Loading...
Progress Set - 03-30-20218'-0"6'-1"9'-10"6'-1"6'-1"9'-10"6'-1"6X6 PT POSTNEW 24"X36" SPREAD FOOTINGHALFBATH36"x80"ENTRY30"x80"28"x80"30"x80"OFFICEGARAGE2'-8 1/8"3'-0"13'-0 5/8"8'-6 7/8"11'-7 3/4"36"x80"ENTRY11'-7 3/4"GARAGE6X6 PT POST36"x80"ENTRY30"x80"30"x80"EXITGARAGENEW 24"X36" SPREAD FOOTINGNOTE: FLOOR FRAMING OVER SLAB.INSULATE CAVITIES CREATED.36"x80"ENTRYGARAGENEW 24"X36" SPREAD FOOTINGOWNER STORAGEVANITY19" DEPTH30" BIF. DOORCLOSET UNDER STAIR30"x80"30"x80"OFFICEVANITY19" DEPTH30" BIF. DOORCLOSET UNDER STAIR30"x80"OFFICE30" BIF. DOORCLOSET UNDER STAIR30"x80"OFFICE30" BIF. DOORCLOSET UNDER STAIR7'-6" HEAD ROOM(UNDERNEATH)7'-3"UPUPUPUPWALKWAYWALKWAY30"x80"EXIT30"x80"EXIT30"x80"EXIT2'-6"36" BIF. DOORCLST36" BIF. DOOR28"x80"4'-0 1/4"7'-3"2'-6"CLST4'-0"4'-0"HALFBATH28"x80"VANITY19" DEPTH36" BIF. DOORCLST30"x80"VANITY19" DEPTH36" BIF. DOOR28"x80"CLST3'-9 5/8"7'-3"2'-6"4'-0"3'-9 1/2"7'-3"2'-6"4'-0"WALKWAYWALKWAY2A1023'-9 3/8"3'-9 1/4"4'-0"4'-0"7'-6" HEAD ROOM(UNDERNEATH)EGRESSLADDEREGRESSLADDEREGRESSLADDEREGRESSLADDERNOTE: FLOOR FRAMING OVER SLAB.INSULATE CAVITIES CREATED.FRAME NEWWINDOWFRAME NEWWINDOWFRAME NEWWINDOWFRAME NEWWINDOWFRAME NEWWINDOW4X44'-0" FIRERESISTANTSHEATHING4'-0" FIRERESISTANTSHEATHINGA1012(SEE DETAIL)(SEE DETAIL)PLANT BEDPLANT BEDPLANT BEDPLANT BED3A101STAIRWAYSTAIRWAY10" CONCRETE FOUNDATION BELOWOFFSET1 7/8"4'-0" FIRE RESISTANT SHEATHING1" GWB5/8" TYPE 'X' GWBEACH SIDE2X4 STUDS16" O.C.FUR OUT WALLUP TO STAIRTERMINATION9 1/4"EXIST'GEXIST'GEXIST'GFIRST FLOOR1'-5"SECOND FLOOR10'-9 1/2"1" GWB LINER PANELSATTACH TO BOTTOM CHORDOF TRUSSES w/ 2" C-RUNNERAS REQUIRED BY GUIDELINES3" MINERAL WOOL BATTINSULATION BOTH SIDES5/8" TYPE 'X' GWB2 x 4 WOOD STUDS @ 16"O.C. (BOTH SIDES)3/4" PLYWOODSEALANT (BOTH SIDES)FINISH FLOORUSG ALUM. BREAKAWAYCLIPS, INSTALL PERMANUF. GUIDELINES1" GWB LINER PANEL(2) 1" C-RUNNERSAT JOINTS9 1/4"ENGINEEREDTRUSSES; TYP.SEALANT (BOTH SIDES)5/8" TYPE 'X' GWBSEALANT (BOTH SIDES)5/8" TYPE 'X' GWB EACH SIDEOF CENTER (2x)TRUSS UPTO ROOF DECK.UL Design No. U3051" GWB LINER PANELENGINEEREDTRUSSES; TYP.1" GWB LINER PANELSATTACH TO BOTTOM CHORDOF TRUSSES w/ 2" C-RUNNERAS REQUIRED BY GUIDELINES3" MINERAL WOOL BATTINSULATION BOTH SIDES5/8" TYPE 'X' GWB2 x 4 WOOD STUDS @ 16"O.C. (BOTH SIDES)SEALANT (BOTH SIDES)USG ALUM. BREAKAWAYCLIPS, INSTALL PERMANUF. GUIDELINES1" GWB LINER PANEL(2) 1" C-RUNNERSAT JOINTS9 1/4"5/8" TYPE 'X' GWB3/4" PLYWOODFINISH FLOOR2X10 FLOOR JOISTSPT SILL PLATE1" C-RUNNER, POWER DRIVENFASTENERS 24" O.C. WITHSEALANT AS REQ'DANCHOR BOLTSBOTH SIDES@ 48" O.C.Date:Project No.Drawn By:Sheet Title:Revisions3 Converse Street Palmer, MA 01069413-283-2553 fax 413-289-8993e-mail: admin@architectural-insights.comAI Proj. #DRAWINGS AND SPECIFICATIONS, as instruments of service, are the exclusiveproperty of this architect whether the project for which they were preparedis executed and constructed or not. These documents are not to be reproducedin any form and they are not to be used by the project owner nor any otherentity on any other projects or for any extensions or additions or alterations tothe original project except by written authorization and permission from andOWNERSHIP OF DOCUMENTS NOTICEagreement with this architect.Checked By:PRINTED:G:\Projects\2020\20-25 Barrett StreetConversion\GarageRecycleBldg(Recovery).rvt3/30/2021 2:50:39 PMSUNWOOD GREEN95 BARRETT STREETNORTHAMPTON, MASSACHUSETTS20-25FLOOR PLAN03/30/2120-25JALA101LETPROPOSED SECOND FLOOR ADDITION FOR: 1/4" = 1'-0"1FIRST FLOOR PLAN02'4' 8'No. Description DatePROGRESSDRAFTED 03-30-2021 1/2" = 1'-0"2FIRE SEPARATION WALL- DETAIL PLAN 1/2" = 1'-0"3FIRE SEPARATION WALL- WALL SECTIONNOTE: SYSTEM TO RUN FROMFOUNDATION TO FIRE RATEDDECK ABOVE. REFLIVINGKITCHENBEDROOMBATH12'-1 3/8"5'-4 1/2"7'-4 1/8"11'-7 3/4"11'-1 1/2"5'-10"16'-11 1/4"11'-2 1/2"10'-9 1/2"30"x80"30"x80"34"x80"BEDROOMBEDROOMCLSTCLSTPANTRYCLREFKITCHENREFLIVINGKITCHENBEDROOM32"x80"REFLIVINGKITCHENBEDROOM32"x80"BATHCLVANITY30"VANITY30"BATHCLVANITY30"CLLIVINGBEDROOMBATH5'-10"16'-11 1/4"11'-7 3/4"11'-1 1/2"11'-4 3/4"11'-9 1/8"11'-1 7/8"11'-5 1/4"11'-2 1/4"11'-8 5/8"5'-5 3/8"7'-7 1/8"5'-10"17'-3 7/8"11'-1 7/8"16'-9 1/2"6'-0 3/4"7'-7 1/2"CLSTCANT.3'-10"CANT.3'-10"REAR DECKCANT.3'-10"32"x80"32"x80"30"x80"6'x12'REAR DECK6'x12'REAR DECK6'x12'32"x80"32"x80"REAR DECK6'x12'28"x80"28"x80"28"x80"28"x80"2A1026'-8" HEAD HEIGHT6'-8" HEAD HEIGHT6'-8" HEAD HEIGHT6'-8" HEAD HEIGHTDNROOF BELOWROOF BELOWROOF BELOWEGRESSLADDEREGRESSLADDEREGRESSLADDEREGRESSLADDERVANITY24"3A102CLSTCLSTCLST6X6 POST6X6 POST6X6 POST6X6 POST6X6 POST6X6 POST6X6 POST4X4 POST2'-6"2'-6"2'-6"2'-6"DNDNDNFIRST FLOOR1'-5"SECOND FLOOR10'-9 1/2"NEW 14" LVLEXISTING WALL FRAMING13'-4 1/4"1/3 CANTILEVER6'-1 1/4"2/3 TOTAL LENGTH12'-2 1/2"3'-7 1/4"2X10 16" O.C.PT 2X10 16" O.C.CLEAR3'-4"FLOOR-TO-FLOOR HEIGHT9'-4 1/2"HEAD HEIGHT8'-0"EXISTING SLAB + FND WALLTRIM DOWN EXIST'G WALL FRAMING FOR LVL2X10 @ 12" o.c., prtd.2X10 @ 12" o.c., prtd.FLOOR FRAMING OVER SLAB.INSULATE CAVITIES CREATED.SECOND FLOOR10'-9 1/2"2X6 CEILING JOISTEXISTING ENGINEEREDTRUSSESFINISHED CLG.7'-11 1/4"(2) 9-1/2" X 1-3/4" LVL4" / 12"TOP OF PLATE7'-11 3/4"FINISHED CLG.8'-8 1/2"TOP OF PLATE8'-9"2X8 RAFTEREXISTING TRUSS CORDBEDROOMLIVING AREAFIRST FLOOR BELOW(NOT SHOWN)Date:Project No.Drawn By:Sheet Title:Revisions3 Converse Street Palmer, MA 01069413-283-2553 fax 413-289-8993e-mail: admin@architectural-insights.comAI Proj. #DRAWINGS AND SPECIFICATIONS, as instruments of service, are the exclusiveproperty of this architect whether the project for which they were preparedis executed and constructed or not. These documents are not to be reproducedin any form and they are not to be used by the project owner nor any otherentity on any other projects or for any extensions or additions or alterations tothe original project except by written authorization and permission from andOWNERSHIP OF DOCUMENTS NOTICEagreement with this architect.Checked By:PRINTED:G:\Projects\2020\20-25 Barrett StreetConversion\GarageRecycleBldg(Recovery).rvt3/30/2021 2:50:41 PMSUNWOOD GREEN95 BARRETT STREETNORTHAMPTON, MASSACHUSETTS20-25SECOND FLOORPLAN + SECTIONS03/30/2120-25JALA102LETPROPOSED SECOND FLOOR ADDITION FOR:No. Description Date 1/4" = 1'-0"1SECOND FLOOR PLAN02'4' 8' 1/2" = 1'-0"2CANTILEVER FRAMING DETAIL01'2' 4' 1/2" = 1'-0"3TRUSS ROOF SECTION01'2' 4'PROGRESSDRAFTED 03-30-2021 13'-0 3/4"11'-11 1/2"6'-1 1/2"6'-0 5/8"4'-0"4'-0"7'-7 1/4"4'-0"6'-0 5/8"13'-3 3/4"6'-1 1/2"13'-3 3/4"6'-1 1/2"4" / 12"4" / 12"7" / 12"7" / 12"5" / 12"7" / 12"4" / 12"4" / 12"6'-1 1/2"NEW SHED ROOFNEW SHED ROOFNEW SHED ROOFNEW SHED ROOFNEW ENTRY ROOFNEW ENTRY ROOFNEW ENTRY ROOF(BELOW)EXISTING ROOFNOTE :EXISTING ROOF TO BE REMOVEDINTACT AND RE-SET ON TOP PLATEOF NEW SECOND FLOORNOTE :EXISTING ROOF TO BE REMOVEDINTACT AND RE-SET ON TOP PLATEOF NEW SECOND FLOOREXISTING ROOF4'-0"FIRE RESISTANTROOF SHEATHINGFIRE RESISTANTROOF SHEATHING4'-0"4'-0"(DECK BELOW)(DECK BELOW)(DECK BELOW)(DECK BELOW)Date:Project No.Drawn By:Sheet Title:Revisions3 Converse Street Palmer, MA 01069413-283-2553 fax 413-289-8993e-mail: admin@architectural-insights.comAI Proj. #DRAWINGS AND SPECIFICATIONS, as instruments of service, are the exclusiveproperty of this architect whether the project for which they were preparedis executed and constructed or not. These documents are not to be reproducedin any form and they are not to be used by the project owner nor any otherentity on any other projects or for any extensions or additions or alterations tothe original project except by written authorization and permission from andOWNERSHIP OF DOCUMENTS NOTICEagreement with this architect.Checked By:PRINTED:G:\Projects\2020\20-25 Barrett StreetConversion\GarageRecycleBldg(Recovery).rvt3/30/2021 2:50:42 PMSUNWOOD GREEN95 BARRETT STREETNORTHAMPTON, MASSACHUSETTS20-25ROOF PLAN03/30/2120-25JALA103LETPROPOSED SECOND FLOOR ADDITION FOR: 1/4" = 1'-0"1ROOF PLANNo. Description Date02'4' 8'PROGRESSDRAFTED 03-30-2021 GRADE1'-0 1/4"TOP OF PLATE19'-6 1/2"FIRST FLOOR1'-5"SECOND FLOOR10'-9 1/2"8'-9"9'-4 1/2"BOARD & BATTENSIDINGHORIZONTALSIDINGBOARD & BATTENSIDING7" / 12"7" / 12"4" / 12"NEW SHED ROOFWALKWAY GUARDRAILGRADE1'-0 1/4"TOP OF PLATE19'-6 1/2"FIRST FLOOR1'-5"SECOND FLOOR10'-9 1/2"8'-9"9'-4 1/2"BOARD & BATTENSIDINGHORIZONTALSIDING4" / 12"4" / 12"7" / 12"7" / 12"NEW SHED ROOFWALKWAY GUARDRAILGRADE1'-0 1/4"TOP OF PLATE19'-6 1/2"FIRST FLOOR1'-5"SECOND FLOOR10'-9 1/2"9'-4 1/2"8'-9"EXISTING ROOFEXISTING ROOFNOTE :EXISTING ROOF TO BE REMOVEDINTACT AND RE-SET ON TOP PLATEOF NEW SECOND FLOORNEW SHED ROOFNEW SHED ROOFNEW SHED ROOFNEW SHED ROOFWALKWAY GUARDRAILWALKWAY GUARDRAILEGRESS LADDEREGRESS LADDEREGRESS LADDEREGRESS LADDERGRADE1'-0 1/4"TOP OF PLATE19'-6 1/2"FIRST FLOOR1'-5"SECOND FLOOR10'-9 1/2"9'-4 1/2"8'-9"5" / 12"EXISTING ROOFEXISTING ROOFEXISTING ROOFEXISTING ROOFNOTE :EXISTING ROOF TO BE REMOVEDINTACT AND RE-SET ON TOP PLATEOF NEW SECOND FLOORBOARD & BATTENSIDINGHORIZONTALSIDINGBOARD & BATTENSIDINGHORIZONTALSIDINGEXISTING ROOFLEVELWALKWAY GUARDRAILWALKWAY GUARDRAILIssue Date:Project No.Drawn By:AI Proj. #DRAWINGS AND SPECIFICATIONS, as instruments of service, are the exclusiveproperty of this architect whether the project for which they were preparedis executed and constructed or not. These documents are not to be reproducedin any form and they are not to be used by the project owner nor any otherentity on any other projects or for any extensions or additions or alterations tothe original project except by written authorization and permission from andOWNERSHIP OF DOCUMENTS NOTICEagreement with this architect.Checked By:Printed on:Sheet Title:3 Converse Street Palmer, MA 01069413-283-2553 fax 413-289-8993e-mail: admin@architectural-insights.comRevisionsG:\Projects\2020\20-25 Barrett StreetConversion\GarageRecycleBldg(Recovery).rvt3/30/2021 2:50:47 PM20-2503/30/2120-25JALA201LETSUNWOOD GREEN95 BARRETT STREETNORTHAMPTON, MASSACHUSETTSEXTERIORELEVATIONSPROPOSED SECOND FLOOR ADDITION FOR: 3/16" = 1'-0"4 EAST ELEVATION 3/16" = 1'-0"3 WEST ELEVATION 3/16" = 1'-0"1 NORTH ELEVATION 3/16" = 1'-0"2 SOUTH ELEVATIONNo. Description DateGARAGE / RECYCLE BUILDINGPROGRESSDRAFTED 03-30-2021 AFFSOFFITGYP. BD.NOTE :INTERIOR / EXTERIOR LIGHTINGFIXTURES TO BE SELECTEDBY OWNERGYP. BD.GYP. BD.GYP. BD.GYP. BD.GYP. BD.GYP. BD.GYP. BD.GYP. BD.GYP. BD.GYP. BD.GYP. BD.GYP. BD.SOFFITSOFFITSOFFITNOTE :INTERIOR / EXTERIOR LIGHTINGFIXTURES TO BE SELECTEDBY OWNER8'-6"8'-6"8'-6"8'-6"8'-6"8'-6"8'-6"8'-6"8'-6"AFF AFFAFFAFFAFFAFF8'-6"8'-6"AFFAFFAFF AFF8'-6"8'-6"AFFAFFSTAIRSTAIRSTAIRSTAIRDECKABOVEDECKABOVEDECKABOVECLOSET(UNDER STAIR)CLOSET(UNDER STAIR)CLOSET(UNDER STAIR)CLOSET(UNDER STAIR)8'-6"8'-6"8'-6"8'-6"8'-6"8'-6"8'-6"8'-6"NEW ENTRY ROOFNEW ENTRY ROOFNEW ENTRY ROOFEXIST'GO.H.DOOREXIST'GO.H.DOOREXIST'GO.H.DOOREXIST'GO.H.DOOREXIST'GO.H.DOORHDSD COSMOKEDETECTOR(TYP.)CARBON MONOXIDEDETECTOR(TYP.)SD COSD COSD COHDHEATDETECTOR(TYP.)HDSDSDSDSDHD HDSMOKEDETECTOR(TYP.)GYP. BD.GYP. BD.GYP. BD.AFFGYP. BD.GYP. BD.GYP. BD.GYP. BD.GYP. BD.7'-11 3/4"AFF8'-0"7'-11 3/4"7'-11 3/4"AFFAFFAFFAFF8'-0"8'-0"AFFAFF8'-0"8'-0"8'-0"AFFAFF8'-0"8'-0"AFFAFFAFF7'-11 3/4"7'-11 3/4"NOTE :INTERIOR / EXTERIOR LIGHTINGFIXTURES TO BE SELECTEDBY OWNERNOTE :INTERIOR / EXTERIOR LIGHTINGFIXTURES TO BE SELECTEDBY OWNERSDSMOKEDETECTOR(TYP.)COCARBON MONOXIDEDETECTOR(TYP.)SDSDCOSDCOSDCOSDSD SDDate:Project No.Drawn By:Sheet Title:Revisions3 Converse Street Palmer, MA 01069413-283-2553 fax 413-289-8993e-mail: admin@architectural-insights.comAI Proj. #DRAWINGS AND SPECIFICATIONS, as instruments of service, are the exclusiveproperty of this architect whether the project for which they were preparedis executed and constructed or not. These documents are not to be reproducedin any form and they are not to be used by the project owner nor any otherentity on any other projects or for any extensions or additions or alterations tothe original project except by written authorization and permission from andOWNERSHIP OF DOCUMENTS NOTICEagreement with this architect.Checked By:PRINTED:G:\Projects\2020\20-25 Barrett StreetConversion\GarageRecycleBldg(Recovery).rvt3/30/2021 2:50:47 PMSUNWOOD GREEN95 BARRETT STREETNORTHAMPTON, MASSACHUSETTS20-25CEILING PLANS03/30/2120-25JALA701LETPROPOSED SECOND FLOOR ADDITION FOR:No. Description Date 1/4" = 1'-0"1FIRST FLOOR REFLECTED CEILING PLAN 1/4" = 1'-0"2SECOND FLOOR PLAN02'4' 8'02'4' 8'