City or Town: PermitiLicense#
Issuing Authority(circle one):
1.Board of Health 2.Building Department 3.Cily!Town Clerk 4.Electrical inspector 5.Plumbing Inspector
6.Other
Contact Person: Phone#:
DocuSign Envelope ID: B9AD5178-278B-48D9-A46B-14885A7E1BOE
The Roofing Process : What to Expect
When will my roof be scheduled? Once the contract, deposit, and building permit
are all in place, we can proceed with installing your roof. Roofing is hazardous and the safety of
our crew is a priority. We must work around the weather forecast; here in New England, this
means we can't plan our schedule very far in advance, and can't promise specific installation
dates. Long stretches of inclement weather will cause delays. We appreciate your flexibility and
patience in our dealings with Mother Nature!
Your project manager will contact you a few days before they wish to proceed. Our crews are
hardworking and efficient; most residential installations take only 1-2 days to install.
Do I need to do anything to prepare? As noted on your contract, we are not
responsible for dirt/debris that may fall into the attic. Depending on the condition of the
plywood, you may see little to no debris, or it could be more substantial. If you store items in the
attic, we recommend covering with plastic sheeting.
Do I need to notify my neighbors? If your home is extremely close to other homes
or driveways, there's a possibility we may need to be on their property temporarily to lay
protection or collect debris. In this case, yes, please notify your neighbors. Otherwise, it is a
courtesy. Your neighbors will likely appreciate notification of the noise/traffic.
Materials and Dumpster Delivery: The materials and dumpster may arrive the day
before the scheduled installation (especially if your installation is taking place on a weekend).
Depending on your home's layout and driveway(s), we may need vehicles moved at this point.
Parking: On the day of the installation, we ask that you move ALL vehicles out of ALL
driveways, and away from the house, to avoid any damage, and for our access.
How early will you start? Our crews will begin as early as 7.30am. They will work a
long day, often until dark if necessary. We aim to have the installation completed in as few days
as possible to minimize disruption to you and your neighbors.
Do I need to be home? It's up to you. Some customers like to keep an eye on what's
going on. Others would rather not be home because of the noise. Be aware that roofing is loud
(banging, nail guns, etc) so you may need to make arrangements for residents, tenants or pets.
Please do not plan on outdoor activities while we are working, for safety's sake. Please keep
pets inside, or on a leash away from the roofing activities.
DocuSign Envelope ID: B9AD5178-278B-48D9-A46B-14885A7E1BOE
What if I have an urgent question? If you have an urgent issue outside of regular
office hours, call or text your project manager directly on his cell.
Unforeseen Issues: Once we remove the existing roofing, we can inspect the underlying
sheathing. Your contract states we will replace a small amount of plywood at no additional cost
if needed. If more serious issues are found, the project manager will contact you to explain.
There may need to be an upcharge on the final bill, consistent with the per sheet or square foot
amount quoted in your estimate.
Cleanup: No way around it, roofing is messy work. Rest assured that when the job is done,
we will pickup all debris and do magnetic sweeps. Since we may work until dark, the main crew
may need to leave before cleaning up, or if the job ends midday, they may leave to start another
job. Another staff person will come later or the next day for more cleaning.
There are materials left over. Did I get charged for those?
Your job is priced according to the measurements. We always bring extra material for the
jobsite, just to be safe. You were not charged for those and we will be collecting them. One of
our staff will pick up the extra material after the installation crew is gone, usually within 1-2 days.
When will the dumpster be removed? The dumpster is usually removed the next
business day after the main crew has finished. Weekends or holidays may delay pickup.
The dumpster company should check for any debris after removal, but please do a visual check
before walking or driving over the area where the dumpster was located. If you see any debris
there, please let us know.
The job is done but I have concerns, what should I do?
Please be aware that even after the main installation crew has left, that doesn't mean our job is
done. The project manager will be coming by as soon as possible to do a final inspection, and a
staff person will come by to do a final sweep, and pickup leftover items. Depending on our
schedule, all of the final touchups, cleaning & pickups are usually completed in about 1-3 days
after main installation is complete. If you have any other questions, please let us know.
Thank you for choosing Peak Performance Roofing!
We will do our very best to make this major home improvement a smooth experience for you!
r--uoousyo.a by:
2/14/2024
'-262C7C386AC248F
p1 Lovefield St., Easthampton MA 01027
E K
413-203-5888 M-F 9am-4pm
PERFOR CE
ROOFING peakperformanceroofingllc@gmail.com