10B-086 (8) BP-2023-1212
237 MAIN ST COMMONWEALTH OF MASSACHUSETTS
Map:Block:Lot:
10B-086-001 CITY OF NORTHAMPTON
Permit: Alts Renovations
Repair
PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS
DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A)
BUILDING PERMIT
Permit# BP-2023-1212 PERMISSION IS HEREBY GRANTED TO:
Project# ROOF/SKYLIGHTS 2023 Contractor: License:
PEAK PERFORMANCE ROOFING
Est. Cost: 43500 LLC CS-103061
Const.Class: Exp.Date: 09/21/2024
Use Group: Owner: LLC MAIN ST LEEDS
Lot Size (sq.ft.)
Zoning: URB Applicant: PEAK PERFORMANCE ROOFING LLC
Applicant Address Phone: Insurance:
1 LOVEFIELD ST 413-203-5888 R2WC342657
EASTHAMPTON, MA 01027
ISSUED ON: 09/06/2023
• TO PERFORM THE FOLLOWING WORK:
STRIP AND REROOF, REPLACE SKYLIGHTS
POST THIS CARD SO IT IS VISIBLE FROM THE STREET
Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector
Underground: Service: Meter: Footings:
Rough: Rough: House # Foundation:
Final: Final: Final: Rough Frame:
Gas: Fire Department Driveway Final: Fireplace/Chimney:
Rough: Oil: Insulation:
Smoke: Final:
THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF
ANY OF ITS RULES AND REGULATIONS.
Signature:
c,6).11L, (P1 ' 1
Fees Paid: $305.00
212 Main Street,Phone(413)587-1240,Fax: (413)587-1272
Office of the Building Commissioner
DocuSign Envelope ID:2863126F-A49B-4386-B31B-4805ED844CA1
Versionl.7 Commercial Buildingyermit May 15, 2000
Department use only
RECEIVED ity of Northampton Status of Permit:
uilding Department Curb Cut/Driveway Permit
212 Main Street Sewer/Septic Availability
SEP — 6 2023 Room 100 Water/Well Availability
Northampton, MA 01060 Two Sets of Structural Plans
ApFPT •hon- 41 —587-1240 Fax 413-587-1272 Plot/Site Plans
OFgUILDINf INSPECTIONS Other Specify
NORTHA TON MA 01.
APPLICATION TO CONTT' I , REPAIR, RENOVATE, CHANGE THE USE OR OCCUPANCY OF, OR DEMOLISH ANY BUILDING
OTHER THAN A ONE OR TWO FAMILY DWELLING
SECTION 1 -SITE INFORMATION
1.1 Property Address: This section to be completed by office
Map Lot Unit
237 Main St., Northampton Zone Overlay District
Elm St. District CB District
SECTION 2 -PROPERTY OWNERSHIP/AUTHORIZED AGENT
2.1 Owner of Record:
Bowles Enterprises, LLC 237 Main St., Northampton
Name(Print) CL rrent Mailing Address:
r—oau5„nedby: 413 537 8745
jjgh/ItortbtV(t,S Telephone
1^—t.CU86UH61U854C6.
2.2 Authorized Agent:
James J. Flannery/ Peak Performance Roofing LLC 1 Lovefield St., Easthampton MA 01027
Name(Print) Current Mailing Address:
413-203-5888
l RanSignature Telephone
SECTION 3-ESTIMATED CONSTRUCTION COSTS
Item Estimated Cost(Dollars)to be Official Use Only
completed by permit applicant
1. Building 43500 (a) Building Permit Fee
2. Electrical (b)Estimated Total Cost of
Construction from (6)
3. Plumbing Building Permit Fee
4. Mechanical(HVAC)
5. Fire Protection
6. Total = (1 + 2+ 3 +4 + 5) 43500 Check Number y
This Section For Official Use Only
Building Permit Number Date
Issued
Signature://� L za3
Building Commissioner/Inspector of Buildings Date
DocuSign Envelope ID:2863126F-A49B-4386-B31 B-4805ED844CA1
Versionl.7 Commercial Building Permit May 15,2000
SECTION 4-CONSTRUCTION SERVICES FOR PROJECTS LESS THAN 35,000
CUBIC FEET OF ENCLOSED SPACE
Interior Alterations D Existing Wall Signs 0 Demolition❑ Repairs❑ Additions ❑ Accessory Building❑ '
Exterior Alteration ❑ Existing Ground Sign❑ New Signs ❑ Roofing El Change of Use❑ Other ❑
Brief Description Remove top layer of roof material, install insulation. Install Genflex TPO fully adhered roof system (or
equal) over the existing roof surface.. Replace 2 sklylights.
Of Proposed Work:
SECTION 5-USE GROUP AND CONSTRUCTION TYPE
USE GROUP (Check as applicable) CONSTRUCTION TYPE
A Assembly ❑ A-1 ❑ A-2 ❑ A-3 El1A I ❑
A-4 ❑ A-5 ❑ 1 B ❑
B Business 0 2A ❑
E Educational 0 2B I ❑
F Factory ❑ F-1 ❑ F-2 ❑ 2C ❑
H High Hazard ❑ 3A ❑
I Institutional ❑ I-1 ❑ 1-2 0 1-3 ❑ 3B ❑
M Mercantile ❑ 4 ❑
R Residential ❑ R-1 ❑ R-2 ❑ R-3 ❑ 5A ❑
S Storage ❑ Si- ❑ S-2 ❑ 5B ❑
U Utility ❑ Specify:
M Mixed Use ❑ Specify:
S Special Use ❑ Specify:
COMPLETE THIS SECTION IF EXISTING BUILDING UNDERGOING RENOVATIONS, ADDITIONS AND/OR CHANGE IN USE
Existing Use Group: Proposed Use Group:
Existing Hazard Index 780 CMR 34): Proposed Hazard Index 780 CMR 34):
SECTION 6 BUILDING HEIGHT AND AREA
BUILDING AREA EXISTING PROPOSED NEW CONSTRUCTION OFFICE USE ONLY
Floor Area per Floor (sf)
15 1st
2nd
2nd
3rd 3rd
4th 4m
Total Area (sf) Total Proposed New Construction (sf)
Total Height (ft)
Total Height ft
7. Water Supply(M.G.L. c.40, § 54) 7.1 Flood Zone Information: 7.3 Sewage Disposal System:
Public ❑ Private ❑ Zone Outside Flood Zone❑ Municipal 0 On site disposal system DI
DocuSign Envelope ID:2863126F-A49B-4386-B31B-4805ED844CA1
Versionl.7 Commercial Building Permit May 15,2000
8. NORTHAMPTON ZONING
Existing Proposed Required by Zoning
This column to be filled in by
Building Department
Lot Size
Frontage
Setbacks Front
Side L: R: L: R:
Rear
Building Height
Bldg. Square Footage
Open Space Footage
(Lot area minus bldg&paved
parking)
#of Parking Spaces
Fill:
(volume&Location)
A. Has a Special Permit/Variance/Finding ever been issued for/on the site?
NO X DON'T KNOW YES
IF YES, date issued:
IF YES: Was the permit recorded at the Registry of Deeds?
NO DON'T KNOW YESII
IF YES: enter Book Page and/or Document#
B. Does the site contain a brook, body of water or wetlands? NO DON'T KNOW YES
IF YES, has a permit been or need to be obtained from the Conservation Commission?
Needs to be obtained Obtained 0 , Date Issued:
C. Do any signs exist on the property? YES NO
IF YES, describe size, type and location:
D. Are there any proposed changes to or additions of signs intended for the property ? YEI NO
IF YES, describe size, type and location:
E. Will the construction activity disturb clearing, gradin excavation, or filling)over 1 acre or is it part of a common plan
that will disturb over 1 acre? YES NO
IF YES,then a Northampton Storm Water Management Permit from the DPW is required.
DocuSign Envelope ID:2863126F-A49B-4386-B31 B-4805ED844CA1
Versionl.7 Commercial Building Permit May 15,2000
SECTION 9-PROFESSIONAL DESIGN AND CONSTRUCTION SERVICES -FOR BUILDINGS AND STRUCTURES SUBJECT TO
CONSTRUCTION CONTROL PURSUANT TO 780 CMR 116 (CONTAINING MORE THAN 35,000 C.F. OF ENCLOSED SPACE)
9.1 Registered Architect:
Not Applicable
Name(Registrant):
Registration Number
Address
Expiration Date
Signature Telephone
9.2 Registered Professional Engineer(s):
Name Area of Responsibility
Address Registration Number
Signature Telephone Expiration Date
Name Area of Responsibility
Address Registration Number
Signature Telephone Expiration Date
Name Area of Responsibility
Address Registration Number
Signature Telephone Expiration Date
Name .__ . ,w Area of Responsibility
..._
Address Registration Number
Signature Telephone Expiration Date
9.3 General Contractor
Peak Performance Roofing, LLC Not Applicable m
Company Name:
James J. Flannery
Responsible In Charge of Construction
1 Lovefield St., Easthampton, MA 01027
Address
00,,es ahhertt 413-203-5888
Signature Telephone
DocuSign Envelope ID:2863126F-A49B-4386-B31 B-4805ED844CA1
Versionl.7 Commercial Building Permit May 15,2000
SECTION 10-STRUCTURAL PEER REVIEW(780 CMR 110.11)
Independent Structural Engineering Structural Peer Review Required Yes ❑ No W
SECTION 11 -OWNER AUTHORIZATION -TO BE COMPLETED WHEN
OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT
Donna Bowles of Bowles Enterprises, LLC .m as Owner of the subject property
hereby authorize James J. Flannery / Peak Performance Roofing, LLC
�� � d to
act on my altyall matters relative to work authorized by this building permit application. ...
C/O : ODIA.ut bOwtt 8/15/2023
FcnarnAWn=Nd(F
Signature of Owner Date
James J. Flannery / PEAK PERFORMANCE ROOFING LLC as Owner/Authorized
Agent hereby declare that the statements and information on the foregoing application are true and accurate, to the best of my knowledge
and belief.
Signed under the pains and penalties of perjury.
James J. Flannery
Print Name
c\aWtsapq^.en 08/14/2023
Signature of Owner/Agent Date
SECTION 12 -CONSTRUCTION SERVICES
10.1 Licensed Construction Supervisor: Not Applicable 0
Name of License Holder: James J. Flannery CS-103061
License Number
Holyoke, MA 01040 09/21/2024
Address Expiration Date
ictirAe,S, Rartrser 413-203-5888
Signature Telephone
SECTION 13-WORKERS' COMPENSATION INSURANCE AFFIDAVIT(M.G.L. c. 152, §25C(6))
Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result
in the denial of the issuance of the bui ing permit.
Signed Affidavit Attached Yes No❑
DocuSign Envelope ID:2863126F-A49B-4386-B31 B-4805ED844CA1
The Roofing Process : What to Expect
When will my roof be scheduled? Once the contract, deposit, and building permit
are all in place, we can proceed with installing your roof. Roofing is hazardous and the safety of
our crew is a priority. We must work around the weather forecast; here in New England, this
means we can't plan our schedule very far in advance, and can't promise specific installation
dates. Long stretches of inclement weather will cause delays. We appreciate your flexibility and
patience in our dealings with Mother Nature!
Your project manager will contact you a few days before they wish to proceed. Our crews are
hardworking and efficient; most residential installations take only 1-2 days to install.
Do I need to do anything to prepare? As noted on your contract, we are not
responsible for dirt/debris that may fall into the attic. Depending on the condition of the
plywood, you may see little to no debris, or it could be more substantial. If you store items in the
attic, we recommend covering with plastic sheeting.
Do I need to notify my neighbors? If your home is extremely close to other homes
or driveways, there's a possibility we may need to be on their property temporarily to lay
protection or collect debris. In this case, yes, please notify your neighbors. Otherwise, it is a
courtesy. Your neighbors will likely appreciate notification of the noise/traffic.
Materials and Dumpster Delivery: The materials and dumpster may arrive the day
before the scheduled installation (especially if your installation is taking place on a weekend).
Depending on your home's layout and driveway(s), we may need vehicles moved at this point.
Parking: On the day of the installation, we ask that you move ALL vehicles out of ALL
driveways, and away from the house, to avoid any damage, and for our access.
How early will you start? Our crews will begin as early as 7.30am. They will work a
long day, often until dark if necessary. We aim to have the installation completed in as few days
as possible to minimize disruption to you and your neighbors.
Do I need to be home? It's up to you. Some customers like to keep an eye on what's
going on. Others would rather not be home because of the noise. Be aware that roofing is loud
(banging, nail guns, etc) so you may need to make arrangements for residents, tenants or pets.
Please do not plan on outdoor activities while we are working, for safety's sake. Please keep
pets inside, or on a leash away from the roofing activities.
DocuSign Envelope ID:2863126F-A49B-4386-B31B-4805ED844CA1
What if I have an urgent question? If you have an urgent issue outside of regular
office hours, call or text your project manager directly on his cell.
Unforeseen Issues: Once we remove the existing roofing, we can inspect the underlying
sheathing. Your contract states we will replace a small amount of plywood at no additional cost
if needed. If more serious issues are found, the project manager will contact you to explain.
There may need to be an upcharge on the final bill, consistent with the per sheet or square foot
amount quoted in your estimate.
Cleanup: No way around it, roofing is messy work. Rest assured that when the job is done,
we will pickup all debris and do magnetic sweeps. Since we may work until dark, the main crew
may need to leave before cleaning up, or if the job ends midday, they may leave to start another
job. Another staff person will come later or the next day for more cleaning.
There are materials left over. Did I get charged for those?
Your job is priced according to the measurements. We always bring extra material for the
jobsite, just to be safe. You were not charged for those and we will be collecting them. One of
our staff will pick up the extra material after the installation crew is gone, usually within 1-2 days.
When will the dumpster be removed? The dumpster is usually removed the next
business day after the main crew has finished. Weekends or holidays may delay pickup.
The dumpster company should check for any debris after removal, but please do a visual check
before walking or driving over the area where the dumpster was located. If you see any debris
there, please let us know.
The job is done but I have concerns, what should I do?
Please be aware that even after the main installation crew has left, that doesn't mean our job is
done. The project manager will be coming by as soon as possible to do a final inspection, and a
staff person will come by to do a final sweep, and pickup leftover items. Depending on our
schedule, all of the final touchups, cleaning & pickups are usually completed in about 1-3 days
after main installation is complete. If you have any other questions, please let us know.
Thank you for choosing Peak Performance Roofing!
We will do our very best to make this major home improvement a smooth experience for you!
POIAk t jowls 8/15/2023
p1 Lovefield St., Easthampton MA 01027
E K 413-203-5888M-F _
P E R F O R CE
gam 4pm
ROOFING peakperformanceroofinglIc@gmail.com
The Commonwealth of Massachusetts
1.Z...\.
Department of Industrial Accidents
.i,
, .,...‘ Office of Investigations
600 Washington Street
Boston,MA 02111
,-----,,:, -•
''''':*. .':•"-''' www.mass.govidia
Workers' Compensation Insurance Affidavit: BuildersiContractors/Electricians/Plumbers
Applicant Information Please Print Legibly
Name (Business!Oranizatiolvindividual): Peak Performance Roofing. ! LC
Address: 1 Lovefield St.
City/State/Zip:
Easthampton, MA 01027 Phone #: 413-203-5888
, I
Are y u an employer? Check the appropriate box: Type of project(required):
I. I am a employer with_ 4 4. i i I am a general contractor and I
6. 0 New construction
employees(full and/or pan-time).* have hired the sub-contractors
2.0 I am a sole proprietor or partner- listed on the attached sheet. 7. 11 Remodeling
ship and have no employees These sub-contractors have 8. El Demolition
working for me in any capacity. employees and have workers'
9. 0 Building addition
iNo workers comp.insurance comp.insurance.*
required.] 5. Ft We arc a corporation and its , 10.E1 Electrical repairs or additions
3.1 1 I am a homeowner doing all work officers have exercised their 11.0 Plumbing repairs or additions
myself.[No workers' comp. right of exemption per MGT..
12.gRoof repairs
insurance required.]+ c. 152.§1(4),and we have no
' —1 Other
employees.[No workers' 13.1 __________
comp.insurance required.] I
An applicant that checks box#1 must also fill out the section below showing their workers'compensation policy iniormation.
'-' Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such,
'Contractors that check this box must attached an additional sheet show ing the name of the sub-contractors and state whether or not those entities have
employees. If the sub-contractors have employees,they must preside their workers'comp.policy number.
1 am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site
information.
Berkshire Hathaway Guard
Insurance Company Name: —
Policy #or Self-ins.Lie.11: R2WG202869 Expiration Date: 04/27/2024
Job Site Address: 237 MAIN ST. , Northampton MA
citystatei,..xp:____ _______ , •
Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date).
Failure to secure coverage as required under Section 25A of MCI.c. 152 can lead to the imposition of criminal penalties of a
fine up to$1540.00 and/or one-year imprisonment.as well as civil penalties in the form of a STOP WORK ORDER and a fine
of up to S250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of
Investigations of the DIA for insurance coverage verification.
I do hereby certify under the pains and penalties of perjury that the information provided above is true and correct.
, tr
1 8/16/2023
Date: ,.......„__. „.„
413-203-5888
Phone II:
Official use only. Do not write in this nrea,to be completed by city or town official.
City or Town: Permit/License#
Issuing Authority(circle one):
1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing inspector •
6.Other
Contact Person: Phone#:
City of Northampton 212 Main Street, Northampton, MA 01060
Solid Waste Disposal Affidavit
In accordance of the provisions of MGL c 40, S54, I acknowledge that as
a condition of the building permit all debris resulting from the construction
activity governed by this Building Permit shall be disposed of in a properly
licensed solid waste disposal facility, as defined by MGL c 111 , S 150A.
Address of the work: 237 Main St.
The debris will be transported by: Aaron's 24/7 Towing and Roll-On
The debris will be received by: Valley Recycling
Building permit number:
Name of Permit Applicant Peak Performance Roofing LLC/James Flannery
8/16/2023 James Flannery
Date Signature of Permit Applicant
DocuSign Envelope ID:2863126F-A49B-4386-B31B-4805ED844CA1
Peak Performance Roofing LLC
1 Lovefield St.
Easthampton, MA 01027
413-203-5888 P E K
peakperformanceroofingllc@gmail.com P E R F 0 R C E
ROOFING
MA HIC#183698 MA CSL#103061
ADDRESS
Bowles Enterprises, LLC
237 Main St.
Northampton, MA
Donna Bowles
413 537 8745
ESA"'=. AT 4 DATE
11052 08/13/2023
JOB LOCATION
237 Main St. NOHO
ACTIVITY DESCRIPTION QTY RATE AMOUNT
Other Commercial Peak Performance Roofing will provide the labor and 1 43,500.00 43,500.00
materials to perform the following:
1. Remove top layer of roof materials.
2. Mechanically fasten 2 layers of 2.5"
polyisocyanurate insulation with screws and plates.
3. Install Genflex TPO fully adhered roof system (or
equal) over the existing roof surface.
4. Replace two existing skylights with Velux pyramid
shaped commercial units.
https://commercial.veluxusa.com/products/metal-
framed/semi-custom/classic/square-pyramid
5. Install new stainless Bilco roof scuttle.
https://www.crssupply.com/search-results/bilco-s-50-
36x30-aluminum-roof-hatch
6. Fabricate and install bronze aluminum drip edge for
front and rear edges.
Remove all debris from premises, and throughout the
job, continue cleanup and keep the premises
undamaged. WE ARE NOT RESPONSIBLE FOR
DEBRIS THAT MAY FALL INTO ATTIC/INTERIOR.
DocuSign Envelope ID:2863126F-A49B-4386-B31B-4805ED844CA1
ACTIVITY DESCRIPTION QTY RATE AMOUNT
Please use reasonable caution during the installation
process: do not walk or drive under active work or on
areas of potential roofing debris. Installations are
weather permitting; inclement weather will cause
scheduling delays.
Peak Performance Roofing LLC will obtain the building
permit.
Warranty confirmation shall be provided upon final
payment. Installation and manufacturer warranties are
not in effect until Paid In Full.
Total: $43,500
A one-third deposit of$14,500 will secure contract,
permitting, material order, and priority scheduling.
The balance shall be due upon completion, within 10
days of invoice. Accounts outstanding over 30 days
subject to 2%finance charge monthly.
TOTAL $43i-500 00
Docusigned by: 8/15/2023
pDIn ln.ol. f?OW kS
Accepted By `—FCD86DB62D854C6.. Accepted Date
CONSTRUCTION CONTROL WAIVER
From:
James Flannery, dba:
Peak Performance Roofing, LLC
1 Lovefield St.
Easthampton, MA 01027
To:
Jonathan Flagg
Building Commissioner
City of Northampton
212 Main Street
Northampton, MA 01060
The Massachusetts Building Code, section 107.1 allows for an exclusion from requirements for
construction control in certain situations. In accordance with code section 104.10, I request that you
grant a modification to waive the requirement for construction control of the project at
237 Main St. , Northampton
because the work is of a minor nature, will not affect structural elements, health, accessibility, life or fire
safety, and will be done in accordance with the prescriptive requirements of the code.
Thank you for your consideration.
Respectfully,
James Flannery , S "1"01