Loading...
25C-085 File #66 APPLICANT/CONTACT PERSON:MICHELLE RABOIN PROPERTY LOCATION 238 BRIDGE ST UNIT A MAP:LOT 25C-085-001 ZONE THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Building Permit Filled out Fee Paid $30.00 Type of Construction: ZPA -CHANGE OF USE TO FRAME AND PRINT SHOP New Construction Non Structural Renovations Addition to Existing Accessory Structure Building Plans Included: Owner/ Statement or License 3 sets of Plans/Plot Plan Driveway Grade% THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFOXGIATION PRESENTED: ./Approved Additional permits required(see below) e PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR _ Special Permit With Site Plan ZONING BOARD PERMIT REQUIkED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management Demolition Delay //77.2 M Z Z02.3 Signature of Building Official Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission, Department of public works and other applicable permit granting authorities. *Variances are granted only to those applicants who meet the strict standards of MGL 40A.Contact Office of Planning&Development for more information. RECEIVED File No. 0(1) ekt* -130 OCT 1 7 ZONING PERMIT APPLICATION (35a•4.4) Please type in this fillable PDF or print and hand-write all information and return to DFiT O� ii_r,iyc;iri a eector) at the Building Department (212 Main St.) with the $30 filing fee by check and money order (payable to the City of Northampton) or credit card (in person only). Michelle Raboin michelle@hopeandfeathersframing.com 1. Name of Applicant: Email: 15 Camden Street South Hadley, MA 01075 413-695-8581 Address: Telephone: Ann- Marie Moggio 2. Owner of Property: PO Box 60127 Florence, MA 01062 Address: Telephone: prospective buyer 3. Status of Applicant: Owner ❑ Contract Purchaser ❑ Lessee ❑ Other (explain) 238A Bridge Street, Northampton MA 01060 4. Job Location:__ Parcel Id: Zoning Map# Parcel# District(s): In Elm Street District In Central Business District (TO BE FILLED IN BY THE BUILDING DEPARTMENT) real estate office 5. Existing Use of Structure/Property: 6. Description of Proposed Use/Work/Project/Occupation: (Use additional sheets if necessary): Proposed use: retail frame and print shop Proposed work: removal /addition of interior partition walls, new flooring, new signage 7. Attached Plans: Sketch Plan 111 Site Plan ❑ Engineered/Surveyed Plans ❑ 8. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO ❑ DON'T KNOW El YES LI IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO ❑ DON'T KNOW ❑ YES ❑ IF YES: enter Book Page and/or Document # 9.Does the site contain a brook, body of water or wetlands? NO ❑ DON'T KNOW I- I YES LI IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained ❑ Obtained ❑ , date issued: (Form Continues On Other Side) 6/7/2023 10. Do any signs exist on the property? YES 111 NO IF YES, describe size, type and location: Are there any proposed changes to or additions of signs intended for the property? YES I' I NO to be determined IF YES, describe size, type and location: 11. Will the construction activity disturb (clearing, grading, excavation, or filling) over 1 acre or is it part of a common plan of development that will disturb over 1 acre? YES ❑ NO (i IF YES, then a Northampton Storm Water Management Permit from the IDPW is required. 12. ALL INFORMATION MUST BE COMPLETED, or PERMIT CAN BE DENIED DUE TO LACK OF INFORMATION This column reserved for use by the Building Dept.only. EXISTING PROPOSED REQUIRED BY ZONING Lot Size 13,939 13,939 Frontage Setbacks Front unknown unchanged Side L: R: L: R: L: R: Rear Building Height unknown unchanged Building Square Footage 1426 1426 % Open Space: 0 0 (lot area minus building Er paved parking) #of Parking Spaces 4 4 #of Loading Docks 0 0 Fill: 0 0 (volume it location) Driveway Grade% 0 0 13. Certification: I hereby certify that the information contained herein is true and accurate to the best of my knowledge. 10/17/2023 Date: Applicant's Signature NOTE: Issuance of a zoning permit does not relieve an applicant's burden to com.1 with all zoning requirements and obtain all required permits from the hoard of Health,Conservation Commission, _�Commission and Architectural Boards,Department of Public Work and other applicable permit granting authorities. 6/7/2023 238 Bridge St. units A & B proposed remodel Existing Restrooml Existing existing Restroom exit existing exit utility ...........i t , added partition wall I(_,__________ added partition wall I Michelle Raboin Hope & Feathers Framing (413) 695-8581 michelle@hopeandfeathersframing.com iiiimmil mom. existing existing exit exit File #65 APPLICANT/CONTACT PERSON:MICHELLE RABOIN PROPERTY LOCATION 238 BRIDGE ST UNIT B MAP:LOT 25C-085-002 ZONE THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Building Permit Filled out Fee Paid $30.00 Type of Construction: ZPA -CHANGE USE TO RETAIL FRAME AND PRINT SHOP New Construction Non Structural Renovations Addition to Existing Accessory Structure Building Plans Included: Owner/ Statement or License 3 sets of Plans/Plot Plan Driveway Grade% THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INLFQR4ATION PRESENTED: Approved Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management Demolition Delay /�%2 Z32,0Z3 Signature of Building Official Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission, Department of public works and other applicable permit granting authorities. * Variances are granted only to those applicants who meet the strict standards of MGL 40A.Contact Office of Planning&Development for more information. RECEIVED File No. ocT 17 2o23ZOIVING PERMIT APPLICATION (350.4.4)1 Please type in is fillable PDF or print and hand-write all information and return to °fWAi) ' larfi ' ccor at the Building Department (212 Main St.) with the $30 filing fee by check and money order (payable to the City of Northampton) or credit card (in person only). Michelle Raboin michelle@hopeandfeathersframing.com 1. Name of Applicant: Email: 15 Camden Street South Hadley, MA 01075 413-695-8581 Address: Telephone: Brandywine AG Corp 2. Owner of Property: 238B Bridge Street 01060 Address: Telephone: prospective buyer 3. Status of Applicant: Owner ❑ Contract Purchaser ❑ Lessee ❑ Other (explain) 238B Bridge Street Northampton MA 01060 4. Job Location: Parcel Id: Zoning Map# Parcel# District(s): In Elm Street District In Central Business District (TO BE FILLED IN BY THE BUILDING DEPARTMENT) business 5. Existing Use of Structure/Property: 6. Description of Proposed Use/Work/Project/Occupation: (Use additional sheets if necessary): Proposed use: retail frame and print shop Proposed work: removal /addition of interior partition walls, new flooring, new signage 7. Attached Plans: Sketch Plan WI Site Plan ❑ Engineered/Surveyed Plans ❑ 8. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO ❑ DON'T KNOW El YES ❑ IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds?n NO I 1 DON'T KNOW YES ❑ IF YES: enter Book Page and/or Document # n 9.Does the site contain a brook, body of water or wetlands? NO El DONT KNOW El YES I 1 IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained ❑ Obtained ❑ , date issued: (Form Continues On Other Side) 6/7/2023 10. Do any signs exist on the property? YES ❑ NO 0 IF YES, describe size, type and location: Are there any proposed changes to or additions of signs intended for the property? YES 111 NO 0 to be determined IF YES, describe size, type and location: 11. Will the construction activity disturb (clearing, grading, excavation, or filling) over 1 acre or is it part of a common plan of development that will disturb over 1 acre? YES I I NO [ ] IF YES, then a Northampton Storm Water Management Permit from the DPW is required. 12. ALL INFORMATION MUST BE COMPLETED, or PERMIT CAN BE DENIED DUE TO LACK OF INFORMATION This column reserved for use by the Building Dept.only. EXISTING PROPOSED REQUIRED BY ZONING Lot Size 13,939 13,939 Frontage unknown unchanged Setbacks Front unknown unchanged Side L: R: L: R: L: R: Rear Building Height unknown unchanged Building Square Footage 1750 1750 %Open Space: 0 0 (lot area minus building Et paved parking) #of Parking Spaces 4 4 #of Loading Docks 0 0 Fill: 0 0 (volume & location) Driveway Grade% unknown unchanged 13. Certification: I hereby certify that the information contained herein is true and accurate to the best of my knowledge. 10/17/2023 Date: Applicant's Signature NOTE: Issuance of a zoning permit does not relieve an applicant's burden to corn 81 with all zoning requirements and obtain all required permits from the oard of Health,Conservation Commission, _ Commission and Architectural Boards,Department of Public Work-and other applicable permit granting authorities. 6/7/2023 238 Bridge St. units A & B proposed remodel Existing Restroom Existing I existing ' Restroom exit existing exit utility added partition wall added partition wall I Michelle Raboin Hope & Feathers Framing (413) 695-8581 michelle@hopeandfeathersframing.com existing existing exit exit