Loading...
1010 Ryan Solar site zoning 2018-09-1735-079 EELADYSLIPPER LNSYLVAN LNSITE LOCATION(Burts Pit Road)PROJECT SITE VICINITY MAP:PREPARED BY:LOCATION MAP:CED NORTHAMPTON SOLAR LLCBURTS PIT ROADNORTHAMPTON, MASSACHUSETTSMMI PROJECT NO. 5223-11SEPTEMBER 17, 2018PREPARED FOR:CED NORTHAMPTON SOLAR LLCConEdison Development100 Summit Lake DriveValhalla, NY 10595LIST OF DRAWINGSNO.NAMETITLE01--TITLE SHEET02LDLEGEND & NOTES03ININDEX SHEET04 - 05EX-1 - EX-2EXISTING CONDITIONS PLAN06 - 07LA-1 - LA-2SITE LAYOUT & GRADING PLAN08 - 09SE-1 - SE-2SEDIMENT & EROSION CONTROL PLANNICSD-1MISCELLANEOUS SITE DETAILSNICCP-2ONE LINE DIAGRAM (BY ELECTRICAL ENGINEER)0'100'200'SCALE 1" = 200'01/2"1"0'750'1500'SCALE 1" = 1500'01/2"1"Copyright Milone & MacBroom, Inc - 2018Know what'sbelow.before you dig.CallRwww.digsafe.comZONING PERMIT APPLICATION DRAWINGS SHEET NAMEDATELDPROJECT NO.DESIGNEDSCALEDRAWNCHECKEDSEPTEMBER 17, 20185223-11---LEGEND & NOTESNORTHAMPTON, MASSACHUSETTSCED NORTHAMPTON SOLAR LLCBURTS PIT ROADSHEET NO.02 OF 09DESCRIPTIONBYDATENOT FOR CONSTRUCTIONCopyright Milone & MacBroom, Inc - 2018TREELINEEDGE OF GRAVELSURVEY NOTESEXISTING CONDITIONS LEGENDGRADING NOTESTHE RESHAPING OF THE GROUND SURFACE WITH EXCAVATION ANDFILLING OR A COMBINATION OF, TO OBTAIN PLANNED GRADES,SHALL PROCEED IN ACCORDANCE THE SEDIMENT AND EROSIONMEASURES IN ADDITION THE FOLLOWING CRITERIA:1.THE CUT FACE OF EARTH EXCAVATION SHALL NOT BE STEEPERTHAN TWO HORIZONTAL TO ONE VERTICAL (2:1).2.THE PERMANENT EXPOSED FACES OF FILLS SHALL NOT BESTEEPER THAN TWO HORIZONTAL TO ONE VERTICAL (2:1).3.THE CUT FACE OF ROCK EXCAVATION SHALL NOT BE STEEPERTHAN ONE HORIZONTAL TO TWO VERTICAL (1:2).4.PROVISIONS SHOULD BE INCLUDED TO CONVEY SURFACE WATERSAFELY TO STORM DRAINS TO PREVENT SURFACE RUNOFF FROMDAMAGING CUT FACES AND FILL SLOPES.5.NO FILL SHOULD BE PLACED WHERE IT WILL SLIDE OR WASHINTO ADJACENT WETLANDS, WATERCOURSES, OR WATER BODIES.6.PRIOR TO ANY RE-GRADING, A STABILIZED CONSTRUCTIONENTRANCE SHALL BE PLACED AT THE ENTRANCE TO THE WORKAREA IN ORDER TO REDUCE MUD AND OTHER SEDIMENTS FROMLEAVING THE SITE.SITE LAYOUT LEGEND200201CONTOUR (INDEX)CONTOUR (INTERMEDIATE)UTILITY POLE146.9SPOT GRADESEDIMENT & EROSION LEGENDSILT FENCESTAKED STRAW BALESSILT FENCE & STAKED STRAW BALESLIMIT OF CLEARINGSTRAW WATTLETEMPORARY STRAW WATTLE BARRIERCONSTRUCTION ENTRANCE PADEROSION CONTROL MATTINGBUILDING / STRUCTUREABUTTER LINE1.BASE TOPOGRAPHY IS BASED ON LIDAR DATA OBTAINED FROM THEMASSGIS DATABASE. HORIZONTAL DATUM IS NAD83. VERTICALDATUM IS NAVD88.2.THE SUBJECT PARCEL AND ABUTTING PROPERTY BOUNDARYINFORMATION SHOWN HEREON IS BASED ON THE MASSGISDATABASE AND THE TOWN OF NORTHAMPTON ASSESSORS MAPPING.BOUNDARIES ARE THEREFORE APPROXIMATE IN NATURE AND SHALLNOT BE TREATED AS FINAL.3.LOCATIONS OF UTILITIES SHOWN HEREIN ARE THE RESULT OFSURFACE EVIDENCE AS LOCATED BY FIELD SURVEY AND ANECDOTALKNOWLEDGE OF THE SITE. NO RELIABLE PLANS OF RECORD, OROTHER AVAILABLE SOURCES OF UTILITY INFORMATION WEREFOUND. THIS PLAN DOES NOT DEPICT THE EXACT LOCATIONS OFALL UTILITIES WHICH MAY EXIST AT THIS TIME WITHIN THEPREMISES SURVEYED.4.WETLAND DELINEATION PERFORMED BY MILONE & MACBROOM ONOCT. 31, 2017 & JUNE 27, 2018.5.WETLAND DELINEATION BY OTHERS ON ADJACENT 1010 RYAN ROADPARCEL WEST OF THE SITE DELINEATED BY WENDELL WETLANDSERVICES IN MARCH 2018 AND WAS SUBSEQUENTLY APPROVED BYTHE NORTHAMPTON CONSERVATION COMMISSION.PROPOSED CONTOURSPOT ELEVATIONGRAVEL SURFACEPROPOSED ELECTRICALSERVICEPROPOSED CHANLINKFENCE / GATEPROPOSED OVERHEADELECTRICAL SERVICETRANSFORMER PADPHOTOVOLTAIC ARRAYPROPOSED LIMIT OF WORKPROPOSED UTILITY POLE250260.20EZONING DATAZONING DISTRICTDIMENSIONAL / DENSITY CRITERIAREGULATION PROVIDEDMIN. LOT AREA0 SF2,160,576 SFYARD SETBACKS FRONT50 FT50 FT +/- SIDE50 FT50 FT +/- REAR50 FT50 FT +/-NOTES:1.FRONT, REAR, AND SIDE YARD SETBACKS SHALL BE A MINIMUM OF50 FEET ADJACENT TO ANY LOT BEING USED FOR RESIDENTIALPURPOSES PER THE REQUIREMENTS OF THE NORTHAMPTON ZONINGBYLAW, ARTICLE IX, SECTION 350-37.1, LARGE SCALE SOLARPHOTOVOLTAIC INSTALLATIONS.WATER SUPPLY PROTECTION (WSP)11GENERAL NOTES1.ALL DIMENSIONS AND ELEVATIONS SHALL BE VERIFIED IN THEFIELD (V.I.F.) PRIOR TO CONSTRUCTION. ANY DISCREPANCIESSHALL BE BROUGHT TO THE ATTENTION OF THE OWNER'SREPRESENTATIVE.2.THE CONTRACTOR SHALL PERFORM NECESSARY CONSTRUCTIONNOTIFICATIONS, APPLY FOR AND OBTAIN NECESSARY PERMITS,PAY FEES, AND POST BONDS ASSOCIATED WITH THE WORK ASREQUIRED BY THE CONTRACT DOCUMENTS.3.CONTRACTOR SHALL BE RESPONSIBLE FOR THE MAINTENANCE ANDSAFETY OF TRAFFIC ON THE PUBLIC AND PRIVATE WAYS AFFECTEDBY THE CONSTRUCTION OF THE PROJECT.4.ALL SLOPES, VEGETATION, PAVING, WALKS, AND IMPROVEMENTSOUTSIDE THE AREAS TO BE AFFECTED BY THE CONSTRUCTION OFTHE PROJECT SHALL BE PROTECTED. DAMAGES RESULTING FROMCONSTRUCTION ACTIVITIES OUTSIDE THE PROJECT LIMITS SHALLBE REPAIRED AT NO ADDITIONAL COST TO THE OWNER.5.THE CONTRACTOR IS RESPONSIBLE FOR SITE SECURITY AND JOBSAFETY. PERFORM CONSTRUCTION ACTIVITIES IN ACCORDANCEWITH O.S.H.A. STANDARDS AND LOCAL REQUIREMENTS.1.PRIOR TO COMMENCEMENT OF WORK A PRECONSTRUCTION MEETING SHALL BEHELD WITH MUNICIPAL STAFF AND REPRESENTATIVES OF THE CONTRACTORAND OWNER. AT THIS MEETING, ONE PERSON (UNDER THE DIRECTION OF THECONTRACTOR) WILL BE PLACED IN CHARGE OF SEDIMENT AND EROSIONCONTROL FOR THE ENTIRE SITE.2.CONTRACTOR TO STAKE OUT LIMIT OF DISTURBANCE. NO DISTURBANCE IS TOTAKE PLACE BEYOND THE LIMITS OF WORK SHOWN.3.CONTRACTOR TO INSTALL SEDIMENT AND EROSION CONTROLS ALONG THEPERIMETER, AS SHOWN ON THE SEDIMENT CONTROL PLAN AND STABILIZEDCONSTRUCTION ENTRANCE.4.CLEAR AND GRUB SITE AND STOCKPILE TOPSOIL AS NECESSARY. PLACESEDIMENT FILTER FENCE AROUND STOCKPILES.5.CONSTRUCT STORMWATER MANAGEMENT BASINS AFTER THE SITE IS CLEAREDAND GRUBBED.6.SLOPES ARE TO BE ESTABLISHED AS SOON AS PRACTICAL BEFORE PV ARRAYINSTALLATION. STABILIZE ALL SLOPES IMMEDIATELY AFTER THEIRESTABLISHMENT.7.THE SEDIMENT CONTROL PLAN SHALL BE MODIFIED BY THE CONTRACTOR ATTHE DIRECTION OF THE OWNER'S REPRESENTATIVE AND THE MUNICIPALITYDESIGNATED REPRESENTATIVE AS NECESSITATED BY CHANGING SITECONDITIONS.8.INSPECTION OF THE SITE FOR EROSION SHALL CONTINUE FOR A PERIOD OFTHREE MONTHS AFTER PROJECT COMPLETION AND WHEN RAINFALL EXCEEDSONE HALF INCH OR MORE.9.ALL DEWATERING WASTE WATERS SHALL BE DISCHARGED IN A MANNER WHICHMINIMIZES THE DISCOLORATION OF THE RECEIVING WATERS.10.THE SITE SHOULD BE KEPT CLEAN OF LOOSE DEBRIS, LITTER, AND BUILDINGMATERIALS SUCH THAT NONE OF THE ABOVE ENTER WATERS OR WETLANDS.11.A COPY OF ALL PLANS AND REVISIONS, AND THE SEDIMENT CONTROL PLANSHALL BE MAINTAINED ON-SITE AT ALL TIMES DURING CONSTRUCTION.SEDIMENT & EROSION CONTROL NOTESSETBACK LINEWETLANDTREEROCKEVERGREEN TREEWETLAND FLAG1100' WETLAND BUFFERFLAGGED WETLAND LIMITWETLAND BUFFERRIVERFRONT AREASETBACK LINE200' RIVERFRONT AREATMRGHMMMRG RYAN RDBURTS PIT RDWOODLAND DRSYLVAN LNLADYSLIPPER LNBAYBERRY LNRYAN RDWESTWOOD TERRACEW PARSONS LNWESTHAMPTON ROADSOVEREIGN WAYTIFFANY LNWEST FARMS RDSHEET NAMEDATEINPROJECT NO.DESIGNEDMRGSCALEDRAWNHMMCHECKEDMRGSWNESEPTEMBER 17, 20185223-111" = 200'INDEX SHEETNORTHAMPTON, MASSACHUSETTSCED NORTHAMPTON SOLAR LLCBURTS PIT ROADSHEET NO.03 OF 09DESCRIPTIONBYDATENOT FOR CONSTRUCTION0'100'200'01/2"1"Copyright Milone & MacBroom, Inc - 2018SEE SHEETS: EX-1, LA-1, & SE-1SEE SHEETS: EX-2, LA-2, & SE-2 RYAN RDSYLVAN LNWOODLAND DRBILL WILLARD INCBK. 1977 PG. 1302BLDBLDBLDBLDBLDSCALEBIT DRIVEGRAVEL DRIVEFEMA FLOOD ZONE A40' BLSF BUFFERFEMA FLOOD ZONE A40' BLSF BUFFER100' WETLAND BUFFERSHEET NAMEDATEEX-1PROJECT NO.DESIGNEDMRGSCALEDRAWNHMMCHECKEDMRGSWNESEPTEMBER 17, 20185223-111" = 80'EXISTING CONDITIONS PLANNORTHAMPTON, MASSACHUSETTSCED NORTHAMPTON SOLAR LLCBURTS PIT ROADSHEET NO.04 OF 09DESCRIPTIONBYDATENOT FOR CONSTRUCTION0'40'80'01/2"1"Copyright Milone & MacBroom, Inc - 2018MATCHLINE - SEE SHEET EX-2 100' WETLAND BUFFER200' RIVERFRONT AREA50' PROPERTY SETBACK100' WETLAND BUFFER40' BLSF BUFFERFEMA FLOOD ZONE ABILL WILLARD INCBK. 1157 PG. 444LADYSLIPPER LNBILL WILLARD INCBK. 1583 PG. 727BILL WILLARDINC.BK. 4295 PG. 332JAMES GUGGINA &FRED E. CRISPBK. 7166 PG. 75PAMELA PARSONSBK. 5534 PG. 332MELANIE J. &KAREN A. CURRIEBK. 3620 PG. 54JOHN W. HORNOR& RONALD E.SKINNBK. 9719 PG. 236CLAUDE D. & ANNDUQUETTEBK. 2780 PG. 262ALEXANDERSIMONBK. 8090 PG. 169JAMES J. & RUTHMARTIN-REHRMANNBK. 2785 PG. 243KERRY F. &DONNA L.MEEHANBK. 8745 PG. 227JAMIE ANNCAPLANBK. 10705 PG. 62BILL E. & LAURENE. PETERSONBK. 5276 PG. 296KARA KRITISHARPERBK. 11359 PG. 127DONNA MEISSE &JOE HAMILLBK. 3799 PG. 344GERALD & SUSANC. HAGUEBK. 2004 PG. 264CAROL CARGILLBK. 6757 PG. 79JAMES M. & LORIJ. CAMPOSEOBK. 2616 PG. 184MATTHEW J. HUSEBK. 5615 PG. 335PAUL S. & TAMARAJ. BOURGEOISBK. 11363 PG. 290JULIE KOSSON &MARCIAMERITHEWBK. 4281 PG. 151BK. 3646 PG. 112LORRAINEMANGIONEBK. 3646 PG. 112MELISSA &PATRICK W.HAYES IIIBK. 3360 PG. 25350' PROPERTY SETBACKGRAVEL DRIVEFEMA FLOOD ZONE A40' BLSF BUFFER100' WETLAND BUFFERFEMA FLOOD ZONE AFEMA FLOOD ZONE AFEMA FLOOD ZONE AFEMA FLOOD ZONE A40' BLSF BUFFER50' PROPERTY SETBACK50' PROPERTY SETBACKSHEET NAMEDATEEX-2PROJECT NO.DESIGNEDMRGSCALEDRAWNHMMCHECKEDMRGSWNESEPTEMBER 17, 20185223-111" = 80'EXISTING CONDITIONS PLANNORTHAMPTON, MASSACHUSETTSCED NORTHAMPTON SOLAR LLCBURTS PIT ROADSHEET NO.05 OF 09DESCRIPTIONBYDATENOT FOR CONSTRUCTION0'40'80'01/2"1"Copyright Milone & MacBroom, Inc - 2018MATCHLINE - SEE SHEET EX-1 RYAN RDSYLVAN LNWOODLAND DRBILL WILLARD INCBK. 1977 PG. 1302BLDBLDBLDBLDBLDSCALEBIT DRIVEGRAVEL DRIVEFEMA FLOOD ZONE A40' BLSF BUFFERFEMA FLOOD ZONE A40' BLSF BUFFER100' WETLAND BUFFEROVERHEAD ELECTRICAL SERVICEAND UTILITY POLES (TYP)OVERHEAD ELECTRICAL SERVICEAND UTILITY POLES (TYP)274280310300290320310310280330290310272290300290278276276SHEET NAMEDATELA-1PROJECT NO.DESIGNEDSCALEDRAWNCHECKEDSWNESEPTEMBER 17, 20185223-111" = 80'SITE LAYOUT & GRADING PLANNORTHAMPTON, MASSACHUSETTSCED NORTHAMPTON SOLAR LLCBURTS PIT ROADSHEET NO.06 OF 09DESCRIPTIONBYDATE0'40'80'01/2"1"Copyright Milone & MacBroom, Inc - 2018MATCHLINE - SEE SHEET LA-2MRGHMMMRG 35-079 EEEEEE100' WETLAND BUFFER200' RIVERFRONT AREA50' PROPERTY SETBACK100' WETLAND BUFFER40' BLSF BUFFERFEMA FLOOD ZONE ABILL WILLARD INCBK. 1157 PG. 444LADYSLIPPER LNBILL WILLARD INCBK. 1583 PG. 727BILL WILLARDINC.BK. 4295 PG. 332JAMES GUGGINA &FRED E. CRISPBK. 7166 PG. 75PAMELA PARSONSBK. 5534 PG. 332MELANIE J. &KAREN A. CURRIEBK. 3620 PG. 54JOHN W. HORNOR& RONALD E.SKINNBK. 9719 PG. 236CLAUDE D. & ANNDUQUETTEBK. 2780 PG. 262ALEXANDERSIMONBK. 8090 PG. 169JAMES J. & RUTHMARTIN-REHRMANNBK. 2785 PG. 243KERRY F. &DONNA L.MEEHANBK. 8745 PG. 227JAMIE ANNCAPLANBK. 10705 PG. 62BILL E. & LAURENE. PETERSONBK. 5276 PG. 296KARA KRITISHARPERBK. 11359 PG. 127DONNA MEISSE &JOE HAMILLBK. 3799 PG. 344GERALD & SUSANC. HAGUEBK. 2004 PG. 264CAROL CARGILLBK. 6757 PG. 79JAMES M. & LORIJ. CAMPOSEOBK. 2616 PG. 184MATTHEW J. HUSEBK. 5615 PG. 335PAUL S. & TAMARAJ. BOURGEOISBK. 11363 PG. 290JULIE KOSSON &MARCIAMERITHEWBK. 4281 PG. 151BK. 3646 PG. 112LORRAINEMANGIONEBK. 3646 PG. 112MELISSA &PATRICK W.HAYES IIIBK. 3360 PG. 25350' PROPERTY SETBACKGRAVEL DRIVEFEMA FLOOD ZONE A40' BLSF BUFFER100' WETLAND BUFFERFEMA FLOOD ZONE AFEMA FLOOD ZONE AFEMA FLOOD ZONE AFEMA FLOOD ZONE A40' BLSF BUFFER50' PROPERTY SETBACK50' PROPERTY SETBACK274276278280282284286288292294292290288286284280282294OVERHEAD ELECTRICAL SERVICEAND UTILITY POLES (TYP)PHOTOVOLTAICARRAY (TYP)8' CHAIN LINKFENCE (TYP)MEET EXISTINGGRAVEL DRIVE15' GRAVEL DRIVEPARKING SPACE FOR ONEMAINTENANCE VEHICLE290 290290280280290280280290280290290302276286274280290290290280290280280290280280280278280280290296290294284280290272272272272302290SHEET NAMEDATELA-2PROJECT NO.DESIGNEDSCALEDRAWNCHECKEDSWNESEPTEMBER 17, 20185223-111" = 80'SITE LAYOUT & GRADING PLANNORTHAMPTON, MASSACHUSETTSCED NORTHAMPTON SOLAR LLCBURTS PIT ROADSHEET NO.07 OF 09DESCRIPTIONBYDATE0'40'80'01/2"1"Copyright Milone & MacBroom, Inc - 2018MATCHLINE - SEE SHEET LA-1MRGHMMMRG RYAN RDSYLVAN LNWOODLAND DRBILL WILLARD INCBK. 1977 PG. 1302BLDBLDBLDBLDBLDSCALEBIT DRIVEGRAVEL DRIVEFEMA FLOOD ZONE A40' BLSF BUFFERFEMA FLOOD ZONE A40' BLSF BUFFER100' WETLAND BUFFERSHEET NAMEDATESE-1PROJECT NO.DESIGNEDSCALEDRAWNCHECKEDSWNESEPTEMBER 17, 20185223-111" = 80'SEDIMENT & EROSION CONTROL PLANNORTHAMPTON, MASSACHUSETTSCED NORTHAMPTON SOLAR LLCBURTS PIT ROADSHEET NO.08 OF 09DESCRIPTIONBYDATE0'40'80'01/2"1"Copyright Milone & MacBroom, Inc - 2018MATCHLINE - SEE SHEET SE-2MRGHMMMRG 35-079 EEEEEE100' WETLAND BUFFER200' RIVERFRONT AREA50' PROPERTY SETBACK100' WETLAND BUFFER40' BLSF BUFFERFEMA FLOOD ZONE ABILL WILLARD INCBK. 1157 PG. 444LADYSLIPPER LNBILL WILLARD INCBK. 1583 PG. 727BILL WILLARDINC.BK. 4295 PG. 332JAMES GUGGINA &FRED E. CRISPBK. 7166 PG. 75PAMELA PARSONSBK. 5534 PG. 332MELANIE J. &KAREN A. CURRIEBK. 3620 PG. 54JOHN W. HORNOR& RONALD E.SKINNBK. 9719 PG. 236CLAUDE D. & ANNDUQUETTEBK. 2780 PG. 262ALEXANDERSIMONBK. 8090 PG. 169JAMES J. & RUTHMARTIN-REHRMANNBK. 2785 PG. 243KERRY F. &DONNA L.MEEHANBK. 8745 PG. 227JAMIE ANNCAPLANBK. 10705 PG. 62BILL E. & LAURENE. PETERSONBK. 5276 PG. 296KARA KRITISHARPERBK. 11359 PG. 127DONNA MEISSE &JOE HAMILLBK. 3799 PG. 344GERALD & SUSANC. HAGUEBK. 2004 PG. 264CAROL CARGILLBK. 6757 PG. 79JAMES M. & LORIJ. CAMPOSEOBK. 2616 PG. 184MATTHEW J. HUSEBK. 5615 PG. 335PAUL S. & TAMARAJ. BOURGEOISBK. 11363 PG. 290JULIE KOSSON &MARCIAMERITHEWBK. 4281 PG. 151BK. 3646 PG. 112LORRAINEMANGIONEBK. 3646 PG. 112MELISSA &PATRICK W.HAYES IIIBK. 3360 PG. 25350' PROPERTY SETBACKGRAVEL DRIVEFEMA FLOOD ZONE A40' BLSF BUFFER100' WETLAND BUFFERFEMA FLOOD ZONE AFEMA FLOOD ZONE AFEMA FLOOD ZONE AFEMA FLOOD ZONE A40' BLSF BUFFER50' PROPERTY SETBACK50' PROPERTY SETBACK274276278280286288290292284282294292290288286284282280294GATE AND CONSTRUCTIONENTRANCE PADLIMIT OF WORK LINE (TYP.)SILT FENCE & STAKEDSTRAW BALESSILT FENCEEROSION CONTROLMATTINGSILT FENCE & STAKEDSTRAW BALESSHEET NAMEDATESE-2PROJECT NO.DESIGNEDSCALEDRAWNCHECKEDSWNESEPTEMBER 17, 20185223-111" = 80'SEDIMENT & EROSION CONTROL PLANNORTHAMPTON, MASSACHUSETTSCED NORTHAMPTON SOLAR LLCBURTS PIT ROADSHEET NO.09 OF 09DESCRIPTIONBYDATE0'40'80'01/2"1"Copyright Milone & MacBroom, Inc - 2018MATCHLINE - SEE SHEET SE-1MRGHMMMRG