Loading...
MorganRev Date Description Project Title Issue Date: Drawn By: Checked By: Project ID: Drawing No. Project North 1 3/3/2023 Schematic Sheet Title Scale: 5/31/2023 JPB JPB 23001 AS NOTED FOR PERMIT - 5/31/2023 This drawing is not intended nor shall it be used for construction purposes unless the Signed professional seal of a registered architect employed by Jody Barker, Architecture & Design, LLC is affixed in the space below. The Architect shall be deemed the author of these documents and shall retain all common law, statutory and other reserved rights, including the copyright.JODY BARKER, A.I.A. | Architecture + Design, LLC32 Willow StreetFlorence, Massachusetts 01062cell: 617.216.5988e: jodybarker.aia@gmail.comProposed Renovations to 31 CAROLYN STREET Northampton, Massachusetts 2 4/10/2023 DD Set 3 5/31/2023 For permit 000 COVER SHEET Proposed Renovations to 31 CAROLYN STREET Northampton, Massachusetts LOCUS MAP DRAWING LIST: EX-1 Existing Floor Plans EX-2 Existing Exterior Elevations A-1 Basement, 1st Floor, & Roof Plans A-2 2nd Floor Plan -- Proposed A-3 2nd Floor Reflected Ceiling Plan -- Proposed A-4 Exterior Elevations A-5 Building Section Rev Date Description Project Title Issue Date: Drawn By: Checked By: Project ID: Drawing No. Project North 1 3/3/2023 Schematic Sheet Title Scale: 5/31/2023 JPB JPB 23001 AS NOTED FOR PERMIT - 5/31/2023 This drawing is not intended nor shall it be used for construction purposes unless the Signed professional seal of a registered architect employed by Jody Barker, Architecture & Design, LLC is affixed in the space below. The Architect shall be deemed the author of these documents and shall retain all common law, statutory and other reserved rights, including the copyright.JODY BARKER, A.I.A. | Architecture + Design, LLC32 Willow StreetFlorence, Massachusetts 01062cell: 617.216.5988e: jodybarker.aia@gmail.comProposed Renovations to 31 CAROLYN STREET Northampton, Massachusetts 2 4/10/2023 DD Set 3 5/31/2023 For permit A-1 BASEMENT, 1st FLOOR & ROOF PLANS chimneystove (heater)W D Basement Plan -- Proposed Scale: 1/8" = 1'-0"1 0 5 10 FT Music Room Mech. Rm. Storage Room Clos.Garage (above) Laundry Bar Breezeway (above)U Clos. New 3-1/2" x 8' lally column, 14,000 lbs. w/ 30"x30"x12" reinforeced concrete footing. Align w/ post @ 1st floor, above. See structural for additional notes.±11'-6 3/4"±16'-9 1/4"EQUAL EQUAL Coordinate modifications in and to the Mechanical Room as required by new utilities w/ HVAC & Plumbing sub-contractors. stove ref. chimney 1st Floor Plan -- Proposed Scale: 1/8" = 1'-0"2 0 5 10 FT Living Room Bath Dining Room Clos.Garage Kitchen Clos.Clos.BreezewayDU Office Modify closets & chimney core as required for new 2nd floor utilities. Coordinate work with HVAC & Plumbing sub-contractors. Install new blocking & structural column in existing stair wall @ 1st floor. See structural drawings for size & information. Align w/ new post @ basement. Roof Plan -- Proposed Scale: 1/8" = 1'-0"3 0 5 10 FT Garage Roof (Below)Breezeway Roof(Below)1'-6 1/2"27'-3"NEW DORMER AT CENTER1'-6 1/2"New architectural asphalt shingles at existing gable ends, each side. Install metal step flashing at joint of gable end and new roof dormer, each side. Install new metal flashing at joint of lower roof & new 2nd floor dormer addition. Install new EPDM roofing at Breezeway roof. Install new white TPO roofing at new 2nd floor dormer addtion. Extend exist. chimney above new dormer as req'd by Code. Install new architectural asphalt shingles at entry porch roof. Install mtl. flash'g. at joint of EPDM & asphalt shingle roofs GENERAL NOTES: Install continuous metal drip edge at all eaves Install min. 3'0" ice & water shield at all eaves & valleys. New roof to be structured to support future solar panels, per Code. Provide conduit to new roof for future solar, per Code. NOTES: PROVIDE MOISTURE RESISTANT WALL BOARD AT ALL WET WALLS. ALL REBAR TO BE GROUNDED PER NFPA-70 AS MODIFIED BY 527 CMR 12.00 & ART 250.52(A)3. 3. ALL INSULATION SHALL BE IN FULL CONTACT WITH THE WARM SIDE. PROVIDE BLOCKING UNDER ALL PARTITIONS RUNNING PARALLEL TO FLOOR JOISTS ALL LIGHTING SHALL BE LED TYPICAL WINDOW HEADER SIZES: SINGLE - (2)2X8 W/ RIGID FOAM INSULATION DOUBLE & TRIPLE - (2)2X10 W/ RIGID FOAM INSULATION GENERAL NOTES *Roof Sheathing: minimum 1/2" thick DOC PS-1 plywood, APA 32/16 nailed. *Wall sheathing: 7/16" thick plywood APA 24/16, blocked and nailed. * Nailing per shall comply with IBC Table 2304.9.1 except where more or larger nailing shown on drawings. * All roof rafters, joists, beams shall be anchored to supports with metal framing anchors. * Provide continuous wall studs each side of wall openings equal to one half or greater of number of studs interrupted by openings. * All wall studs shall be continuous from floor to floor or from floor to roof. * Cross bridge all dimensional lumber roof and floor joists at midspan and provide solid blocking or rim joists at all joist supports and joist ends. * Solid blocking between trusses at bearings. * Metal connectors: Simpson Strong Ties unless otherwise noted, install with number and type of nails to achieve maximum rated capacity. Note that heavy duty and skewed hangers may require special order. * All beams shall be braced against rotation at points of bearing. * Unless otherwise indicated, install two lengths of solid blocking x joist depth x 12 inches long in floor framing under column loads. Columns must have a continuous load path to foundation. * Lead holes for lag bolts shall be 60% to 70% of lag shank diameter in compliance with AITC criteria. * Provide a minimum of one trimmer and one king studs at each end of each header. (U.N.O.) Provide a minimum of (2) King studs at opening widths greater than 4'-0". WALL BRACING NOTES: ALL WALL BRACING SHALL BE IN ACCORDANCE WITH 2015 INTERNATIONAL BUILDING CODE 2308.6 WALL BRACING AND INTERNATIONAL RESIDENTIAL CODE SECTION R602.10 WALL BRACING. MAXIMUM BRACED WALL PANEL SPACING SHALL BE 25' FROM CENTER TO CENTER OF BRACED WALL PANELS PER FIGURE 2308.6.1 MAXIMUM BRACED WALL PANEL END DISTANCE SHALL BE A SUM OF 12'-6" PER FIGURE 2308.6.1 WHERE CONTINUOUS SHEATHING METHOD IS UTILIZED, PROVIDE MINIMUM 24" PANEL CORNER RETURN AT THE END OF EACH BRACED WALL LINE OR A MINIMUM 800 LB HOLD-DOWN IN LIEU OF A CORNER RETURN PER R602.10.2.2.1 AND FIGURE R60210.7 CONTINUOUSLY SHEATHED BRACED WALL PANEL LOCATION AND CORNER CONSTRUCTION MINIMUM BRACED WALL PANEL DIMENSION AT GYPSUM BOARD METHODS SHALL BE 4'-0" PER TABLE R602.10.4 MINIMUM LENGTH REQUIREMENTS FOR BRACED WALL PANELS MINIMUM BRACED WALL PANEL DIMENSION AT CONTINUOUS SHEATHING METHODS SHALL BE 24" ADJACENT TO 64" HEIGHT OPENINGS, 26" ADJACENT TO 68" HEIGHT OPENINGS & 48" ADJACENT TO 96" HEIGHT OPENINGS PER TABLE R602.10.5.2 LENGTH REQUIREMENTS FOR BRACED WALL PANELS WITH CONTINUOUS SHEATHING Rev Date Description Project Title Issue Date: Drawn By: Checked By: Project ID: Drawing No. Project North 1 3/3/2023 Schematic Sheet Title Scale: 5/31/2023 JPB JPB 23001 AS NOTED FOR PERMIT - 5/31/2023 This drawing is not intended nor shall it be used for construction purposes unless the Signed professional seal of a registered architect employed by Jody Barker, Architecture & Design, LLC is affixed in the space below. The Architect shall be deemed the author of these documents and shall retain all common law, statutory and other reserved rights, including the copyright.JODY BARKER, A.I.A. | Architecture + Design, LLC32 Willow StreetFlorence, Massachusetts 01062cell: 617.216.5988e: jodybarker.aia@gmail.comProposed Renovations to 31 CAROLYN STREET Northampton, Massachusetts 2 4/10/2023 DD Set 3 5/31/2023 For permit A-2 2nd FLOOR PLAN -- Proposed clothes rod @ 60" shelf @ 66" clothes rod @ 60" shelf @ 66" clothes rod @ 60" shelf @ 66" chimney D-06 D-05 D-07 D-02 D-01 42"x42" shower 42" vanity D-03 D-04 D Proposed 2nd Floor Plan Scale: 1/4" = 1'-0"1 0 5 10 FT Office / Guest Master Bedroom Closet Garage Roof (Below) Closet Bedroom 2 M. Bath Closet 8'-3 1/2" sloped ceiling, above sloped ceiling, above ex. window ex. window 36x60 DHwindowEGRESS(2) 36x60 DH windowEGRESS27x40 DHwindow±30'-4" (V1'-6 1/2"27'-3" new dormer1'-6 1/2"5'-7 3/4"6'-7 1/2"14'-11 3/4"±3'-9" max. width to allow 6'8" clearance @ stairs below, VIF 24'-2 1/2" 4'-0"16'-2 1/2"4'-0" ±24'-2 1/2" (V 4'-0"16'-2 1/2"4'-0" 3 1/2" 4'-10"1'-8"2'-4" 5 1/2"9'-7"3 1/2"13'-5"5 1/2"±13'-10"±11'-10 1/2"±4 1/2"6'-10 1/2"3 1/2"9'-11"4'-9 1/4"8'-1 1/2"9'-6 1/2"4'-9 3/4"1'-6 1/2"1'-6 1/2"2'-0 1/2"3 1/2"3'-11 1/2"3 1/2"2'-1"3 1/2"1'-9 1/2"ex. wood floor, refinish New wood floor in closet area to match adjacent bedroom flooring. threshold tile floor 1'-6" Existing end wall -- 2x4 w/ masonry veneer to remain, each end of house. EXTERIOR WALL: Clapboard siding to match ex. house 7/16" ZIP sheathing 2x6 @ 16" OC Min. R-28 insulation, per Code Vapor Barrier 1/2" GWB @ interior Door Schedule Nominal Size Door Style Mark Location Width Height Thickness Configuration Comments D-01 Master Bedroom 2'6"6'8"1 1/2"Swing Simple D-02 Master Bath 2'6"6'8"1 1/2"Swing Simple D-03 Closet 2'8"6'8"1 1/2"Bi-fold Simple D-04 Closet 2'8"6'8"1 1/2"Bi-fold Simple D-05 Office / Guest 2'6"6'8"1 1/2"Swing Simple D-06 Bedroom 2 2'6"6'8"1 1/2"Swing Simple D-07 Bedroom 2 2'6"6'8"1 1/2"Swing Simple New low wall, 36" tall, with painted wood cap. ex. wood floor, refinish ex. wood floor, refinish ex. wood floor, refinish refinish treads & risers @ stairs (2) 36x60 DH windowEGRESS27x40 DHwindowTEMPEREDNew wood floor in former attic space match adjacent bedroom flooring. new wd.exist. wd. new wd.exist. wd. new wd.exist. wd. new wd.exist. wd. New wood floor in former attic space match adjacent bedroom flooring. New wood floor in former attic space match adjacent bedroom flooring. 1'-6" WINDOW TYPES Scale: 1/4" = 1'0" GENERAL NOTES: Provide insulated, low-E, argon filled glazing. Provide matching screens for all operable windows. Window glazing to be tempered where indicated on plans & elevations Manufacturer and window construction type to be determined.7'-0" head ht., typ.5'-0"2'-0"sill5'-0"2'-0"3'-4"3'-8"A B C (2) 36x60 DH window factory mulled EGRESS WINDOW (1) Each - Master Bedroom & Bedroom #2 36x60 DH window. EGRESS WINDOW. (1) - Office / Guest Room 27x40 DH window. (1) - Master Bath TEMPERED (1) - Master Bedroom A A B C C 6'-0" 3'-0"3'-0" 3'-0"2'-3" Post down. See structural for add'tl. notes. Structural ridge beam, 2-ply 14" LVL. See structural for add'tl. notes. GENERAL NOTES: GC to coordinate installation of new mini-plit system in Master Bedroom, Office / Guest Room, & Bedroom #2 with HVAC contractor. Install new, supplimental electrical baseboard heating in Master Bath. Rev Date Description Project Title Issue Date: Drawn By: Checked By: Project ID: Drawing No. Project North 1 3/3/2023 Schematic Sheet Title Scale: 5/31/2023 JPB JPB 23001 AS NOTED FOR PERMIT - 5/31/2023 This drawing is not intended nor shall it be used for construction purposes unless the Signed professional seal of a registered architect employed by Jody Barker, Architecture & Design, LLC is affixed in the space below. The Architect shall be deemed the author of these documents and shall retain all common law, statutory and other reserved rights, including the copyright.JODY BARKER, A.I.A. | Architecture + Design, LLC32 Willow StreetFlorence, Massachusetts 01062cell: 617.216.5988e: jodybarker.aia@gmail.comProposed Renovations to 31 CAROLYN STREET Northampton, Massachusetts 2 4/10/2023 DD Set 3 5/31/2023 For permit A-3 2nd FLOOR REFLECTED CEILING PLAN -- Proposed BATHROOM SCONCE, MASTER BATH smoke CO smoke CO smoke CO smoke CO clothes rod @ 60" shelf @ 66" clothes rod @ 60" shelf @ 66" clothes rod @ 60" shelf @ 66" chimney 42"x42" shower 42" vanity D Proposed 2nd Floor Reflected Ceiling Plan Scale: 1/4" = 1'-0"1 0 5 10 FT KEY: LED DOWN LIGHT, DIMMABLE, 3000K TEMP. R.2 S.1 EF LIGHT EXHAUST FAN & LIGHT COMBO UNIT S 3 S D S LIGHT SWITCH 3-WAY LIGHT SWITCH DIMMER LIGHT SWITCH OUTLET 48"OUTLET & MOUNTING HEIGHT A.F.F. GFI OUTLET, GFI OUTLET, 208V CEILING FAN EXH FAN EXHAUST FAN P.1 DECORATIVE SURFACE MOUNT AT STAIRS smoke CO SMOKE & CARBON MONOXIDE DETECTOR HEAT HEAT DETECTOR R.1 LED DOWN LIGHT, DIMMABLE, 3000K TEMP, WET LOCATION keyKEYLESS LIGHT FIXTURE w/ LED LAMP OUTLET, SWITCHEDswitch GENERAL NOTES: Review switching and outlet locations with Owner in field prior to final installation. Provide conduit & location for future solar at roof & attic. Install outlets as directed by Electrical Code. Install additional outlets as indicated on plans and / or as requested by Owner. All lighting to be dimmable, LED, 3000K, unless otherwise noted. EF LIGHT S.1SDP.1 S D S3to 1st floor switch S S GFI48"SD DECORATIVE SURFACE MOUNT AT BEDROOMS P.2 P.2 P.2 P.2 sloped ceilingsloped ceiling ±7'6" A.F.F., low point ±8'10 1/2" A.F.F., high point ±7'6" A.F.F., low point Rev Date Description Project Title Issue Date: Drawn By: Checked By: Project ID: Drawing No. Project North 1 3/3/2023 Schematic Sheet Title Scale: 5/31/2023 JPB JPB 23001 AS NOTED FOR PERMIT - 5/31/2023 This drawing is not intended nor shall it be used for construction purposes unless the Signed professional seal of a registered architect employed by Jody Barker, Architecture & Design, LLC is affixed in the space below. The Architect shall be deemed the author of these documents and shall retain all common law, statutory and other reserved rights, including the copyright.JODY BARKER, A.I.A. | Architecture + Design, LLC32 Willow StreetFlorence, Massachusetts 01062cell: 617.216.5988e: jodybarker.aia@gmail.comProposed Renovations to 31 CAROLYN STREET Northampton, Massachusetts 2 4/10/2023 DD Set 3 5/31/2023 For permit A-4 EXTERIOR ELEVATIONS Proposed Front Elevation (Plan North) Scale: 1/8" = 1'-0"1 0 5 10 FTvaries8'-4 1/2"±8'-10 1/2"7'-4 1/2"2nd flr. ceiling, low 2nd flr. 1st flr. 1st flr. ceiling Approx. grade 2nd flr. ceiling, high ±7'-5"ex.ex.ex.ex. New TPO roof at new dormer. Color: "White" New architectural asphalt shingles at gable ends Existing masonry veneer to remain. New vinyl clapboard siding at dormer, typical Step flashing at wall to roof joint, typ. Extend existing chimney above new dormer as req'd. by Code. A Aegressegressegress egressProposed Side Elevation (Plan East) Scale: 1/8" = 1'-0"2 0 5 10 FTvaries8'-4 1/2"±8'-10 1/2"7'-4 1/2"2nd flr. ceiling, low 2nd flr. 1st flr. 1st flr. ceiling Approx. grade 2nd flr. ceiling, high ±7'-5"ex.ex. ex. ex.New arch. asphalt shingles at gable ends Existing masonry veneer to remain. New vinyl clapboard siding at dormer, typical Step flashing at wall to roof joint, typ. Extend existing chimney above new dormer as req'd. by Code. ex. New metal flashing at roof / chimney joint, min 8" New EPDM roof at breezeway Proposed Rear Elevation (Partial South) Scale: 1/8" = 1'-0"3 0 5 10 FT B CC varies8'-4 1/2"±8'-10 1/2"7'-4 1/2"2nd flr. ceiling, low 2nd flr. 1st flr. 1st flr. ceiling Approx. grade 2nd flr. ceiling, high ±7'-5"ex. New TPO roof at new dormer. Color: "White" New metal roofing at gable ends Existing masonry veneer to remain. New vinyl clapboard siding at dormer, typical Step flashing at wall to roof joint, typ. Extend existing chimney above new dormer as req'd. by Code.temperedegressInstall metal flashing at chimney / roof joint, min 8" high. Proposed Side Elevation (Plan West) Scale: 1/8" = 1'-0"4 0 5 10 FTvaries8'-4 1/2"±8'-10 1/2"7'-4 1/2"2nd flr. ceiling, low 2nd flr. 1st flr. 1st flr. ceiling Approx. grade 2nd flr. ceiling, high ±7'-5"ex. ex. ex. ex.New arch. asphalt shingles at gable ends Existing masonry veneer to remain. New vinyl clapboard siding at dormer, typical Step flashing at wall to roof joint, typ. Extend existing chimney above new dormer as req'd. by Code. ex. New arch. asphalt shingles at porch entry roof New metal flashing at roof / chimney joint, min 8" New EPDM roof at breezeway Rev Date Description Project Title Issue Date: Drawn By: Checked By: Project ID: Drawing No. Project North 1 3/3/2023 Schematic Sheet Title Scale: 5/31/2023 JPB JPB 23001 AS NOTED FOR PERMIT - 5/31/2023 This drawing is not intended nor shall it be used for construction purposes unless the Signed professional seal of a registered architect employed by Jody Barker, Architecture & Design, LLC is affixed in the space below. The Architect shall be deemed the author of these documents and shall retain all common law, statutory and other reserved rights, including the copyright.JODY BARKER, A.I.A. | Architecture + Design, LLC32 Willow StreetFlorence, Massachusetts 01062cell: 617.216.5988e: jodybarker.aia@gmail.comProposed Renovations to 31 CAROLYN STREET Northampton, Massachusetts 2 4/10/2023 DD Set 3 5/31/2023 For permit A-5 BUILDING SECTION Building Section at Master Bedroom Scale: 1/2" = 1'-0"1 0 1 2 3 4 5 FT±.8'-4 1/2"7'-6"varies±.7'-4 1/2"±.1'-0"top of wall 2nd floor 1st floor ceiling 1st floor DINING ROOM KITCHEN BASEMENT±7'-5" low point ceiling±8'-10 1/2" high point ceilingexisting wood framing to remain Hardwood floor (exisitng & new?) 3/4" plywood subfloor (existing or new?) Line of existing roof 1/2" GWB at ceiling on 3/4" shims TPO roof at new dormer 5/8" ZIP sheathing 2x12 @ 16" OC Min. R60 insulation at roof per Code NOTE: Install min. 3'0" ice & water shield at all eaves and valleys 12 1.75 2'-0" sill(no tempered glass)5'-0"Breezeway roof BREEZEWAY Clad wood window with insulated glazing. Low-E, argon filled. Provide matching full window screen. Air seal at perimeter of windows, typical Flashing at window head and top of window trim EXTERIOR WALL Clapboard siding 1/2" ZIP sheathing 2x6 @ 16" OC Min. R20 insulation per Code Vapor barrier 1/2" GWB at interior grade (varies) 2-ply 14" LVL at ridge -- see strucural Metal drip edge @ all eaves Metal flashing at breezeway roof and dormer wall joint Rev Date Description Project Title Issue Date: Drawn By: Checked By: Project ID: Drawing No. Project North 1 3/3/2023 Schematic Sheet Title Scale: 5/31/2023 JPB JPB 23001 AS NOTED FOR PERMIT - 5/31/2023 This drawing is not intended nor shall it be used for construction purposes unless the Signed professional seal of a registered architect employed by Jody Barker, Architecture & Design, LLC is affixed in the space below. The Architect shall be deemed the author of these documents and shall retain all common law, statutory and other reserved rights, including the copyright.JODY BARKER, A.I.A. | Architecture + Design, LLC32 Willow StreetFlorence, Massachusetts 01062cell: 617.216.5988e: jodybarker.aia@gmail.comProposed Renovations to 31 CAROLYN STREET Northampton, Massachusetts 2 4/10/2023 DD Set 3 5/31/2023 For permit EX-1 EXISTING FLOOR PLANS chimneystove (heater)W D Existing Basement Scale: 1/8" = 1'-0"0 0 5 10 FT Music Room Mech. Rm. Storage Room Clos.Garage (above) Laundry Bar Breezeway (above)U Clos. Demolition / modification as required in Mechanical Room space for new plumbing to 2nd floor bath. Coordinate w/ HVAC & Plumbing sub-contractors. Demolition / modification as required for new column & concrete footing -- see sheet A2 & structural.stove ref. chimney Existing 1st Floor Plan Scale: 1/8" = 1'-0"1 0 5 10 FT Living Room Bath Dining Room Clos.Garage Kitchen Clos.Clos.BreezewayDU Office Existing stairs to second floor to remain. Refinish. Modify existing closets as required for plumbing to new Master Bath @ 2nd floor. Coordinate w/ HVAC & Plumbing sub-contractors. Demolition / modification as required for new column -- see structural. Line of existing beam, above chimney Existing 2nd Floor Plan Scale: 1/8" = 1'-0"2 0 5 10 FT Bedroom Bedroom Clos. Clos. Clos. Clos. Clos. Garage Roof (Below)built-inatticatticatticatticatticBreezeway Roof(Below)Existing end gable to remain, ea. side. Ex. wood flooring to remain. Protect & refinish. Piece in / match new wood floor to match in damaged and expanded finish floor areas. Ex. wood flooring to remain. Protect & refinish. Piece in / match new wood floor to match in damaged and expanded finish floor areas. Existing chimney to remain. Prep as req'd to extend above new raised roofline. Ex. stair to remain. Refinish. Demo / modify existing breezeway roof as required by construction of new 2nd floor dormer. General note: demo existing walls and built-ins at 2nd floor. Salvage doors for possible re-use. Rev Date Description Project Title Issue Date: Drawn By: Checked By: Project ID: Drawing No. Project North 1 3/3/2023 Schematic Sheet Title Scale: 5/31/2023 JPB JPB 23001 AS NOTED FOR PERMIT - 5/31/2023 This drawing is not intended nor shall it be used for construction purposes unless the Signed professional seal of a registered architect employed by Jody Barker, Architecture & Design, LLC is affixed in the space below. The Architect shall be deemed the author of these documents and shall retain all common law, statutory and other reserved rights, including the copyright.JODY BARKER, A.I.A. | Architecture + Design, LLC32 Willow StreetFlorence, Massachusetts 01062cell: 617.216.5988e: jodybarker.aia@gmail.comProposed Renovations to 31 CAROLYN STREET Northampton, Massachusetts 2 4/10/2023 DD Set 3 5/31/2023 For permit EX-2 EXISTING EXTERIOR ELEVATIONS Existing Front Elevation (Plan North) Scale: 1/8" = 1'-0"1 0 5 10 FTvaries8'-4 1/2"6'-8"7'-4 1/2"2nd flr. ceiling 2nd flr. 1st flr. 1st flr. ceiling Approx. grade ±2'-0"±2'-0" Demo roof, dormers, & associated materials as required for construction of new 2nd floor spaces. Existing veneer to remain at 1st floor End gables to remain, ea. side. Support during construction of new 2nd floor spaces. Existing Side Elevation (Plan East) Scale: 1/8" = 1'-0"2 0 5 10 FT Demo roof, dormers, & associated materials as required for construction of new 2nd floor spaces. Existing veneer to remain at 1st floor & gable. End gables to remain, ea. side. Support during construction of new 2nd floor spaces. Extend existing chimney to remain as required to clear new 2nd floor roof line. Modify breezeway roof as required for construction of new 2nd floor spaces. Existing Rear Elevation (Partial South) Scale: 1/8" = 1'-0"3 0 5 10 FT Demo roof, dormers, & associated materials as required for construction of new 2nd floor spaces. Existing veneer to remain at 1st floor End gables to remain, ea. side. Support during construction of new 2nd floor spaces. Extend existing chimney to remain as required to clear new 2nd floor roof line. Modify breezeway roof as required for construction of new 2nd floor spaces. Existing Side Elevation (Plan West) Scale: 1/8" = 1'-0"4 0 5 10 FT Demo roof, dormers, & associated materials as required for construction of new 2nd floor spaces. Existing veneer to remain at 1st floor & gable. End gables to remain, ea. side. Support during construction of new 2nd floor spaces. Extend existing chimney to remain as required to clear new 2nd floor roof line. Modify breezeway roof as required for construction of new 2nd floor spaces. Hd1Hd1C1 C2 C2 BM1-2 BM1-2H2H2BM1RJ2 RJ1 RJ1 RJ1RJ1RJ2RJ2RJ124' 2 1/2"30' 4"17' 9"12' 7"Revisions:By: Products PlotID Net Qty Product Length Plies BM1-2 4 1-3/4" x 7-1/4" VERSA-LAM® LVL 2.1E 3100 SP 4' 0" 2 BM1 2 1-3/4" x 14" VERSA-LAM® LVL 2.1E 3100 SP 32' 0" 2 RJ1 8 2x12 SPF No.2 16' 0" 1 RJ2 44 2x12 SPF No.2 14' 0" 1 C1 1 3-1/2" x 5-1/4" VERSA-LAM® LVL 1.8E 2650 SP 10' 0" 1 C2 2 4x4 DF No.2 4' 0" 1 Wall Framing PlotID Net Qty Product Length Plies Hd1 4 2x10 SPF No.2 7' 0" 2 Accessories PlotID Net Qty Product Length Plies 31 5/8" Plywood or OSB (19/32" APA Rated Sheathing 40/20 Exposure 1) 1 Hangers PlotID Qty Manuf Product Flange H2 8 LRU212Z Reverse H3 44 LRU212Z None Sheet: 3/3 DWG: Job # By: Doug Hodgins Date: Date Scale: 1/4" = 1'-0" BC FRAMERPLANS BASEDON ARCHITECTURALSET DATED 0/0/00NOTE:ALL MEASUREMENTSTO BE VERIFIEDIN THE FIELD. ROOF FRAMING PLAN 2X12 @ 16"O.C.SALES PRESENTATION DRAWINGThis placing plan is provided as a courtesy to the Builder. Itisintended to indicate product selection and placement. Nostructural or dimensional check has been made with the designdrawings of the building. It is the responsibility of the Customerto review and approve all bearing conditions, connections,spans, loading, product usages, and quantities. This drawinghas not been checked by Boise Cascade Engineering.CustomerCustomer Contact31Carorlyn StStreet TBDNorthampton , Ma ***FOR REVIEW *** VERIFY ALL CHECKED ITEMS PRIOR TO ORDERING Please call with any questions or concerns (800) 832-8089 Beam sizes changed from specification Steel or flitch beams by others required Flush beams deeper than floor joists Verify Post and or column locations Posts added (see notes on plan) X Verify joists and beam lengths X Critical dimensions have been scaled Verify framing at fireplace Verify framing at stairwell Joist depth changed Joist direction changed Joist series changed Joist spacing changed Beams added for structural reasons Mid span bridging recommended Verify design criteria Note high deflection Connection by others req'd Additional information required to complete joist layout X Shop drawing is an estimate only, not for construction Based on truss roof system Signature:_____________________ Date:_________________ Company:______________________________ against top flange with 1/8" Boise Rim Board Web Stiffener for 14" & 16" joists. 5 - 3" (10d) nails gap between bottom flange 1/8" Stiffeners are required on both sides - Hangers with side nailing. - Any hanger with sides not containing the top flange with 3 - 3" (10d) - Web stiffener nailed of the joist. 11 7/8" joists, and nails for 9 1/2" and of the web when : Point Load from above > 1000 lbs. Install web stiffeners tight For Point Load from above: F16-E F16-E Web Stiffeners DO NOT Cut Flanges DN01 cut, notch or drill flangesDO NOTDN01 See Note 3 End Bearing 1/3 Span Intermediate Bearing 1/3 Depth NOTES: 1. Square and rectangular holes are NOT permitted. 2. Round holes may be drilled or cut with a hole saw anywhere within the hatched area of the beam. 3. The horizontal distance between adjacent holes must be at least two times the diameter of the larger hole. 4. Do not drill more than three access holes in any four foot long section of beam. 5. The maximum round hole diameter permitted is: 6. These limitations apply to holes drilled for plumbing or wiring access only. The size and location of holes drilled for fasteners are governed by the provisions of the National Design Specification® for Wood Construction. 7. Beams deflect under load. Size holes to provide clearance where required. 8. This hole chart is valid for beams supporting uniform load only. For beams supporting concentrated loads or for beams with larger holes, contact Boise® EWP Engineering. Beam Depth Maximum Hole Diameter 5 1/2" 7 1/4" 9 1/4" + 3/4" 1" 2" 1/3 Span 1/3 Depth 1/3 Depth Allowable Holes in VERSA-LAM BeamsLVL-AH ® LVL-AH LVL Allowable Holes Diagram OJ-A Joist Offset for Plumbing Boise I-Joist can be offset up to 3" to avoid vertical plumbing. Joist 3" max CL Joist 3" max CL OJ-A Note: Sheathing shall not span greater than rating I-Joist Reinforced Cantilever F21 BCI joist23/32" min. plywood/OSB plywood/OSB rated with 8d nail into each flange. sheathing reinforcement. 23/32" min. deeper joists. each side with 18" and Web stiffener required or rimboard closure. Nail 2 '0 " 2 '0 " cantilever required for blocking block Backer ®F21 points & at each end of blocking require web stiffeners at bearing Note: 18" and 20" depth joists Boise joist blocking vertical load capacity. See Boise literature for joist blockingF01 Joist Blocking at End Bearing F01 Stagger nails from both and by 25% for non - snow load roofs where building code allows. Nail values may be increased by 15% for snow load roofs Nail pattern for 3 - piece member must occur on both sides. 2" min. See chart 16d sinker nails Double & Triple 1-3/4" Versa-Lam ( a ) 12" o.c. sides to avoid splitting. 3 ( a )350 525 Max. Uniform Load Nail Pattern Members Number of 2 Side Loaded Connection ( lbs. per In. ft. ) 2 rows 470 3 rows 705 ®B12-A B12-A Multiple VL Connection Side Load Nail F08 Post Load Transfer Solid block all posts from above to bearing below. See Boise literature for Nail Boise Rimboard nail into each flange. to BCI joist with 8d B o is e R im b o a rd vertical load capacity. ® F07 F07 Rim Joist Perpandicular Scan with your smart phone or visit: Boise Cascade EWP Install guides: https://www.bc.com/manufacturing/?ctp=ew Boise Cascade EWP Continuing Education: https://boisecascade.buildingmedia.com/ EWP Guides Continuing Education