87 Grove Ave Deck FramingSparkle Second Floor DeckDRAWN BYSH
ISSUE
06.04.2019
CLIENT
Bucky Sparkle PROJECTSparkle Second Floor Deck PROJECT NO.104
ISSUE06.04.2019DRAWN BYSHCLIENTBucky Sparkle87 Grove AveLeeds MA PROJECTSparkle Second Floor DeckPROJECT NO.104Village Carpentry and Landscaping45 Pleasant St.Southampton MA, 01073 A.01Floor FramingFloor Framing
1/4" = 1'-0"A.01
Half Lapped Cedar 4x4
Double 2x6 Rim Joist
2x6 PT floor joists
12” OC Ledger Connected using Ledgerloks
Joist attached using 2x6 Simpson joist hangers
25'-8"9'-10 1/2"Future 6” overhangs
ISSUE06.04.2019DRAWN BYSHCLIENTBucky Sparkle87 Grove AveLeeds MA PROJECTSparkle Second Floor DeckPROJECT NO.104Village Carpentry and Landscaping45 Pleasant St.Southampton MA, 01073 A.02Ceiling FramingCeiling Framing
1/2” = 1'-0"A.02
8'-1 3/4"
Cedar 4x6 carrying beams for lattice and future house overhang Cedar 2x4 arbor framing
Bracing for
lateral
support
ISSUE06.04.2019DRAWN BYSHCLIENTBucky Sparkle87 Grove AveLeeds MA PROJECTSparkle Second Floor DeckPROJECT NO.104Village Carpentry and Landscaping45 Pleasant St.Southampton MA, 01073 A.03Front ElevationFront Elevation
1/2” = 1'-0"A.03
Railing final design
Not yet finalized.
-proposed code compliant railings8'-8 3/4"6'-1 1/4"Cedar 4x4 braces installed for racking support of arbor
ISSUE06.04.2019DRAWN BYSHCLIENTBucky Sparkle87 Grove AveLeeds MA PROJECTSparkle Second Floor DeckPROJECT NO.104Village Carpentry and Landscaping45 Pleasant St.Southampton MA, 01073 A.04Side ElevationsSide Elevations
1/2” = 1'-0"A.04
1º approximate angle of floor on roof deck