Loading...
35-065 (2) BP-2023-0204 897 RYAN RD COMMONWEALTH OF MASSACHUSETTS Map:Block:Lot: 35-065-001 CITY OF NORTHAMPTON Permit: Solar Build PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) BUILDING PERMIT Permit# BP-2023-0204 PERMISSION IS HEREBY GRAN D TO: Project# 2023 SOLAR Contractor: License: Est. Cost: 34000 TRINITY SOLAR CSL10802• Const.Class: Exp.Date: 04/22/2024 Use Group: Owner: BLISS RATHBUN PATRICK W&NA*MI Lot Size (sq.ft.) Zoning: WSP Applicant: TRINITY SOLAR Applicant Address Phone: Insurance: 32 GROVE ST (508)577-3391 WC 13588108 PLYMPTON, MA 02367 ISSUED ON: 02/22/2023 TO PERFORM THE FOLLOWING WORK: INSTALL 23 PANEL 9.3 KW ROOF MOUNT SOLAR SYSTEM POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House # Foundation: Final: Final: Final: Rough Frame: Gas: Fire Department Driveway Final: Fireplace/Chimney: Rough: Oil: Insulation: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VI I LATION OF ANY OF ITS RULES AND REGULATIONS. Signature: Qs- Fees Paid: $75.00 212 Main Street,Phone(413)587-1240,Fax: (413)587-1272 Office of the Building Commissioner •, Is.t.. , The Commonwealth of Massach setts tr 4.1 A., jip Board of Building Regulations and tanddrds F EB Pi 1 rum FOR G LULU FOR VI Massachusetts State Building Code, 780 CIVIR .L.1SE Building Permit Application To Construct, Repair, enoratF9:r-Denleks,sultmc aTC-1-:Agvise Mar 2011 ON One- or Two-Family Dwelling :11-1AMT;TON.MA 61063 This Section For Official Use Only Building Fermit Number: &"' =,?_73 ' C-404/ Date Applied: / evio 4.Z-ss /9.-Z Z-Z Z•20Z3 Building Official(Print Name) -Signature 1 Date SECTION 1: SITE INFORMATION 1.1 Property Address: 1.2 Assessors Map&Parcel Numbers 897 Ryan Road,Northampton,MA .36 00 -- 1.1a Is this an accepted street?yesr1/1 no Map Number Parcel Number 1.3 Zoning Information: 1.4 Property Dimensions: Residential-Solar Zoning District Proposed Use Lot Area(sq ft) Frontage(ft) 1.5 Building Setbacks(ft) Front Yard Side Yards Rear Yard Required Provided Required Provided Required P I vided 1.6 Water Supply: (M.G.L c.40,§54) 1.7 Flood Zone Information: 1.8 Sewage Disposal Syste : Zone: Outside Flood Zone? Public 0 Private El — Check if yes0 Municipal 0 On site disposal i stem 0 SECTION 2: PROPERTY OWNERSHIP' 2.1 Owner'of Record: Patrick Rathbun Northampton MA 01062 Name(Print) City,State.ZIP 897 Ryan Road (413)230-8205 natrick rathbuiaNahoo.co 1 No.and Street Telephone Email Address SECTION 3: DESCRIPTION OF PROPOSED WORK'(check all that apply) New Construction CI Existing Building 0 Owner-Occupied 0 Repairs(s) 0 Alteration(s) 0 .ddition 0 Demolition 0 Accessory Bldg. 0 Number of Units Other iSpecify:Solar Brief Description of Proposed Work2: Install 9.2 kW DC solar on roof(23 panels) Will not exceed building footprint, but will add 6"to roof height. SECTION 4:ESTIMATED CONSTRUCTION COSTS Estimated Costs: Item Official Use Only (Labor and Materials) 1.Building $10,000 1. Building Permit Fee:$ Indicate how fee is determined: 0 Standard City/Town Application Fee 2.Electrical $24,000 0 Total Project Cost3(Item 6)x multiplier x 3.Plumbing $ 2. Other Fees: $ 4.Mechanical (HVAC) $ List: • 5.Mechanical (Fire $ Total All Fees: $ Suppression) Check NoJA4011 Check Amounlr-Sq Cash Amount: 6.Total Project Cost: $34,000 0 Paid in Full 0 Outstanding Balance Due: SECTION 5: CONSTRUCTION SERVICES 5.1 Construction Supervisor License(CSL) CS-108025 4/22/2024 Phil Smith License Number Expiration Date Name of CSL Holder List CSL Type(see below) U 6 Torrey St No.and Street Type Description Easthampton,MA 01027 U Unrestricted(Buildings up to 35,000 Cu.ft.) R Restricted 1&2 Family Dwelling 7fCity/To to ZIP M Masonry X � 2RC Roofing Covering WS Window and Siding SF Solid Fuel Burning Appliances 413-203-9088 x 1524 applications.westma@trinity-solar.com I Insulation Telephone Email address D _ Demolition 5.2 Registered Home Improvement Contractor(HIC) 170355 10/11/2023 Trinity Solar Inc DBA Trinity Solar HIC Registration Number Expiration Date HIC Company Name or HIC Registrant Name 20 Patterson Brook Road-Unit 10 applications.westma@trinity-solar.cotn No.and Street Email address West Wareham MA 02576 413-203-9088 x 1524 City/Town,State,ZIP Telephone SECTION 6:WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c. 152.g 25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the Issuance of the building permit. Signed Affidavit Attached? Yes ® No 0 SECTION 7a: OWNER AUTHORIZATION TO BE COMPLETED WHEN OWNER'S AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I,as Owner of the subject property,hereby authorize Please See Attached to act on my behalf,in all matters relative to work authorized by this building permit application. Print Owner's Name(Electronic Signature) Date SECTION 7b:OWNER'OR AUTHORIZED AGENT DECLARATION By entering my name belo I hereby attest under the pains and penalties of perjury that all of the information containe ' i app ' on is true and to to the best of my knowledge and understanding. X 02/20/2023 Print Owner' or Authorized Agent's Name(Electronic Signature) Date NOTES: 1. An Owner who obtains a building permit to do his/her own work,or an owner who hires an unregistered contractor (not registered in the Home Improvement Contractor(HIC)Program),will not have access to the arbitration program or guaranty fund under M.G.L.c. 142A.Other important information on the HIC Program can be found at www.mass.gov/oca Information on the Construction Supervisor License can be found at www.mass.gov/dps 2. When substantial work is planned,provide the information below: Total floor area(sq. ft.) (including garage,finished basement/attics,decks or porch) Gross living area(sq.ft.) Habitable room count Number of fireplaces Number of bedrooms Number of bathrooms Number of half/baths Type of heating system Number of decks/porches Type of cooling system Enclosed Open 3. "Total Project Square Footage"may be substituted for"Total Project Cost"