Loading...
4 Orchard Garage Apt PlansISSUEMM.DD.YYDRAWN BYSHCLIENTClient Name4 Lexington AveHolyoke MA PROJECTProject NamePROJECT NO.101Village Carpentry and Landscaping45 Pleasant St.Southampton MA, 01073 A.01Floor PlanFloor Plan 1/4" = 1'-0"A.0121'-0"9'-4 1/2"11'-6" 12'-10 1/2"3'-0"3'-1 1/2"5'-0" 2'-1/2" 10'-0" 7'-10"9'-3"WATER HEATER 32'-3" BATH BED STUDY KITCHEN LIVING/ DINNING ENTRY 5'-8" ISSUEMM.DD.YYDRAWN BYSHCLIENTClient Name4 Lexington AveHolyoke MA PROJECTProject NamePROJECT NO.101Village Carpentry and Landscaping45 Pleasant St.Southampton MA, 01073 A.02North ElevationsNorth Elevations 1/4" = 1'-0"A.025'-0"7'-9 3/4"4'-2"2'-8 3/4"6'-6"4'-0"4'-0" ISSUEMM.DD.YYDRAWN BYSHCLIENTClient Name4 Lexington AveHolyoke MA PROJECTProject NamePROJECT NO.101Village Carpentry and Landscaping45 Pleasant St.Southampton MA, 01073 A.03West ElevationsWest Elevations 1/4" = 1'-0"A.03 2'-6" 1'-6 3/4" 5'-7 1/4" 2'-6"11'-0"12'-10"8'-0" ISSUEMM.DD.YYDRAWN BYSHCLIENTClient Name4 Lexington AveHolyoke MA PROJECTProject NamePROJECT NO.101Village Carpentry and Landscaping45 Pleasant St.Southampton MA, 01073 A.04South South Elevations 1/4" = 1'-0"A.048'-0"4'-9 1/2"2'-7"7'-0"2'-11" ISSUEMM.DD.YYDRAWN BYSHCLIENTClient Name4 Lexington AveHolyoke MA PROJECTProject NamePROJECT NO.101Village Carpentry and Landscaping45 Pleasant St.Southampton MA, 01073 A.05Electrical PlanElectrical Plan 1/4" = 1'-0"A.05 ENTRY STUDY BATHROOM BEDROOM KITCHEN LIVING/ DINNING LFH ISSUEMM.DD.YYDRAWN BYSHCLIENTClient Name4 Lexington AveHolyoke MA PROJECTProject NamePROJECT NO.101Village Carpentry and Landscaping45 Pleasant St.Southampton MA, 01073 A.06Framing DetailsWall Detail NTSA.06 2 CEILING INSULATION BETWEEN CARRYING BEAMS 16” LOOSE FILL CELLULOSE R - 49 CEILING JOISTS BETWEEN CARRYING BEAMNS SET 3” UP FROM BOTTOM OF BEAM 16 O.C 2X6 1/2” SHEETROCK ON CEILING WITH LATEX PAINT FOR MOISTURE BARRIER CAULKING ON EDGES EXPOSED PORTION OF BEAM EXISTING ROOF WITH MEMBRANE EXISTING 4 LAYER BRICK WALL EXISTING FOUNDATION UNDER EXTERIOR BRICK WALLS EXISTING SLAB PLUMBER WILL CUT AS NEEDED. CONCRETE WILL BE REINSTALLED IN CUT TRENCHES TO CREATE FLAT FLOOR 2” XPS FOAM ON SLAB FOR FLOOR INSULATION R13 DOUBLE LAYER ADVANTECH SUBFLOOR THIS WILL BE A FUNCTIONALLY FLOATING FLOOR TO ELIMINATE TERMAL CONNECTION TO GROUND 2X4 WALLS SPACED AWAY FROM BRICK 3” CLOSED CELL FOAM R22 - BOTH AIR AND VAPOR BARRIER 1/2” INTERIOR SHEETROCK LATEX PAINT NEW FLANGED WINDOWS ATTACHED TO INTER OF BRICK FACE FOR AIR/VAPOUR SEAL IN LINE WITH BRICK FACE AIR SEALING SOULUTION LIQUID APPLIED VAPOR/AIR BARRIER TROWELED DIRECTLY ONTO INSIDE FACE OF BRICK AIR/VAPOR BARRIER EXSISTING 2X8 RAFTER 10’ 6” SPAN WILL BE LEFT ALONE EXSISTING 2X6 RAFTER SISTERED WITH 2X8 NEW CEILING JOISTS 10’2” SPAN 2X6 16 O.C. INSTALLED WITH JOIST HANGERS EXISTING 12X20 CARRYING BEAMS Ceiling/Roof framing NTSA.06 1 NEW FLAT ROOF VENTS INSTALLED TO VENT INSUALTION ISSUEMM.DD.YYDRAWN BYSHCLIENTClient Name4 Lexington AveHolyoke MA PROJECTProject NamePROJECT NO.101Village Carpentry and Landscaping45 Pleasant St.Southampton MA, 01073 A.07Site MapN ELECTRIC LINE 200 AMP UNDERGROUND SEWER LINE UNDERGROUND FROM HOUSE WATER MAIN IN FROM STREET NEW DRIVEWAY WILL BE TRG AND MATCH EXISTING SHAPE