Loading...
CC LetterDATE:August 31,2023 RE:54 Clement St,Florence,MA 01062,USA To Whom It May Concern, As per your request,Exactus Energy has conducted a site assessment of the building at the above address. PV solar panels are proposed to be installed on roof areas as shown in the submitted plans.The panels are clamped to rails which are attached to the roof with a lagged mounting system.The PV system (PV modules,racking,mounting hardware,etc.)shall be installed according to the manufacturer ’s approved installation specifications.The Engineer of Record and Exactus Energy claim no responsibility for misuse or improper installation. It was found that the roof systems satisfactorily meet the applicable code standards included in the IBC 2015,IRC 2015,IEBC 2015 and ASCE 7-10 as well as the design criteria shown below: Design Criteria: Risk Category =II Exposure Category =B Wind speed =117 mph Ground snow load =40 psf Roof dead load =9 psf Solar system dead load =3 psf Overall,the roof system integrity is adequate to support the PV alteration with no modifications or reinforcements as required per 2015 IEBC Code Sections 402.3 and 403.3. This letter was completed in accordance to recognized design standards,professional engineering experience,and judgement.Prior to installation,the on-site contractor must notify Exactus Energy if there are any discrepancies,or damages to the members,that was not addressed in the plan set. If you have any further questions,please do not hesitate to contact me. Acknowledged by: