Loading...
Infiltration System Acceptance Letter_20220415F:\P2009\1145\C71\Reports & Memo\Infiltration System Acceptance Letter.docx TO:Carolyn Misch, AICP Assistant Director City of Northampton Office of Planning and Sustainability 210 Main Street, Room 11 Northampton, MA 01060 FROM:Matthew Taylor, P.E. and Eric Bernardin P.E. DATE:April 15, 2022 RE:Higgins Way – Northampton, Infiltration System Acceptance Letter Fuss & O’Neill, Inc. Project No. 20091145.C71 Dear Ms. Misch: On October 28th 2021, after completion of the subdivision infrastructure project, field observations of the subsurface infiltration system were performed by Fuss and O’Neill. Based on the field observations, , the central subsurface infiltration located in the infield grassed area of Higgins Way was found to be functioning as designed and no maintenance is required at this time. It is recommended that the standard inspection schedule be upheld to maintain the functionality of the system. If you have any further questions, please do not hesitate to contact Matt at ext. 4425 or Eric at 4430. We look forward to working with you on this project. Sincerely, Matthew Taylor, PE Eric Bernardin, PE, LEED AP Project Manager Vice President