Loading...
03-007 (19) BP-2023-0987 468 COLES MEADOW RD COMMONWEALTH OF MASSACHUSETTS Map:Block:Lot: 03-007-001 CITY OF NORTHAMPTON Permit: Alts Renovations Repair PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) BUILDING PERMIT Permit # BP-2023-0987 PERMISSIO IS HEREBY GRANTED TO: Project# roof and skylights 2023 Contractor: License: PEAK PERFORMAN E EXTERIOR Est. Cost: 75660 HOME IMPROVEM NT null CS-103061 Const.Class: Exp.Date: 09/21/202 CHA, EUNGHEE, TRUSTEE OF JUST FLOW Use Group: Owner: REAL TRUST Lot Size (sq.ft.) PEAK RFORMANCE EXTERIOR HOME Zoning: WSP Applicant: IMPRO MENT Applicant Address Phone: Insurance: 103 UPPER BEVERLY HILLS (413)214-7474 R2WC466879 WEST SPRINGFIELD, MA 01089 ISSUED ON: 07/27/2023 TO PERFORM THE FOLLOWING WORK: STRIP AND REROOF, NEW SKYLIGHTS POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House # Foundation: Final: Final: Final: Rough Frame: Gas: Fire Department Driveway Final: Fireplace/Chimney: Rough: Oil: Insulation: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Signature: ( I b >2 . 1,?soui.5, Fees Paid: S100.00 212 Main Street,Phone(413)587-1240,Fax (413)587-1272 Office of the Building Commissi ner DocuSign Envelope ID:3FA2B59E-000B-4C72-AB2D-A8CFC46F4A24 5,� �i Q)L- Versionl.7 C mmeBuilding Permit May 15, 2000 &.n Department use only City of Northampton Status of Permit: � Building Department Curb Cut/Driveway Permit 0 12 Main Street Sewer/Septic Availability Room 100 Water/Well Availability nFaT 6 (20 N r rthampton, MA 01060 Two Sets of Structural Plans tio�Tygn�N�, ph e 4 -587-1240 Fax 413-587-1272 Plot/Site Plans SUr' Other Specify APPLICATIO' lacCONST- CT, REPAIR, RENOVATE, CHANGE THE USE OR OCCUPANCY OF, OR DEMOLISH ANY BUILDING OTHER THAN A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION 1.1 Property Address: This section to be completed by office Map Lot Unit 468 Coles Meadow Rd, Northampton Zone Overlay District Elm St. District CB District SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: JUST FLOW REALTY TRUST c/o Terna Gilley-Gyado 468 Coles Meadow Rd, Northampton �� Name(Print) CL rrent Mailing Address: 0o s;9 aae 646-812-3067 Telephone 2.2 Authorized Agent: James J. Flannery/Peak Performance Roofing LLC 1 Lovefield St., Easthampton MA 01027 Name(Print) Current Mailing Address: 413-203-5888 (\ari eS f(annen.. Signature Telephone SECTION 3 -ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by permit applicant 1. Building 75660 (a) Building Permit Fee 2. Electrical (b) Estimated Total Cost of Construction from (6) 3. Plumbing Building Permit Fee 4. Mechanical (HVAC) ("1/ 5. Fire Protection 6. Total = (1 + 2 + 3 +4 + 5) 75660 Check Number This Section For Official Use Only Building Permit Number Date 16 -01 Issued Signature: ./,//2 7- Z7- ZD23 Building Commissioner/Inspector of Buildings Date DocuSign Envelope ID:3FA2B59E-000B-4C72-AB2D-A8CFC46F4A24 ACTIVITY DESCRIPTION QTY RATE AMOUNT Total: $75,660 A one-third deposit of$25,220 will secure contract, permitting, material order, and priority scheduling. The balance shall be due upon completion, within 10 days of invoice. Accounts outstanding over 30 days subject to 2%finance charge monthly. TOTAL $7-5i660 00 r—DocuSigned by: IIMNtt,giqu , 7/18/2023 \—960D3ECC8E24470... Accepted By Accepted Date DocuSign Envelope ID: 3FA2B59E-000B-4C72-AB2D-A8CFC46F4A24 Versionl.7 Commercial Building Perrpit May 15, 2000 SECTION 4-CONSTRUCTION SERVICES FOR PROJECTS LESS THAN 35,000 CUBIC FEET OF ENCLOSED SPACE Interior Alterations ❑ Existing Wall Signs ❑ Demolition D Repairs❑ Additions ❑ Accessory Building 0 Exterior Alteration 0 Existing Ground Sign❑ New Signs ❑ Roofing D Change of Use❑ Other ❑ Brief Description STRIP AND REPLACE ROOFS WITH STANDING SEAM METAL ROOFING SYSTEM. REPLACE 3 SKYLIGHTS. Of Proposed Work: SECTION 5-USE GROUP AND CONSTRUCTION TYPE USE GROUP (Check as applicable) CONSTRUCTION TYPE A Assembly A-1 0 A-2 ❑ A-3 ❑ 1A I ❑ A-4 ❑ A-5 ❑ 1 B 0 B Business ❑ 2A ❑ E Educational ❑ 2B 0 F Factory 0 F-1 0 F-2 ❑ 2C 0 H High Hazard ❑ 3A 0 I Institutional 0 1-1 0 1-2 0 1-3 ❑ 3B 0 M Mercantile 0 4 0 R Residential ❑ R-1 0 R-2 0 R-3 ❑ 5A 0 S Storage 0 S-1 ❑ S-2 ❑ 5B 0 U Utility ❑ Specify: M Mixed Use ❑ Specify: _..,. ...... .... . .. . S Special Use ❑ Specify: • COMPLETE THIS SECTION IF EXISTING BUILDING UNDERGOING RENOVATIONS, ADDITIONS AND/OR CHANGE IN USE Existing Use Group: Proposed Use Group: Existing Hazard Index 780 CMR 34): Proposed Hazard Index 780 CMR 34): SECTION 6 BUILDING HEIGHT AND AREA BUILDING AREA EXISTING PROPOSED NEW CONSTRUCTION OFFICE USE ONLY Floor Area per Floor(sf) SI 1st ___.... 2nd rv__ 2nd ... ._..,.,,<...�. m<m..a_.. ,....,. 3d 4th i m__. Total Area (sf) Total Proposed New Construction (sf) Total Height(ft) ,.. ___ Total Height ft 7.Water Supply(M.G.L. c. 40, § 54) 7.1 Flood Zone Information: 7.3 Sewage Disposal System: Public ❑ Private ❑ Zone Outside Flood Zones Municipal ❑ On site disposal systems DocuSign Envelope ID:3FA2B59E-000B-4C72-AB2D-A8CFC46F4A24 Versionl.7 Commercial Building Permit May 15,2000 8. NORTHAMPTON ZONING Existing Proposed Required by Zoning This column to be filled in by Building Department Lot Size Frontage Setbacks Front Side L: R: L: R: Rear Building Height Bldg. Square Footage Open Space Footage (Lot area minus bldg&paved parking) #of Parking Spaces Fill: (volume&Location) A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO X DON'T KNOW YES IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO DON'T KNOW YES1-7 IF YES: enter Book Page and/or Document # B. Does the site contain a brook, body of water or wetlands? NO DON'T KNOW YES 11111 IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained Obtained , Date Issued: C. Do any signs exist on the property? YES NO IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property? YES NO IF YES, describe size, type and location: E. Will the construction activity disturb clearing, gradin excavation, or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES f NO IF YES, then a Northampton Storm Water Management Permit from the DPW is required. DocuSign Envelope ID: 3FA2B59E-000B-4C72-AB2D-A8CFC46F4A24 Versionl.7 Commercial Building Permit May 15,2000 SECTION 9-PROFESSIONAL DESIGN AND CONSTRUCTION SERVICES -FOR BUILDINGS AND STRUCTURES SUBJECT TO CONSTRUCTION CONTROL PURSUANT TO 780 CMR 116(CONTAINING MORE THAN 35,000 C.F. OF ENCLOSED SPACE) 9.1 Registered Architect: • Not Applicable Name(Registrant): Registration Number Address ...... ............... Expiration Date Signature Telephone 9.2 Registered Professional Engineer(s): Name Area of Responsibility Address Registration Number Signature Telephone Expiration Date Name Area of Responsibility ar. Address Registration Number Signature Telephone Expiration Date Name Area of Responsibility Address Registration Number Signature Telephone Expiration Date Name Area of Responsibility Address Registration Number Signature Telephone Expiration Date 9.3 General Contractor Peak Performance Roofing, LLC Not Applicable m Company Name: James J. Flannery Responsible In Charge of Construction 1 Lovefield St., Easthampton, MA 01027 Address fil"""PX16, 413-203-5888 Signature Telephone DocuSign Envelope ID:3FA2B59E-000B-4C72-AB2D-A8CFC46F4A24 Versionl.7 Commercial Building Permit May 15,2000 SECTION 10-STRUCTURAL PEER REVIEW(780 CMR 110.11) Independent Structural Engineering Structural Peer Review Required Yes 1] No 117 SECTION 11 -OWNER AUTHORIZATION -TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT JUST FLOW REALTY TRUST C/O Terna Gilley-Gyado I, .. _d. ;as Owner of the subject property hereby authorize James J. Flannery / Peak Performance Roofing, LLC to act on my behalf, in all matters relative to work authorized by this building permit application. f--oosaaov_ 7/18/2023 4filwit 1.I w w 44,61n. 'S+gnature of Owner Date James J. Flannery / PEAK PERFORMANCE ROOFING LLC , as Owner/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate, to the best of my knowledge and belief. Signed under the pains and penalties of perjury. James J. Flannery Print Name • Larv,,ertj" 7/11/2023 Signature of Owner/Agent Date SECTION 12 -CONSTRUCTION SERVICES 10.1 Licensed Construction Supervisor: Not Applicable ❑ Name of License Holder: James J. Flannery CS-103061 License Number Holyoke, MA 01040 09/21/2024 Address Expiration Date rn aai'"e,s (arrer 413-203-5888 Signature Telephone SECTION 13 -WORKERS' COMPENSATION INSURANCE AFFIDAVIT(M.G.L. c. 152, §25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the bui ing permit. Signed Affidavit Attached Yes No 7 DocuSign Envelope ID: 3FA2B59E-000B-4C72-AB2D-A8CFC46F4A24 The Roofing Process : What to Expect When will my roof be scheduled? Once the contract, deposit, and building permit are all in place, we can proceed with installing your roof. Roofing is hazardous and the safety of our crew is a priority. We must work around the weather forecast; here in New England, this means we can't plan our schedule very far in advance, and can't promise specific installation dates. Long stretches of inclement weather will cause delays. We appreciate your flexibility and patience in our dealings with Mother Nature! Your project manager will contact you a few days before they wish to proceed. Our crews are hardworking and efficient; most residential installations take only 1-2 days to install. Do I need to do anything to prepare? As noted on your contract, we are not responsible for dirt/debris that may fall into the attic. Depending on the condition of the plywood, you may see little to no debris, or it could be more substantial. If you store items in the attic, we recommend covering with plastic sheeting. Do I need to notify my neighbors? If your home is extremely close to other homes or driveways, there's a possibility we may need to be on their property temporarily to lay protection or collect debris. In this case, yes, please notify your neighbors. Otherwise, it is a courtesy. Your neighbors will likely appreciate notification of the noise/traffic. Materials and Dumpster Delivery: The materials and dumpster may arrive the day before the scheduled installation (especially if your installation is taking place on a weekend). Depending on your home's layout and driveway(s), we may need vehicles moved at this point. Parking: On the day of the installation, we ask that you move ALL vehicles out of ALL driveways, and away from the house, to avoid any damage, and for our access. How early will you start? Our crews will begin as early as 7.30am. They will work a long day, often until dark if necessary. We aim to have the installation completed in as few days as possible to minimize disruption to you and your neighbors. Do I need to be home? It's up to you. Some customers like to keep an eye on what's going on. Others would rather not be home because of the noise. Be aware that roofing is loud (banging, nail guns, etc) so you may need to make arrangements for residents, tenants or pets. Please do not plan on outdoor activities while we are working, for safety's sake. Please keep pets inside, or on a leash away from the roofing activities. DocuSign Envelope ID:3FA2B59E-000B-4C72-AB2D-A8CFC46F4A24 What if I have an urgent question? If you have an urgent issue outside of regular office hours, call or text your project manager directly on his cell. Unforeseen Issues: Once we remove the existing roofing, we can inspect the underlying sheathing. Your contract states we will replace a small amount of plywood at no additional cost if needed. If more serious issues are found, the project manager will contact you to explain. There may need to be an upcharge on the final bill, consistent with the per sheet or square foot amount quoted in your estimate. Cleanup: No way around it, roofing is messy work. Rest assured that when the job is done, we will pickup all debris and do magnetic sweeps. Since we may work until dark, the main crew may need to leave before cleaning up, or if the job ends midday, they may leave to start another job. Another staff person will come later or the next day for more cleaning. There are materials left over. Did I get charged for those? Your job is priced according to the measurements. We always bring extra material for the jobsite, just to be safe. You were not charged for those and we will be collecting them. One of our staff will pick up the extra material after the installation crew is gone, usually within 1-2 days. When will the dumpster be removed? The dumpster is usually removed the next business day after the main crew has finished. Weekends or holidays may delay pickup. The dumpster company should check for any debris after removal, but please do a visual check before walking or driving over the area where the dumpster was located. If you see any debris there, please let us know. The job is done but I have concerns, what should I do? Please be aware that even after the main installation crew has left, that doesn't mean our job is done. The project manager will be coming by as soon as possible to do a final inspection, and a staff person will come by to do a final sweep, and pickup leftover items. Depending on our schedule, all of the final touchups, cleaning & pickups are usually completed in about 1-3 days after main installation is complete. If you have any other questions, please let us know. Thank you for choosing Peak Performance Roofing! We will do our very best to make this major home improvement a smooth experience for you! i—acu4q..a ev: aal is(kkuvN,aA, � 7/18/2023 NomE.8E2Cd]0... P E K 1 Lovefield St., Easthampton MA 01027 P E R F O R CE 413-203-5888 M-F 9am-4pm ROOFING peakperformanceroofingllc©gmail.com ACC D® CERTIFICATE OF LIABILITY INSURANCE DATE(MM/DD/YYYY) 07/12/2023 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Adina Edgett,CISR NAME: Alera Group,Inc. PHONE (413)586-0111 FAX (413)586-6481 (A/C,No,Ext): (A/C,No): Webber&Grinnell Division E-MAIL aedgett@webberandgrinnell.com ADDRESS: 8 North King Street INSURER(S)AFFORDING COVERAGE NAIC# Northampton MA 01060 INSURER A: Crum&Forster Specialty/BRECK INSURED INSURER B: Plymouth Rock Assurance 14737 Peak Performance Roofing,LLC INSURER C: WCAR-Berkshire Hathaway GUARD Attn:James Flannery INSURER D: 1 Lovefield Street INSURER E: Easthampton MA 01027 INSURER F: COVERAGES CERTIFICATE NUMBER: Exp 07/24 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. LTRINSR ANSD SUBR WVO POLICY NUMBER POLICY EFF POLICY EXP LIMITS TYPE OF INSURANCE (MM/DD/YYYY) (MM/DD/YYYY) X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 DAMAGE I O RENTED 100,000 CLAIMS-MADE X OCCUR PREMISES(Ea occurrence) $ • MED EXP(Any one person) $ 5.000 A GL0098368/NYR 07/07/2023 07/07/2024 PERSONAL&ADV INJURY $ 1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ 2,000,000 POLICY n JER� n LOC 2,000,000 PRODUCTS-COMP/OPAGG $ OTHER: $ AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ 1,000,000 (Ea accident) ANY AUTO BODILY INJURY(Per person) $ B OWNED SCHEDULED PRC00001007091 06/27/2023 06/27/2024 BODILY INJURY(Per accident) $ AUTOS ONLY X AUTOS X HIRED NON-OWNED PROPERTY DAMAGE $ AUTOS ONLY X AUTOS ONLY (Per accident) Medical payments $ 5,000 UMBRELLA LIAB _ OCCUR EACH OCCURRENCE $ EXCESS LIAB CLAIMS-MADE AGGREGATE $ DED RETENTION $ $ WORKERS COMPENSATION PER OTH- AND EMPLOYERS'LIABILITY STATUTE ER r/N 500,000 C ANY PRO Y N/A R2WC493286 04/27/2023 04/27/2024 E.L.EACH ACCIDENT $ OFFFFICER/MEMBMEMBER EXCLUDED? (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $ 500,000 If yes,describe under 500,000 DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ DESCRIPTION OF OPERATIONS/LOCATIONS I VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space is required) CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE '' ©1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD City of Northampton 212 Main Street, Northampton, MA 01060 Solid Waste Disposal Affidavit In accordance of the provisions of MGL c 40, S54, I acknowledge that as a condition of the building permit all debris resulting from the construction activity governed by this Building Permit shall be disposed of in a properly licensed solid waste disposal facility, as defined by MGL c 111 , S 150A. Address of the work: 468 COLES MEADOW ROAD The debris will be transported by: Aaron's 24/7 Towing and Roll-On The debris will be received by: Valley Recycling Building permit number: Name of Permit Applicant Peak Performance Roofing LLC/James Flannery 7/21/2023 James Flannery Date Signature of Permit Applicant The Commonwealth of Massachusetts Department of Industrial Accidents - Office of investigations 600 Washington Street Boston,MA 02111 www.mass.govidia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name (BusinessfOrganizatiorvindividual): Peak Performance Roofing. LLC 1 Address: Lovefield St. City/State/Zip: Easthampton, MA 01027 Phone#: 413-203-5888 Are y u an employer? Check the appropriate box: Type of project(required): I. am a employer with 4 4. ri I am a general contractor and I 6. ri New constniction employees(full and/or part-time).* have hired the sub-contractors 2.D I am a sole proprietor or partner- listed on the attached sheet. 7. [1 Remodeling ship and have no employees These sub-contractors have Demolition working for me in any capacity_ employees and have workers' 9 uBuilding addition [No workers' comp.insurance comp.insurance.t required.] 5. ri We arc a corporation and its 10.11 Electrical repairs or additions 3.i 11 am a homeowner doing all work officers have exercised their 11.11 Plumbing repairs or additions myself. [No workers comp. right of exemption per MGL 12.[ 'Roof repairs insurance required.] ÷ c. 152.§1(4). and we have no employe-es. [No workers' 13,n Other, comp.insurance required.] An applicant that checks box#1 must also fill out the section below showing their s8orkers'compensation policy information. Homeowners who submit this affidavit indicatimg.they are doing all wort and then hire outside contractors must submit a new affidavit indicating such. 'Contractors that check this box must attached an additional sheet shov,ing the name of the sub-contractors and state whether or not those entities have employees. lithe sub-contractors has c eittplo)ecs,they must preside their workers'comp.policy number. I am an employer that is proPiding workers'compensation insurance for my employees. Below is the policy and job site information. Berkshire Hathaway Guard Insurance Company Name:_ Policy fi or Self-ins.Lie. #: R2WC202869 Expiration Date: 04/27/2024 Job Site Address: 468 COLES MEADOW ROAD cityisiateizipLNORTHAMPT0N, MA Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1500.00 and/or one-year imprisonment,as well as civil penalties in the folio of a STOP WORK ORDER and a fine of up to S250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify under the pains and penalties of perjury that the information provided above is true and correct. Signature: Date: 7/21/2023 413-203-5888 Phone#: - - Official use only. Do not write in this area,to be completed by city or town official. City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/fowl)Clerk 4.Electrical Inspector 5.Plumbing inspector 6.Other if Contact Person: Phone it: • ,j7it;91,- (.50"?,NowetveeZ42I ../(frielate:" /14 erifi, Office of Consumer Affairs and Business Regulation 1000 Washington Street- Suite 710 Boston, Massachusetts 02118 Home Improvement Contractor Registration Type: LLC 183698 PEAK PERFORMANCE ROOFING,LLC, Registration- Expiration 11/93/2023 1 LOVEFIELD ST. EASTHAMPTON,MA 01027 Update Address and Return Card. SCA 1 0 2014.05/17 Offfee of consumer Affairs& uslness Regulation HOME IMPROVEMENT CONTRACTOR Registration valid for individual use only TYPE:LLC before the expiration date. If found return to: Registration EXPIratiort Office of Consumer Affairs and Business Regulation 183698 11103/2023 1000 Washington Street -Suite 710 PEAK PERFORMANCE ROOFING,LLC. Boston,MA 02118 JAMES FLANNERY Qt 1 LOVEFIELD ST. EASTHAMPTON,MA 01027 Undersecret Not valid without signature ary Commonwealth of Massachusetts Division of Occupational Licensure Board of Building Regulations and Standards Ifte Cons rvisor 'e•:f CS-103061 "Ares: 0912112024 JAMES HANN„ LOVERELEiST', •-• EASTHAMPTON MIA=, t- 0 Commissioner DocuSign Envelope ID: 3FA2B59E-000B-4C72-AB2D-A8CFC46F4A24 Peak Performance Roofing LLC 1 Lovefield St. Easthampton, MA 01027 E 14C 413-203-5888 CC /''� /�`' peakperformanceroofingllc@gmail.com P E R T �„/ R ��.r E ROOFING MA HIC #183698 MA CSI_#103061 Terna Tilley-Gyado 468 Coles Meadow Rd. Northampton paznut7@gmail.com 646-812-3067 ST1M.. E D rE 10987 07/11/2023 JOB LOCATION 468 Coles Meadow Rd. Northampto AC i iVi iY DESCRIPTION QTY RATE AMOUNT Metal Commercial DISCLAIMER: The cost of removing and reinstalling 1 75,660.00 75,660.00 the solar is not included. If it is determined prior to the date of the job that we will be involved in this process, we will generate a separate invoice for that service. THIS CONTRACT COVERS BUILDINGS B AND C: (Per customer"We need to hold off on BUILDING A so as to be able to replace the solar system once the work is complete". Peak Performance Roofing will provide the labor and materials to perform the following: SEE #9-#12 FOR IMPORTANT DETAILS 1. Remove the existing roof materials. 2. Inspect the sheathing for any rot or deterioration. Any new plywood necessary will be $60 per sheet installed. Any new roofing boards will be $6 per foot installed. (Wood prices subject to change based on market fluctuations) 3. Install 3' of CertainTeed Winterguard HT (High Temperature) ice & water shield at the eaves, and any applicable valleys. 2' at any applicable transitions/chimneys/skylights. 4. Install synthetic underlayment on all remaining areas of the roof. DocuSign Envelope ID:3FA2B59E-000B-4C72-AB2D-A8CFC46F4A24 ACTIVITY DESCRIPTION QTY RA E AMOUNT 5. Install 24-gauge standing seam metal roof system. 16"wide panels with 1.5" mechanical lock seams. Brand: Sheffield or equal https://sheffieldmetals.com/learning-center/profile/smi- 1-5-mechanical-seam/ COLOR: SIERRA TAN 6. Install additional areas for solar: Clips 18" on center. 7. Ensure the sheathing is cut at the ridge to allow for proper exhaust ventilation. Install vented "z"enclosures and fasten ridge cap to "z" enclosures. https://www.standingseamroofvent.com/roof-vent- products 8. Complete all necessary flashings including new LIFETIME pipe boots and base flashing around chimney. 9. Install Colorgard snow rails on each building in areas over walkways. http://www.metalplusllc.com/documents/metalplus- colorgard-brochure.pdf 10. Remove &dispose of inactive Satellite dishes. 11. Fabricate and install drip edge and a metal panel on each Bird Ledge (see visual). 12. Replace THREE Manual Venting Skylights with matching Units from Velux (see visual). Remove all debris from premises, and throughout the job, continue cleanup and keep the premises undamaged. WE ARE NOT RESPONSIBLE FOR DEBRIS THAT MAY FALL INTO ATTIC/INTERIOR. Please use reasonable caution during the installation process: do not walk or drive under active work or on areas of potential roofing debris. Installations are weather permitting; inclement weather will cause scheduling delays. Peak Performance Roofing LLC will obtain the building permit. Warranty confirmation shall be provided upon final payment. Installation and manufacturer warranties are not in effect until Paid In Full.