Loading...
780 CMR 107.6.2 edit107.6.2 Registered Design Professional Services. 107.6.2.1 Design. All plans, computations and specifications involving new construction, alterations, repairs, expansions or additions or change in use or occupancy of existing buildings shall be prepared by or under the direct supervision of a registered design professional and shall bear his or her signature and seal (seesection 107.1.1). Said signature and seal shall signify that the plans, computations and specifications meet the applicable provisions of 780 CMR and accepted engineering practices. Any alternative means and methods which deviate from prescriptive requirements of 780 CMR shall be submitted to the building official for approval in a narrative form separate from the plans. 107.6.2.2 Construction. The registered design professionals who are responsible for the design, plans, calculations, and specifications, their designee or the registered design professionals who have been retained for construction phase services, shall perform the following tasks: 1.Review, for conformance to 780 CMR and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2.Perform the duties for registered design professionals in 780 CMR 17.00: Special Inspections and Tests. 3.Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the construction documents and 780 CMR. The permit application shall not be deemed completed until all of the construction documents required by 780 CMR have been submitted. Documentation indicating that work complies with the plans and specifications shall be provided at the completion of each phase when required by the building official. Upon completion of the work, the registered design professional shall file a final document to the building official indicating that, to the best of his or her knowledge and belief, the work has been performed in accordance with the approved plans and 780 CMR. Forms for construction control when required by the building official shall be those found at http:// www.mass.gov/ocabr/government/oca-agencies/dpl-lp/opsi/. 107.6.2.3 Special Inspections and Tests. Special inspections and tests shall be provided in accordance with 780 CMR 17.00: Special Inspections and Tests. 107.6.2.4 Non Structural System Test and Inspection. Tests and inspections of non-structural systems shall be performed in accordance with applicable engineering practice standards, referenced standards listed in 780 CMR 35.00: Referenced Standards, or as otherwise specified in 780 CMR. 107.6.3 Construction Contractor Services. The actual construction of the work shall be the responsibility of the general contractor as identified on the approvedpermit and shall involve the following: 1.Execution of all work in accordance with the approvedconstruction documents. 2.Execution and control of all means and methods of construction in a safe and satisfactory manner in accordance with all applicable local, state, and federal statutes and regulations. 3.Upon completion of the construction, certification in writing to the responsible registered design professional that, to the best of the contractor’s knowledge and belief, construction has been done in substantial accord with section 107.6 and with all pertinent deviations specifically noted. The building official may require a copy of this certification.