Loading...
230123-Pricing&PermitDocs-UNIT1Drawn by: Checked by: BC Scale: Project No. see aboveDate: C FOUNDATION PLAN A1.0 File: VBFarmHomes-SingleStory.pln Print Date: 1/19/23Bruce Coldham FAIATwo New Single Family Housesfor Habitat for Humanity(Single Story Dwelling Unit)Victoria Bismark Farm HousingBurts Pit Road, Northampton, MA1 Jan uary 2 0 2 3 Permit & Pricin g Dra wi n gs Architect's Consultants Structural Engineer: TBD Building Design: Michael Broad Leverett, MA Owner's Consultants Landscape Architect & Civil Engineer Berkshire Design Group, Northampton, MA Environmental Design Consultant TBD 8"48'-8"8"9'-23/4"19'-81/4"8"24'-8"8"7'-9"26'-0"8"24'-8"8"26'-0"50'-0" 8'-33/4"7'-11/2"7'-11/2"8'-11/2"7'-9"11'-0"3'-10"36'-83/4"4'-71/2"8'-73/4"10'-31/2"13'-103/4" 38" SPAN WITH NO ANCHOR BOLTS (DOORWAY) 38" SPAN WITH NO ANCHOR BOLTS (DOORWAY)SEWER EXIT THROUGH FOUNDATION WALL; 36"± BELOW FLOOR LEVEL 10" DIAM. CONCRETE PIER; 'BIGFOOT' BF 1020 WITH 12" BASES (TYP. OF 6) 10" DIAM. CONCRETE PIER; 'BIGFOOT' BF 1020 WITH 12" BASES (TYP. OF 2) 4" DIAM. PERFORATED PVC DRAINAGE (RADON COLLECTION) PIPE RUNNING FROM RADON STUB TO FOUNDATION WALL IN BOTH DIRECTIONS 4" DIAM. RADON RELIEF PIPE WATER LINE THROUGH FOUNDATION WALL; 60"± BELOW FLOOR LEVEL WATER RISER 4" THICK CONCRETE SLAB WITH 4" X 6" LEDGE AROUND INTERIOR; INSTALL 6 X 6 MESH REINFORCING THROUGHOUT 1 A4.1 1 A4.1 2 A4.1 2 A4.1 4 A4.1 4 A4.1 4"4"8"5' 0"See Site Plan L-1 - GRADE, SLOPE AWAY FROM BUIDLING 4" POURED CONCRETE FLOOR ON 6 MIL. POLY VAPOR BARRIER ON ONE LAYER 2" TYPE 9 EPS INSULATION (R 4.5 PER INCH) 2" TYPE 9 EPS INSULATION AT INSIDE PERIMETER OF FOUNDATION WALL; 4' DOWN 5" CRUSHED STONE - RADON COLLECTION "PLENUM" 8" CONCRETE FOUNDATION WALL, SEE STRUCTURAL CLEAN, GRANULAR FILL UNDISTURBED SOIL TOP SOIL CLEAN GRANULAR COMPACTED FILL 2" TYPE 9 EPS INSULATION AT PERIMETER OF SLAB TOP OF SLAB — FIRST FLOOR LEVEL BOTTOM OF FOOTING SCALE: 1/4" = 1'-0" FOUNDATION PLAN A1.0 SCALE: 1" = 1'-0" FOUNDATION WALL DETAIL SECTION Drawn by: Checked by: BC Scale: Project No. see aboveDate: C FIRST FLOOR PLAN A1.1 File: VBFarmHomes-SingleStory.pln Print Date: 1/19/23Bruce Coldham FAIATwo New Single Family Housesfor Habitat for Humanity(Single Story Dwelling Unit)Victoria Bismark Farm HousingBurts Pit Road, Northampton, MA1 Jan uary 2 0 2 3 Permit & Pricin g Dra wi n gs Architect's Consultants Structural Engineer: TBD Building Design: Michael Broad Leverett, MA Owner's Consultants Landscape Architect & Civil Engineer Berkshire Design Group, Northampton, MA Environmental Design Consultant TBD 2015%03%18((( A0.0 General Project Notes.docx {Note: When PDF’ing - use custom paper size 5”x36”}( ( ( ( GENERAL PROJECT NOTES 1. The contractor shall apply for and supply all permits. 2. The contractor shall keep the building closed and secure at all times and protect the building and site from theft and/or vandalism. The contractor shall be responsible for all damage or loss due to theft or vandalism resulting from contract operations. 3. All work shall be done in strict accordance with all state and local codes and ordinances. 2017%01%01&& & A1.0 Floor Plans Dwg Notes.docx {Note: When PDF’ing - use custom paper size 5”x36”}& & & & FLOOR PLAN NOTES 1. Dimensions are to face of framing unless noted otherwise. 2. Elevational dimensions are from top of wood panel sub-floor and from top of concrete slab. 3. Window width & height dimensions given to window unit (not R.O.) 4. Verify sill heights and operation of windows with schedules and types S.H. (Sill Height) indicated on plan is top of rough opening framing at sill. Review rough opening and plate heights with Architect prior to framing. 5. Closets and linen closets are 2’-0” minimum clear depth unless otherwise noted. 6. Vibration Isolation: a. (NONE REQUIRED) 7. Pack plumbing waste chases with acoustical insulation and thoroughly air (sound) seal where these pass through living spaces. 8. See specifications and sheet A5.1 for specific air sealing techniques, specified air infiltration limits and blower door testing schedule. This affects all trades, all penetrations and construction schedule. Blower door testing will be conducted to ensure the building conforms to air infiltration limits (see sheet A5.1 for more information). 9. See sheet E1 Power Plans, E2 Lighting Plans, M1 Mechanical Plans for more information. Habitat will install ¾” x 48” high plywood mounting panels on walls where directed by Electrician (and by PV installer if involved). 10. Provide blocking as required for, but not limited to, the following: shelving, cabinets, grab bars, bathroom accessories, HVAC, plumbing and electrical equipment. 11. All exterior slabs and covered surfaces to be sloped 1/8” per foot minimum away from building. 2017%01%01&& & P1 Plumbing Notes.docx& & {Note: When PDF’ing - use custom paper size 5”x36”}& & & & GENERAL PLUMBING NOTES 1. PLUMBING CONTRACTOR IS TO WORK A PLUMBING FIXTURES PACKAGED PROVIDED BY HABITAT. 2. Use PEX piping for hot and cold water supply piping. 3. Install dedicated runs on hot water supply lines using 3/8 inch (in lieu of ½ inch) and ½ inch (in lieu of ¾ inch) diameter piping to reduce run- time (and therefore wastage) to get hot water at faucets 4. All water piping — hot and cold — to be insulated 5. Ensure that all plumbing vents through roof are to the north side of the ridge — and not through roof planes scheduled for solar collecting arrays. 6. Attend to air sealing of pipe penetrations through the air barrier as follows: a. Install a roof vent “boot” to all vent pipes per Detail and tape or sealant seal the boot flange to the underside of the sheathing air barrier. b. Seal water supply pipe penetrations through wall plane using a gasket such as a “KAFLEX or ROFLEX air tight EPDM sleeve” available from foursevenfive.com. 7. Pack plumbing waste chases with acoustical insulation and thoroughly air (sound) seal where these pass through living spaces. 8. Install water supply piping in the following locations using vibration isolating ‘Holdrite’ resilient pipe supports: a. (NONE REQUIRED) DW 1,300 sq ft 29 sq ft 13 sq ft 10 13 A A 9 A A 3 A A X1 11 5 4 7 1 2 6128 A G BBG X2 C X3 DW REF 31/2"3'-91/2"31/2"4'-103/4"31/2"3'-43/4"31/2"31/2"9'-8"51/2"31/2"2'-2"31/2"2'-8"31/2"7'-61/2"51/2"51/2"20'-01/2"31/2"9'-31/2"51/2"7'-81/2"31/2"11'-0"51/2"5'-71/2"51/2"4'-81/2"31/2"4'-6"51/2"51/2"11'-10"31/2"2'-2"31/2"10'-6"51/2"6'-1"13'-10"6'-1"31/2"5'-0"31/2"1'-10"31/2"1'-101/2"31/2"1'-10"31/2"3'-6"5'-51/2"5'-6"5'-6"10'-61/4"8'-81/2"8'-63/4"5'-9" 13'-103/4"17'-13/4"13'-91/2"5'-2" 51/2"11'-0"31/2"2'-2"31/2"13'-31/2"31/2"2'-2"31/2" 2'-2"31/2"5'-4"31/2"11'-21/2"51/2" 5'-0"8'-51/2"4'-0"6'-8"13'-8"5'-8"31/2"2'-9"31/2" 6'-53/4"31/2"4'-23/4"31/2" 20'-01/2" 1'-4"2'-0"3'-0"1'-7"1'-7"1'-4" 2'-8"2'-6"3'-2"31/2"2'-73/4"31/2"6'-83/4"51/2"51/2"8'-0"8'-0"14'-6"8'-21/4" 5'-11" 3'-9"7'-11"11'-01/4"26'-0"10'-4"51/2"31/2"2'-0"7'-3"7'-3" 5' X 4' LANDING 6" BELOW MAIN FLOOR LEVEL; CONSTRUCTED OF 2 X 6 PT EDGE BEAMS (BEARING ONTO CONCRETE PIERS) AND 2 X 6 PT LOIST IN THE SAME PLANE @ 16" O.C. W/ 5/4 PLASTIC LUMBER DECKING OVERHOSE BIBHOSE BIBSHEAR WALL; SEEDRAWING S-14" DIAM. RADON RELIEF PIPE ERV MOUNTED IN UPPER PORTION OF CLOSET; STORAGE SPACE AND WATER METER BELOW ENTRY PORCH AND SHED FLOOR AT MAIN FLOOR LEVEL; CONSTRUCTED OF 2 X 8 PT EDGE BEAMS BEARING ONTO CONCRETE PIERS; 2 X 6 PT JOISTS @ 16" O.C. SPANNING BETWEEN EDGE BEAMS (IN PLANE OF BEAMS) WITH 5/4 PLASTIC LUMBER DECKING OVER JOISTS FOR ENTRY DECK LOW WALL; 36" HIGH TWO AIR SOURCE HEAT PUMP OUTDOOR UNITS STACK-MOUNTED ON GALVANIZED STEEL FRAME ON CONCRETE PAD ON MILDLY COMPACTED GRADE ELECTRIC SERVICE ENTRY AND METER PANEL HEAT PUMP DHW TANK;. ELECTRICAL PANEL Allow Ref. Door to Open 180 Degrees FULL-WIDTH, PT FRAMED STEP SUPPORTED ON CRUSHED STONE IF REQUIRED BY GRADING 22" X 30" ATTIC ACCESS OPENING SOFFIT CONCEALING ERV FRESH AIR DUCT TO MAIN BEDROOM DININGROOMLIVINGROOM KITCHEN BEDROOM 3BEDROOM 2BEDROOM 1SHED ENTRYPORCH PANTRYCOATCLOSETCLOSETCLOSETCLOSET CLOSET CLOS.BATHROOMLAUNDRYHALF-BATH ENTRY GROSS FLOOR AREA RAMP 1 A4.1 1 A4.1 2 A4.1 2 A4.1 4 A4.1 4 A4.1 RANGE HOOD DUCT AND EXHAUST 16" (LOWER) & 12" (UPPER) PANTRY SHELVING 4" PANTRY SHELVING 16" (LOWER) & 12" (UPPER) PANTRY SHELVING 4' WIDE FRAMED 2 X 6 PT RAMP WITH 5/4 PLASTIC LUMBER; 8% PTICH; LENGTH AS REQUIRED TO LINK PARKING ARFEA GRADE WITH ENTRY 8" DEEP OPEN SHELVING ON WALL OVER COUNTER NO. 1 2 3 4 5 6 7 7 8 9 10 11 12 12 13 X1 X2 X3 LOCATION WIDTH 2'-6" 2'-6" 3'-0" 4'-0" 2'-6" 3'-0" 6'-0" 6'-0" 2'-2" 3'-0" 3'-0" 5'-0" 3'-0" 3'-0" 6'-0" 3'-0" 3'-0" 3'-0" HEIGHT 6'-8" 6'-8" 6'-8" 6'-8" 6'-8" 6'-8" 6'-8" 6'-8" 6'-8" 6'-8" 6'-8" 6'-8" 6'-8" 6'-8" 6'-8" 6'-8" 6'-8" 6'-8" TYPE A A A A A A A C A A A C A A C B B A DOOR CONST. SC SC SC SC SC SC SC SC SC SC SC SC SC SC SC IFG IFG THK.FINISH Paint Paint Paint Paint Paint Paint Paint Paint Paint Paint Paint Paint Paint Paint Paint Paint Paint Paint GLASS Insu;lated Te,mperInsu;lated Te,mper FRAME MAT. WOOD WOOD WOOD WOOD WOOD WOOD WOOD WOOD WOOD WOOD WOOD WOOD WOOD WOOD WOOD THRESHOLD FIRE RATING NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE HDWR. SET AREA 17.66 17.66 21.03 27.76 17.66 21.03 41.22 41.22 15.42 21.03 21.03 34.49 21.03 21.03 41.22 21.38 21.38 21.38 REMARKS UNDERCUT DOOR PANEL FOR RETURN AIR - 3/4" UNDERCUT DOOR PANEL FOR RETURN AIR - 3/4" AIR SEALING KIT AIR SEALING KIT AIR SEALING KIT WINDOW SCHEDULE MARK A B C G QUANTITY 7 2 1 2 12 MANUFACTURER MODEL NO. --- --- --- --- SIZE ( WIDTH X HEIGHT) 3'-0"×5'-0" 5'-0"×5'-0" 2'-6"×4'-0" 2'-6"×3'-6" AREA 15.00 25.00 10.00 8.75 182.50 ft² TYPE --- --- --- --- REMARKS A B C ITP IFG - Insulated Fiber Glass IM - Insulated Metal PMF - Press Molded Fiber HC - Hollow Core SC - Solid Core WF - Wood Frame WF&P - Wood Frame & Panel WF&S - Wood Frame w/ Screening CWF - Clad Wood Frame ITP - Insulated Tempered Plate TP - Tempered Plate N SCALE: 1/4" = 1'-0" FIRST FLOOR A1.1 SCALE: 1:1.43 DOOR SCHEDULE A1.1 SCALE: 1' = 1'-0" WINDOW SCHEDULE 01 A1.1 SCALE: 1/4" = 1'-0" DOOR TYPES-ELEVATI0N DOOR SCHEDULE KEY: Drawn by: Checked by: BC Scale: Project No. see aboveDate: C ELEVATIONS & WINDOW SCHEDULE A3.1 File: VBFarmHomes-SingleStory.pln Print Date: 1/19/23Bruce Coldham FAIATwo New Single Family Housesfor Habitat for Humanity(Single Story Dwelling Unit)Victoria Bismark Farm HousingBurts Pit Road, Northampton, MA1 Jan uary 2 0 2 3 Permit & Pricin g Dra wi n gs Architect's Consultants Structural Engineer: TBD Building Design: Michael Broad Leverett, MA Owner's Consultants Landscape Architect & Civil Engineer Berkshire Design Group, Northampton, MA Environmental Design Consultant TBD WINDOW SCHEDULE MARK A B C G QUANTITY 7 2 1 2 12 MANUFACTURER MODEL NO. --- --- --- --- SIZE ( WIDTH X HEIGHT) 3'-0"×5'-0" 5'-0"×5'-0" 2'-6"×4'-0" 2'-6"×3'-6" AREA 15.00 25.00 10.00 8.75 182.50 ft² TYPE --- --- --- --- REMARKS 2017%01%01&& & A3 Elevs Dwg Notes.docx& & {Note: When PDF’ing - use custom paper size 5”x36”}& & & & EXTERIOR ELEVATION NOTES 1. All dimensions are to face of framing, top of sub-floor, or top or face of concrete unless otherwise noted. 2. Mounting Blocks in plane of siding for power outlet, hose bib, ventilation duct, lighting fixture or similar penetrations shall of the same material and material thickness as exterior trim material — 5/4 Mounting blocks shall be canted at the top edge and have a top flashing — formed aluminum in color to match siding or trim. & -4'-6" Foundation ±0" FIRST FLOOR +8'-13/4" ROOF — Top Plate CONCRETE; EXPOSED CORNER BOARD — 5/4 X 6 VINYL DRYER VENT PV ARRAY INSTALLED OVER ASPHALT SHINGLE ROOFING (TBD) TWO AIR SOURCE HEAT PUMP OUTDOOR UNITS STACK-MOUNTED ON GALVANIZED STEEL FRAME ON CONCRETE PAD ON MILDLY COMPACTED GRADE ELECTRIC GFI EXT. RECEPTACLE4X4 POST CASED IN 1 X .. WOOD; (TYP. OF 2) HOSE BIB, 18" ABOVE GRADE GA G B B ASPHALT SHINGLE ROOF COVERING VINYL SIDING; 4" EXPOSURE -4'-6" Foundation ±0" FIRST FLOOR +8'-13/4" ROOF — Top Plate RANGE HOOD EXHAUST - IN EXTERIOR WALL CONCRETE; EXPOSED CORNER BOARD — 5/4 X 6 VINYL TWO AIR SOURCE HEAT PUMP OUTDOOR UNITS STACK-MOUNTED ON GALVANIZED STEEL FRAME ON CONCRETE PAD ON MILDLY COMPACTED GRADE HOSE BIB, 18" ABOVE GRADE A ASPHALT SHINGLE ROOF COVERING AC ±0" FIRST FLOOR +8'-13/4" ROOF — Top Plate CONCRETE; EXPOSED CORNER BOARD — 5/4 X 6 VINYL 4X4 POST CASED IN 1 X .. WOOD; (TYP. OF 2) ELECTRIC SERVICE PANEL AND METER BOARD 4'W X 4'H — SUFFICIENT SPACE FOR PV INVERTER ANCHOR FOR O/H ELECTRICAL CABLE ATTTACHMENT A VINYL SIDING; 4" EXPOSURE VINYL SIDING; 4" EXPOSURE A -4'-6" Foundation ±0" FIRST FLOOR +8'-13/4" ROOF — Top Plate TWO AIR SOURCE HEAT PUMP OUTDOOR UNITS STACK- MOUNTED ON GALVANIZED STEEL FRAME ON CONCRETE PAD ON MILDLY COMPACTED GRADE ELECTRIC GFI EXT. RECEPTACLE ERV AIR GRILL 0N MOUNT BLOCK (MECHANIC TO DETERMINE WHETHER INTAKE OR EXHAUST) ERV AIR GRILL 0N MOUNT BLOCK LIGHT FIXTURE ; SEE LIGHTING PLAN A A SCALE: 1' = 1'-0" WINDOW SCHEDULE 01 A3.1 SCALE: 3/16" = 1'-0" ELEVATION SCALE: 3/16" = 1'-0" ELEVATION SCALE: 3/16" = 1'-0" ELEVATION SCALE: 3/16" = 1'-0" ELEVATION Drawn by: Checked by: BC Scale: Project No. see aboveDate: C BUILDING SECTIONS A4.1 File: VBFarmHomes-SingleStory.pln Print Date: 1/19/23Bruce Coldham FAIATwo New Single Family Housesfor Habitat for Humanity(Single Story Dwelling Unit)Victoria Bismark Farm HousingBurts Pit Road, Northampton, MA1 Jan uary 2 0 2 3 Permit & Pricin g Dra wi n gs Architect's Consultants Structural Engineer: TBD Building Design: Michael Broad Leverett, MA Owner's Consultants Landscape Architect & Civil Engineer Berkshire Design Group, Northampton, MA Environmental Design Consultant TBD 1 A5.1 -4'-6" Foundation ±0" FIRST FLOOR +8'-13/4" ROOF — Top Plate 8'-13/4"127.50 INSTALL CEILING GYPBOARD CONTINUOUS AIR BARRIER — BEFORE INSTALLING INTERIOR PARTITIONS 16" TRUSS HEEL ON ALL TRUSSES TOC WALL 6 12 6 12 8'-13/4"8'-111/4"INSTALL CEILING GYPBOARD CONTINUOUS AIR BARRIER — BEFORE INSTALLING INTERIOR PARTITIONS 16" TRUSS HEEL ON ALL TRUSSES SHED ROOF: SITE-FABRICATED TRUSSES WITH 2 X 6 TOP CHORDS AND 2 X 4 STRUTS AND TIES VINYL SOFFIT CEILING ON 2 X 4 FRAMING 6 12 6 12 -4'-6" Foundation ±0" FIRST FLOOR +8'-13/4" ROOF — Top Plate 8'-1"INSTALL CEILING GYPBOARD CONTINUOUS AIR BARRIER — BEFORE INSTALLING INTERIOR PARTITIONS SCALE: 1/4" = 1'-0" SECTION 1 SCALE: 1/4" = 1'-0" SECTION 2 SCALE: 1/4" = 1'-0" SECTION 4 Drawn by: Checked by: BC Scale: Project No. see aboveDate: C WALL SECTION & INTERIOR ELEVs. A5.1 File: VBFarmHomes-SingleStory.pln Print Date: 1/19/23Bruce Coldham FAIATwo New Single Family Housesfor Habitat for Humanity(Single Story Dwelling Unit)Victoria Bismark Farm HousingBurts Pit Road, Northampton, MA1 Jan uary 2 0 2 3 Permit & Pricin g Dra wi n gs Architect's Consultants Structural Engineer: TBD Building Design: Michael Broad Leverett, MA Owner's Consultants Landscape Architect & Civil Engineer Berkshire Design Group, Northampton, MA Environmental Design Consultant TBD 3'-0"6'-0"1'-0"2'-8"2'-6"3'-2" 1'-3" MICROWAVE & RANGE HOOD COMBO FULL HEIGHT BACKSPLASH BEHIND RANGE 3'-0"6"3'-0"1'-6"2'-6"2'-03/4"31/2"83/4" RANGE HOOD DUCT DIRECTLY THRU WALL OPEN SHELVING — NO DOORS 1'-11/2" 4"4"8" 1"1' 4"188.00 205' 0 1/4" (8' 1" ABOVE 2nd FLOOR) 182.50 GRADE, SLOPE AWAY FROM BUIDLING VINYL SOFFIT ROOF ASSEMBLY ・ASPHALT SHINGLE ROOFING, ・ROOF UNDERLAYMENT, ・5/8" OSB SHEATHING, ・WOOD TRUSSES WITH 16" RAISED HEEL; SET 24" O.C. • VENT CHANNEL ・LOOSE FILL ATTIC "FLOOR" WITH CELLULOSE INSULATION TO 18 INCHES ( @ R 3.0 /inch — R-55) • 1 X 4 WOOD FURRING ・5/8" GWB; INSTALLED CONTINUOUS ACROSS CEILING PLANE BEFORE INSTALLATION OF INTERIOR PARTITIONS. GWB IS THE AIR BARRIER VENT CHANNEL 4" CONCRETE SLAB W/ 6X6 WW MESH REINFORCING POURED ON 6 MIL. POLY VAPOR BARRIER ON ONE LAYER 2" TYPE 9 EPS INSULATION (R 4.5 PER INCH) 2" TYPE 9 EPS INSULATION AT INSIDE PERIMETER OF FOUNDATION WALL; 4' DOWN 5" CRUSHED STONE - RADON COLLECTION "PLENUM" 8" CONCRETE FOUNDATION WALL, SEE STRUCTURAL CLEAN, GRANULAR FILL UNDISTURBED SOIL TOP SOIL WINDOW CLEAN GRANULAR COMPACTED FILL 2" TYPE 9 EPS INSULATION AT PERIMETER OF SLABP T TERMINATION STRIP – 1 1/2" X 2" 3/4" X 8" PLYWOOD WALL CAP SEALED TO WALL TOP PLATE; (AIR BARRIER COMPONENT) SEAL GWB CEILING TO PLYWOOD WALL CAP; (AIR BARRIER COMPONENT) DOUBLE 2 X 10 HEADER WITH RIGID INSULATION BETWEEN METAL WRAP FASCIA 1 X 2 WOOD SEAL OSB SHEATHING TO TOP PLATE — AIR BARRIER COMPONENT SEAL OSB SHEATHING TO TOP PLATE — AIR BARRIER COMPONENT SEAL PLATE TO CONCRETE FOUNDATION WALL — AIR BARRIER COMPONENT 16" TRUSS HEEL ON ALL TRUSSES TOP PLATE TOP OF SLAB — FIRST FLOOR LEVEL BOTTOM OF FOOTING WALL ASSEMBLY ・SIDING, VINYL PLANKS; EXPOSURE ..... ・DRAINAGE PLANE MEMBRANE; TAPE ALL RIGID INSULATION SEAMS • 2" XPS RIGID INSULATION ・1/2" OSB (or ZIP SYSTEM) SHEATHING, TAPED AS AIR BARRIER, ・2X6 STRUCTURAL WALL FRAMING, LOAD BEARING - 24" O.C., ・FILL FRAMING CAVITY WITH CELLULOSE INSULATION TO 3.5 PCF MIN. DENSITY (R3.5/IN.), ・1/2" GWB SCALE: 1/2" = 1'-0" Int Elev—Kitchen–NORTH SCALE: 1/2" = 1'-0" Interior Elevation – Kitchen–EAST SCALE: 1/2" = 1'-0" Int Elev—Bathroom–WESTSCALE: 1/2" = 1'-0" Int Elev—Bathroom–EAST SCALE: 1/2" = 1'-0" Int Elev—HALF BATHROOM SCALE: 1" = 1'-0" TYPICAL WALL SECTION SCALE: 1/2" = 1'-0" Int Elev–Kitchen—SOUTH A5.1 Drawn by: Checked by: BC Scale: Project No. see aboveDate: C S1 FRAMING PLAN File: VBFarmHomes-SingleStory.pln Print Date: 12/19/22Bruce Coldham FAIATwo New Single Family Housesfor Habitat for Humanity(Single Story Dwelling Unit)Victoria Bismark Farm HousingBurts Pit Road, Northampton, MA1 Jan uary 2 0 2 3 Permit & Pricin g Dra wi n gs Architect's Consultants Structural Engineer: TBD Building Design: Michael Broad Leverett, MA Owner's Consultants Landscape Architect & Civil Engineer Berkshire Design Group, Northampton, MA Environmental Design Consultant TBD DOUBLE 2 X 6 SPF BEAM EITHER SIDE DOUBLE 2 X 6 SPF BEAM DOUBLE 2 X 6 SPF RAFTER EXTENSIONS TO TRUSS TOP CHORD SHED ROOF: SITE-FABRICATED TRUSSES WITH 2 X 6 TOP CHORDS AND 2 X 4 STRUTS AND TIES PORCH ROOF: SITE- FABRICATED TRUSSES WITH 2 X 6 TOP CHORDS AND 2 X 4 STRUTS AND TIES 2 X 4 ROOF OVERLAY FRAMING AT EACH END SHEAR WALL; NAIL 1/2" OSBSHEATHING TO STUD WALLPARTITION FRAME 6" O.C. ONALL STUDS AND PLATESTRUSSES @ 24" O.C. — 16" HIGH RAISED HEELS EACH END 1 A4.1 1 A4.1 2 A4.1 2 A4.1 4 A4.1 4 A4.1 SCALE: 1/4" = 1'-0" ROOF FRAMING PLAN S 1 Drawn by: Checked by: BC Scale: Project No. see aboveDate: C POWER PLAN E1 File: VBFarmHomes-SingleStory.pln Print Date: 1/19/23Bruce Coldham FAIATwo New Single Family Housesfor Habitat for Humanity(Single Story Dwelling Unit)Victoria Bismark Farm HousingBurts Pit Road, Northampton, MA1 Jan uary 2 0 2 3 Permit & Pricin g Dra wi n gs Architect's Consultants Structural Engineer: TBD Building Design: Michael Broad Leverett, MA Owner's Consultants Landscape Architect & Civil Engineer Berkshire Design Group, Northampton, MA Environmental Design Consultant TBD 220 TV POWER PLAN KEY CABLE TV CONNECTION DUPLEX OUTLET QUAD OUTLET DUPLEX OUTLET WATER PROOF 220 VOLT OUTLET TELEPHONE OUTLET GROUND FAULT OUTLET WP GFCI DW WP DW REF GFIWPWPGFI POWER TO RANGE HOODPOWER TO AIR SOURCE HEAT PUMP WALL MOUNTED AHU POWER TO AIR SOURCE HEAT PUMP WALL MOUNTED AHU POWER TO AIR SOURCE HEAT PUMP PAD MOUNTED COMPRESSOR/ CONDITIONER UNIT DISHWASHER POWER TO MICROWAVE (OVER RANGE HOOD)REFRIGERATOR OUTLET NEEDS TO BE WITH 5' OF ASHP COMPRESSOR/ CONDENSER PROVIDE POWER FOR CABLE/WIFI ROUTER @ 6' AFL POWER TO ERV UNIT PROVIDE 15A POWER FOR WALL-MOUNTED SUPPLEMENTAL ELECTRIC HEATING PANEL; CONFIRM 60" AFL MOUNTING HEIGHT W/ CONST. SUPERINTENDENT PROVIDE 30 AMP POWER FOR DRYER ELECTRIC SERVICE ENTRY AND METER PANEL; 4 X 4 MOUNTING BOARD WITH SPACE FOR PV INVERTER ELECTRIC PANEL; RECESSED INTO R.O. IN PARTITION; ACCESS FROM HALLWAY SIDE RANGE; ... AMP; 220V PROVIDE — AMP POWER FOR ELECTRIC HEAT PUMP WATER HEATER PROVIDE 20 AMP POWER RUN 1" CONDUIT FROM NET WORK INTERFACE AT BUILDING EXTERIORALTERNATE AIR SOURCE HEAT PUMP WALL MOUNTED AHU LOCATION ELECTRIC SERVICE CABLE FROM UTILITY POLE TO HIGH POINT ON GABLE END WALL ABOVE 240V 40 AMP PROVISION FOR ELECTRIC VEHICLE CHARGING TO BE PROVIDE AT SERVICE PANEL WITH CONDUIT FOR FUTURE CABLE TO LOCATION AT WEST CORNER OF SHED. THIS LOCATION WILL SERVE A CHARGING BOLLARD SET AT AN APPROPRIATE DISTANCE FROM THE PARKED VEHICLE DININGROOMLIVINGROOM KITCHEN BEDROOM 3BEDROOM 2BEDROOM 1SHED ENTRYPORCH PANTRYCOATCLOSETCLOSETCLOSETCLOSET CLOSET CLOS.BATHROOMLAUNDRYHALF-BATH ENTRY RAMP NOTE: 1 PROVIDE 15 AMP RECEPTACLE IN EACH BEDROOM FOR A PORTABLE, SUPPLEMENTARY ELECTRIC HEATER N SCALE: 1/4" = 1'-0" POWER PLAN Drawn by: Checked by: BC Scale: Project No. see aboveDate: C LIGHTING PLAN E2 File: VBFarmHomes-SingleStory.pln Print Date: 1/19/23Bruce Coldham FAIATwo New Single Family Housesfor Habitat for Humanity(Single Story Dwelling Unit)Victoria Bismark Farm HousingBurts Pit Road, Northampton, MA1 Jan uary 2 0 2 3 Permit & Pricin g Dra wi n gs Architect's Consultants Structural Engineer: TBD Building Design: Michael Broad Leverett, MA Owner's Consultants Landscape Architect & Civil Engineer Berkshire Design Group, Northampton, MA Environmental Design Consultant TBD SD/CO SMOKE & CARBON COMBO UNIT LIGHTING PLAN KEY (C) SURFACE MOUNTED CEILING FIXTURE (W) WALL MOUNTED FIXTURE (R) RECESSED CEILING LED 'WAFER' FIXTURE (L) LINEAR LED FIXTURE (L) LINEAR LED VANITY FIXTURE (L) DOUBLE LINEAR LED WRAP AROUND (R) RECESSED CEILING WALL WASH FIXTURE DIMMER SWITCH THREE WAY DIMMER SWITCH SWITCH THREE WAY SWITCH FOUR WAY SWITCH (M) MONO POINT FLOOD FIXTURE 3D D 3 4 DW DW REF3 33SD/COSD/COSD/COSD/CO33 3 C C C C CC C CC C C-Ext C C C C CCC 'DARK-SKY' COMPATIBLE FLOOD LIGHT SURFACE MOUNTED; DIRECTED TO ILLUMINATE ENTRY FROM PARKING KEYLESS LIGHT FIXTURE SOCKET WET AREA TOLERANT LED RECESSED ELECTRICAL PANELM1 DININGROOMLIVINGROOM KITCHEN BEDROOM 3BEDROOM 2BEDROOM 1SHED ENTRYPORCH PANTRYCOATCLOSETCLOSETCLOSETCLOSET CLOSET CLOS.BATHROOMLAUNDRYHALF-BATH ENTRY RAMP NOTE 1: ALL CEILING LIGHTING & JUNCTION BOXES TO BE SET INTO 'LESSCO' POLYETHYLENE BOXES TO FACILITATE AIR SEALING NOTE 2: CEILING LIGHTING BOXES IN BEDROOMS AND LIVING SPACES TO BE CAPABLE OF SUPPORTING CEILING FANS L1 L1 N SCALE: 1/4" = 1'-0" LIGHTING PLAN Drawn by: Checked by: BC Scale: Project No. see aboveDate: C MECHANICAL PLAN M1 File: VBFarmHomes-SingleStory.pln Print Date: 1/19/23Bruce Coldham FAIATwo New Single Family Housesfor Habitat for Humanity(Single Story Dwelling Unit)Victoria Bismark Farm HousingBurts Pit Road, Northampton, MA1 Jan uary 2 0 2 3 Permit & Pricin g Dra wi n gs Architect's Consultants Structural Engineer: TBD Building Design: Michael Broad Leverett, MA Owner's Consultants Landscape Architect & Civil Engineer Berkshire Design Group, Northampton, MA Environmental Design Consultant TBD RETURN REGISTER SUPPLY REGISTER VENTILATION LEGEND R20 S20 SUPPLY CFM RETURN CFM (EXHAUST) ERV CONTROL PANEL BOOST SWITCH C B DW DW REF AIR SOURCE HEAT PUMP PAD & FAN MOUNTED COMPRESSOR/ CONDITIONER UNITS (TWO STACKED TOGETHER) AIR SOURCE HEAT PUMP WALL MOUNTED AHUAIR SOURCE HEAT PUMPWALL MOUNTED AHUDIRECT CONDENSATE LINE TO WASTE PIPE ERV (EXHAUST) AIR EXTERIOR GRILLE ERV FRESH (INTAKE) AIR EXTERIOR GRILLE ERV UNIT MOUNT IN UPPER PORTION OF CLOSET ERV SUPPLY & EXHAUST DUCTING IN ATTIC (INSULATED AND AIR TIGHT) DUCT FOR KITCHEN RANGE HOOD DIRECT CONDENSATE LINE TO THROUGH EXTERIOR WALL (LOW DOWN) TO DISCHARGE ALTERNATIVE (PREFERRED) LOCATION FOR AIR SOURCE HEAT PUMP WALL MOUNTED AHU (IF CONDENSATE CAN BE EASILY MANAGED) DININGROOMLIVINGROOM KITCHEN BEDROOM 3BEDROOM 2BEDROOM 1SHED ENTRYPORCH PANTRYCOATCLOSETCLOSETCLOSETCLOSET CLOSET CLOS.BATHROOMLAUNDRYHALF-BATH FRESH AIR @ 30 CFM EXHAUST AIR @ 30 CFMEXHAUST AIR @ 60 CFM ENTRY FRESH AIR @ 30 CFM RAMP FRESH AIR @ 30 CFM N SCALE: 1/4" = 1'-0" MECHANICAL PLAN