Loading...
87 Grove Ave Deck FramingSparkle Second Floor DeckDRAWN BYSH ISSUE 06.04.2019 CLIENT Bucky Sparkle PROJECTSparkle Second Floor Deck PROJECT NO.104 ISSUE06.04.2019DRAWN BYSHCLIENTBucky Sparkle87 Grove AveLeeds MA PROJECTSparkle Second Floor DeckPROJECT NO.104Village Carpentry and Landscaping45 Pleasant St.Southampton MA, 01073 A.01Floor FramingFloor Framing 1/4" = 1'-0"A.01 Half Lapped Cedar 4x4 Double 2x6 Rim Joist 2x6 PT floor joists 12” OC Ledger Connected using Ledgerloks Joist attached using 2x6 Simpson joist hangers 25'-8"9'-10 1/2"Future 6” overhangs ISSUE06.04.2019DRAWN BYSHCLIENTBucky Sparkle87 Grove AveLeeds MA PROJECTSparkle Second Floor DeckPROJECT NO.104Village Carpentry and Landscaping45 Pleasant St.Southampton MA, 01073 A.02Ceiling FramingCeiling Framing 1/2” = 1'-0"A.02 8'-1 3/4" Cedar 4x6 carrying beams for lattice and future house overhang Cedar 2x4 arbor framing Bracing for lateral support ISSUE06.04.2019DRAWN BYSHCLIENTBucky Sparkle87 Grove AveLeeds MA PROJECTSparkle Second Floor DeckPROJECT NO.104Village Carpentry and Landscaping45 Pleasant St.Southampton MA, 01073 A.03Front ElevationFront Elevation 1/2” = 1'-0"A.03 Railing final design Not yet finalized. -proposed code compliant railings8'-8 3/4"6'-1 1/4"Cedar 4x4 braces installed for racking support of arbor ISSUE06.04.2019DRAWN BYSHCLIENTBucky Sparkle87 Grove AveLeeds MA PROJECTSparkle Second Floor DeckPROJECT NO.104Village Carpentry and Landscaping45 Pleasant St.Southampton MA, 01073 A.04Side ElevationsSide Elevations 1/2” = 1'-0"A.04 1º approximate angle of floor on roof deck