Loading...
23_1102_COMCheck_FINALCOMcheck Software Version COMcheckWeb Envelope Compliance Certificate Project Title: 2021 IECC Project Type:Addition Vertical Glazing / Wall Area:22% Location:Northampton, Massachusetts Climate Zone:5a Construction Site: 30 Locust Street Northampton, Massachusetts 01060 Owner/Agent: Cooley Dickinson Hospital 30 Locust Street Northampton, Massachusetts 01060 Designer/Contractor: isgenuity 500 Harrison Avenue Boston, Massachusetts 02118 617-419-4660 Project Information Energy Code: Emergency Department Renovation Building Area Floor Area 1-Hospital : Nonresidential 7840 Envelope Assemblies Assembly Cavity R-Value Cont. R-Value Proposed U-Factor Budget U- Factor(a) Gross Area or Perimeter Roof: Insulation Entirely Above Deck, [Bldg. Use 1 - Hospital]7840 ---30.0 0.032 0.032 Floor: Unheated Slab-On-Grade, Vertical 3 ft., [Bldg. Use 1 - Hospital] (c) 190 ---20.0 0.472 0.520 Floor: Unheated Slab-On-Grade, Vertical 3 ft., [Bldg. Use 1 - Hospital] (c) 95 ---13.1 0.491 0.520 NORTH Ext. Wall: Steel-Framed, 16in. o.c., [Bldg. Use 1 - Hospital]1452 24.0 12.0 0.044 0.055 Window: Metal Frame with Thermal Break: Fixed, Perf. Specs.: Product ID 1601UT, SHGC 0.38, PF 1.07, [Bldg. Use 1 - Hospital] (b) 129 ------0.350 0.360 Window: Vinyl Frame: Fixed, Perf. Specs.: Product ID 601UT, SHGC 0.22, [Bldg. Use 1 - Hospital] (b) 13 ------0.350 0.360 Door: Glass (over 50% glazing): Metal Frame, Entrance Door, Perf. Specs.: Product ID Duraglide 5300 Series, SHGC 0.38, [Bldg. Use 1 - Hospital] (b) 88 ------0.620 0.630 Door: Insulated Metal, Swinging, [Bldg. Use 1 - Hospital]24 ------0.370 0.370 Door: Insulated Metal, Swinging, [Bldg. Use 1 - Hospital]42 ------0.370 0.370 EAST Ext. Wall: Steel-Framed, 16in. o.c., [Bldg. Use 1 - Hospital]1705 24.0 12.0 0.044 0.055 Window: Metal Frame with Thermal Break: Fixed, Perf. Specs.: Product ID 1601UT, SHGC 0.38, PF 2.50, [Bldg. Use 1 - Hospital] (b) 775 ------0.350 0.360 Door: Glass (over 50% glazing): Metal Frame, Entrance Door, Perf. Specs.: Product ID Dura-glide 3000, SHGC 0.38, [Bldg. Use 1 - Hospital] (b) 43 ------0.620 0.630 Door: Insulated Metal, Swinging, [Bldg. Use 1 - Hospital]52 ------0.370 0.370 SOUTH Ext. Wall: Steel-Framed, 16in. o.c., [Bldg. Use 1 - Hospital]1634 24.0 12.0 0.044 0.055 Window: Vinyl Frame: Fixed, Perf. Specs.: Product ID 601UT,13 ------0.350 0.360 Project Title: Data filename: Emergency Department Renovation 11/02/23Report date: 91 ofPage Assembly Cavity R-Value Cont. R-Value Proposed U-Factor Budget U- Factor(a) Gross Area or Perimeter SHGC 0.22, [Bldg. Use 1 - Hospital] (b) Window: Vinyl Frame: Fixed, Perf. Specs.: Product ID 601UT, SHGC 0.22, [Bldg. Use 1 - Hospital] (b) 13 ------0.350 0.360 Window: Vinyl Frame: Fixed, Perf. Specs.: Product ID 601UT, SHGC 0.22, [Bldg. Use 1 - Hospital] (b) 13 ------0.350 0.360 WEST Ext. Wall: Steel-Framed, 16in. o.c., [Bldg. Use 1 - Hospital]256 24.0 12.0 0.044 0.055 (a)Budget U-factors are used for software baseline calculations ONLY, and are not code requirements. (b)Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation. (c)Slab-On-Grade proposed and budget U-factors shown in table are F-factors. Envelope Compliance Statement Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed envelope systems have been designed to meet the 2021 IECC requirements in COMcheck Version COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name - Title Signature Date Envelope PASSES: Design 6% better than code Project Title: Data filename: Emergency Department Renovation 11/02/23Report date: 92 ofPage Inspection Checklist Requirements: 0.0% were addressed directly in the COMcheck software COMcheck Software Version COMcheckWeb Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Energy Code: 2021 IECC Section # & Req.ID Plan Review Complies?Comments/Assumptions C103.2 [PR1]1 Plans and/or specifications provide all information with which compliance can be determined for the building envelope and document where exceptions to the standard are claimed. Complies Does Not Not Observable Not Applicable C402.4.1 [PR10]1 The vertical fenestration area <= 30 percent of the gross above-grade wall area. Complies Does Not Not Observable Not Applicable C402.4.1 [PR11]1 The skylight area <= 3 percent of the gross roof area. Complies Does Not Not Observable Not Applicable C402.4.2 [PR14]1 In enclosed spaces > 2,500 ft2 directly under a roof with ceiling heights >15 ft. and used as an office, lobby, atrium, concourse, corridor, storage, gymnasium/exercise center, convention center, automotive service, manufacturing, non- refrigerated warehouse, retail store, distribution/sorting area, transportation, or workshop, the following requirements apply: (a) the daylight zone under skylights is >= half the floor area; (b) the skylight area to daylight zone is >= 3 percent with a skylight VT >= 0.40; or a minimum skylight effective aperture >= 1 percent. Complies Does Not Not Observable Not Applicable C406 [PR9]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the additional energy efficiency package options. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Emergency Department Renovation 11/02/23Report date: 93 ofPage Section # & Req.ID Footing / Foundation Inspection Complies?Comments/Assumptions C303.2 [FO4]2 Slab edge insulation installed per manufacturer’s instructions. Complies Does Not Not Observable Not Applicable C303.2.1 [FO6]1 Exterior insulation protected against damage, sunlight, moisture, wind, landscaping and equipment maintenance activities. Complies Does Not Not Observable Not Applicable C105 [FO3]2 Installed slab-on-grade insulation type and R-value consistent with insulation specifications reported in plans and COMcheck reports. Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.2.4 [FO7]2 Slab edge insulation depth/length. Slab insulation extending away from building is covered by pavement or >= 10 inches of soil. Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Emergency Department Renovation 11/02/23Report date: 94 ofPage Section # & Req.ID Framing / Rough-In Inspection Complies?Comments/Assumptions C303.1.3 [FR12]2 Fenestration products rated in accordance with NFRC certified and as to performance labels or certificates provided. Complies Does Not Not Observable Not Applicable C402.4.3 [FR10]1 Vertical fenestration SHGC value.Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.4.3, C402.4.3. 4 [FR8]1 Installed vertical fenestration U-factor and SHGC consistent with label specifications and as reported in plans and COMcheck reports. Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.4.5 [FR14]2 U-factor of opaque swinging and nonswinging doors associated with the building thermal envelope meets requirements. Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.5.1 [FR16]1 The building envelope contains a continuous air barrier that is sealed in an approved manner and either constructed or tested in an approved manner. Air barrier penetrations are sealed in an approved manner. Complies Does Not Not Observable Not Applicable C402.5.4 [FR18]3 Factory-built fenestration and doors are labeled as meeting air leakage requirements. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Emergency Department Renovation 11/02/23Report date: 95 ofPage Section # & Req.ID Mechanical Rough-In Inspection Complies?Comments/Assumptions C403.7.7 [ME58]3 Outdoor air and exhaust systems have motorized dampers that automatically shut when not in use and meet maximum leakage rates. Check gravity dampers where allowed. Reference section language for operational details. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Emergency Department Renovation 11/02/23Report date: 96 ofPage Section # & Req.ID Rough-In Electrical Inspection Complies?Comments/Assumptions C405.7 [EL26]2 Low-voltage dry-type distribution electric transformers meet the minimum efficiency requirements of Table C405.6. Complies Does Not Not Observable Not Applicable C405.8 [EL27]2 Electric motors meet the minimum efficiency requirements of Tables C405.7(1) through C405.7(4). Efficiency verified through certification under an approved certification program or the equipment efficiency ratings shall be provided by motor manufacturer (where certification programs do not exist). Complies Does Not Not Observable Not Applicable C405.9.1, C405.9.2 [EL28]2 Escalators and moving walks comply with ASME A17.1/CSA B44 and have automatic controls configured to reduce speed to the minimum permitted speed in accordance with ASME A17.1/CSA B44 or applicable local code when not conveying passengers. Complies Does Not Not Observable Not Applicable C405.10 [EL29]2 Total voltage drop across the combination of feeders and branch circuits <= 5%. Complies Does Not Not Observable Not Applicable C405.1.1 [EL30]2 At least 90% of dwelling unit permanently installed lighting shall have lamp efficacy >= 65 lm/W or luminaires with efficacy >= 45 lm/W or comply with C405.2.4 or C405.3. Complies Does Not Not Observable Not Applicable C405.11, C405.11.1 [EL31]2 50% of 15/20 amp receptacles installed in enclosed offices, conference rooms, copy rooms, break rooms, classrooms and workstations and > 25% of branch circuit feeders for modular furniture will have automatic receptacle control in accordance with C405.11.1. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Emergency Department Renovation 11/02/23Report date: 97 ofPage Section # & Req.ID Insulation Inspection Complies?Comments/Assumptions C303.1 [IN3]1 Roof insulation installed per manufacturer’s instructions and is labeled with R-value or insulation certificate providing R-value and other relevant data. Blown or poured loose- fill insulation is installed only where the roof slope is <=3 in 12. Complies Does Not Not Observable Not Applicable C402.2.1 [IN20]1 Roof assembly meets minimal thermal resistance installed between roof framing or in a continuous fashion on the roof assembly as stipulated in Table C402.1.3. Requirements for above deck insulation, minimum thickness, suspended ceilings, staggered joints and skylight curbs will be met. Complies Does Not Not Observable Not Applicable C303.2 [IN7]1 Above-grade wall insulation installed per manufacturer’s instructions. Complies Does Not Not Observable Not Applicable C105 [IN6]1 Installed above-grade wall insulation type and R-value consistent with insulation specifications reported in plans and COMcheck reports. Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.2.3 [IN8]2 Installed floor insulation type and R- value consistent with insulation specifications reported in plans and COMcheck reports. Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.2.6 [IN18]3 Radiant panels and associated components, designed for heat transfer from the panel surfaces to the occupants or indoor space are insulated with a minimum of R-3.5. Complies Does Not Not Observable Not Applicable C105 [IN2]1 Installed roof insulation type and R- value consistent with insulation specifications reported in plans and COMcheck reports. For some ceiling systems, verification may need to occur during Framing Inspection. Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.5.1. 1 [IN1]1 All sources of air leakage in the building thermal envelope are sealed, caulked, gasketed, weather stripped or wrapped with moisture vapor- permeable wrapping material to minimize air leakage. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Emergency Department Renovation 11/02/23Report date: 98 ofPage Section # & Req.ID Final Inspection Complies?Comments/Assumptions C401.3 [FI58]1 A thermal envelope certificate will be supplied and completed by an approved third party. Complies Does Not Not Observable Not Applicable C402.5.10 [FI26]3 Recessed luminaires in thermal envelope to limit infiltration and be IC rated and labeled. Seal between interior finish and luminaire housing. Complies Does Not Not Observable Not Applicable C402.5.11 [FI59]1 Operable openings > 40 ft2 will be interlocked with heating and cooling systems to setback setpoint temperatures within 10 minutes of opening. Complies Does Not Not Observable Not Applicable C402.5.8 [FI37]1 Weatherseals installed on all loading dock cargo door openings and provide direct contact along the top and sides of vehicles parked in the doorway. Complies Does Not Not Observable Not Applicable C408.1.1 [FI57]1 Building operations and maintenance documents will be provided to the owner. Documents will cover manufacturers' information, specifications, programming procedures and means of illustrating to owner how building, equipment and systems are intended to be installed, maintained, and operated. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Emergency Department Renovation 11/02/23Report date: 99 ofPage