Loading...
23C-018 (7) BP-2023-1221 110 NONOTUCK ST COMMONWEALTH OF MASSACHUSETTS Map:Block:Lot: 23C-018-001 CITY OF NORTHAMPTON Permit: Alts Renovations Repair PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) BUILDING PERMIT Permit# BP-2023-1221 PERMISSION IS HEREBY GRANTED TO: Project# INSULATION 2023 Contractor: License: Est. Cost: 5000 HOMEWORKS ENERGY INC 106148 Const.Class: Exp.Date: 07/30/2024 Use Group: Owner: SULLIVAN MICHAEL E& MARTHA S JENKINS Lot Size(sq.ft.) Zoning: URB Applicant: HOMEWORKS ENERGY INC Applicant Address Phone: Insurance: 235 ESSEX ST 781-205-4484 1847910 WHITMAN, MA 02382 ISSUED ON: 09/07/2023 TO PERFORM THE FOLLOWING WORK: INSULATION/WEATHERIZATION POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House # Foundation: Final: Final: Final: Rough Frame: Gas: Fire Department Driveway Final: Fireplace/Chimney: Rough: Oil: Insulation: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Signature: q . ciAr, Fees Paid: $65.00 212 Main Street,Phone(413)587-1240,Fax:(413)587-1272 Office of the Building Commissioner FEE: $65.00 € ���� Please email Permit to WXPermitting@homeworksenergy.com r ,;i City of No amp on - V : FOR'� Building epa rtter�$ !` c. ..4), `` 212I�Aain reet ep �L; R m .� v\- . INSULATION ; ,24,,,,,,,,,,,, Northampton 0 `�Oc • phone 413-587-1240 Fa -1272 Op.JL., Y ti A �^I-1 n`CT. U6 APPLICATION FOR INSULATION FOR A ONE OR TWO MILY D ELLING ONLY SECTION 1 -SITE INFORMATION INSUL TION PERMIT This section to be completed by office 1.1 Property Address: Map Lot Unit 110 Nonotuck Street Northampton MA 01062 Zone Overlay District Elm St.District CB District SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: Michael Sullivan 110 Nonotuck Street Northampton MA 01062 Name(Print) Current Mailing Address: See Attached Telephone Signature 2.2 Authorized Agent: Adam Glenn 235 Essex Street, Whitman, MA 02382 Name(Print) cr������ Current Mailing Address: 781-205-4484 Signature Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by permit applicant 1. Building 5,000 (a)Building Permit Fee 2. Electrical (b) Estimated Total Cost of Construction from(6) 3. Plumbing Building Permit Fee 4. Mechanical (HVAC) Cc 5. Fire Protection 6. Total = (1 +2+ 3+4+5) 5,000 Check Number / - .)C-15. pp�� This Section For Official Use Only Building Permit Number: VD- )-3- 1)-)-' Date Issued: Signature: /7/17--- /' 7. 2bG3 Building Commissioner/Inspector of Buildings Date wxpermitting @ homeworksenergy.com EMAIL ADDRESS (REQUIRED; EITHER HOMEOWNER OR CONTRACTOR) SECTION 4-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: Not Applicable ❑ Name of License Holder:Adam Glenn 106148 License Number 235 Essex Street, Whitman, MA 02382 07/30/2024 Addre o�2 Expiration Date 781-205-4484 Signature Telephone 9.Registered Home Improvement Contractor: Not Applicable ❑ HomeWorks Energy 181138 Company Name Registration Number 235 Essex Street, Whitman, MA 02382 03/02/2025 Address cid Expiration Date 1:-Jetid << Telephone 781-205-4484 SECTION 5-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c. 152,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes No 0 Brief Description of Proposed Work Residential weatherization/ Air sealing. No structural changes. SITE ID 809970 I Adam Glenn , as Owner/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pains and penalties of perjury. Adam Glenn cd444 ,scrav_ Print Name 8/30/2023 Signature of Owner/Agent Date Michael Sullivan , as Owner of the subject property hereby authorize HomeWorks Energy to act on my behalf, in all matters relative to work authorized by this building permit application. See Attached 8/30/2023 Signature of Owner Date City of Northampton atH Mj9 ••'� ,°� Massachusetts �� 40 DEPARTMENT OF BUILDING INSPECTIONS 5, 212 Main Street • Municipal Building c,D Northampton, MA 01060 3'M�y 3,)��`� AFFIDAVIT Home Improvement Contractor Law Supplement to Permit Application The Office of Consumer Affairs and Business Regulation("OCABR")regulates the registration of contractors and subcontractors performing improvements or renovations on detached one to four family homes.Prior to performing work on such homes,a contractor must be registered as a Home Improvement Contractor("HIC"). M.G.L.Chapter 142A requires that the"reconstruction,alteration, renovation, repair, modernization, conversion, improvement, removal, demolition, or construction of an addition to any pre-existing owner-occupied building containing at least one but not more than four dwelling units....or to structures which are adjacent to such residence or building"be done by registered contractors. Note:lithe homeowner has contracted with a corporation or LLC,that entity must be registered Type of Work:Weatherization Est. Cost:5,000 Address of Work: 110 Nonotuck Street Northampton MA 01062 Date of Permit Application: 8/30/2023 I hereby certify that: Registration is not required for the following reason(s): _Work excluded by law(explain): _Job under$1,000.00 Owner obtaining own permit(explain): Building not owner-occupied Other(specify): OWNERS OBTAINING THEIR OWN PERMIT OR ENTERING INTO CONTRACTS WITH UNREGISTERED CONTRACTORS OR SUBCONTRACTORS FOR APPLICABLE HOME IMPROVEMENT WORK ARE NOT ELIGIBLE FOR AND DO NOT HAVE ACCESS TO THE ARBITRATION PROGRAM OR GUARANTY FUND UNDER M.G.L.Chapter 142A.SUCH OWNERS ALSO ASSUME THE RESPONSIBILITES FOR ALL WORK PERFORMED UNDER THE BUILDING PERMIT.SEE NEXT PAGE FOR MORE INFORMATION. Signed under the penalties of perjury: I hereby apply for a building permit as the agent of the owner: 8/30/2023 Adam Glenn 181138 Date Contractor Name HIC Registration No. OR: Notwithstanding the above notice,I hereby apply for a building permit as the owner of the above property: Date Owner Name and Signature City of Northampton Massachusetts <, DEPARTMENT OF BUILDING INSPECTIONS 212 Main Street •Municipal Building �*--� Northampton, MA 01060 s,i Debris Disposal Affidavit In accordance of the provisions of MGL c 40, S54, I acknowledge that as a condition of the building permit all debris resulting from the construction activity governed by this Building Permit shall be disposed of in a properly licensed solid waste disposal facility, as defined by MGL c 111, S 150A. The debris from construction work being performed at: 110 Nonotuck Street Northampton MA 01062 (Please print house number and street name) Is to be disposed of at: McNamara Waste Services LLC, 24 E Longmeadow Rd, Hampden,MA 01036 (Please print name and location of facility) Or will be disposed of in a dumpster onsite rented or leased from: (Company Name and Address) ,c4av 8/30/2023 Signature of Permit Applicant or Owner Date If, for any reason, the debris will not be disposed of as indicated, the Applicant or Owner shall notify the Building Department as to the location where the debris will be disposed. `�y{,,, ,jrJ City of Northampton S e. s {5.,"'''' 10 x' ,_ Massachusetts �� 1' ''e,. CW �I ' t DEPARTMENT OF BUILDING INSPECTIONS x f _ yJk 1 �.- 212 Main Street • Municipal Building 'sy.,... �O .�,,. Northampton, MA 01060 �Y 3�� MANDATORY FOR HOUSES BUILT BEFORE 1945 Property Address: 110 Nonotuck Street Northampton MA 01062 Contractor Name HomeWorks Energy Address: 235 Essex Street City, State: Whitman, MA 02382 Phone: 781-205-4484 Property Owner Name: Michael Sullivan Address: 110 Nonotuck Street Northampton MA 01062 City, State: I Adam Glenn (contractor) attest and affirm that the building I intend to insulate does not have any open air (knob and tube)wiring in the spaces to be insulated and that I have provided the property owner with a copy of this affidavit. Contractor signature CdliA4 S1;)°P;IV coe-- Date 8/30/2023 The Commonwealth of Massachusetts Department of Industrial Accidents 3= Office of Investigations Lafayette City Center • -JO- 2 Avenue de Lafayette, Boston,MA 02111-1750 ''M www.mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name (Business/Organization/Individual): HomeWorks Energy Address: 235 Essex Street City/State/Zip:Whitman, MA 02382 Phone #: 781-205-4484 Are you an employer? Check the appropriate box: Type of project(required): 1.❑■ I am a employer with 500+ 4. ❑ I am a general contractor and I employees (full and/or part-time).* have hired the sub-contractors 6. El New construction 2.El I am a sole proprietor or partner- listed on the attached sheet. 7. ❑ Remodeling ship and have no employees These sub-contractors have 8. ❑ Demolition workingfor me in anycapacity. employees and have workers' p �' 9. ❑ Building addition [No workers' comp. insurance comp. insurance.: required.] 5. 0 We are a corporation and its 10.0 Electrical repairs or additions officers have exercised their 11. Plumbing El I am a homeowner doing all work repairs or additions myself. [No workers' comp. right of exemption per MGL 12.❑ Roof repairs insurance required.] t c. 152, §1(4),and we have no Weatherization employees. [No workers' 13.$ Other comp. insurance required.] *Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. tContractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: Federated Mutual Insurance Company Policy#or Self-ins. Lic. #:#1847910 Expiration Date: 1/1/2024 Job Site Address: 110 Nonotuck Street Northampton MA 01062 City/State/Zip: Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify und r the pains �and pees of perjury that the information provided above is true and correct. Signature: .2;0 v • ' Date: 8/30/2023 Phone#: 781-205-4484 Official use only. Do not write in this area, to be completed by city or town official. City or Town: Permit/License # Issuing Authority(check one): 1. Board of Health 2. Building Department 3. City/Town Clerk 4. Electrical Inspector 5. Plumbing Inspector 6. Other Contact Person: Phone#: CPRO A CERTIFICATE OF LIABILITY INSURANCE �'12/ 12/d0/2022 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POUCIES BELOW.THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rids to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT FEDERATED MUTUAL INSURANCE COMPANY NAME: CLIENT CONTACT CENTER E FAX HOME OFFICE: P.O.BOX 328 (aCNNo,Est):888-333-4949 (A/C,No):507-446-4664 OWATONNA,MN 55060 E-ADDRESS:CLIENTCONTACTCENTER@FEDINS.COM INSURER(S)AFFORDING COVERAGE NAIL t/ INSURER A:FEDERATED MUTUAL INSURANCE COMPANY 13935 INSURED 419-899.0 INSURER B: HOMEWORKS ENERGY,INC. INSURER C: 101 STATION LNDG MEDFORD,MA 02155-5134 INSURER D: INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER:0 REVISION NUMBER:1 THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS.EXCLUSIONS AND CONDITIONS OF SUCH POLICIES LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE AODL SUER POLICY NUMBER POLICY EFT POLICY ELF LIMITS LTRINSR WL'D IMM!DDIYYYYI (MM/DDIVYVY) X COMMERCIAL GENERAL UABIUTY EACH OCCURRENCE $1,000,000 CLAIMS-MADE X'OCCUR PREMISEST IEaR occurrence) _ $100,000 MED EXP(Any one person) EXCLUDED A N N 1847909 01/01/2023 01/01/2024 PERSONALS ADV INJURY $1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $2,000,000 POLICY � I JEC I LOC PRODUCTS-COMP/OP AGO S2,000,000 OTHER: AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $1,000,000 (Ea acddend X ANY AUTO BODILY INJURY(Per person) OWNED AUTOS ONLY SCHEDULED A _ AUTOS N N 1847908 01/01/2023 01/01/2024 BODILY INJURY(Per accident) HIRED AUTOS ONLY _-NON-OWNED PROPERTY DAMAGE AUTOS ONLY (Per accident) X UMBRELLA LIAR X OCCUR EACH OCCURRENCE $1,000,000 A EXCESSLIAB CLAIMS-MADE N N 1847911 01/01/2023 01/01/2024 AGGREGATE $1,000,000 DED RETENTION WORKERS COMPENSATION X PER STATUTE OTH- AND EMPLOYERS'LIABILITY 1/I N ER ANY PROPRIETORIPARTNERIEXECUTIVE E.L.EACH ACCIDENT $500000 A OFFICER/MEMBER EXCLUDED? _NIA N 1847910 01/01/2023 01/01/2024 E.L.DISEASE-EA EMPLOYEE (Mandatory In NH) S500,000 It yes,describe under DESCRIPTION OF OPERATIONS below E.L DISEASE-POLICY LIMIT $500,000 DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES(ACORD 101,Additional Remarks Schedule.may be attached It more space is required) THIS COPY IS NOT TO BE REPRODUCED FOR ISSUANCE OF CERTIFICATES. CERTIFICATE HOLDER CANCELLATION 01 SHOULD ANY OF THE ABOVE DESCRIBED POUCIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN A CERTIFICATE HAS BEEN FILED WITH EACH OF YOUR CERTIFICATE ACCORDANCE WITH THE POLICY PROVISIONS. HOLDERS. AUTHORIZED REPRESENTATIVE //` /{J�/j. _ I �+ / 'VW Cv 1988-2015 ACORD CORPORATION.All rights reserved. ACORD 25(2016103) The ACORD name and logo are registered marks of ACORD kilt Commonwealth of Massachusetts Division of Occupational Licensure Construction Supervisor Specialty Board of Sodding R i�itiorks and Standards Rest L 4C to: 9 k IT f_ CSSL4C -inautation Contractor Cortstructit;,�upe4,r Specialty ' , CSSL-106148 H ires: 07/30/2024 ADAM GLEN i 5 19 CHARGE • % ,. WAREHAM .;'" i •;* Failure topossess a current edition at the Massachusetts 'TfItGYr P-r State Buildsng Code is cause for revocation of this license. For information about this license Cap{617)727-3200or visit wwv.mass.govidpi Commissioner ' .i. .... r. .t.,.. THE COMMONWEALTH OF MASSACHUSETTS Office of Consumer Affairs and Business Regulation 1000 Washington Street - Suite 710 Boston, Massachusetts 02118 Home Improvement Contractor Registration rt = .�...... "u Type: Corporation v =-- - egistration: 181138 HOME WORKS ENERGY, INC. '..t =" - Expiration: 03/02/2025 101 STATION LANDING STE 110 ` . MEDFORD, MA 02155 - '."� 400010.116.40 Update Address and Return Card. THE COMMONWEALTH OF MASSACHUSETTS Office of Consumer Affairs&Business Regulation Registration valid for individual use only before the HOME IMPROVEMENT CONTRACTOR expiration date. If found return to: TYPE:Corporation Office of Consumer Affairs and Business Regulation Registration Expiration 1000 Washington Street -Suite 710 181138 03/02/2025 Boston,MA 02118 HOME WORKS ENERGY,INC. �-..1 ADAM GLENN all444' � 101 STATION LANDING STE 110 ,;���,i, ' zG:'s1.k" v,e �''--"�j MEDFORD, MA 02155 Undersecretary Not valid without signature Insulation/Air Sealing Permit Authorization Specialist: Brian Cowles Company: HomeWorks Energy Email: brian.cowles@homeworksenergy.com Address: 101 Station Landing Cell: 4133480244 Medford, Ma 02155 Phone: 781.305.3319 Customer: Michael Sullivan Address: 110 Nonotuck Street Email: sullyme@comcast.net Northampton, MA,01062 Site ID: 809970 Phone: 4135865113 I, the owner of the property identified above hereby authorize HomeWorks Energy Inc., or their Partner to act on my behalf in obtaining any building permit that maybe required to perform insulation and/or Weatherization work on my property and all matters related to the work authorized by said permit if one is obtained. Any related permit application cost will come at no additional charge provided that the agreed Weatherization work is completed. In the event that a permit is pulled on your home for insulation and/or weatherization work, you may be required to have a final inspection of the work scheduled and performed by the building inspector in your town. If required by the town, you will be notified by HomeWorks Energy that an inspection is necessary with instructions on how to complete this process to close out your permit. Email: sullyme@comcast.net Customer Signature: Date: 8/29/2023 Michael Sullivan For Condo Owners: If you have property oversight by a condo associationt, please have the association's authorized person(s)complete and sign the section below. Please email this document to wxpermitting@homeworksenergy.com once completed. We, being the duly authorized representatives of the association Name of association or management companyt or management company have reveiwed the plans and specifications for improvements to the address specified abov€ We further acknowledge that the above listed owner has given notice that they intend to seek permits and to carry out the proposed work. Signature of representative Date Print Name t Other unit owners may sign when there is no association. HomeWorks Energy �fl Home Performance Contractor irr 1 101 Station Landing,Medford,MA 02155 CONTRACT - AUDIT HomeWorks 781-305-3319 CUSTOMER PHONE DATE CLIENT# WORK ORDER Mike Sullivan (413) 586-5113 08/29/2023 809970 12801 SERVICE STREET BILLING STREET PROPOSED BY: 110 Nonotuck Street 110 Nonotuck St HomeWorks Energy SERVICE CITY,STATE,ZIP BILLING CITY,STATE,ZIP Florence, MA 01062 Florence, MA 01062 Page 1 DESCRIPTION QTY COST INCENTIVE TOTAL PERFORM AIR SEALING AT ESTIMATED 62.5 CFM50 PER HO 8 $852.72 $852.72 Seal areas of your home against wasteful, excessive air leakage. Materials to be used to seal your home can include caulks,foams and other products. Primary areas for sealing include air leakage to attics, basements, attached garages and other unheated areas (windows are not generally addressed.) EXTERIOR DOOR WEATHER STRIPPING 3 $108.96 $108.96 Provide labor and materials to install 0-Ion weatherstripping to door(s)to restrict air leakage. DOOR SWEEP 3 $88.98 $88.98 Provide labor and materials to install a doorsweep to restrict air leakage. DAMMING 100 $278.00 $208.50 $69.50 Provide labor and materials to install a 12" layer of R-38 unfaced fiberglass batts for damming purposes. ATTIC FLOOR OPEN BLOW CELLULOSE 7" 930 $1,915.80 $1,436.85 $478.95 Provide labor and materials to install a 7" layer of R-26 Class I Cellulose to open attic space. DOOR:THERMAL BARRIER POLYISO 2"(ATTIC) 1 $103.05 $77.29 $25.76 Provide labor and materials to insulate the back of the attic door with 2" rigid insulation board. ATTIC STAIR COVER THERMAL BARRIER 1 $313.63 $313.63 Provide labor and materials to install an easily moved, insulating cover for the attic access folding stair. The cover has integral weather- stripping to restrict air leakage. INSTALL 2"THERMAL BARRIER POLYISO ON OPEN BASEMEN 65 $360.10 $270.08 $90.02 Provide labor and materials to install rigid board insulation to the perimeter of the basement ceiling at the house sill. PROPAVENT 2' OR 4' 25 $117.00 $87.75 $29.25 Provide labor and materials to install ventilation chutes in the rafter bays to maintain air flow. HomeWorks Energy Home Performance Contractor ;[ ! 101 Station Landing,Medford,MA 02155 CONTRACT - AUDIT works 781-305-3319 Energy,Inc CUSTOMER PHONE DATE CLIENT# WORK ORDER Mike Sullivan (413) 586-5113 08/29/2023 809970 12801 SERVICE STREET BILLING STREET PROPOSED BY: 110 Nonotuck Street 110 Nonotuck St HomeWorks Energy SERVICE CITY,STATE.ZIP BILLING CITY,STATE,ZIP Florence, MA 01062 Florence, MA 01062 Page 2 DESCRIPTION QTY COST INCENTIVE TOTAL REPLACE BATH FAN HOSE 1 $32.23 $24.17 $8.06 Provide labor and materials to install an insulated 4"exhaust hose to existing bathroom fan(s). Total: $4,170.47 Program Incentive: $3,468.93 Customer Total: $701.54 WE AGREE HEREBY TO FURNISH SERVICES-COMPLETE IN ACCORDANCE WITH ABOVE SPECIFICATIONS.FOR THE SUM OF ***Seven Hundred One & 54/100 Dollars $701.54 5 ) *(911 %C-- 5._ COMPANY REPRESEN THE � CUSTOMER SIGNATURE NOTE:THIS CONTRACT MAY HE WITHDRAWN BY US IF NOT EXECUTED WITHIN DATE OF ACCEPTANCE SIGN DATE 30 DAYS.