Savage - Stamped Plan Set1.1.1 PROJECT NOTES:
1.1.2 THIS PHOTOVOLTAIC (PV) SYSTEM SHALL COMPLY WITH THE NATIONAL
ELECTRIC CODE (NEC) ARTICLE 690, ALL MANUFACTURERS’S LISTING
AND INSTALLATION INSTRUCTIONS, AND THE RELEVANT CODES AS
SPECIFIED BY THE AUTHORITY HAVING JURISDICTION’S (AHJ)
APPLICABLE CODES.
1.1.3 THE UTILITY INTERCONNECTION APPLICATION MUST BE APPROVED
AND PV SYSTEM INSPECTED PRIOR TO PARALLEL OPERATION
1.1.4 ALL PV SYSTEM COMPONENTS; MODULES, UTILITY-INTERACTIVE
INVERTERS, AND SOURCE CIRCUIT COMBINER BOXES ARE IDENTIFIED
AND LISTED FOR USE IN PHOTOVOLTAIC SYSTEMS AS REQUIRED BY
NEC 690.4: PV MODULES: UL1703, IEC61730, AND IEC61215, AND NFPA 70
CLASS C FIRE INVERTERS: UL 1741 CERTIFIED, IEEE 1547, 929, 519
COMBINER BOX(ES): UL 1703 OR UL 1741 ACCESSORY
1.1.5 MAX DC VOLTAGE CALCULATED USING MANUFACTURER PROVIDED
TEMP COEFFICIENT FOR VOC. IF UNAVAILABLE, MAX DC VOLTAGE
CALCULATED ACCORDING TO NEC 690.7.
1.1.6 ALL INVERTERS, PHOTOVOLTAIC MODULES, PHOTOVOLTAIC PANELS,
AND SOURCE CIRCUIT COMBINERS INTENDED FOR USE IN A
PHOTOVOLTAIC POWER SYSTEM WILL BE IDENTIFIED AND LISTED FOR
THE APPLICATION PER 690.4 (D). SHALL BE INSTALLED ACCORDING TO
ANY INSTRUCTIONS FROM LISTING OR LABELING [NEC 110.3].
1.1.7 ALL SIGNAGE TO BE PLACED IN ACCORDANCE WITH LOCAL BUILDING
CODE. IF EXPOSED TO SUNLIGHT, IT SHALL BE UV RESISTANT. ALL
PLAQUES AND SIGNAGE WILL BE INSTALLED AS REQUIRED BY THE NEC
AND AHJ.
1.2.1 SCOPE OF WORK:
1.2.2 PRIME CONTRACTOR IS RESPONSIBLE FOR THE DESIGN AND
SPECIFICATIONS OF THE GRID-TIED PHOTOVOLTAIC SYSTEM RETROFIT.
PRIME CONTRACTOR WILL BE RESPONSIBLE FOR COLLECTING
EXISTING ONSITE REQUIREMENTS TO DESIGN, SPECIFY, AND INSTALL
THE EXTERIOR ROOF-MOUNTED PORTION OF THE PHOTOVOLTAIC
SYSTEMS DETAILED IN THIS DOCUMENT.
1.3.1 WORK INCLUDES:
1.3.2 PV ROOF ATTACHMENTS - IRONRIDGE FLASHFOOT2
1.3.3 PV RACKING SYSTEM INSTALLATION - IRONRIDGE XR-100
1.3.4 PV MODULE AND INVERTER INSTALLATION - JA SOLAR
JAM54S31-395/MR / SOLAR EDGE SE10000H-US (240V) WITH PRISM
TECHNOLOGY / BACKUP INTERFACE BI-EUSGN-01/ SOLAR EDGE
ENERGY BANK 10KWH
1.3.5 PV EQUIPMENT GROUNDING
1.3.6 PV SYSTEM WIRING TO A ROOF-MOUNTED JUNCTION BOX
1.3.7 PV LOAD CENTERS (IF INCLUDED)
1.3.8 PV METERING/MONITORING (IF INCLUDED)
1.3.9 PV DISCONNECTS
1.3.10 PV FINAL COMMISSIONING
1.3.11 (E) ELECTRICAL EQUIPMENT RETROFIT FOR PV
1.3.12 SIGNAGE PLACED IN ACCORDANCE WITH LOCAL BUILDING CODE
GENERAL NOTES
N2017C
SCOPE OF WORK
SYSTEM SIZE: STC: 35 x 395W = 13.825kW
PTC: 35 x 368.7W = 12.905kW
(35) JA SOLAR JAM54S31-395/MR
(1) SOLAR EDGE SE10000H-US ENERGY HUB INVERTER
WITH PRISM TECHNOLOGY (240V)
(2) SOLAREDGE ENERGYBANK 10KWH
(1) BACKUP INTERFACE BI-EUSGN-01
ATTACHMENT TYPE: IRONRIDGE FLASHFOOT2
MSP UPGRADE: NO
OWNER
NAME: FRANCIS SAVAGE
PROJECT MANAGER
NAME: ERIC WILSON
PHONE:
CONTRACTOR
NAME: INSIGHT SOLAR
PHONE: 4133387555
AUTHORITIES HAVING JURISDICTION
BUILDING: NORTHAMPTON CITY
ZONING: NORTHAMPTON CITY
UTILITY:
DESIGN SPECIFICATIONS
OCCUPANCY: II
CONSTRUCTION: SINGLE-FAMILY
ZONING: RESIDENTIAL
GROUND SNOW LOAD: 40 PSF
WIND EXPOSURE: B
WIND SPEED: 117 MPH
APPLICABLE CODES & STANDARDS
BUILDING: MASSACHUSETTS BUILDING CODE,
9TH EDITION, ASAMENDED (780 CMR)
MASSACHUSETTS RESIDENTIONAL BUILDING
CODE, 9TH EDITION, AS AMENDED (780 CMR)
ELECTRICAL: NEC 2020
FIRE: MASSACHUSETTS COMPREHENSIVE FIRE
SAFETY CODE (527 CMR 1.00)
PROJECT INFORMATION
NEW PV SYSTEM: 13.825 kWp
SAVAGE RESIDENCE
41 HENSHAW AVE
NORTHAMPTON, MA 01060
ASSESSOR'S #: 31B-171-001
B F
A DE
2
3
UNAUTHORIZED USE OF THIS
DRAWING SET WITHOUT WRITTEN
PERMISSION FROM CONTRACTOR IS IN
VIOLATION OF U.S. COPYRIGHT LAWS
AND WILL BE SUBJECT TO CIVIL
DAMAGES AND PROSECUTIONS.
NEW PV SYSTEM: 13.825 kWp
ENGINEER OF RECORD
11.20.2022
DESIGN BY:I.P.
M.B.
SAVAGE
RESIDENCE
41 HENSHAW AVE
NORTHAMPTON, MA 01060
APN: 31B-171-001
PAPER SIZE: 11" x 17" (ANSI B)
A CDE GH
BC FGH
1
4
5
6
CONTRACTOR
PHONE:
LIC. NO.:
DATE:
CHECKED BY:
REVISIONS
HIC. NO.:
ELE. NO.:
ADDRESS:59C NORTH
HATFIELD, MA 01038
INSIGHT SOLAR
4133387555
MA 192102
T-001.00
COVER PAGE
(SHEET 1)
01 AERIAL PHOTO
NOT TO SCALE
N
EW
S
02 PLAT MAP
NOT TO SCALE
SHEET LIST TABLE
SHEET NUMBER SHEET TITLE
T-001 COVER PAGE
G-001 NOTES
A-101 SITE PLAN
A-102 ELECTRICAL PLAN
A-103 SOLAR ATTACHMENT PLAN
E-601 LINE DIAGRAM
E-602 DESIGN TABLES
E-603 PLACARDS
S-501 ASSEMBLY DETAILS
R-001 RESOURCE DOCUMENT
R-002 RESOURCE DOCUMENT
R-003 RESOURCE DOCUMENT
R-004 RESOURCE DOCUMENT
R-005 RESOURCE DOCUMENT
R-006 RESOURCE DOCUMENT
R-007 RESOURCE DOCUMENT
HENSHAW AVE11-22-2022
2.1.1 SITE NOTES:
2.1.2 A LADDER WILL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH OSHA
REGULATIONS.
2.1.3 THE PV MODULES ARE CONSIDERED NON-COMBUSTIBLE AND THIS SYSTEM IS A
UTILITY INTERACTIVE SYSTEM WITH STORAGE BATTERIES.
2.1.4 THE SOLAR PV INSTALLATION WILL NOT OBSTRUCT ANY PLUMBING, MECHANICAL, OR
BUILDING ROOF VENTS.
2.1.5 PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING AND PROPOSED
ELECTRICAL EQUIPMENT WILL BE PROVIDED AS PER SECTION NEC 110.26.
2.1.6 ROOF COVERINGS SHALL BE DESIGNED, INSTALLED, AND MAINTAINED IN
ACCORDANCE WITH THIS CODE AND THE APPROVED MANUFACTURER'S
INSTRUCTIONS SUCH THAT THE ROOF COVERING SERVES TO PROTECT THE
BUILDING OR STRUCTURE.
2.2.1 EQUIPMENT LOCATIONS
2.2.2 ALL EQUIPMENT SHALL MEET MINIMUM SETBACKS AS REQUIRED BY NEC 110.26.
2.2.3 WIRING SYSTEMS INSTALLED IN DIRECT SUNLIGHT MUST BE RATED FOR EXPECTED
OPERATING TEMPERATURE AS SPECIFIED BY NEC 690.31 (A),(C) AND NEC TABLES
310.15 (B)(2)(A) AND 310.15 (B)(3)(C).
2.2.3 JUNCTION AND PULL BOXES PERMITTED INSTALLED UNDER PV MODULES
ACCORDING TO NEC 690.34.
2.2.4 ADDITIONAL AC DISCONNECT(S) SHALL BE PROVIDED WHERE THE INVERTER IS NOT
WITHIN SIGHT OF THE AC SERVICING DISCONNECT.
2.2.5 ALL EQUIPMENT SHALL BE INSTALLED ACCESSIBLE TO QUALIFIED PERSONNEL
ACCORDING TO NEC APPLICABLE CODES.
2.2.6 ALL COMPONENTS ARE LISTED FOR THEIR PURPOSE AND RATED FOR OUTDOOR
USAGE WHEN APPROPRIATE.
2.3.1 STRUCTURAL NOTES:
2.3.2 RACKING SYSTEM & PV ARRAY WILL BE INSTALLED ACCORDING TO
CODE-COMPLIANT INSTALLATION MANUAL. TOP CLAMPS REQUIRE A
DESIGNATED SPACE BETWEEN MODULES, AND RAILS MUST ALSO EXTEND A
MINIMUM DISTANCE BEYOND EITHER EDGE OF THE ARRAY/SUBARRAY,
ACCORDING TO RAIL MANUFACTURER’S INSTRUCTIONS.
2.3.3 JUNCTION BOX WILL BE INSTALLED PER MANUFACTURERS' SPECIFICATIONS.
IF ROOF-PENETRATING TYPE, IT SHALL BE FLASHED & SEALED PER LOCAL
REQUIREMENTS.
2.3.4 ROOFTOP PENETRATIONS FOR PV RACEWAY WILL BE COMPLETED AND
SEALED W/ APPROVED CHEMICAL SEALANT PER CODE BY A LICENSED
CONTRACTOR.
2.3.5 ALL PV RELATED ROOF ATTACHMENTS TO BE SPACED NO GREATER THAN THE
SPAN DISTANCE SPECIFIED BY THE RACKING MANUFACTURER.
2.3.6 WHEN POSSIBLE, ALL PV RELATED RACKING ATTACHMENTS WILL BE
STAGGERED AMONGST THE ROOF FRAMING MEMBERS.
2.4.1 GROUNDING NOTES:
2.4.2 GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FOR THEIR PURPOSE, AND
GROUNDING DEVICES EXPOSED TO THE ELEMENTS SHALL BE RATED FOR SUCH
USE.
2.4.3 PV SYSTEMS REQUIRE AN EQUIPMENT GROUNDING CONDUCTOR. ALL METAL
ELECTRICAL EQUIPMENT AND STRUCTURAL COMPONENTS BONDED TO GROUND, IN
ACCORDANCE WITH 250.134 OR 250.136(A). ONLY THE DC CONDUCTORS ARE
UNGROUNDED.
2.4.4 PV EQUIPMENT SHALL BE GROUNDED ACCORDING TO NEC 690.43 AND MINIMUM NEC
TABLE 250.122.
2.4.5 METAL PARTS OF MODULE FRAMES, MODULE RACKING, AND ENCLOSURE
CONSIDERED GROUNDED IN ACCORD WITH 250.134 AND 250.136(A).
2.4.6 EACH MODULE WILL BE GROUNDED USING WEEB GROUNDING CLIPS AS SHOWN IN
MANUFACTURER DOCUMENTATION AND APPROVED BY THE AHJ. IF WEEBS ARE NOT
USED, MODULE GROUNDING LUGS MUST BE INSTALLED AT THE SPECIFIED
GROUNDING LUG HOLES PER THE MANUFACTURERS' INSTALLATION
REQUIREMENTS.
2.4.7 THE GROUNDING CONNECTION TO A MODULE SHALL BE ARRANGED SUCH THAT THE
REMOVAL OF A MODULE DOES NOT INTERRUPT A GROUNDING CONDUCTOR TO
ANOTHER MODULE.
2.4.8 GROUNDING AND BONDING CONDUCTORS, IF INSULATED, SHALL BE COLORED GREEN
OR MARKED GREEN IF #4 AWG OR LARGER [NEC 250.119]
2.4.9 THE GROUNDING ELECTRODE SYSTEM COMPLIES WITH NEC 690.47 AND NEC 250.50
THROUGH 250.106. IF EXISTING SYSTEM IS INACCESSIBLE, OR INADEQUATE, A
GROUNDING ELECTRODE SYSTEM PROVIDED ACCORDING TO NEC 250, NEC 690.47
AND AHJ.
2.4.10 DC PV ARRAYS SHALL BE PROVIDED WITH DC GROUND-FAULT PROTECTION MEETING
THE REQUIREMENTS OF 690.41(B)(1) AND (2) TO REDUCE FIRE HAZARDS
2.5.1 INTERCONNECTION NOTES:
2.5.2 LOAD-SIDE INTERCONNECTION SHALL BE IN ACCORDANCE WITH [NEC
705.12 (B)]
2.5.3 THE SUM OF THE UTILITY OCPD AND INVERTER CONTINUOUS OUTPUT MAY
NOT EXCEED 120% OF BUSBAR RATING [NEC 705.12(B)(2)(3)].
2.5.4 THE SUM OF 125 PERCENT OF THE POWER SOURCE(S) OUTPUT CIRCUIT
CURRENT AND THE RATING OF THE OVERCURRENT DEVICE PROTECTING THE
BUSBAR SHALL NOT EXCEED 120 PERCENT OF THE AMPACITY OF THE
BUSBAR, PV DEDICATED BACKFEED BREAKERS MUST BE LOCATED OPPOSITE
END OF THE BUS FROM THE UTILITY SOURCE OCPD [NEC 705.12(B)(2)(3)].
2.5.5 AT MULTIPLE ELECTRIC POWER SOURCES OUTPUT COMBINER PANEL, TOTAL
RATING OF ALL OVERCURRENT DEVICES SHALL NOT EXCEED AMPACITY OF
BUSBAR. HOWEVER, THE COMBINED OVERCURRENT DEVICE MAY BE
EXCLUDED ACCORDING TO NEC 705.12 (B)(2)(3)(C).
2.5.6 FEEDER TAP INTERCONNECTION (LOAD SIDE) ACCORDING TO NEC 705.12
(B)(2)(1)
2.5.7 SUPPLY SIDE TAP INTERCONNECTION ACCORDING TO NEC 705.12 (A) WITH
SERVICE ENTRANCE CONDUCTORS IN ACCORDANCE WITH NEC 230.42
2.5.8 BACKFEEDING BREAKER FOR ELECTRIC POWER SOURCES OUTPUT IS EXEMPT
FROM ADDITIONAL FASTENING [NEC 705.12 (B)(5)].
2.6.1 DISCONNECTION AND OVER-CURRENT PROTECTION NOTES:
2.6.2 DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT WHEN THE SWITCH
IS OPENED THE CONDUCTORS REMAINING ENERGIZED ARE CONNECTED TO
THE TERMINALS MARKED “LINE SIDE” (TYPICALLY THE UPPER TERMINALS).
2.6.3 DISCONNECTS TO BE ACCESSIBLE TO QUALIFIED UTILITY PERSONNEL, BE
LOCKABLE, AND BE A VISIBLE-BREAK SWITCH.
2.6.4 BOTH POSITIVE AND NEGATIVE PV CONDUCTORS ARE UNGROUNDED.
THEREFORE BOTH MUST OPEN WHERE A DISCONNECT IS REQUIRED,
ACCORDING TO NEC 690.13.
2.6.5 ISOLATING DEVICES OR EQUIPMENT DISCONNECTING MEANS SHALL BE
INSTALLED IN CIRCUITS CONNECTED TO EQUIPMENT AT A LOCATION WITHIN
THE EQUIPMENT, OR WITHIN SIGHT AND WITHIN 10 FT. OF THE EQUIPMENT. AN
EQUIPMENT DISCONNECTING MEANS SHALL BE PERMITTED TO BE REMOTE
FROM THE EQUIPMENT WHERE THE EQUIPMENT DISCONNECTING MEANS CAN
BE REMOTELY OPERATED FROM WITHIN 10 FT. OF THE EQUIPMENT,
ACCORDING TO NEC 690.15 (A).
2.6.6 PV SYSTEM CIRCUITS INSTALLED ON OR IN BUILDINGS SHALL INCLUDE A
RAPID SHUTDOWN FUNCTION TO REDUCE SHOCK HAZARD FOR EMERGENCY
RESPONDERS IN ACCORDANCE WITH 690.12(A) THROUGH (D)
2.6.7 ALL OCPD RATINGS AND TYPES SPECIFIED ACCORDING TO NEC 690.8, 690.9,
AND 240.
2.6.8 BOTH POSITIVE AND NEGATIVE PV CONDUCTORS ARE UNGROUNDED,
THEREFORE BOTH REQUIRE OVER-CURRENT PROTECTION, ACCORDING TO
NEC 240.21. (SEE EXCEPTION IN NEC 690.9)
2.6.9 IF REQUIRED BY AHJ, SYSTEM WILL INCLUDE ARC-FAULT CIRCUIT PROTECTION
ACCORDING TO NEC 690.11 AND UL1699B.
2.7.1 WIRING & CONDUIT NOTES:
2.7.2 ALL CONDUIT AND WIRE WILL BE LISTED AND APPROVED FOR THEIR PURPOSE.
CONDUIT AND WIRE SPECIFICATIONS ARE BASED ON MINIMUM CODE
REQUIREMENTS AND ARE NOT MEANT TO LIMIT UP-SIZING.
2.7.3 ALL CONDUCTORS SIZED ACCORDING TO NEC 690.8, NEC 690.7.
2.7.4 EXPOSED PV SOURCE CIRCUITS AND OUTPUT CIRCUITS SHALL USE WIRE
LISTED AND IDENTIFIED AS PHOTOVOLTAIC (PV) WIRE [690.31 (C)]. PV
MODULES WIRE LEADS SHALL BE LISTED FOR USE ON PV ARRAYS,
ACCORDING TO NEC 690.31 (A).
2.7.5 PV WIRE BLACK WIRE MAY BE FIELD-MARKED WHITE [NEC 200.6 (A)(6)].
2.7.6 MODULE WIRING SHALL BE LOCATED AND SECURED UNDER THE ARRAY.
2.7.7 ACCORDING TO NEC 200.7, UNGROUNDED SYSTEMS DC CONDUCTORS
COLORED OR MARKED AS FOLLOWS:
DC POSITIVE- RED, OR OTHER COLOR EXCLUDING WHITE, GRAY AND
GREEN
DC NEGATIVE- BLACK, OR OTHER COLOR EXCLUDING WHITE, GRAY AND
GREEN
2.7.8 AC CONDUCTORS COLORED OR MARKED AS FOLLOWS:
PHASE A OR L1- BLACK
PHASE B OR L2- RED, OR OTHER CONVENTION IF THREE PHASE
PHASE C OR L3- BLUE, YELLOW, ORANGE*, OR OTHER CONVENTION
NEUTRAL- WHITE OR GRAY
* IN 4-WIRE DELTA CONNECTED SYSTEMS THE PHASE WITH HIGHER VOLTAGE
TO BE MARKED ORANGE [NEC 110.15].
N2017C
N2017C
B F
A DE
2
3
UNAUTHORIZED USE OF THIS
DRAWING SET WITHOUT WRITTEN
PERMISSION FROM CONTRACTOR IS IN
VIOLATION OF U.S. COPYRIGHT LAWS
AND WILL BE SUBJECT TO CIVIL
DAMAGES AND PROSECUTIONS.
NEW PV SYSTEM: 13.825 kWp
ENGINEER OF RECORD
11.20.2022
DESIGN BY:I.P.
M.B.
SAVAGE
RESIDENCE
41 HENSHAW AVE
NORTHAMPTON, MA 01060
APN: 31B-171-001
PAPER SIZE: 11" x 17" (ANSI B)
A CDE GH
BC FGH
1
4
5
6
CONTRACTOR
PHONE:
LIC. NO.:
DATE:
CHECKED BY:
REVISIONS
HIC. NO.:
ELE. NO.:
ADDRESS:59C NORTH
HATFIELD, MA 01038
INSIGHT SOLAR
4133387555
MA 192102
G-001.00
NOTES
(SHEET 2)
11-22-2022
GENERAL NOTES
1. FIELD VERIFY ALL MEASUREMENTS
2. ITEMS BELOW MAY NOT BE ON THIS PAGE
PROPERTY LINE
N
EW
S
01/16" = 1'-0"
SITE PLAN01 8' 16'
B F
A DE
2
3
UNAUTHORIZED USE OF THIS
DRAWING SET WITHOUT WRITTEN
PERMISSION FROM CONTRACTOR IS IN
VIOLATION OF U.S. COPYRIGHT LAWS
AND WILL BE SUBJECT TO CIVIL
DAMAGES AND PROSECUTIONS.
NEW PV SYSTEM: 13.825 kWp
ENGINEER OF RECORD
11.20.2022
DESIGN BY:I.P.
M.B.
SAVAGE
RESIDENCE
41 HENSHAW AVE
NORTHAMPTON, MA 01060
APN: 31B-171-001
PAPER SIZE: 11" x 17" (ANSI B)
A CDE GH
BC FGH
1
4
5
6
CONTRACTOR
PHONE:
LIC. NO.:
DATE:
CHECKED BY:
REVISIONS
HIC. NO.:
ELE. NO.:
ADDRESS:59C NORTH
HATFIELD, MA 01038
INSIGHT SOLAR
4133387555
MA 192102
A-101.00
SITE PLAN
(SHEET 3)
AREA OF WORK
ENTRANCE
HENSHAW AVE
UTILITY METER
AC DISCONNECT
BACKUP INTERFACE
DC RAPID SHUTDOWN SHUNT TRIP
32'-1"
40'-11"
7'-9"
21'-3"
11-22-2022
MODULE:
JA SOLAR
JAM54S31-395/MR
395 WATTS
44.65''
67.8''
GENERAL NOTES
1. FIELD VERIFY ALL MEASUREMENTS
2. ITEMS BELOW MAY NOT BE ON THIS PAGE
B F
A DE
2
3
UNAUTHORIZED USE OF THIS
DRAWING SET WITHOUT WRITTEN
PERMISSION FROM CONTRACTOR IS IN
VIOLATION OF U.S. COPYRIGHT LAWS
AND WILL BE SUBJECT TO CIVIL
DAMAGES AND PROSECUTIONS.
NEW PV SYSTEM: 13.825 kWp
ENGINEER OF RECORD
11.20.2022
DESIGN BY:I.P.
M.B.
SAVAGE
RESIDENCE
41 HENSHAW AVE
NORTHAMPTON, MA 01060
APN: 31B-171-001
PAPER SIZE: 11" x 17" (ANSI B)
A CDE GH
BC FGH
1
4
5
6
CONTRACTOR
PHONE:
LIC. NO.:
DATE:
CHECKED BY:
REVISIONS
HIC. NO.:
ELE. NO.:
ADDRESS:59C NORTH
HATFIELD, MA 01038
INSIGHT SOLAR
4133387555
MA 192102
01/8" = 1'
ELECTRICAL PLAN014' 8'A-102.00
ELECTRICAL PLAN
(SHEET 4)
MODULE STRINGING
MODULE STRINGING
A
B
INTERIOR PV EQUIPMENT
(E) (1) UTILITY METER
EXTERIOR PV EQUIPMENT
(N) (1) AC DISCONNECT
(N) (1) INVERTER
(E) (1) MAIN ELECTRICAL PANEL
(N) (2) BATTERIES
(N) (1) BACKUP INTERFACE
MODULE STRINGINGC
(N) (1) DC RAPID SHUTDOWN SHUNT TRIP
A
ARRAY 1 - 1.975 kW
[x5] (N) MODULES
TILT: 42 DEGREES
ROOF PITCH: 11:12
AZIMUTH: 190 DEGREES
N
EW
S
(N) (1) JUNCTION BOX
A
A
A
A
A
AAA
B B B B
BB
B
B
B
B
B
B
C
C
C
C
C
C
C
C
C
C
C
C
CC
ARRAY 2 - 2.370 kW
[x6] (N) MODULES
TILT: 42 DEGREES
ROOF PITCH: 11:12
AZIMUTH: 190 DEGREES
ARRAY 3 - 1.580 kW
[x4] (N) MODULES
TILT: 42 DEGREES
ROOF PITCH: 11:12
AZIMUTH: 280 DEGREES
ARRAY 4 - 2.370 kW
[x6] (N) MODULES
TILT: 5 DEGREES
ROOF PITCH: 1:12
AZIMUTH: 0 DEGREES
ARRAY 5 - 5.530 kW
[x14] (N) MODULES
TILT: 5 DEGREES
ROOF PITCH: 1:12
AZIMUTH: 0 DEGREES
11-22-2022
GENERAL NOTES
1. FIELD VERIFY ALL MEASUREMENTS
2. ITEMS BELOW MAY NOT BE ON THIS PAGE
ROOF RAFTERS
MODULE:
JA SOLAR
JAM54S31-395/MR
395 WATTS
44.65''
67.8''
B F
A DE
2
3
UNAUTHORIZED USE OF THIS
DRAWING SET WITHOUT WRITTEN
PERMISSION FROM CONTRACTOR IS IN
VIOLATION OF U.S. COPYRIGHT LAWS
AND WILL BE SUBJECT TO CIVIL
DAMAGES AND PROSECUTIONS.
NEW PV SYSTEM: 13.825 kWp
ENGINEER OF RECORD
11.20.2022
DESIGN BY:I.P.
M.B.
SAVAGE
RESIDENCE
41 HENSHAW AVE
NORTHAMPTON, MA 01060
APN: 31B-171-001
PAPER SIZE: 11" x 17" (ANSI B)
A CDE GH
BC FGH
1
4
5
6
CONTRACTOR
PHONE:
LIC. NO.:
DATE:
CHECKED BY:
REVISIONS
HIC. NO.:
ELE. NO.:
ADDRESS:59C NORTH
HATFIELD, MA 01038
INSIGHT SOLAR
4133387555
MA 192102
01/8" = 1'
SOLAR ATTACHMENT PLAN014' 8'A-103.00
SOLAR ATTACHMENT PLAN
(SHEET 5)
ROOF MATERIAL IS ASPHALT SHINGLE
N
EW
S
FLUSH MOUNT SOLAR MODULES
ATTACHED TO ROOF SURFACE (SEE
SHEET S-501 FOR MOUNTING DETAILS)
11'-2"14'-11"
11'-2"
11'-2"
26'-1"
11-22-2022
1. PV SYSTEM EQUIPPED WITH RAPID
SHUTDOWN DISCONNECT PER NEC 690.12
2. SYSTEM COMPLIANT WITH NEC 690.13
6
GG
L1
L2
N
N G
(E)
MAIN
200A
TO (E)
LOADS
(E) MAIN ELECTRICAL PANEL
240/120 V 1Ø, 3W
MAIN BUSS: 200A
SOLAR EDGE
SE10000H-US ENERGY HUB
INVERTER WITH PRISM
TECHNOLOGY (240V)
NOMINAL OUTPUT
POWER = 10000W
(N) (35) JA SOLAR
JAM54S31-395/MR
395W
(N) (35) SOLAR EDGE
P401 POWER
OPTIMIZER
BACKUP INTERFACE
BI-EUSGN-01-+I SOLAREDGE
ENERGYBANK
10KWH
3 4
G
AC DISCONNECT
60A
7 -+I SOLAREDGE
ENERGYBANK
10KWH
5
L2
N
L1
(E)
UTILITY
METER
L1
L2
N
G
GNL2L1
L1
L2
N
G NL2L1
GNL2L1G
EXT RSD
ON OFF
CB1
200A/2P60A
(N) DC RAPID
SHUTDOWN
SHUNT TRIP
L2
N
L1
TO UTILITY
GRID (OH)
CB2
MODULE STRINGINGA
MODULE STRINGINGB
MODULE STRINGINGC
(E) GROUNDING
ELECTRODE
GROUND
ROD
G
2
IN BRANCH
A
9
IN BRANCH
B
12
1
IN BRANCH
C
14 (N) JUNCTION BOX
CONDUCTOR AND CONDUIT SCHEDULE W/ELECTRICAL CALCULATIONS
ID TYPICAL CONDUCTOR CONDUIT
CURRENT-CARRYING
CONDUCTORS IN CONDUIT OCPD EGC
TEMP. CORR.
FACTOR
CONDUIT FILL
FACTOR
CONT.
CURRENT
MAX. CURRENT
(125%)BASE AMP.DERATED
AMP.TERM. TEMP. RATING AMP. @ TERMINAL
1 3 10 AWG PV WIRE, COPPER FREE AIR 2 N/A
6 AWG BARE, COPPER 0.96 (32.7 °C)1 15A 18.75A 55A 52.8A 75°C 50A
21 10 AWG THWN-2, COPPER 0.75'' DIA EMT 6 N/A
6 AWG THWN-2, COPPER 0.96 (32.7 °C)0.8 15A 18.75A 40A 30.72A 75°C 35A
3 1 6 AWG THWN-2, COPPER 0.75'' DIA EMT 3 N/A
6 AWG THWN-2, COPPER 0.96 (32.7 °C)1 42A 52.5A 75A 72A 75°C 65A
41 6 AWG THWN-2, COPPER 0.75'' DIA EMT 3 60A
6 AWG THWN-2, COPPER 0.96 (32.7 °C)1 42A 52.5A 75A 72A 75°C 65A
5 1 3/O AWG THWN-2, COPPER 0.75'' DIA EMT 3 200A -0.96 (32.7 °C)1-200A 225A 216A 75°C 200A
61 3/O AWG THWN-2, COPPER 1'' DIA EMT 3 200A
6 AWG THWN-2, COPPER 0.96 (32.7 °C)1 - 200A 225A 216A 75°C 200A
72 10 AWG THWN-2, COPPER 0.75'' DIA EMT 4 N/A -
0.96 (32.7 °C)1 20A 25A 40A 38.4A 75°C 35A
E-601.00
LINE DIAGRAM
(SHEET 6)
B F
A DE
2
3
UNAUTHORIZED USE OF THIS
DRAWING SET WITHOUT WRITTEN
PERMISSION FROM CONTRACTOR IS IN
VIOLATION OF U.S. COPYRIGHT LAWS
AND WILL BE SUBJECT TO CIVIL
DAMAGES AND PROSECUTIONS.
NEW PV SYSTEM: 13.825 kWp
ENGINEER OF RECORD
11.20.2022
DESIGN BY:I.P.
M.B.
SAVAGE
RESIDENCE
41 HENSHAW AVE
NORTHAMPTON, MA 01060
APN: 31B-171-001
PAPER SIZE: 11" x 17" (ANSI B)
A CDE GH
BC FGH
1
4
5
6
CONTRACTOR
PHONE:
LIC. NO.:
DATE:
CHECKED BY:
REVISIONS
HIC. NO.:
ELE. NO.:
ADDRESS:59C NORTH
HATFIELD, MA 01038
INSIGHT SOLAR
4133387555
MA 192102
11-22-2022
BILL OF MATERIALS
CATEGORY MAKE MODEL NUMBER REF QTY UNIT QTY/UNIT DESCRIPTION
MODULE JA SOLAR JAM54S31-395/MR PM1-35 35 PIECES 1
JA SOLAR JAM54S31-395/MR 395W 108 HALF-CELLS, MONOCRYSTALLINE SILICON
INVERTER SOLAR EDGE
SE10000H-US (240V) ENERGY HUB
INVERTER WITH PRISM TECHNOLOGY (240V)I1 1 PIECE 1
SOLAR EDGE SE10000H-US (240V) ENERGY HUB INVERTER WITH PRISM TECHNOLOGY (240V) 10000W INVERTER
MODULE OPTIMIZER SOLAR EDGE P401 PO1-35 35 PIECES 1
SOLAR EDGE P401 OPTIMIZER (REQUIRED PART OF INVERTER'S DISTRIBUTED DC ARCHITECTURE)
DISCONNECT EATON DG222URB SW1 1 PIECE 1 EATON DG222URB, NON FUSED, 2-POLE, 60A, 240VAC OR EQUIVALENT
BACKUP INTERFACE SOLAR EDGE BI-EUSGN-01 BI1 1 PIECE 1
SOLAR EDGE BACKUP INTERFACE BI-EUSGN-01, 200A MAX
STORAGE BATTERY SOLAR EDGE ENERGY BANK 10KWH BB1-2 2 PIECES 1 STORAGE BATTERY SOLAR EDGE ENERGY BANK 10KWH
WIRING GEN-10-AWG-PV-WIRE-CU WR1 270 FEET 1
10 AWG PV WIRE, COPPER (POSITIVE AND NEGATIVE)
WIRING GEN-6-AWG-BARE-CU WR1 135 FEET 1 6 AWG BARE, COPPER (GROUND)
WIRING GEN-10-AWG-THWN-2-CU-RD
WR2, 7 60 FEET 1
10 AWG THWN-2, COPPER, RED (POSITIVE)
WIRING GEN-10-AWG-THWN-2-CU-BLK
WR2, 7 60 FEET 1
10 AWG THWN-2, COPPER, BLACK (NEGATIVE)
WIRING GEN-6-AWG-THWN-2-CU-RD WR3-4 30 FEET 1 6 AWG THWN-2, COPPER, RED (LINE 1)
WIRING GEN-6-AWG-THWN-2-CU-BLK WR3-4 30 FEET 1
6 AWG THWN-2, COPPER, BLACK (LINE 2)
WIRING GEN-6-AWG-THWN-2-CU-WH WR3-4 30 FEET 1
6 AWG THWN-2, COPPER, WHITE (NEUTRAL)
WIRING GEN-6-AWG-THWN-2-CU-GR
WR2-4,6 40 FEET 1
6 AWG THWN-2, COPPER, GREEN (GROUND)
WIRING GEN-3/0-AWG-THWN-2-CU-RD WR5-6 40 FEET 1 3/0 AWG THWN-2, COPPER, RED (LINE 1)
WIRING GEN-3/0-AWG-THWN-2-CU-BLK WR5-6 40 FEET 1
3/0 AWG THWN-2, COPPER, BLACK (LINE 2)
WIRING GEN-3/0-AWG-THWN-2-CU-WH WR5-6 40 FEET 1
3/0 AWG THWN-2, COPPER, WHITE (NEUTRAL)
WIREWAY GEN-EMT-0.75'' DIA
WW2-5, 7 60 FEET 1
EMT CONDUIT, 0.75'' DIA
WIREWAY GEN-EMT-2'' DIA WW5-6 40 FEET 1
EMT CONDUIT, 2'' DIA
OCPD GENERIC MANUFACTURER GEN-CB-60A-240VAC CB1 1 PIECE 1
CIRCUIT BREAKER, 60A, 240VAC
OCPD GENERIC MANUFACTURER GEN-CB-200A-240VAC CB2 1 PIECE 1
CIRCUIT BREAKER, 200A, 240VAC
TRANSITION BOX GENERIC MANUFACTURER GEN-AWB-TB-4-4X JB1-2 2 PIECES 1 TRANSITION/PASS-THROUGH BOX, WITH 4 TERMINAL BLOCKS
DISCONNECTS
INVERTERS
OCPDS
ASHRAE EXTREME LOW -25.9°C (-14.6°F), SOURCE: BARNES MUNI (42.16°; -72.72°)
ASHRAE 2% HIGH 32.7°C (90.9°F), SOURCE: BARNES MUNI (42.16°; -72.72°)
REF.QTY.RATED CURRENT MAX VOLTAGE
CB1 1 60A 240VAC
CB2 1 200A 240VAC
REF.QTY.MAKE AND MODEL RATED CURRENT MAX RATED VOLTAGE
SW1 1 EATON DG222URB OR EQUIV.60A 240VAC
REF.QTY.MAKE AND MODEL AC
VOLTAGE GROUND OCPD
RATING
RATED
POWER
MAX OUTPUT
CURRENT
MAX INPUT
CURRENT
MAX INPUT
VOLTAGE
CEC WEIGHTED
EFFICIENCY
I1 1
SOLAR EDGE SE10000H-US (240V) ENERGY HUB
INVERTER WITH PRISM TECHNOLOGY (240V)240V FLOATING 60A 10000W 42A 27A 480V 99.0%
POWER OPTIMIZERS
MODULES
REF.QTY.MAKE AND MODEL PMAX PTC ISC IMP VOC VMP TEMP. COEFF. OF VOC FUSE RATING
PM1-35 35 JA SOLAR JAM54S31-395/MR 395W 368.7W 13.7A 12.81A 36.98V 30.84V
-0.102V/°C (-0.28%/°C)20A
REF.QTY.MODEL RATED INPUT POWER MAX OUTPUT CURRENT MAX INPUT ISC MAX DC VOLTAGE WEIGHTED EFFICIENCY
PO1-35 35 SOLAR EDGE P401 400W 15A 14.65A 60V 98.8%
SYSTEM SUMMARY
INVERTER #1
STRING #1 STRING #2 STRING #3
POWERBOX MAX OUTPUT CURRENT 15A 15A 15A
OPTIMIZERS IN SERIES 9 12 14
NOMINAL STRING VOLTAGE 400V 400V 400V
ARRAY OPERATING CURRENT 8.89A 11.85A 13.83A
ARRAY STC POWER 13,825W
ARRAY PTC POWER 12,905W
MAX AC CURRENT 42A
MAX AC POWER 10,000W
DERATED (CEC) AC POWER 10,000W
E-602.00
DESIGN TABLES
(SHEET 7)
B F
A DE
2
3
UNAUTHORIZED USE OF THIS
DRAWING SET WITHOUT WRITTEN
PERMISSION FROM CONTRACTOR IS IN
VIOLATION OF U.S. COPYRIGHT LAWS
AND WILL BE SUBJECT TO CIVIL
DAMAGES AND PROSECUTIONS.
NEW PV SYSTEM: 13.825 kWp
ENGINEER OF RECORD
11.20.2022
DESIGN BY:I.P.
M.B.
SAVAGE
RESIDENCE
41 HENSHAW AVE
NORTHAMPTON, MA 01060
APN: 31B-171-001
PAPER SIZE: 11" x 17" (ANSI B)
A CDE GH
BC FGH
1
4
5
6
CONTRACTOR
PHONE:
LIC. NO.:
DATE:
CHECKED BY:
REVISIONS
HIC. NO.:
ELE. NO.:
ADDRESS:59C NORTH
HATFIELD, MA 01038
INSIGHT SOLAR
4133387555
MA 192102
11-22-2022
(E) UTILITY
METER (N) BATTERY
EXTERIOR EQUIPMENT
TO PV ARRAY
(N) AC DISCONNECT
(N) INVERTER
TO (N) INVERTER
TO (E) MEP
(E) MEP
TO (N) BACKUP INTERFACE
TO (N) AC DISCONNECT
INTERIOR EQUIPMENT
(E) UTILITY
(N) BACKUP INTERFACE
(N) BATTERY
GRADE
FRONT
BACK
!CAUTION!
MULTIPLE SOURCES OF POWER. THIS
BUILDING IS ALSO SUPPLIED FROM ROOF
MOUNTED SOLAR ARRAY AND ESS WITH
SAFETY DISCONNECTS AS SHOWN:
01 EQUIPMENT ELEVATION
NOT TO SCALE E-603.00
PLACARDS
(SHEET 8)
B F
A DE
2
3
UNAUTHORIZED USE OF THIS
DRAWING SET WITHOUT WRITTEN
PERMISSION FROM CONTRACTOR IS IN
VIOLATION OF U.S. COPYRIGHT LAWS
AND WILL BE SUBJECT TO CIVIL
DAMAGES AND PROSECUTIONS.
NEW PV SYSTEM: 13.825 kWp
ENGINEER OF RECORD
11.20.2022
DESIGN BY:I.P.
M.B.
SAVAGE
RESIDENCE
41 HENSHAW AVE
NORTHAMPTON, MA 01060
APN: 31B-171-001
PAPER SIZE: 11" x 17" (ANSI B)
A CDE GH
BC FGH
1
4
5
6
CONTRACTOR
PHONE:
LIC. NO.:
DATE:
CHECKED BY:
REVISIONS
HIC. NO.:
ELE. NO.:
ADDRESS:59C NORTH
HATFIELD, MA 01038
INSIGHT SOLAR
4133387555
MA 192102
PV ARRAY
ELECTRICAL SHOCK HAZARD
TERMINALS ON THE LINE AND
LOAD SIDES MAY BE ENERGIZED
IN THE OPEN POSITION
WARNING
LABEL 1
AT EACH DISCONNECTING MEANS FOR
PHOTOVOLTAIC EQUIPMENT (2" X 4").
[NEC 690.13].
POWER SOURCE
OUTPUT CONNECTION
DO NOT RELOCATE THIS
OVERCURRENT DEVICE
WARNING
LABEL 2
AT POINT OF INTERCONNECTION
OVERCURRENT DEVICE (2" X 4").
[NEC 705.12(B)(2)(3)(B)].
LABEL 4
AT EXPOSED RACEWAYS, CABLE TRAYS, AND OTHER WIRING
METHODS; SPACED AT MAXIMUM 10 FT SECTION OR WHERE
SEPARATED BY ENCLOSURES, WALLS, PARTITIONS, CEILINGS,
OR FLOORS (5 3/4" X 1 1/8").
[NEC 690.31(G)]
LETTERS AT LEAST 3/8 INCH; WHITE ON RED BACKGROUND;
REFLECTIVE
[IFC 605.11.1.1]
RAPID SHUTDOWN
SWITCH FOR
SOLAR PV SYSTEM
LABEL 5
AT RAPID SHUTDOWN DISCONNECT SWITCH (5 1/4" X 2").
[NEC 690.56(C)(3)].
LABEL 9
AT EACH AC DISCONNECTING MEANS
(4" X 1").
[NEC 690.13(B)].
LABEL 10
AT EACH DC DISCONNECTING MEANS
(4" X 1").
[NEC 690.13(B)].
SOLAR PV SYSTEM
EQUIPPED WITH
RAPID SHUTDOWN
TURN RAPID SHUTDOWN SWITCH TO
THE "OFF" POSITION TO SHUT DOWN
PV SYSTEM AND REDUCE SHOCK
HAZARD IN ARRAY
SOLAR ELECTRIC
PV PANELS
LABEL 3
AT RAPID SHUTDOWN SYSTEM
(3 3/4" X 5 1/4"). [NEC 690.56(C)(1)(A)].
LABELING NOTES
1.1 LABELING REQUIREMENTS BASED ON THE 2020 NATIONAL ELECTRICAL CODE,
INTERNATIONAL FIRE CODE 605.11, OSHA STANDARD 1910.145, ANSI Z535
1.2 MATERIAL BASED ON THE REQUIREMENTS OF THE AUTHORITY HAVING
JURISDICTION.
1.3 LABELS TO BE OF SUFFICIENT DURABILITY TO WITHSTAND THE ENVIRONMENT
INVOLVED.
1.4 LABELS TO BE A MINIMUM LETTER HEIGHT OF 3/8” AND PERMANENTLY AFFIXED.
1.5 ALERTING WORDS TO BE COLOR CODED. “DANGER” WILL HAVE RED
BACKGROUND; “WARNING” WILL HAVE ORANGE BACKGROUND; “CAUTION” WILL HAVE
YELLOW BACKGROUND. [ANSI Z535]
1.6 ALL SIGNAGE MUST BE PERMANENTLY ATTACHED AND BE WEATHER
RESISTANT/SUNLIGHT RESISTANT AND CANNOT BE HAND-WRITTEN PER NEC 110.21(B)
INTERACTIVE PHOTOVOLTAIC SYSTEM CONNECTED
PHOTOVOLTAIC SYSTEM DISCONNECT LOCATED
NORTH SIDE OF THE HOUSE
DIRECTORY
PERMANENT PLAQUE OR DIRECTORY PROVIDING THE LOCATION OF THE SERVICE
DISCONNECTING MEANS AND THE PHOTOVOLTAIC SYSTEM DISCONNECTING
MEANS IF NOT IN THE SAME LOCATION (5 3/4" X 1 1/8").
[NEC 690.56(B)]
WHERE THE PV SYSTEMS ARE REMOTELY LOCATED FROM EACH OTHER, A
DIRECTORY IN ACCORDANCE WITH 705.10 SHALL BE PROVIDED AT EACH PV
SYSTEM DISCONNECTING MEANS.
PV SYSTEM EQUIPMENT AND DISCONNECTING MEANS SHALL NOT BE INSTALLED IN
BATHROOMS
[NEC 690.4(D),(E)]
PHOTOVOLTAIC SOLAR
AC DISCONNECT
CAUTION
SOLAR ELECTRIC SYSTEM CONNECTED
LABEL 6
AT UTILITY METER (5 3/4" X 1 1/8")
[NEC 690.56(B)]
WARNING
TRIPLE POWER SUPPLY
SOURCES: UTILITY GRID,
BATTERY AND PV SOLAR
ELECTRIC SYSTEM
LABEL 7
AT POINT OF INTERCONNECTION
(2 3/4" X 1 5/8").
[NEC 705.12(B)(3)]
WARNING
SOLAR ELECTRIC
CIRCUIT BREAKER
IS BACKFED
LABEL 8
AT POINT OF
INTERCONNECTION
(2" X 1").
[NEC 705.12(B)(3)]
PHOTOVOLTAIC SOLAR
DC DISCONNECT
PHOTOVOLTAIC POWER SOURCE
LABEL 12
AT EACH DC DISCONNECTING
MEANS (3" X 4").
[NEC 690.53].
MAXIMUM VOLTAGE
MAXIMUM CIRCUIT CURRENT
MAX. RATED OUTPUT CURRENT
OF THE CHARGE CONTROLLER OR
DC-TO-DC CONVERTER (IF INSTALLED)
LABEL 11
AT POINT OF INTERCONNECTION, MARKED
AT DISCONNECTING MEANS (4" X 2").
[NEC 690.54]
AC DISCONNECT
PHOTOVOLTAIC SYSTEM
POWER SOURCE
RATED AC
OUTPUT CURRENT
NOMINAL OPERATING
AC VOLTAGE
AMPS
VOLTS
42
240
480
27
45 NEWSESS (INSIDE)
MAIN DISTRIBUTION
UTILITY DISCONNECT
RAPID SHUTDOWN
SWITCH FOR
SOLAR PV SYSTEM
PV ARRAY
11-22-2022
S-501
D5
20
11
121413151822
3 1
54
252423
8
27
2
S-501
D4
SHEET KEYNOTES
1. ROOF MATERIAL: ASPHALT SHINGLE
2. ROOF STRUCTURE: SINGLE SPAN RAFTER
3. ATTACHMENT TYPE: IRONRIDGE FLASHFOOT2
4. MODULE MANUFACTURER: JA SOLAR
5. MODULE MODEL: JAM54S31-395/MR
6. MODULE LENGTH: 67.8''
7. MODULE WIDTH: 44.65''
8. MODULE WEIGHT: 47.4 LBS.
9. SEE SHEET A-103 FOR DIMENSION(S)
10. MIN. FIRE OFFSET: NO FIRE CODE ENFORCED.
11. RAFTER SPACING: 24 IN. O.C.
12. RAFTER SIZE: 2X8 IN. NOMINAL
13. LAG BOLT DIAMETER: 5/16 IN.
14. LAG BOLT EMBEDMENT: 4 IN.
15. TOTAL # OF ATTACHMENTS: 88
16. TOTAL AREA: 735.79 SQ. FT.
17. TOTAL WEIGHT: 1896.48 LBS.
18. WEIGHT PER ATTACHMENT: 21.55 LBS.
19. DISTRIBUTED LOAD: 2.58 PSF.
20. MAX. HORIZONTAL STANDOFF: 48 IN.
21. MAX. VERTICAL STANDOFF: IN ACCORDANCE WITH
MODULE MANUFACTURER'S INSTRUCTIONS
22. STANDOFF STAGGERING: YES
23. RAIL MANUFACTURER (OR EQUIV.): IRONRIDGE
24. RAIL MODEL (OR EQUIVALENT): XR100
25. RAIL WEIGHT: 0.68 PLF.
26. MAX. RAFTER SPAN: N/A.
27. MODULE CLEARANCE: 3 IN. MIN., 6 IN. MAX
1. FIELD VERIFY ALL MEASUREMENTS
2. ITEMS BELOW MAY NOT BE ON THIS PAGE
GENERAL NOTES
ROOF SLOPE910
10
6 21
7
B F
A DE
2
3
UNAUTHORIZED USE OF THIS
DRAWING SET WITHOUT WRITTEN
PERMISSION FROM CONTRACTOR IS IN
VIOLATION OF U.S. COPYRIGHT LAWS
AND WILL BE SUBJECT TO CIVIL
DAMAGES AND PROSECUTIONS.
NEW PV SYSTEM: 13.825 kWp
ENGINEER OF RECORD
11.20.2022
DESIGN BY:I.P.
M.B.
SAVAGE
RESIDENCE
41 HENSHAW AVE
NORTHAMPTON, MA 01060
APN: 31B-171-001
PAPER SIZE: 11" x 17" (ANSI B)
A CDE GH
BC FGH
1
4
5
6
CONTRACTOR
PHONE:
LIC. NO.:
DATE:
CHECKED BY:
REVISIONS
HIC. NO.:
ELE. NO.:
ADDRESS:59C NORTH
HATFIELD, MA 01038
INSIGHT SOLAR
4133387555
MA 192102
S-501.00
ASSEMBLY DETAILS
RACKING DETAIL (TRANSVERSE)D1 SCALE: NOT TO SCALE
RACKING DETAIL (LONGITUDINAL)D2 SCALE: NOT TO SCALE
RACKING DETAIL (TOP)D3 SCALE: NOT TO SCALE
DETAIL (LONGITUDINAL)D5 SCALE: NOT TO SCALE
DETAIL (TRANSVERSE)D4 SCALE: NOT TO SCALE
SLIDE FLASHING, BETWEEN
1ST AND 2ND COURSE, SO
THE TOP IS AT LEAST 3/4"
ABOVE THE EDGE OF THE
3RD COURSE AND THE
BOTTOM IS ABOVE THE EDGE
OF THE 1ST COURSE.
3RD COURSE
2ND COURSE
1ST COURSE
FLASHING DETAIL (TOP)D6 SCALE: NOT TO SCALE
(SHEET 9)
11-22-2022
B F
A DE
2
3
UNAUTHORIZED USE OF THIS
DRAWING SET WITHOUT WRITTEN
PERMISSION FROM CONTRACTOR IS IN
VIOLATION OF U.S. COPYRIGHT LAWS
AND WILL BE SUBJECT TO CIVIL
DAMAGES AND PROSECUTIONS.
NEW PV SYSTEM: 13.825 kWp
ENGINEER OF RECORD
11.20.2022
DESIGN BY:I.P.
M.B.
SAVAGE
RESIDENCE
41 HENSHAW AVE
NORTHAMPTON, MA 01060
APN: 31B-171-001
PAPER SIZE: 11" x 17" (ANSI B)
A CDE GH
BC FGH
1
4
5
6
CONTRACTOR
PHONE:
LIC. NO.:
DATE:
CHECKED BY:
REVISIONS
HIC. NO.:
ELE. NO.:
ADDRESS:59C NORTH
HATFIELD, MA 01038
INSIGHT SOLAR
4133387555
MA 192102
R-001.00
RESOURCE DOCUMENT
(SHEET 10)
B F
A DE
2
3
UNAUTHORIZED USE OF THIS
DRAWING SET WITHOUT WRITTEN
PERMISSION FROM CONTRACTOR IS IN
VIOLATION OF U.S. COPYRIGHT LAWS
AND WILL BE SUBJECT TO CIVIL
DAMAGES AND PROSECUTIONS.
NEW PV SYSTEM: 13.825 kWp
ENGINEER OF RECORD
11.20.2022
DESIGN BY:I.P.
M.B.
SAVAGE
RESIDENCE
41 HENSHAW AVE
NORTHAMPTON, MA 01060
APN: 31B-171-001
PAPER SIZE: 11" x 17" (ANSI B)
A CDE GH
BC FGH
1
4
5
6
CONTRACTOR
PHONE:
LIC. NO.:
DATE:
CHECKED BY:
REVISIONS
HIC. NO.:
ELE. NO.:
ADDRESS:59C NORTH
HATFIELD, MA 01038
INSIGHT SOLAR
4133387555
MA 192102
R-002.00
RESOURCE DOCUMENT
(SHEET 11)
B F
A DE
2
3
UNAUTHORIZED USE OF THIS
DRAWING SET WITHOUT WRITTEN
PERMISSION FROM CONTRACTOR IS IN
VIOLATION OF U.S. COPYRIGHT LAWS
AND WILL BE SUBJECT TO CIVIL
DAMAGES AND PROSECUTIONS.
NEW PV SYSTEM: 13.825 kWp
ENGINEER OF RECORD
11.20.2022
DESIGN BY:I.P.
M.B.
SAVAGE
RESIDENCE
41 HENSHAW AVE
NORTHAMPTON, MA 01060
APN: 31B-171-001
PAPER SIZE: 11" x 17" (ANSI B)
A CDE GH
BC FGH
1
4
5
6
CONTRACTOR
PHONE:
LIC. NO.:
DATE:
CHECKED BY:
REVISIONS
HIC. NO.:
ELE. NO.:
ADDRESS:59C NORTH
HATFIELD, MA 01038
INSIGHT SOLAR
4133387555
MA 192102
R-003.00
RESOURCE DOCUMENT
(SHEET 12)
B F
A DE
2
3
UNAUTHORIZED USE OF THIS
DRAWING SET WITHOUT WRITTEN
PERMISSION FROM CONTRACTOR IS IN
VIOLATION OF U.S. COPYRIGHT LAWS
AND WILL BE SUBJECT TO CIVIL
DAMAGES AND PROSECUTIONS.
NEW PV SYSTEM: 13.825 kWp
ENGINEER OF RECORD
11.20.2022
DESIGN BY:I.P.
M.B.
SAVAGE
RESIDENCE
41 HENSHAW AVE
NORTHAMPTON, MA 01060
APN: 31B-171-001
PAPER SIZE: 11" x 17" (ANSI B)
A CDE GH
BC FGH
1
4
5
6
CONTRACTOR
PHONE:
LIC. NO.:
DATE:
CHECKED BY:
REVISIONS
HIC. NO.:
ELE. NO.:
ADDRESS:59C NORTH
HATFIELD, MA 01038
INSIGHT SOLAR
4133387555
MA 192102
R-004.00
RESOURCE DOCUMENT
(SHEET 13)
B F
A DE
2
3
UNAUTHORIZED USE OF THIS
DRAWING SET WITHOUT WRITTEN
PERMISSION FROM CONTRACTOR IS IN
VIOLATION OF U.S. COPYRIGHT LAWS
AND WILL BE SUBJECT TO CIVIL
DAMAGES AND PROSECUTIONS.
NEW PV SYSTEM: 13.825 kWp
ENGINEER OF RECORD
11.20.2022
DESIGN BY:I.P.
M.B.
SAVAGE
RESIDENCE
41 HENSHAW AVE
NORTHAMPTON, MA 01060
APN: 31B-171-001
PAPER SIZE: 11" x 17" (ANSI B)
A CDE GH
BC FGH
1
4
5
6
CONTRACTOR
PHONE:
LIC. NO.:
DATE:
CHECKED BY:
REVISIONS
HIC. NO.:
ELE. NO.:
ADDRESS:59C NORTH
HATFIELD, MA 01038
INSIGHT SOLAR
4133387555
MA 192102
R-005.00
RESOURCE DOCUMENT
(SHEET 14)
B F
A DE
2
3
UNAUTHORIZED USE OF THIS
DRAWING SET WITHOUT WRITTEN
PERMISSION FROM CONTRACTOR IS IN
VIOLATION OF U.S. COPYRIGHT LAWS
AND WILL BE SUBJECT TO CIVIL
DAMAGES AND PROSECUTIONS.
NEW PV SYSTEM: 13.825 kWp
ENGINEER OF RECORD
11.20.2022
DESIGN BY:I.P.
M.B.
SAVAGE
RESIDENCE
41 HENSHAW AVE
NORTHAMPTON, MA 01060
APN: 31B-171-001
PAPER SIZE: 11" x 17" (ANSI B)
A CDE GH
BC FGH
1
4
5
6
CONTRACTOR
PHONE:
LIC. NO.:
DATE:
CHECKED BY:
REVISIONS
HIC. NO.:
ELE. NO.:
ADDRESS:59C NORTH
HATFIELD, MA 01038
INSIGHT SOLAR
4133387555
MA 192102
(SHEET 15)
RESOURCE DOCUMENT
R-006.00
B F
A DE
2
3
UNAUTHORIZED USE OF THIS
DRAWING SET WITHOUT WRITTEN
PERMISSION FROM CONTRACTOR IS IN
VIOLATION OF U.S. COPYRIGHT LAWS
AND WILL BE SUBJECT TO CIVIL
DAMAGES AND PROSECUTIONS.
NEW PV SYSTEM: 13.825 kWp
ENGINEER OF RECORD
11.20.2022
DESIGN BY:I.P.
M.B.
SAVAGE
RESIDENCE
41 HENSHAW AVE
NORTHAMPTON, MA 01060
APN: 31B-171-001
PAPER SIZE: 11" x 17" (ANSI B)
A CDE GH
BC FGH
1
4
5
6
CONTRACTOR
PHONE:
LIC. NO.:
DATE:
CHECKED BY:
REVISIONS
HIC. NO.:
ELE. NO.:
ADDRESS:59C NORTH
HATFIELD, MA 01038
INSIGHT SOLAR
4133387555
MA 192102
R-007.00
RESOURCE DOCUMENT
(SHEET 16)