Loading...
4 NORTH MAIN ST 4 NORTH MAIN ST WB-2023-0083 Map:Block:Lot: COMMONWEALTH OF M SSACHUSETTS 340010J000000540 Permit: Alts Renovations TOWN OF WILLI SBURG Repair Williamsburg PERSONS CONTRACTING WITH UNREGI TERED CONTRACTORS DO NOT HAVE ACCESS TO THE GUARA TY FUND (MGL c.142A) BUILDING PERMIT Permit# WB-2023-0083 PERMISSION S HEREBY GRANTED TO: Project# ROOF 2023 Contractor: License: PEAK.PERFORMAN U E ROOFING Est. Cost: 49130 LLC CS-103061 Const.Class: Exp.Date: 09/21/202' Use Group: Owner: Lot Size (sq.ft.) Zoning: Applicant: PEAK P RFORMANCE ROOFING LLC Applicant Address Phone: Insurance: 1 LOVEFIELD ST 413-203-5888 R2WC342657 EASTHAMPTON, MA 01027 ISSUED ON: 07/20/2023 TO PERFORM THE FOLLOWING WORK: STRIP AND REROOF POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: el • >2 . II Fees Paid: $70.00 212 Main Street,Phone(413)587-1240,Fax: 1413)587-1272 Louis Hasbrouck—Building Commis.ioner DocuSign Envelope ID:748E6439-0D15-4388-A6DF-F03D78D29B1 04/(,&dif 9Z(N The Commonwealth of Mas:ach etts✓G Vik/ TOWN of WILLIAM ; 10 �0 c' Massachusetts State Building Code( 80 CMR) 4 ition Building Permit Application for any Building other than a O • „st o-Fam<Dw ling (This Section For Official Use Only) 04, tis Building Permit Number:2 r3 g3 Date Applied: Building Inspector: 47,/� ri SECTION 1:LOCATION(Please indicate Block#and Lot#for locations for which a street address o}ava'.able) 4 N Main St. Williamsburg 01096 Fir on•re•ational h.r . No.and Street City/Town Zip Code Name of Building(if applicable) SECTION 2:PROPOSED WORK If New Construction check here 0 or check all that apply in the two rows below Existing Building 0 Renovation Of Alteration 0 Addition 0 Demolition 0 (Please fill out and submit Appendix 1) Change of Use 0 Change of Occupancy 0 Other OiSpecify: roofing Are building plans and/or construction documents being supplied as part of the permit application? Yes 0 No 0 Is an Independent Structural Engineering Peer Review required? Yes 0 No 0 Brief Description of Proposed Work: Strip and replace asphalt roof. SECTION 3:COMPLETE THIS SECTION IF EXISTING BUILDING UNDERGOING RENOVATION,ADDITION,OR CHANGE IN USE OR OCCUPANCY Check here if an Existing Building Evaluation is enclosed(See 780 CMR 3402.0, 0 Existing Use Group(s): Proposed Use Group(s): Existing Hazard Index 780 CMR 34: Proposed Hazard Index 780 CMR 34: SECTION 4:BUILDING HEIGHT AND AREA Existing Proposed No.of Floors/Stories(include basement levels)&Area Per Floor(sq.ft.) Total Area(sq.ft.)and Total Height(ft.) SECTION 5:USE GROUP(Check as applicable) A: Assembly A-1 0 A-2r 0 A-2nc 0 A-3 0 A-4 0 A-5 0 B: Business 0 E: Educational 0 F: Factory F-1 0 F2❑ H: High Hazard H-1 0 H-2 0 H-3 0 H-4 0 H-5 0 I: Institutional I-1 0 I-2❑ I-3 0 I-4 0 M: Mercantile 0 R: 1 esidential R-10 R-2 0 R-3 0 R-4 0 S: Storage S-1 0 S-2 0 U: Utility 0 Spe al Use 0 and please describe below: Special Use: SECTION 6:CONSTRUCTION TYPE(Check as applicable) IA 0 IB ❑ IIA ❑ IIB 0 IIIA ❑ IIIB ❑ IV 0 VA 0 VB 0 SECTION 7:SITE INFORMATION(refer to 780 CMR 111.0 for details on each item) Water Supply: Flood Zone Information: Sewage Disposal: Trench Permit Debris Removal: Public 0 Check if outside Flood Zone CIIndicate municipal 0 A trench will not be Licensed Disposal Site 0 d Private 0 or indentify Zone: or on site system 0 ae i t i 0 or trench or specify: perr mit is enclosed 0 _ Railroad right-of-way: Hazards to Air Navigation: MA Historic Commission Review Process: Not Applicable 0 Is Structure within airport approach area? Is their review completed? or Consent to Build enclosed 0 Yes 0 or No 0 Yes 0 No 0 SECTION 8:CONTENT OF CERTIFICATE OF OCCUPANCY Edition of Code: Use Group(s): Type of Construction: Occupant Load per Floor: Does the building contain an Sprinkler System?: Special Stipulations: DocuSign Envelope ID:748E6439-0D15-4388-A6DF-F03D78D29B1 E ACTIVITY DESCRIPTION OTY RATE AMOUNT 8. Complete all necessary(lashings including new LIFETIME pipe boots and base flashing around chimney. Remove all debris from premises, and throughout the job, continue cleanup and keep the premises undamaged. WE ARE NOT RESPONSIBLE FOR DEBRIS THAT MAY FALL INTO ATTIC/INTERIOR. Please use reasonable caution during the installation process: do not walk or drive under active work or on areas of potential roofing debris. Installations are weather permitting; inclement weather will cause scheduling delays. Peak Performance Roofing LLC will obtain the building permit. Warranty confirmation shall be provided upon final payment. Installation and manufacturer warranties are not in effect until Paid In Full. Includes CertainTeed Lifetime Limited Warranty (Transferable) with 10 year SureStart period. https://www.certainteed.com/resources/Asphalt_Warranty CTR3782 1912 E.pdf AREA 1=$19,450 AREA 2=$29,680 TOTAL: $49,130 A one-third deposit of $16,376 will secure contract, permitting, material order, and priority scheduling. The balance shall be due upon completion, within 10 days of invoice. Accounts outstanding over 30 days subject to 2%finance charge monthly. TOTAL $49,130_00 DocuSIgned by: UVU/. (PGSt 6/30/2023 —9DFF39CD32EC4D8 Accepted By ... Accepted Date DocuSign Envelope ID:748E6439-0D15-4388-A6DF-F03D78D29B1E SECTION 9: PROPERTY OWNER AUTHORIZATION Name and Address of Property Owner First Congregational Church 4 North Main St. Wil iamsburg 01096 Name(Print) No.and Street City/ own Zip Property Owner Contact Information: do Linda West - - 413522-45 5 burgychurch a(�gmail.com Title Telephone No.(business) Telephone . (cell) e-mail address If applicable,the property owner hereby authorizes James J._Flannery 1 Lovefield St. E tham ton MA 01027 Name Street Address C ty/Town State Zip to act on the property owner's behalf,in all matters relative to work authorized by this building permit application. SECTION 10:CONSTRUCTION CONTROL(Please fill out Appendix 2) (If building is less than 35,000 cu.ft.of enclosed space and/or not under Construction Control then check here Mand skip Section 10.1) 10.1 Registered Professional Responsible for Construction Control Name(Registrant) Telephone No. e-mail address Registration Number Street Address City/Town State Zip Discipline Expiration Date 10.2 General Contractor Peak Performance Roofing LLC Company Name: James J. Flannery CS-103061 Unrestricted Exp. 09/21/2024 Name of Person Responsible for Construction License No. and Type if Applicable 1 Lovefield St. Easthampton MA 01027 Street Address City/Town State Zip 413-203-5888 508 294-4052 PeakPerformanceRoofingLLCc cjmail.com Telephone No.(business) Telephone No. (cell) e-mail address SECTION 11:WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152.§ 25C(6)) A Workers'Compensation Insurance Affidavit from the MA Department of Industrial Accidents must be completed and submitted with this application. Failure to provide this affidavit will result ir the denial of the' suance of the building permit. Is a signed Affidavit submitted with this application? Yes g No ❑ SECTION 12:CONSTRUCTION COSTS AND PERMIT FEE Item Estimated Costs:(Labor and Materials) Total Conrtr tion Cost(from Item 6)=$ 1.Building $ 49130 Building Permit Fee=Total Constructio• "i st x r.ert here 2.Electrical $ appr priate municipal fact,r) `:7 . 3.Plumbing $ 4.Mechanical (HVAC) $ Note:M' ' um fee=$ (conta municipality) 5.Mechanical (Other) $ Enclose check ayable to 6.Total Cost $ 49130 (contact municipa ity)and write check number here "4 - - SECTION 13:SIGNATURE OF BUILDING PERMIT APPLICANT By entering my name below,I hereby attest under the pains and penalties of perjury that all of the information contained in this application is true and accurate to the best of my knowledge and understandin . James J. Flannery cam ffannerit Contract r 413.203-5888 6/21/2023 Please print and sign name Title Telephone No. Date 1 Lovefield St. Easthampton MA 01027 Street Address City/Town State Zip e. Municipal Inspector to fill out this section upon application approval: ______/ -7-)61-ZOZ3 Name Date DocuSign Envelope ID:748E6439-0D15-4388-A6DF-F03D78D29B1E Appendix 1 For the demolition of structures the building code requires action on service connections. CHECK IF NOT APPLICABLE 780 CMR 112.0 DEMOLITION OF STRUCTURES 112.1 Service Connections. Before a building or structure is demolished or removed, the owner or agent shall notify all utilities having service connections within the structure such as water, electric, gas, sewer and other connections. A permit to demolish or remove a building or structure shall not be issued until a release is obtained from the utilities, stating that their respective service connections and appurtenant equipment, such as meters and regulators, have been removed or sealed and plugged in a safe manner. All debris shall be disposed of in accordance with 780 CMR 111.5. Please fill in the information below and submit this appendix with the building permit application. The building permit applicant attests under the pains and penalties of perjury that the following is true and accurate. Property Location (Please indicate Block # and Lot # for locations for which a street address is not available) No. and Street City/Town Zip Name of Building(if applicable) For the above described property the following action was taken: Water Shut Off? Yes 0 No 0 Provider notified and Release obtained? Yes 0 No 0 Gas Shut Off? Yes 0 No 0 Provider notified and Release obtained? Yes 0 No 0 Electricity Shut Off? Yes 0 No 0 Provider notified and Release obtained? Yes 0 No 0 Yes 0 No 0 Provider notified and Release obtained? Yes 0 No 0 Other (if applicable) Yes 0 No 0 Provider notified and Release obtained? Yes 0 No 0 Other(if applicable) DocuSign Envelope ID:748E6439-0D15-4388-A6DF-F03D78D29B1 E The Roofing Process : What to Expect When will my roof be scheduled? Once the contract, deposit, and building permit are all in place, we can proceed with installing your roof. Roofing is hazardous and the safety of our crew is a priority. We must work around the weather forecast; here in New England, this means we can't plan our schedule very far in advance, and can't promise specific installation dates. Long stretches of inclement weather will cause delays. We appreciate your flexibility and patience in our dealings with Mother Nature! Your project manager will contact you a few days before they wish to proceed. Our crews are hardworking and efficient; most residential installations take only 1-2 days to install. Do I need to do anything to prepare? As noted on your contract, we are not responsible for dirt/debris that may fall into the attic. Depending on the condition of the plywood, you may see little to no debris, or it could be more substantial. If you store items in the attic, we recommend covering with plastic sheeting. Do I need to notify my neighbors? If your home is extremely close to other homes or driveways, there's a possibility we may need to be on their property temporarily to lay protection or collect debris. In this case, yes, please notify your neighbors. Otherwise, it is a courtesy. Your neighbors will likely appreciate notification of the noise/traffic. Materials and Dumpster Delivery: The materials and dumpster may arrive the day before the scheduled installation (especially if your installation is taking place on a weekend). Depending on your home's layout and driveway(s), we may need vehicles moved at this point. Parking: On the day of the installation, we ask that you move ALL vehicles out of ALL driveways, and away from the house, to avoid any damage, and for our access. How early will you start? Our crews will begin as early as 7.30am. They will work a long day, often until dark if necessary. We aim to have the installation completed in as few days as possible to minimize disruption to you and your neighbors. Do I need to be home? It's up to you. Some customers like to keep an eye on what's going on. Others would rather not be home because of the noise. Be aware that roofing is loud (banging, nail guns, etc) so you may need to make arrangements for residents, tenants or pets. Please do not plan on outdoor activities while we are working, for safety's sake. Please keep pets inside, or on a leash away from the roofing activities. DocuSign Envelope ID:748E6439-0D15-4388-A6DF-F03D78D29B1 E What if I have an urgent question? If you have an urgent issue outside of regular office hours, call or text your project manager directly on his cell. Unforeseen Issues: Once we remove the existing roofing, we can inspect the underlying sheathing. Your contract states we will replace a small amount of plywood at no additional cost if needed. If more serious issues are found, the project manager will contact you to explain. There may need to be an upcharge on the final bill, consistent with the per sheet or square foot amount quoted in your estimate. Cleanup: No way around it, roofing is messy work. Rest assured that when the job is done, we will pickup all debris and do magnetic sweeps. Since we may work until dark, the main crew may need to leave before cleaning up, or if the job ends midday, they may leave to start another job. Another staff person will come later or the next day for more cleaning. There are materials left over. Did I get charged for those? Your job is priced according to the measurements. We always bring extra material for the jobsite, just to be safe. You were not charged for those and we will be collecting them. One of our staff will pick up the extra material after the installation crew is gone, usually within 1-2 days. When will the dumpster be removed? The dumpster is usually removed the next business day after the main crew has finished. Weekends or holidays may delay pickup. The dumpster company should check for any debris after removal, but please do a visual check before walking or driving over the area where the dumpster was located. If you see any debris there, please let us know. The job is done but I have concerns, what should I do? Please be aware that even after the main installation crew has left, that doesn't mean our job is done. The project manager will be coming by as soon as possible to do a final inspection, and a staff person will come by to do a final sweep, and pickup leftover items. Depending on our schedule, all of the final touchups, cleaning & pickups are usually completed in about 1-3 days after main installation is complete. If you have any other questions, please let us know. Thank you for choosing Peak Performance Roofing! We will do our very best to make this major home improvement a smooth experience for you! DocuSigned by. (jt/ A (ki f 6/30/2023 9DFF39CD32EC4D8 . 1 Lovefield St., Easthampton MA 01027 p E H: ,: • 413-203-5888 M-F 9am-4pm P E R F O R �� =� CE ROOFING peakperformanceroofingllc@gmaiLcom DocuSign Envelope ID:748E6439-0D15-4388-A6DF-F03D78D29B1E Peak Performance Roofing LLC 1 Lovefield St. Easthampton, MA 01027 413-203-5888 peakperformanceroofingllc@gmail.com PER 1C Q R C E ROOFING MA HIC#183698 MA CSL#103061 ADDRESS First Congregational Church ATTN: Linda West 4 North Main St. Williamsburg, MA 01096 burgychurch@gmail.com 413-522-4545 10988 06/21/2023 JOB LOCATION 4 N. Main St.,Williamsburg AC €r.W l M (,#``.].I. Asphalt Peak Performance Roofing will provide the labor and materials to perform the 1 49,130.00 49,130.00 Commercial following: SEE EMAIL FOR VISUAL. 1. Remove the existing roofing shingles. 2. Inspect the sheathing for any rot or deterioration. Any new plywood necessary will be $60 per sheet installed. Any new roofing boards will be $6 per foot installed. (Wood prices subject to change based on market fluctuations). 3. Install six feet of ice and water shield on eaves, three feet in any valleys, and three feet around all penetrations. 4. Cover remaining roof with synthetic underlayment. 5. Install new 8" aluminum drip edge on all eaves and rake edges. 6. Install architectural shingles by CertainTeed: Landmark PRO: COLOR TBD https://www.certainteed.com/residential-roofing/products/landmark-pro/ 7. Install Shingle Vent II ridge vent on peaks of roof (where applicable). https://www.certainteed.com/residential-roofing/products/certainteed-ridge-vent- 12-filtered/ City of Northampton 212 Main Street, Northampton, MA 01060 Solid Waste Disposal Affidavit In accordance of the provisions of MGL c 40, S54, I acknowledge that as a condition of the building permit all debris resulting from the construction activity governed by this Building Permit shall be disposed of in a properly licensed solid waste disposal facility, as defined by MGL c 111 , S 150A. Address of the work: 4 North Main St. , Williamsburg The debris will be transported by: Aaron's 24/7 Towing and Roll-On The debris will be received by: Valley Recycling Building permit number: Name of Permit Applicant Peak Performance Roofing LLC/James Flannery 7/3/2023 James Flannery aw\esament Date Signature of Permit Applicant The Commonwealth of Massa'husetts ►2=.g,, Department of Industrial Acc'dents Liz 1 Congress Street, Suite 110 .4 _ Boston,MA 02114-201 www.mass.gov/dia Workers'Compensation Insurance Affidavit:Builders/Co i tractors/Electricians/Plumbers. TO BE FILED WITH THE PERMITTING . UTHORITY. A 8 I licant Information Please Print Le.ibl Name (Business/Organization/Individual): PEAK PERFORMANCE ROOFING, LLC Address: 1 LOVEFIELD STREET City/State/Zip:EASTHAMPTON, MA 01027 Phone #:413-203-5888 Are you an employer?Check the appropriate box: Type of project(required): LID ID I am a employer with 4 employees(full and/or part-time).* 7. ❑New construction ?.❑I am a sole proprietor or partnership and have no employees working for me in 8. 0 Remodeling any capacity.[No workers'comp.insurance required.] 3.0 I am a homeowner doing all work myself.[No workers'comp.insurance required.]t 9. El Demolition 10 Q Building addition 4.❑I am a homeowner and will be hiring contractors to conduct all work on my property. I will ensure that all contractors either have workers'compensation insurance or are sole 11.❑Electrical repairs or additions proprietors with no employees. 12.❑Plumbing repairs or additions 5.❑I am a general contractor and I have hired the sub-contractors listed on the attached sheet. 13.0 Roof repairs These sub-contractors have employees and have workers'comp.insurance.t 6.❑We are a corporation and its officers have exercised their right of exemption per MGL c. 14.['Other 152,§1(4),and we have no employees.[No workers'comp.insurance required.] *Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. tContractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name:BERKSHIRE HATHAWAY GUARD Policy#or Self-ins.Lic.#:R2WC202869 Expiration Date:04/27/2024 5 North Main St. ty •p:Williamsburg, MA Job Site Address:5 ..._... _-_ City/State/Zip: 9� Attach a copy of the workers' compensation policy declaration page(show'ng the policy number and expiration date). Failure to secure coverage as required under MGL c. 152, §25A is a criminal v'olation punishable by a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP-WORK ORDER and a fine of up to$250.00 a day against the violator.A copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify under the pains and penalties of perjuty that the information provided above is true and correct Signature: James J Flannery Date: 7/3/2023 Phone#:413-203-5888 Official use only. Do not write in this area, to be completed by city or towns official. City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: et,,Amiiefvelt-etife:/e( Office of Consumer Affairs and Business Regulation 1000 Washington Street- Suite 710 Boston, Massachusetts 02118 Home Improvement Contractor Registration Type: LLC Registration: 183698 PEAK PERFORMANCE ROOFING,LLC, Expiration, 11/03/2023 1 LOVEFIELD ST. EASTHAMPTON,MA 01027 Update Address and Return Card SCA 1 0 20.445,17 _/ rifot,i,//4 Office of Consumer Affairs a usIness'Fbagutatlert HOME IMPROVEMENT CONTRACTOR Registration valid for individual use only TYPE;LLC before the expiration date. If found return to: Registration EXpiratiort Office of Consumer Affairs and Business Regulation 183698 11/03/2023 1000 Washington Street -Suite 710 iEAK PERFORMANCE ROOFING,LLC. Boston,MA 02118 JAMES FLANNERY LOVEFIELD ST. EASTHAMPTON,MA 01027 Undersecretary Not valid without signature Commonwealth of Massachusetts Division of Occupational Licensure Board of Building Relations and Standards Cons sSIANrvisor CS-103061 445, E;t4,3ires: OW2112024 JAMES Ft f ; -4 1 LOVEFIEL T a 0 E.ASTHAMPTqN MA F vok ° .4* t*,4 .Tf Ir.4%Ines te.r.<4 "we .12 1$.