230123-Pricing&PermitDocs-UNIT1Drawn by:
Checked by:
BC
Scale:
Project No.
see aboveDate:
C
FOUNDATION PLAN
A1.0
File: VBFarmHomes-SingleStory.pln Print Date: 1/19/23Bruce Coldham FAIATwo New Single Family Housesfor Habitat for Humanity(Single Story Dwelling Unit)Victoria Bismark Farm HousingBurts Pit Road, Northampton, MA1 Jan
uary
2
0
2
3
Permit
&
Pricin
g
Dra
wi
n
gs
Architect's Consultants
Structural Engineer:
TBD
Building Design:
Michael Broad
Leverett, MA
Owner's Consultants
Landscape Architect & Civil Engineer
Berkshire Design Group,
Northampton, MA
Environmental Design Consultant
TBD
8"48'-8"8"9'-23/4"19'-81/4"8"24'-8"8"7'-9"26'-0"8"24'-8"8"26'-0"50'-0"
8'-33/4"7'-11/2"7'-11/2"8'-11/2"7'-9"11'-0"3'-10"36'-83/4"4'-71/2"8'-73/4"10'-31/2"13'-103/4"
38" SPAN WITH NO ANCHOR
BOLTS (DOORWAY)
38" SPAN WITH NO ANCHOR
BOLTS (DOORWAY)SEWER EXIT THROUGH
FOUNDATION WALL;
36"± BELOW FLOOR
LEVEL
10" DIAM. CONCRETE PIER;
'BIGFOOT' BF 1020 WITH 12" BASES
(TYP. OF 6)
10" DIAM. CONCRETE PIER;
'BIGFOOT' BF 1020 WITH 12" BASES
(TYP. OF 2)
4" DIAM. PERFORATED PVC DRAINAGE
(RADON COLLECTION) PIPE RUNNING
FROM RADON STUB TO FOUNDATION
WALL IN BOTH DIRECTIONS
4" DIAM. RADON RELIEF PIPE
WATER LINE THROUGH FOUNDATION WALL;
60"± BELOW FLOOR LEVEL
WATER RISER
4" THICK CONCRETE SLAB WITH 4"
X 6" LEDGE AROUND INTERIOR;
INSTALL 6 X 6 MESH REINFORCING
THROUGHOUT
1
A4.1
1
A4.1
2
A4.1
2
A4.1
4
A4.1
4
A4.1
4"4"8"5' 0"See Site Plan L-1
-
GRADE, SLOPE AWAY
FROM BUIDLING
4" POURED CONCRETE FLOOR ON
6 MIL. POLY VAPOR BARRIER ON
ONE LAYER 2" TYPE 9 EPS
INSULATION (R 4.5 PER INCH)
2" TYPE 9 EPS INSULATION AT
INSIDE PERIMETER OF
FOUNDATION WALL; 4' DOWN
5" CRUSHED STONE - RADON COLLECTION
"PLENUM"
8" CONCRETE FOUNDATION
WALL, SEE STRUCTURAL
CLEAN, GRANULAR FILL
UNDISTURBED SOIL
TOP SOIL
CLEAN GRANULAR COMPACTED FILL
2" TYPE 9 EPS INSULATION AT
PERIMETER OF SLAB
TOP OF SLAB — FIRST FLOOR LEVEL
BOTTOM OF FOOTING
SCALE: 1/4" = 1'-0"
FOUNDATION PLAN
A1.0
SCALE: 1" = 1'-0"
FOUNDATION WALL DETAIL SECTION
Drawn by:
Checked by:
BC
Scale:
Project No.
see aboveDate:
C
FIRST FLOOR PLAN
A1.1
File: VBFarmHomes-SingleStory.pln Print Date: 1/19/23Bruce Coldham FAIATwo New Single Family Housesfor Habitat for Humanity(Single Story Dwelling Unit)Victoria Bismark Farm HousingBurts Pit Road, Northampton, MA1 Jan
uary
2
0
2
3
Permit
&
Pricin
g
Dra
wi
n
gs
Architect's Consultants
Structural Engineer:
TBD
Building Design:
Michael Broad
Leverett, MA
Owner's Consultants
Landscape Architect & Civil Engineer
Berkshire Design Group,
Northampton, MA
Environmental Design Consultant
TBD
2015%03%18(((
A0.0 General Project Notes.docx
{Note: When PDF’ing - use custom paper size 5”x36”}(
(
(
(
GENERAL PROJECT NOTES
1. The contractor shall apply for and supply all permits.
2. The contractor shall keep the building closed and secure at all times
and protect the building and site from theft and/or vandalism. The
contractor shall be responsible for all damage or loss due to theft or
vandalism resulting from contract operations.
3. All work shall be done in strict accordance with all state and local
codes and ordinances.
2017%01%01&&
&
A1.0 Floor Plans Dwg Notes.docx
{Note: When PDF’ing - use custom paper size 5”x36”}&
&
&
&
FLOOR PLAN NOTES
1. Dimensions are to face of framing unless noted otherwise.
2. Elevational dimensions are from top of wood panel sub-floor and from
top of concrete slab.
3. Window width & height dimensions given to window unit (not R.O.)
4. Verify sill heights and operation of windows with schedules and types
S.H. (Sill Height) indicated on plan is top of rough opening framing at
sill. Review rough opening and plate heights with Architect prior to
framing.
5. Closets and linen closets are 2’-0” minimum clear depth unless
otherwise noted.
6. Vibration Isolation:
a. (NONE REQUIRED)
7. Pack plumbing waste chases with acoustical insulation and thoroughly
air (sound) seal where these pass through living spaces.
8. See specifications and sheet A5.1 for specific air sealing techniques,
specified air infiltration limits and blower door testing schedule. This
affects all trades, all penetrations and construction schedule. Blower
door testing will be conducted to ensure the building conforms to air
infiltration limits (see sheet A5.1 for more information).
9. See sheet E1 Power Plans, E2 Lighting Plans, M1 Mechanical Plans for
more information.
Habitat will install ¾” x 48” high plywood mounting panels on walls
where directed by Electrician (and by PV installer if involved).
10. Provide blocking as required for, but not limited to, the following:
shelving, cabinets, grab bars, bathroom accessories, HVAC, plumbing
and electrical equipment.
11. All exterior slabs and covered surfaces to be sloped 1/8” per foot
minimum away from building.
2017%01%01&&
&
P1 Plumbing Notes.docx&
&
{Note: When PDF’ing - use custom paper size 5”x36”}&
&
&
&
GENERAL PLUMBING NOTES
1. PLUMBING CONTRACTOR IS TO WORK A PLUMBING FIXTURES
PACKAGED PROVIDED BY HABITAT.
2. Use PEX piping for hot and cold water supply piping.
3. Install dedicated runs on hot water supply lines using 3/8 inch (in lieu of
½ inch) and ½ inch (in lieu of ¾ inch) diameter piping to reduce run-
time (and therefore wastage) to get hot water at faucets
4. All water piping — hot and cold — to be insulated
5. Ensure that all plumbing vents through roof are to the north side of the
ridge — and not through roof planes scheduled for solar collecting
arrays.
6. Attend to air sealing of pipe penetrations through the air barrier as
follows:
a. Install a roof vent “boot” to all vent pipes per Detail and tape or
sealant seal the boot flange to the underside of the sheathing air
barrier.
b. Seal water supply pipe penetrations through wall plane using a
gasket such as a “KAFLEX or ROFLEX air tight EPDM sleeve”
available from foursevenfive.com.
7. Pack plumbing waste chases with acoustical insulation and thoroughly
air (sound) seal where these pass through living spaces.
8. Install water supply piping in the following locations using vibration
isolating ‘Holdrite’ resilient pipe supports:
a. (NONE REQUIRED)
DW
1,300 sq ft
29 sq ft
13 sq ft
10
13
A
A
9
A
A
3
A A
X1
11 5 4
7
1
2
6128
A G BBG
X2
C
X3
DW
REF
31/2"3'-91/2"31/2"4'-103/4"31/2"3'-43/4"31/2"31/2"9'-8"51/2"31/2"2'-2"31/2"2'-8"31/2"7'-61/2"51/2"51/2"20'-01/2"31/2"9'-31/2"51/2"7'-81/2"31/2"11'-0"51/2"5'-71/2"51/2"4'-81/2"31/2"4'-6"51/2"51/2"11'-10"31/2"2'-2"31/2"10'-6"51/2"6'-1"13'-10"6'-1"31/2"5'-0"31/2"1'-10"31/2"1'-101/2"31/2"1'-10"31/2"3'-6"5'-51/2"5'-6"5'-6"10'-61/4"8'-81/2"8'-63/4"5'-9"
13'-103/4"17'-13/4"13'-91/2"5'-2"
51/2"11'-0"31/2"2'-2"31/2"13'-31/2"31/2"2'-2"31/2"
2'-2"31/2"5'-4"31/2"11'-21/2"51/2"
5'-0"8'-51/2"4'-0"6'-8"13'-8"5'-8"31/2"2'-9"31/2"
6'-53/4"31/2"4'-23/4"31/2"
20'-01/2"
1'-4"2'-0"3'-0"1'-7"1'-7"1'-4"
2'-8"2'-6"3'-2"31/2"2'-73/4"31/2"6'-83/4"51/2"51/2"8'-0"8'-0"14'-6"8'-21/4"
5'-11"
3'-9"7'-11"11'-01/4"26'-0"10'-4"51/2"31/2"2'-0"7'-3"7'-3"
5' X 4' LANDING
6" BELOW MAIN FLOOR LEVEL;
CONSTRUCTED OF 2 X 6 PT EDGE
BEAMS (BEARING ONTO CONCRETE
PIERS) AND 2 X 6 PT LOIST IN THE
SAME PLANE @ 16" O.C. W/ 5/4 PLASTIC
LUMBER DECKING OVERHOSE BIBHOSE BIBSHEAR WALL; SEEDRAWING S-14" DIAM. RADON RELIEF PIPE
ERV MOUNTED IN UPPER
PORTION OF CLOSET;
STORAGE SPACE AND WATER
METER BELOW
ENTRY PORCH AND SHED FLOOR
AT MAIN FLOOR LEVEL;
CONSTRUCTED OF 2 X 8 PT EDGE BEAMS
BEARING ONTO CONCRETE PIERS; 2 X 6 PT
JOISTS @ 16" O.C. SPANNING BETWEEN
EDGE BEAMS (IN PLANE OF BEAMS) WITH
5/4 PLASTIC LUMBER DECKING OVER JOISTS
FOR ENTRY DECK
LOW WALL;
36" HIGH
TWO AIR SOURCE
HEAT PUMP
OUTDOOR UNITS
STACK-MOUNTED
ON GALVANIZED
STEEL FRAME ON
CONCRETE PAD ON
MILDLY COMPACTED
GRADE
ELECTRIC
SERVICE ENTRY
AND METER
PANEL
HEAT PUMP DHW TANK;.
ELECTRICAL PANEL
Allow Ref. Door to Open 180 Degrees
FULL-WIDTH, PT FRAMED
STEP SUPPORTED ON
CRUSHED STONE IF
REQUIRED BY GRADING
22" X 30" ATTIC
ACCESS OPENING
SOFFIT
CONCEALING
ERV FRESH AIR
DUCT TO
MAIN
BEDROOM
DININGROOMLIVINGROOM
KITCHEN
BEDROOM 3BEDROOM 2BEDROOM 1SHED
ENTRYPORCH
PANTRYCOATCLOSETCLOSETCLOSETCLOSET
CLOSET
CLOS.BATHROOMLAUNDRYHALF-BATH
ENTRY
GROSS FLOOR AREA
RAMP
1
A4.1
1
A4.1
2
A4.1
2
A4.1
4
A4.1
4
A4.1
RANGE HOOD
DUCT AND
EXHAUST
16" (LOWER) &
12" (UPPER)
PANTRY
SHELVING
4" PANTRY SHELVING
16" (LOWER) & 12" (UPPER)
PANTRY SHELVING
4' WIDE FRAMED 2 X 6 PT RAMP
WITH 5/4 PLASTIC LUMBER;
8% PTICH; LENGTH AS REQUIRED TO
LINK PARKING ARFEA GRADE WITH
ENTRY
8" DEEP OPEN SHELVING ON
WALL OVER COUNTER
NO.
1
2
3
4
5
6
7
7
8
9
10
11
12
12
13
X1
X2
X3
LOCATION WIDTH
2'-6"
2'-6"
3'-0"
4'-0"
2'-6"
3'-0"
6'-0"
6'-0"
2'-2"
3'-0"
3'-0"
5'-0"
3'-0"
3'-0"
6'-0"
3'-0"
3'-0"
3'-0"
HEIGHT
6'-8"
6'-8"
6'-8"
6'-8"
6'-8"
6'-8"
6'-8"
6'-8"
6'-8"
6'-8"
6'-8"
6'-8"
6'-8"
6'-8"
6'-8"
6'-8"
6'-8"
6'-8"
TYPE
A
A
A
A
A
A
A
C
A
A
A
C
A
A
C
B
B
A
DOOR CONST.
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
IFG
IFG
THK.FINISH
Paint
Paint
Paint
Paint
Paint
Paint
Paint
Paint
Paint
Paint
Paint
Paint
Paint
Paint
Paint
Paint
Paint
Paint
GLASS
Insu;lated
Te,mperInsu;lated
Te,mper
FRAME MAT.
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
THRESHOLD FIRE RATING
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
HDWR. SET AREA
17.66
17.66
21.03
27.76
17.66
21.03
41.22
41.22
15.42
21.03
21.03
34.49
21.03
21.03
41.22
21.38
21.38
21.38
REMARKS
UNDERCUT DOOR PANEL FOR RETURN AIR - 3/4"
UNDERCUT DOOR PANEL FOR RETURN AIR - 3/4"
AIR SEALING KIT
AIR SEALING KIT
AIR SEALING KIT
WINDOW SCHEDULE
MARK
A
B
C
G
QUANTITY
7
2
1
2
12
MANUFACTURER MODEL NO.
---
---
---
---
SIZE ( WIDTH X HEIGHT)
3'-0"×5'-0"
5'-0"×5'-0"
2'-6"×4'-0"
2'-6"×3'-6"
AREA
15.00
25.00
10.00
8.75
182.50 ft²
TYPE
---
---
---
---
REMARKS
A B C
ITP
IFG - Insulated Fiber Glass
IM - Insulated Metal
PMF - Press Molded Fiber
HC - Hollow Core
SC - Solid Core
WF - Wood Frame
WF&P - Wood Frame & Panel
WF&S - Wood Frame w/ Screening
CWF - Clad Wood Frame
ITP - Insulated Tempered Plate
TP - Tempered Plate
N
SCALE: 1/4" = 1'-0"
FIRST FLOOR
A1.1
SCALE: 1:1.43
DOOR SCHEDULE
A1.1
SCALE: 1' = 1'-0"
WINDOW SCHEDULE 01
A1.1
SCALE: 1/4" = 1'-0"
DOOR TYPES-ELEVATI0N
DOOR SCHEDULE KEY:
Drawn by:
Checked by:
BC
Scale:
Project No.
see aboveDate:
C
ELEVATIONS &
WINDOW
SCHEDULE
A3.1
File: VBFarmHomes-SingleStory.pln Print Date: 1/19/23Bruce Coldham FAIATwo New Single Family Housesfor Habitat for Humanity(Single Story Dwelling Unit)Victoria Bismark Farm HousingBurts Pit Road, Northampton, MA1 Jan
uary
2
0
2
3
Permit
&
Pricin
g
Dra
wi
n
gs
Architect's Consultants
Structural Engineer:
TBD
Building Design:
Michael Broad
Leverett, MA
Owner's Consultants
Landscape Architect & Civil Engineer
Berkshire Design Group,
Northampton, MA
Environmental Design Consultant
TBD
WINDOW SCHEDULE
MARK
A
B
C
G
QUANTITY
7
2
1
2
12
MANUFACTURER MODEL NO.
---
---
---
---
SIZE ( WIDTH X HEIGHT)
3'-0"×5'-0"
5'-0"×5'-0"
2'-6"×4'-0"
2'-6"×3'-6"
AREA
15.00
25.00
10.00
8.75
182.50 ft²
TYPE
---
---
---
---
REMARKS
2017%01%01&&
&
A3 Elevs Dwg Notes.docx&
&
{Note: When PDF’ing - use custom paper size 5”x36”}&
&
&
&
EXTERIOR ELEVATION NOTES
1. All dimensions are to face of framing, top of sub-floor, or top or face of
concrete unless otherwise noted.
2. Mounting Blocks in plane of siding for power outlet, hose bib,
ventilation duct, lighting fixture or similar penetrations shall of the same
material and material thickness as exterior trim material — 5/4
Mounting blocks shall be canted at the top edge and have a top flashing
— formed aluminum in color to match siding or trim.
&
-4'-6"
Foundation
±0"
FIRST FLOOR
+8'-13/4"
ROOF — Top Plate
CONCRETE; EXPOSED
CORNER BOARD —
5/4 X 6 VINYL
DRYER VENT
PV ARRAY INSTALLED OVER ASPHALT SHINGLE ROOFING (TBD)
TWO AIR SOURCE HEAT PUMP
OUTDOOR UNITS STACK-MOUNTED
ON GALVANIZED STEEL FRAME ON
CONCRETE PAD ON MILDLY
COMPACTED GRADE
ELECTRIC GFI EXT. RECEPTACLE4X4 POST CASED
IN 1 X .. WOOD;
(TYP. OF 2)
HOSE BIB, 18"
ABOVE GRADE
GA G B B
ASPHALT SHINGLE ROOF
COVERING
VINYL SIDING;
4" EXPOSURE
-4'-6"
Foundation
±0"
FIRST FLOOR
+8'-13/4"
ROOF — Top Plate
RANGE HOOD EXHAUST -
IN EXTERIOR WALL
CONCRETE; EXPOSED
CORNER BOARD —
5/4 X 6 VINYL
TWO AIR SOURCE HEAT PUMP
OUTDOOR UNITS STACK-MOUNTED
ON GALVANIZED STEEL FRAME ON
CONCRETE PAD ON MILDLY
COMPACTED GRADE
HOSE BIB, 18"
ABOVE GRADE
A
ASPHALT SHINGLE ROOF
COVERING
AC
±0"
FIRST FLOOR
+8'-13/4"
ROOF — Top Plate
CONCRETE; EXPOSED
CORNER BOARD —
5/4 X 6 VINYL
4X4 POST CASED
IN 1 X .. WOOD;
(TYP. OF 2)
ELECTRIC SERVICE
PANEL AND METER
BOARD 4'W X 4'H —
SUFFICIENT SPACE FOR
PV INVERTER
ANCHOR FOR O/H
ELECTRICAL CABLE
ATTTACHMENT
A
VINYL SIDING;
4" EXPOSURE
VINYL SIDING;
4" EXPOSURE
A
-4'-6"
Foundation
±0"
FIRST FLOOR
+8'-13/4"
ROOF — Top Plate
TWO AIR SOURCE HEAT PUMP OUTDOOR UNITS STACK-
MOUNTED ON GALVANIZED STEEL FRAME ON
CONCRETE PAD ON MILDLY COMPACTED GRADE
ELECTRIC GFI EXT.
RECEPTACLE
ERV AIR GRILL 0N MOUNT BLOCK (MECHANIC TO
DETERMINE WHETHER INTAKE OR EXHAUST)
ERV AIR GRILL 0N
MOUNT BLOCK
LIGHT FIXTURE ;
SEE LIGHTING PLAN
A A
SCALE: 1' = 1'-0"
WINDOW SCHEDULE 01
A3.1
SCALE: 3/16" = 1'-0"
ELEVATION
SCALE: 3/16" = 1'-0"
ELEVATION
SCALE: 3/16" = 1'-0"
ELEVATION
SCALE: 3/16" = 1'-0"
ELEVATION
Drawn by:
Checked by:
BC
Scale:
Project No.
see aboveDate:
C
BUILDING
SECTIONS
A4.1
File: VBFarmHomes-SingleStory.pln Print Date: 1/19/23Bruce Coldham FAIATwo New Single Family Housesfor Habitat for Humanity(Single Story Dwelling Unit)Victoria Bismark Farm HousingBurts Pit Road, Northampton, MA1 Jan
uary
2
0
2
3
Permit
&
Pricin
g
Dra
wi
n
gs
Architect's Consultants
Structural Engineer:
TBD
Building Design:
Michael Broad
Leverett, MA
Owner's Consultants
Landscape Architect & Civil Engineer
Berkshire Design Group,
Northampton, MA
Environmental Design Consultant
TBD
1
A5.1
-4'-6"
Foundation
±0"
FIRST FLOOR
+8'-13/4"
ROOF — Top Plate
8'-13/4"127.50
INSTALL CEILING GYPBOARD
CONTINUOUS AIR BARRIER —
BEFORE INSTALLING INTERIOR
PARTITIONS
16" TRUSS HEEL ON
ALL TRUSSES
TOC WALL
6
12
6
12
8'-13/4"8'-111/4"INSTALL CEILING GYPBOARD
CONTINUOUS AIR BARRIER —
BEFORE INSTALLING INTERIOR
PARTITIONS
16" TRUSS HEEL ON
ALL TRUSSES
SHED ROOF: SITE-FABRICATED
TRUSSES WITH 2 X 6 TOP CHORDS
AND 2 X 4 STRUTS AND TIES
VINYL
SOFFIT
CEILING ON
2 X 4
FRAMING
6
12
6
12
-4'-6"
Foundation
±0"
FIRST FLOOR
+8'-13/4"
ROOF — Top Plate
8'-1"INSTALL CEILING GYPBOARD
CONTINUOUS AIR BARRIER —
BEFORE INSTALLING INTERIOR
PARTITIONS
SCALE: 1/4" = 1'-0"
SECTION 1
SCALE: 1/4" = 1'-0"
SECTION 2
SCALE: 1/4" = 1'-0"
SECTION 4
Drawn by:
Checked by:
BC
Scale:
Project No.
see aboveDate:
C
WALL SECTION &
INTERIOR ELEVs.
A5.1
File: VBFarmHomes-SingleStory.pln Print Date: 1/19/23Bruce Coldham FAIATwo New Single Family Housesfor Habitat for Humanity(Single Story Dwelling Unit)Victoria Bismark Farm HousingBurts Pit Road, Northampton, MA1 Jan
uary
2
0
2
3
Permit
&
Pricin
g
Dra
wi
n
gs
Architect's Consultants
Structural Engineer:
TBD
Building Design:
Michael Broad
Leverett, MA
Owner's Consultants
Landscape Architect & Civil Engineer
Berkshire Design Group,
Northampton, MA
Environmental Design Consultant
TBD
3'-0"6'-0"1'-0"2'-8"2'-6"3'-2"
1'-3"
MICROWAVE & RANGE HOOD
COMBO
FULL HEIGHT BACKSPLASH
BEHIND RANGE
3'-0"6"3'-0"1'-6"2'-6"2'-03/4"31/2"83/4"
RANGE HOOD DUCT
DIRECTLY THRU WALL
OPEN SHELVING — NO
DOORS
1'-11/2"
4"4"8" 1"1' 4"188.00
205' 0 1/4" (8' 1" ABOVE 2nd FLOOR)
182.50
GRADE, SLOPE AWAY
FROM BUIDLING
VINYL SOFFIT
ROOF ASSEMBLY
・ASPHALT SHINGLE ROOFING,
・ROOF UNDERLAYMENT,
・5/8" OSB SHEATHING,
・WOOD TRUSSES WITH 16" RAISED HEEL;
SET 24" O.C.
• VENT CHANNEL
・LOOSE FILL ATTIC "FLOOR" WITH
CELLULOSE INSULATION TO 18 INCHES
( @ R 3.0 /inch — R-55)
• 1 X 4 WOOD FURRING
・5/8" GWB; INSTALLED CONTINUOUS
ACROSS CEILING PLANE BEFORE
INSTALLATION OF INTERIOR PARTITIONS.
GWB IS THE AIR BARRIER
VENT CHANNEL
4" CONCRETE SLAB W/ 6X6 WW
MESH REINFORCING POURED ON
6 MIL. POLY VAPOR BARRIER ON
ONE LAYER 2" TYPE 9 EPS
INSULATION (R 4.5 PER INCH)
2" TYPE 9 EPS INSULATION AT
INSIDE PERIMETER OF
FOUNDATION WALL; 4' DOWN
5" CRUSHED STONE - RADON COLLECTION
"PLENUM"
8" CONCRETE FOUNDATION
WALL, SEE STRUCTURAL
CLEAN, GRANULAR FILL
UNDISTURBED SOIL
TOP SOIL
WINDOW
CLEAN GRANULAR COMPACTED FILL
2" TYPE 9 EPS INSULATION AT
PERIMETER OF SLABP T TERMINATION STRIP – 1 1/2" X 2"
3/4" X 8" PLYWOOD WALL CAP SEALED TO
WALL TOP PLATE; (AIR BARRIER
COMPONENT)
SEAL GWB CEILING TO PLYWOOD WALL
CAP; (AIR BARRIER COMPONENT)
DOUBLE 2 X 10 HEADER WITH RIGID
INSULATION BETWEEN
METAL WRAP
FASCIA
1 X 2 WOOD
SEAL OSB SHEATHING TO
TOP PLATE — AIR
BARRIER COMPONENT
SEAL OSB SHEATHING TO
TOP PLATE — AIR
BARRIER COMPONENT
SEAL PLATE TO CONCRETE
FOUNDATION WALL — AIR
BARRIER COMPONENT
16" TRUSS HEEL ON
ALL TRUSSES
TOP PLATE
TOP OF SLAB — FIRST FLOOR LEVEL
BOTTOM OF FOOTING
WALL ASSEMBLY
・SIDING, VINYL PLANKS; EXPOSURE .....
・DRAINAGE PLANE MEMBRANE; TAPE
ALL RIGID INSULATION SEAMS
• 2" XPS RIGID INSULATION
・1/2" OSB (or ZIP SYSTEM) SHEATHING,
TAPED AS AIR BARRIER,
・2X6 STRUCTURAL WALL FRAMING,
LOAD BEARING - 24" O.C.,
・FILL FRAMING CAVITY WITH
CELLULOSE INSULATION TO 3.5 PCF MIN.
DENSITY (R3.5/IN.),
・1/2" GWB
SCALE: 1/2" = 1'-0"
Int Elev—Kitchen–NORTH
SCALE: 1/2" = 1'-0"
Interior Elevation – Kitchen–EAST
SCALE: 1/2" = 1'-0"
Int Elev—Bathroom–WESTSCALE: 1/2" = 1'-0"
Int Elev—Bathroom–EAST
SCALE: 1/2" = 1'-0"
Int Elev—HALF BATHROOM
SCALE: 1" = 1'-0"
TYPICAL WALL SECTION
SCALE: 1/2" = 1'-0"
Int Elev–Kitchen—SOUTH
A5.1
Drawn by:
Checked by:
BC
Scale:
Project No.
see aboveDate:
C
S1 FRAMING PLAN
File: VBFarmHomes-SingleStory.pln Print Date: 12/19/22Bruce Coldham FAIATwo New Single Family Housesfor Habitat for Humanity(Single Story Dwelling Unit)Victoria Bismark Farm HousingBurts Pit Road, Northampton, MA1 Jan
uary
2
0
2
3
Permit
&
Pricin
g
Dra
wi
n
gs
Architect's Consultants
Structural Engineer:
TBD
Building Design:
Michael Broad
Leverett, MA
Owner's Consultants
Landscape Architect & Civil Engineer
Berkshire Design Group,
Northampton, MA
Environmental Design Consultant
TBD
DOUBLE 2 X 6 SPF BEAM EITHER SIDE
DOUBLE 2 X 6 SPF BEAM
DOUBLE 2 X 6 SPF RAFTER
EXTENSIONS TO TRUSS TOP CHORD
SHED ROOF: SITE-FABRICATED
TRUSSES WITH 2 X 6 TOP CHORDS
AND 2 X 4 STRUTS AND TIES
PORCH ROOF: SITE-
FABRICATED TRUSSES WITH 2
X 6 TOP CHORDS AND 2 X 4
STRUTS AND TIES
2 X 4 ROOF OVERLAY
FRAMING AT EACH END
SHEAR WALL; NAIL 1/2" OSBSHEATHING TO STUD WALLPARTITION FRAME 6" O.C. ONALL STUDS AND PLATESTRUSSES @ 24" O.C. — 16" HIGH
RAISED HEELS EACH END
1
A4.1
1
A4.1
2
A4.1
2
A4.1
4
A4.1
4
A4.1
SCALE: 1/4" = 1'-0"
ROOF FRAMING PLAN
S 1
Drawn by:
Checked by:
BC
Scale:
Project No.
see aboveDate:
C
POWER PLAN
E1
File: VBFarmHomes-SingleStory.pln Print Date: 1/19/23Bruce Coldham FAIATwo New Single Family Housesfor Habitat for Humanity(Single Story Dwelling Unit)Victoria Bismark Farm HousingBurts Pit Road, Northampton, MA1 Jan
uary
2
0
2
3
Permit
&
Pricin
g
Dra
wi
n
gs
Architect's Consultants
Structural Engineer:
TBD
Building Design:
Michael Broad
Leverett, MA
Owner's Consultants
Landscape Architect & Civil Engineer
Berkshire Design Group,
Northampton, MA
Environmental Design Consultant
TBD
220
TV
POWER PLAN KEY
CABLE TV CONNECTION
DUPLEX OUTLET
QUAD OUTLET
DUPLEX OUTLET WATER PROOF
220 VOLT OUTLET
TELEPHONE OUTLET
GROUND FAULT OUTLET
WP
GFCI
DW
WP
DW
REF
GFIWPWPGFI POWER TO
RANGE HOODPOWER TO AIR SOURCE HEAT
PUMP WALL MOUNTED AHU
POWER TO AIR SOURCE HEAT
PUMP WALL MOUNTED AHU
POWER TO AIR SOURCE
HEAT PUMP PAD
MOUNTED COMPRESSOR/
CONDITIONER UNIT
DISHWASHER
POWER TO
MICROWAVE
(OVER RANGE
HOOD)REFRIGERATOR
OUTLET NEEDS TO BE
WITH 5' OF ASHP
COMPRESSOR/
CONDENSER
PROVIDE POWER FOR
CABLE/WIFI ROUTER
@ 6' AFL
POWER TO ERV UNIT
PROVIDE 15A POWER FOR WALL-MOUNTED
SUPPLEMENTAL ELECTRIC HEATING PANEL;
CONFIRM 60" AFL MOUNTING HEIGHT
W/ CONST. SUPERINTENDENT
PROVIDE 30 AMP POWER
FOR DRYER
ELECTRIC SERVICE ENTRY
AND METER PANEL; 4 X 4
MOUNTING BOARD WITH
SPACE FOR PV INVERTER
ELECTRIC PANEL;
RECESSED INTO R.O.
IN PARTITION; ACCESS
FROM HALLWAY SIDE
RANGE;
... AMP; 220V
PROVIDE — AMP POWER
FOR ELECTRIC HEAT
PUMP WATER HEATER
PROVIDE 20 AMP POWER
RUN 1" CONDUIT FROM
NET WORK INTERFACE AT
BUILDING EXTERIORALTERNATE AIR SOURCE HEAT
PUMP WALL MOUNTED AHU
LOCATION
ELECTRIC SERVICE CABLE
FROM UTILITY POLE TO
HIGH POINT ON GABLE
END WALL ABOVE
240V 40 AMP PROVISION FOR ELECTRIC
VEHICLE CHARGING TO BE PROVIDE AT
SERVICE PANEL WITH CONDUIT FOR FUTURE
CABLE TO LOCATION AT WEST CORNER OF
SHED. THIS LOCATION WILL SERVE A
CHARGING BOLLARD SET AT AN
APPROPRIATE DISTANCE FROM THE PARKED
VEHICLE
DININGROOMLIVINGROOM
KITCHEN
BEDROOM 3BEDROOM 2BEDROOM 1SHED
ENTRYPORCH
PANTRYCOATCLOSETCLOSETCLOSETCLOSET
CLOSET
CLOS.BATHROOMLAUNDRYHALF-BATH
ENTRY
RAMP
NOTE: 1
PROVIDE 15 AMP
RECEPTACLE IN EACH
BEDROOM FOR A
PORTABLE,
SUPPLEMENTARY
ELECTRIC HEATER
N
SCALE: 1/4" = 1'-0"
POWER PLAN
Drawn by:
Checked by:
BC
Scale:
Project No.
see aboveDate:
C
LIGHTING PLAN
E2
File: VBFarmHomes-SingleStory.pln Print Date: 1/19/23Bruce Coldham FAIATwo New Single Family Housesfor Habitat for Humanity(Single Story Dwelling Unit)Victoria Bismark Farm HousingBurts Pit Road, Northampton, MA1 Jan
uary
2
0
2
3
Permit
&
Pricin
g
Dra
wi
n
gs
Architect's Consultants
Structural Engineer:
TBD
Building Design:
Michael Broad
Leverett, MA
Owner's Consultants
Landscape Architect & Civil Engineer
Berkshire Design Group,
Northampton, MA
Environmental Design Consultant
TBD
SD/CO
SMOKE & CARBON COMBO UNIT
LIGHTING PLAN KEY
(C) SURFACE MOUNTED CEILING FIXTURE
(W) WALL MOUNTED FIXTURE
(R) RECESSED CEILING LED 'WAFER' FIXTURE
(L) LINEAR LED FIXTURE
(L) LINEAR LED VANITY FIXTURE
(L) DOUBLE LINEAR LED WRAP AROUND
(R) RECESSED CEILING WALL WASH FIXTURE
DIMMER SWITCH
THREE WAY DIMMER SWITCH
SWITCH
THREE WAY SWITCH
FOUR WAY SWITCH
(M) MONO POINT FLOOD FIXTURE 3D
D
3
4
DW
DW
REF3
33SD/COSD/COSD/COSD/CO33 3
C
C
C
C
CC
C
CC
C
C-Ext
C
C
C
C
CCC
'DARK-SKY' COMPATIBLE
FLOOD LIGHT SURFACE
MOUNTED; DIRECTED
TO ILLUMINATE ENTRY
FROM PARKING
KEYLESS LIGHT
FIXTURE SOCKET
WET AREA TOLERANT
LED RECESSED
ELECTRICAL
PANELM1
DININGROOMLIVINGROOM
KITCHEN
BEDROOM 3BEDROOM 2BEDROOM 1SHED
ENTRYPORCH
PANTRYCOATCLOSETCLOSETCLOSETCLOSET
CLOSET
CLOS.BATHROOMLAUNDRYHALF-BATH
ENTRY
RAMP
NOTE 1:
ALL CEILING LIGHTING &
JUNCTION BOXES TO BE
SET INTO 'LESSCO'
POLYETHYLENE BOXES TO
FACILITATE AIR SEALING
NOTE 2:
CEILING LIGHTING BOXES IN
BEDROOMS AND LIVING
SPACES TO BE CAPABLE OF
SUPPORTING CEILING FANS
L1
L1
N
SCALE: 1/4" = 1'-0"
LIGHTING PLAN
Drawn by:
Checked by:
BC
Scale:
Project No.
see aboveDate:
C
MECHANICAL PLAN
M1
File: VBFarmHomes-SingleStory.pln Print Date: 1/19/23Bruce Coldham FAIATwo New Single Family Housesfor Habitat for Humanity(Single Story Dwelling Unit)Victoria Bismark Farm HousingBurts Pit Road, Northampton, MA1 Jan
uary
2
0
2
3
Permit
&
Pricin
g
Dra
wi
n
gs
Architect's Consultants
Structural Engineer:
TBD
Building Design:
Michael Broad
Leverett, MA
Owner's Consultants
Landscape Architect & Civil Engineer
Berkshire Design Group,
Northampton, MA
Environmental Design Consultant
TBD
RETURN REGISTER
SUPPLY REGISTER
VENTILATION LEGEND
R20
S20 SUPPLY CFM
RETURN CFM (EXHAUST)
ERV CONTROL PANEL
BOOST SWITCH
C
B
DW
DW
REF
AIR SOURCE HEAT PUMP PAD & FAN
MOUNTED COMPRESSOR/
CONDITIONER UNITS (TWO
STACKED TOGETHER)
AIR SOURCE HEAT PUMP
WALL MOUNTED AHUAIR SOURCE HEAT PUMPWALL MOUNTED AHUDIRECT CONDENSATE LINE
TO WASTE PIPE
ERV (EXHAUST)
AIR EXTERIOR
GRILLE
ERV FRESH (INTAKE)
AIR EXTERIOR
GRILLE
ERV UNIT
MOUNT IN
UPPER PORTION
OF CLOSET
ERV SUPPLY & EXHAUST
DUCTING IN ATTIC
(INSULATED AND AIR
TIGHT)
DUCT FOR
KITCHEN
RANGE HOOD
DIRECT CONDENSATE
LINE TO THROUGH
EXTERIOR WALL (LOW
DOWN) TO
DISCHARGE
ALTERNATIVE (PREFERRED)
LOCATION FOR AIR SOURCE HEAT
PUMP WALL MOUNTED AHU (IF
CONDENSATE CAN BE EASILY
MANAGED)
DININGROOMLIVINGROOM
KITCHEN
BEDROOM 3BEDROOM 2BEDROOM 1SHED
ENTRYPORCH
PANTRYCOATCLOSETCLOSETCLOSETCLOSET
CLOSET
CLOS.BATHROOMLAUNDRYHALF-BATH
FRESH AIR @
30 CFM
EXHAUST AIR
@ 30 CFMEXHAUST AIR
@ 60 CFM
ENTRY
FRESH AIR @
30 CFM
RAMP
FRESH AIR @
30 CFM
N
SCALE: 1/4" = 1'-0"
MECHANICAL PLAN