Loading...
ECC Group_ Control Construct Waiver NorthamptonFrom: ECC Group, Inc. 642 Outwater Lane Lodi, NJ 07644 To: Louis Hasbrouck Building Commissioner City of Northampton 212 Main Street Northampton, MA 01060 The Massachusetts Building Code, section 107.1 allows for an exclusion from requirements for construction control in certain situations. In accordance with code section 104.10, I request that you grant a modification to waive the requirement for construction control of the project at Northampton Dialysis, 84 Conz Street, Northampton, MA, 01060 because the work is of a minor nature, will not affect structural elements, health, accessibility, life or fire safety, and will be done in accordance with the prescriptive requirements of the code. Thank you for your consideration. Respectfully, _________________________________________________ George Salameh, Project Manager ECC Group, Inc.