Loading...
38A-120 (6) BP-2023-0169 51 OLANDER DR COMMONWEALTH OF MASSACHUSETTS Map:Block:Lot: 38A-120-001 CITY OF NORTHAMPTON Permit: Alts Renovations Repair PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) BUILDING PERMIT Permit# BP-2023-0169 PERMISSION IS HEREBY GRANTED TO: Project# geo therm ht pump Contractor: License: Est. Cost: 19500 DANDELION ENERGY INC 106523 Const.Class: Exp.Date: 12/03/2024 Use Group: Owner: RUBY CRYSTAL ANDREW J&JANET Lot Size (sq.ft.) Zoning: PV/SG a/SG b Applicant: DANDELION ENERGY INC Applicant Address Phone: Insurance: 333 NORTH BEDFORD RD SUITE 220 (860)301-7100 WC 053425881 MOUNT KISCO, NY 10549 ISSUED ON: 02/13/2023 TO PERFORM THE FOLLOWING WORK: GEO THERMAL HEAT PUMP POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Final: Final: Final: Rough Frame: Gas: Fire Department Driveway Final: Fireplace/Chimney: Rough: Oil: Insulation: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Signature: 2- II e. Fees Paid: $130.00 212 Main Street,Phone(413)587-1240,Fax: (413)587-1272 Office of the Building Commissioner The Commonwealth of Massachusetts c ` FOR Board of Building Regulations and Standardsj�,, '. ,sc Massachusetts State Building Code, 780 CM "�J MUNICIPALITY ; USE Building Permit Application To Construct,Repair,Renovate or p lish Revised Mar 2011 One-or Two-Family Dwelling ,'` o �;; nso .VS. This Section For Official Use Only Building Permit Number: ej r0 .2 3 (Cf / Date Applied fr i _1242_S Building Official(Print Name) Signature SECTION 1:SITE INFORMATION 1.1 Property Address: 1.2 Assessors Map&Parcel Numbers 51 Olander Dr,Northampton,MA 01060,USA 1.la Is this an accepted street?yes no Map Number Parcel Number 1.3 Zoning Information: 1.4 Property Dimensions: Zoning District Proposed Use Lot Area(sq ft) Frontage(ft) 1.5 Building Setbacks(ft) Front Yard Side Yards Rear Yard Required Provided Required Provided Required Provided 1.6 Water Supply:(M.G.L c.40,§54) 1.7 Flood Zone Information: 1.8 Sewage Disposal System: Public 0 Private❑ Zone: _ Outside Flood Zone? Municipal 0 On site disposal system 0 Check if yes❑ SECTION 2: PROPERTY OWNERSHIP' 2.1 Owner'of Record: Andrew Crystal 51 Olander Dr,Northampton,MA 01060,USA Name(Print) City,State,ZIP 51 Olander Dr,Northampton,MA 01060,USA (413)427-2942 acrys©comcastnet No.and Street Telephone Email Address SECTION 3:DESCRIPTION OF PROPOSED WORK2(check all that apply) New Construction 0 Existing Building 0 Owner-Occupied 0 Repairs(s) 0 Alteration(s) 0 Addition 0 Demolition 0 Accessory Bldg.0 Number of Units Other 0 Specify:Geothermal Brief Description of Proposed Work2:Install one 6 ton geothermal heat pump,closed loop system. No ductwork is associated with this permit application SECTION 4:ESTIMATED CONSTRUCTION COSTS Item Estimated Costs: Official Use Only (Labor and Materials) 1.Building $ 1. Building Permit Fee: $ Indicate how fee is determined: ❑Standard City/Town Application Fee 2.Electrical $ 0 Total Project Costa(Item 6)x multiplier x 3.Plumbing $ 2. Other Fees: $ 4.Mechanical (HVAC) $19500 List: 5.Mechanical (Fire Suppression) Total All nitiCheck NoCheck Amount: `� Cash Amount: 6.Total Project Cost: $ 'it coo 0 Paid in Full 0 Outstanding Balance Due: SECTION 5: CONSTRUCTION SERVICES 5.1 Construction Supervisor License(CSL) CSFA-106523 12/3/2024 Wyatt Roberts License Number Expiration Date Name of CSL Holder 333 North Bedford Road,Suite 220 List CSL Type(see below) R No.and Street Type Description U Unrestricted(Buildings up to 35,000 cu.ft.) Mount Kisco R Restricted 1&2 Family Dwelling City/Town,State,ZIP M Masonry RC Roofing Covering WS Window and Siding SF Solid Fuel Burning Appliances 845-649-6073 JDeVore@DandelionEnergy.com I Insulation Telephone Email address D Demolition 5.2 Registered Home Improvement Contractor(HIC) 201508 2023/04/11 Dandelion Energy HIC Registration Number Expiration Date HIC Company Name or HIC Registrant Name 333 North Bedford Road,Suite 220 hkowalski@dandelionenergy.com No.and Street Email address Mount Kisco,NY 10549 860-301-7100 City/Town,State,ZIP Telephone SECTION 6:WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152.§ 25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the Issuance of the building permit. Signed Affidavit Attached? Yes 0 No .❑ SECTION 7a:OWNER AUTHORIZATION TO BE COMPLETED WHEN OWNER'S AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I,as Owner of the subject property,hereby authorize Dandelion Energy to act on my behalf,in all matters relative to work authorized by this building permit application. Andrew Crystal See Attached Authorization Print Owner's Name(Electronic Signature) Date SECTION 7h:OWNER'OR AUTHORIZED AGENT DECLARATION By entering my name below,I hereby attest under the pains and penalties of perjury that all of the information contained in this application is true and accurate to the best of my knowledge and understanding. Hannah Kowalski of Dandelion Energy • ., 3/29/2022 Print Owner's or Authorized Agent's Name(Electro ic�a Date NOTES: 1. An Owner who obtains a building permit to do his/her own work,or an owner who hires an unregistered contractor (not registered in the Home Improvement Contractor(HIC)Program),will not have access to the arbitration program or guaranty fund under M.G.L.c. 142A.Other important information on the HIC Program can be found at www.mass.gov/oca Information on the Construction Supervisor License can be found at www.mass.gpv/dps 2. When substantial work is planned,provide the information below: Total floor area(sq.ft.) (including garage,finished basement/attics,decks or porch) Gross living area(sq.ft.) Habitable room count Number of fireplaces Number of bedrooms Number of bathrooms Number of half/baths Type of heating system Number of decks/porches Type of cooling system Enclosed Open 3. "Total Project Square Footage"may be substituted for"Total Project Cost" The Commonwealth of Massachusetts ( Department of Industrial Accidents = 01111. 1 Congress Street,Suite 100 =T Boston,MA 02114-2017 www mass.gov/din %Yorkers'('ompettsatlon Insurance Affidavit:BuilderslContractorsil:IectriciansJPlumbers. TO BE FILED WITH ink:PERMITTING Al'7HORIT1. Apttlirant Information Please Print Leuibly Name(k3usoles,Orlsuteza Ron Indo:'dual i Dandelion Energy Address: 333 North Bedford Road,Suite 220 City/StatateiLIp: Mount Kisco,NY 10549 Phone#: 860-301-7100 Are yea se employer'(-hesk the appngtrinrc trot: Type of project I required). 1.®I am a employer with 140 eniptoyces(foil am L or part-tiro).• ']. CI New construction 20 I ant a.wale proprietor or purtnenhip and have nu emplo ens working for me in S. Remodeling any capacity.[Nu workers'comp.insurance required.) 30 I am a hurttcvwner doing all work myself.[No wnvs'comp. required!.)' 9. 0 Demolition rk 10 Q Building addition area humeowner and will be hiring cnraractors to conduct at work on my pioperty. I will uu ensure that all contractors either have worker,'compensation uc4uranec or are sole 11.Electrical repairs or additions proprietor,w ith no employees. 12.0 Plumbing repairs or additions 50 1 ant a kw-ncral contractor and I have hind thesub-contractors listed un the attached sheet. 13.0 Roof repairs These sub-contractors have employers and hevr worker,'comp.insurance.; h.Q M We an a corporation and its officers have exercised their nght of exemption per GL c. 14. Other t.>'eotherrrta _._. 152,S Ilate and we haven no employees.[No workers'comp.insurance required.] 'Any applicant that chinks box a t must also till out the see0,,n below show tng their workers'eotrtpcnsatiun utt:unoauem. t Homeowners wIw submit this utlicki%tt trtdacaunk:litcy are denng all work and then hire eratside contractor,must,ubtn,l a new affidavit indicating such. Connartors that cheek this box must attached an aldttiunal sheet show mg the name of the sut*ccetiraetor,and state w hither or not those entities hale ec, It the sub-contractors bare e-rtrploy ens.they must pros nle their workers'Lump.pult:y number I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and Job site information. Insurance Company Name: New Hampshire Ins Co Policy#or Self ins.£Lie.#: WC 038394824 NY Expiration Date: 7/1/2022 Job Site Address: % 1 0+4nth'"' 1k City/State/Zip: A/04 as,Qtri-t M,/- 01 C0 Attach a copy of the workers'compensation policy declaration page(showing the policy number ant expiration date). Failure to secure coverage as required under MGL c. 152,*25A is a criminal violation punishable by a fine up to S1,500.00 and'or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to S250.00 a day against the violator.A copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage venlieation. I do hereby cern y aadeerr he pains and penalties of perjury that the information provided above is true and correct. Signature: 4�+�d" Date. 3/29/2022 Phone 4. 60-301-7100 Official use only. Da not write in di s area,to be completed by city or town official ('its or Town: Permit/License# Issuing Authority(circle one): I. Board of Health 2.Building Department 3.Cityffown Clerk 4.Electrical Inspector 5. Plumbing Inspector 6.Other Contact Person: Phone#: DocuSign Envelope ID:15ECFE39-6E1C-4ABB-98E9-B33C70711DB8 DANDELION Date: 7/28/2022 ATTN:Building Department: Subject Property: 51 Olander Dr,Northampton,MA 01060,USA I, Andrew Crystal ,as Owner of the subject property hereby authorize Dandelion Energy,and its representatives,to act on my behalf in all matters relative to work authorized by the enclosed building permit application. —DocuSigned by: X QIt,)xu*i 611StAL `—AU3UJh W ALCA41 (Signature of Property Owner(s)) THE COMMONWEALTH OF MASSACHUSETTS Office of Consumer Affairs and Business Regulation 1000 Washington Street - Suite 710 Boston, Massachusetts 02118 Home Improvement Contractor Registration mi .a m ^r w Type: Corporation , = - Registration: 201508 DANDELION ENERGY,INC ,,, .� Expiration: 04/11/2023 1 CORPORATE DR ;,. .""'""::: 1. PEEKSKILL, NY 10566 .. { rW ze 41144 r1 M ., Update Address and Return Card. THE COMMONWEALTH OF MASSACHUSETTS Office of Consumer Affairs&Business Regulation Registration valid for individual use only before the HOME IMPROVEMENT CONTRACTOR expiration date. If found return to: TYPE:Corporation Office of Consumer Affairs and Business Regulation Registration Expiration 1000 Washington Street -Suite 710 201508 04/11/2023 Boston,MA 02118 DANDELION ENERGY, INC WYATT ROBERTS •// 1 CORPORATE CR -„/,T��_i -.oG(s<% �� PEEKSKILL,NY 10566 Undersecretary I No valid without signature •:.: Nik,, - .., „,, , ... w. -IS i '�` Yam," Commonwealth of Massachusetts --, Division of Professional Licensure Board of Building Regulations and Standards ti. ConstructionSupervt r 1 & 2 Family C S FA-106523 Expires: 12/03/202 � ` --- WYATT ROBERTS 333 NORTH BEDFORD RD STE 220 = ` �= MOUNT KISCO NY 10549 _,.. .. \,,,,,,,,,i .1/2„,„.,, ,,... t`- i ,,..._. _ ,-,N,, , --- , __, ...„ „t , . Commissioner . . � , ,. 4/ .�\';''��.�,, tea ` -�� DANDENE-01 CZHANG ACORO CERTIFICATE OF LIABILITY INSURANCE DATE(MMIDD/YYYY) 9/8/2022 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). ONT PRODUCER NAAMMEACT York International Agency,LLC A/CC,,, o, (914)376-2200 I FAX 914 376-2891 500 Mamaroneck Avenue ( ` ,,.,,�pp��,,� oic 110)` Suite 220 E-MADDRESS:C6r' cats OriCirlti•OORI Harrison,NY 10528 INSURERS)AFFORDING COVERAGE NAIC I INSURER A:Hamilton Insurance Designated ActIvily Company INSURED INSURER B: Dandelion Energy,Inc. IIIBURFRC: 333 N Bedford Rd,Suite 220 I RED: Mount Kisco,NY 10549 INSURER E: +_ _ INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR _--- ------TADDLISUBR ---- POLICY EFF TPOLICY EXP LTR TYPE OF INSURANCE 'INSD WVD POLICY NUMBER OIMIDD/YYYYI (MM/DD/YYYY) urns A X COMMERCIAL GENERAL LIABILITY 1�000,O0O EACH OCCURRENCE f CLAIMS-MADE X 4 OCCUR ENVPKGHI803226 9/812022 918/2023 pREMI E8(gEo T n loa) 50'000 MED DIP(Am oneperson) $ 5,000 PERSONAL&ADV INJURY Q 1e000r000 OWL AGGREGATELIMIITAPPUES PER: GENERAL AGGREGATE f 2,000,000 X POLICY JECT LX)C PRODUCTS-COMP/OP AGG $ 2,000,000 OTHER: $ AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT _(Eaaccident) ANY AUTO BODILY INJURY(Per pawn) $ OWNED SCHEDULED AUTOSI ONLY AUTOS L BODILY INJURY(Per accident) $ UR1EOS ONLY AUTOS ONLY riFeOr PERTY DAMAGE ) UMBRELLA LIAB 1 I OCCUR EACH OCCURRENCE S EXCESS WB CLAIMS-MADE AGGREGATE F DED RETENTION E _ WORKERS COMPENSATION PER OTH- _ AND STATUTE.1 ER EMPLOYERS'LIABILITY Y/N ANY PROPRIETOR/PARTNER/EXECUTIVE EL.EACH ACCIDENT $ OFFICER/MEMBER EXCLUDED? N/A (Mandatory in NH) If yes,describe under E.L DISEASE-EA EMPLOYEE$ DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES(ACORD 101,Additional Remarks Schedule,may be attached If more apace is required) CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE DANDELION ENERGY INC. THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN , ACCORDANCE WITH THE POLICY PROVISIONS. 333 N Bedford Rd#220 Mount Kisco,NY 10549 AUTHORIZED REPRESENTATIVE P. L ACORD 25(2016/03) ©1988-2015 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD AC RR P CERTIFICATE OF LIABILITY INSURANCE DATE(MMIDD/YYYY) 06/20/2022 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT NAME: Marsh Affinity FAX Marsh Affinity (NC,No,Ext): 866-237-4079 (NC,No): a division of Marsh USA Inc. E-MAIL ADPTotalSourceOmarsh.com PO Box 14404 ADDRESS: Des Moines,IA 50306-9686 INSURER(S)AFFORDING COVERAGE NAICft INSURER A: New Hampshire Insurance Co. 23841 INSURED INSURER B: ADP TotalSource CO XXIII,Inc. INSURERC: 5800 Windward Parkway INSURER D: Alpharetta,GA 30005 Alternate Employer: INSURER E: Dandelion Energy Inc INSURER F: 333 N Bedford Rd Mt Kisco,NY 10549 COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADDL SUBR POUCY NUMBER POLICY EFF POLICY EXP LIMITS LTR INSD WVD (MM/DDIYYYY) (MMIDD/YYYY) COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE CLAIMS-MADE OCCUR DAMAGE TO RENTEDPREMISES(Ea occurrence) MED EXP(Any one person) PERSONAL B:ADVINJURY GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE POLICY n PRO JECT n LOC PRODUCTS-COMP/OP AGG $ OTHER: $ AUTOMOBILE LIABIUTY COMBINED SINGLE LIMIT $ (Ea accident) ANY AUTO BODILY INJURY(Per person) OWNED r—+SCHEDULED BODILY INJURY(Per accident) AUTOS ONLY AUTOS HIRED NON-OWNED PROPERTY DAMAGE AUTOS ONLY _AUTOS ONLY (Per accident) UMBRELLA LIAB OCCUR EACH OCCURRENCE $ EXCESS LIAB CLAIMS-MADE AGGREGATE $ DED RETENTION$ $ WORKERS COMPENSATION PER 01H- AND EMPLOYERS'LIABILITY YIN X STATUTE ER ANYPROPRIETOR/PARTNER/EXECUTIVE ^ E.L.EACH ACCIDENT $ 2,000,000 OFFICER/MEMBER EXCLUDED? I N/A WC 053425881 MA 07/01/2022 07/01/2023 A Mandatory in NH) E.L.DIRFASE-E A EMPLOYEE $ 2,000,000 It yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ 2,000,000 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES(ACORD 101,Additional Remarks Schedule,may be attached If more space is required) At worksite employees working for Dandelion Energy Inc paid under ADP TOTALSOURCE,INC:s payroll,are covered under the above stated policy.Dandelion Energy Inc is an abernate employer under this policy. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE Dandelion Energy Inc THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POUCY PROVISIONS. 333 N Bedford Rd Mt Kisco,NY 10549 AUTHORIZED REPRESENTATIVE.6// ©1988-2015 ACORD CORPO rights reserved.ION. All IO ACORD 25(2016/03) ` " The ACORD name and logo are registered marks of ACORD o i yF s . , 4 ii n - .a , , 6 ,.t M,6- q, v-. JL , of•i y, rs Vitoisistit h. I ,, , _ t ; } : - err.. - r,.. ;416 ,.-e i ;4. RYANJ. • �-. c o CARDA k. et,_„. _ .. - H; ':,p9,�,'�FGISTEFEo.... -$ ' fSS/0". ENb\ CONTRACTOR NAME: PROJECT NAME: PROJECT ADDRES DESCRIPTION: 51 DANDELION -- Crystal, Andrew Northampton,MJ4 010so,USA SITEPLAN AA 22-010-0318 _ _ VERSION V2021.11 DRAWN BY: PROJECT ID: DATE: 2023-01-25 � � �"*�m�R�•����go��ON' SCALE:SEE NTS SIZE:ISO B llX17 CflAWINGIM o«.I AY.Eenoa owmc.oarow.,eTM� ID LOOP 1 Z TYPE VERTICAL BORE r=. Y (& NO.OF BORES 2 1 BORE DEPTH 306 FT I .-11 N BORE SPACING 18 FT I ua EST. DEPTH TO BEDROCK 91.45 FT lI HEADER !a O --- ---- 1 U-BEND TYPE SINGLE U-BEND I En d Porch: U-BEND DIAMETER 1-1/4 IN I •a9 ft2 U-BEND MATERIAL HDPE 4710 DR-11 I A -ry GROUT CONDUCTIVITY 1.2 BTU/HR-FT-F HEADER DIAMETER 1-1/2 IN I HEADER MATERIAL HDPE 4710 DR-11 I Built-In GSrege- I 510 R7 . 1st Floor: EST.HEADER LENGTH 60 FT I 2nd Floor: 409 ft, HEADER TRENCH DEPTH 2 FT 1 510 R= TIE-IN TYPE BELOW GROUND I I BOREHOLE TRIANGULATION(-_3 FT) I ' LOOP# BORE# A B I ________ 1 18FT 36.5FT 1 1 — 2 18 FT 21 FT DESIGN NOTES FOR DRILLING: T 1st Floor: 984 ft2 •N/A 2nd Floor: 984 ft2 DESIGN NOTES FOR TRENCHING: •N/A WATER BURIED • r ELECT&COMM I 1 I 1 i I T``p,wumr,. WASTE I SEWER 1 's" OF GAS/FUEL PIPE . 1 WATER SUPPLY ��"40!.--........MA,r.4`y'� I / '�•�// RYAN J. t ,' I of URDA 1-1=_ 1 =u I No.55865 N= '',,,4 0', NAl EM6��1.\`�, CONTRACTOR NAME: PROJECT NAME:�''�/$ A PROJECT ADDRESS: DESCRIPTION: �% DANDELION C� II Andrew Northampton, MA 01060,USA DETAILED SITE PLAN VERSION V2021.11 DRAWN BY: AA PROJECT ID: 22-010-0318 DATE: 2023-01-25 = ^E"%rtA SCALE:SEE NTS SIZE:ISO_B_]SX17 r ORMON.E �,OR WO SURVEYOR TO TI,5 EXISTING EQUIPMENT TO BE REMOVED: AC1 AC1-AC CONDENSER REMOVE N REFRIG.TYPE: R-410a + Fl-FURNACE r-- Irr NATURAL. `L WH1 FUEL TYPE: GAS 2 KEEP USFINEHED .' '6 2111'1 tQ '� ! 4tl M 1 F1 REMOVE / i t EXISTING EQUIPMENT TO BE REMAIN IN PLACE: WH1-HOT WATER HEATER r NATURAL UNFINISHED FUEL TYPE: MY wlr GAS JP Norman. I VP NO / VOLUME: UNKNOWN i cLo MSP1-MAIN SERVICE PANEL SERVICE RATING 200A �` STfX ADE BRAND GE uffwISHED usase V nu„ PROPOSED BREAKERS TO REMOVE: 0 OF MgfoC •AC&FURNACE breakers �y�E HOMEOWNER OBLIGATIONS&EXCLUSIONS: o 4G RYAN J. ,; •N/A o CARDA DESIGN NOTES FOR INSTALLERS: No.55865 •N/A BASEMENT =,1-or EsisTE . .•'4"� %,,``SS/ONM.EN6\,,, CONTRACTOR NAME: PROJECT NAME: PROJECT ADDRESS: DESCRIPTION: /^\ Crystal, Andrew 51 Olander Dr, �� DANDELION rY Northampton,MA 01060,USA EQUIPMENT REMOVAL PLAN AA 22-010-0318 DATE: 2023-01-25 a R K 0-- SCALE:SEE NTS SIZE:ISO_B_11X17 PROFESSVERSION V2021.11 DRAWN BY: PROJECT ID: f. aH��,+c�+or+vwo SURVEY.,TO u.rn TMrs NEW EOUIPMENT TO BE INSTALLED: ID HP1 LOOP 1 GROUND LOOP TIE-IN EQUIPMENT PACKAGE HEAT PUMP 16 FT FROM NW CORNER BRAND ENERTECH YT 1-1/2 IN HDPE SIZE YT-072 30 GAL OF GLYCOL DISTRIBUTION FORCED AIR AIRFLOW:HTG/CLG 2,160 CFM/2,170 CFM SUPPLY VERTICAL RETURN MULTIPOSITION ELECTRICAL 60A-240VAC AUX HEAT YES,60A-240VAC ELECT DISCO REQD YES DESUPERHEATER NO THERMOSTAT ECOBEE EXIST.TSTAT WIRES 4,4 WIRES NEW TSTAT WIRES 7 WIRES REQUIRED CONDITIONED AREA FLOOR 1&2 DUCT ZONING YES,2 ZONES AEROSEAL Y/N NO GROUND LOOP LOOP 1 LINE SET LENGTH - LINE HIDE LENGTH - LINE HIDE COLOR - ADD.REFRIG.REQ. - LIQ.REFRIG.LINE - SUCT.REFRIG.LINE - DRAIN 3/4 IN PUMP TO EXISTING DRAIN `,1111111 o:,,,o' OF HOMEOWNER OBLIGATIONS&EXCLUSIONS: RYAN J. `, •N/A CANA No.55865 DESIGN NOTES FOR INSTALLERS: •N/A ,g0AF615TE0t•�, mrnnn "0• CONTRACTOR NAME: PROJECT NAME: PROJECT ADDRESS: DESCRIPTION: AA [ Crystal, Andrew 51 Olander Dr, NEW EQUIPMENT SCHEDULE DANDELION� ry Northampton,MA 01060,USA AA22-010-0318 .r.., E-.", `E,4 P Es=b ENG'NFER.IG VERSION V2021,11 DRAWN BY: PROJECT ID: DATE: 202.3-01-25 °= , r°rAf=r- SCALE:SEE NTS SIZE:ISO_B_11X17 �es•ioru�x." Oa VNO SURVEYOR TOUTER MS u n"c i".wrw..r� I N .i WH1 a N KEEP 2 UNFINISHED 71e rate 419 sit I HP1 NEW t A • ` LNANNEHED 263`a 15i t` UP ................ 1 Wag II _....... CLO �a...rILommaimmammummemiA 5TO A::E 4- UNFINISHED y 24'x NW 343 WI sEs �0OFMgJ;4,/ =� RYANJ. -_ o' CARDA "`: No.55865 BASEMENT `;,p9OF,..GisTE%E° <:, CONTRACTOR NAME: PROJECT NAME: PROJECT ADDRESS: DESCRIPTION: /\ Crystal, Andrew 51 r Dr, ,1 DANDELIONNorthamptonon,,MA MA 01060,USA NEW EQUIPMENT PLAN AA 22-010-0318 DATE: 2023-01-25 D "S.TM(2'"s" `" gip"` VERSION V2021.11 DRAWN BY: PROJECT ID: UNLESS W wnenncomEEnWOGALK[NSED SCALE:SEE NTS SIZE:ISO B 11X17 PROFESSIONAL ENONEEROR Wq SURVEYOR.TONi9i TM� lit Fd i,'y 1 `� a 5/ ., ;i� = f ySilk: 117,__1\ti,_. ,,,..: REMOVE .,E ; �, BUSHES . _. vest. _...—�. in ;Gt t = r E IIIIIIIIIIIIIIIIIIIIIIMMI • js -. e + �� ®w"" - M� M5 b ale lb-i �Y F" 8 n� w &i itf 4 N # � ' ' 3.- �� y ,,.-. *n A' -' o, 11' - - yee ! tiIx a . .i 4 3 . ` as' -., mA"' i '. a . , ce • uwi. "^ r • TRIM yr .� r - .,i '�• • ni a i ems►.. �/'y" 3', �" C r .y am /x„ A I i -,- 1 - _ t � .pw,' 9. $ : a ,-",:t1,'- .w e.:` ms' ' `` f�' � ,1 N " Kv ,> 4. ` t € 'i` + �`4r � yl£c � �' , ,' r ; � - , L. a ,m i '� v"""a' ,' ' " -'+S' �xF S� r fi • k,,,,,,,,,,, --;:-.,..-,....... „_,....„ ,,,,,,,,,,, ,-- __.,. _, -.-,.., . 'may _ -._�__..._, .�=.' ' '. - "; �JJ'' ._ _a -.......... ,,_ ,.... ..___ _ - , „.. ..„ :F. - 'RED ..-i _,. , , ,....,,,,,:,-,,, . --,,.„ _, , ... 4,,, , ....„ ,-,_ ,,,,„„, - .„..-- _ — .., . 4...,.....,........ .„,, _ _ _ ;�sti,,. ., - ,,fir. ,-,44 „. t. . 4.. _,,_ _ ,.., ''',.... ''' —t., ..,.....,....- -_--- -- - ... . _. ' ' __ . 4°1111111$:. -°*"*'''. P4s. �► 1 } Illar RECONNECT THIS r i s — BRANCH FROM r THE SIDE OF THE TRUNK �� ,v �R a..may. RL A. ..._- ',�w1ry,1 �-�� i 'ems ' 4. Dandelion Heat Pump Packaged Unit Performance Ease of Maintenance • Two-stage Copeland®UltraTech® • Real-time performance monitoring and , . :,,:.,--- compressor with efficiency values up to advanced diagnostic capabiliti 's with home wifi 4.5/20.9(COP/EER) connection.Comes standard wi h every unit. • Unique compressor isolation technology • Removable cabinet panels and emovable and high-density foam cabinet insulation control box providing easy access to internal for ultra-quiet operation components. • EnergyStar certified and made in the USA • Aluminum microchannel air coil which eliminates • Qualifies for the federal tax credit and the potential for failure due to c rrosion, E, other state/local incentives enhancing reliability and efficie cy - • Corrosion-proof plastic drain pan and conden- sate overflow sensor to protect against potential 1 overflows due to clogged condensate drains ii • 3-year workmanship warranty and 10-year ... Simple Installation limited parts warranty .i .i—____ • Vertical air supply with multi-position, • Digital controls which provide a variety of field field-selectable left or right side return selectable settings for each installation,and ENERGY STAR • Universal connection sizes for ground loop, advanced safety controls to protect the desuperheater and condensate connections equipment • Variable speed,constant cfm ECM blower • Factory-installed soft start whicF reduces the designed to adapt to connected ductwork start-up power of the heat pump by 70%. and operate at a fraction of the cost of a • Optional field-installed internal auxiliary heating conventional blower motor Performance Ratings Heating Cooling MODEL LOAD SIZE CAPACITY(BTU/HR) COP CAPACITY(BTU/HR) EER BREAKER SIZE(AMPS) Full 19,000 4.3 27,100 19.9 YT 024 2 Ton 30 Part 15,200 4.8 21,400 28.2 Full 29,100 4.5 41,200 20.9 YT-036 3 Ton 40 Part 23,300 5.1 31,500 31.3 Full 39,900 4.3 53,300 20.2 YT-048 4 Ton I 40 Part 32,000 4.9 42,600 29.6 Full 49,200 4.1 64,300 19.3 YT-060 5 Ton 50 Part 37,700 4.6 50,000 28.0 Full 56,200 3.8 71,900 18.0 YT-072 6 Ton 60 Part 45,800 4.4 58,500 24.8 Rated in accordance with AHRI/ISO standard 13256-1,which includes pump penalties www.dandelionenergy.com Dimensions 1.00--, i ® !,! Q.-I 4 --j i-,!_, a.70 4 r 16.0 -7.25-+ r 76.0 ITIIII, ___ 71/P 7YP.; p ,. I ilo 1 oft t I 6.56 ' p I_ t ♦- - "-"-- ♦ - - ♦ En♦reech R.commenda.Minimum of 2.2.5 foot d Senric.Anauell♦don r r • Access at Front end Air Coil Side. TOP VIEW 16.0 TOP VIEW Showing Optional Filter Rack © , 1.00 [� 0 SOURCE Il li HWG WATER WATER OkiOUT IN SOURCE `IL I0 HWG WATER WATER ® ® IN 01 OUT _- .i _ -- CONFIGURED AS CONFIGURED AS 4i__ 1 SIDE DISCHARGE BACK DISCHARGE Note:Side and Back Discharge configurations ! '� are only available in 036 through 072 models. LEFT VIEW FRONT EW Unit Dimensional Data MODEL WITHOUT WITH RETURN SUPPLY OPTIONAL CONTROL BOX CONTROL BOX AIR FLANGE AIR RANGE FILTER RACK Al *8 C A2 D E F G H J K L M N P R 024 46.0 23.0 26.5 53.25 25.0 20.0 19.1 1.92 3.63 11.62 12.5 7.44 1.05 2.34 3.00 3.63 036-048 54.0 25.4 30.5 61.2 28.0 26.0 23.7 2.34 2.25 16.0 16.0 7.26 1.60 2.34 3.29 2.25 060-072 58.4 25.4 30.5 65.6 32.0 26.0 24.0 2.34 2.25 16.0 16.0 7.26 1.60 2.34 3.29 2.25 Notes: All measurements are in inches. Electrical connect.are 1"for high voltage,1/2"for low voltage. *B(Unit Width)excludes field installed factory supplied flanges. Gru.btooe tom,.Col Temp Trend Performance Monitoring 38.19 "_ Heat pump comes standard with real-time monitoring to provide the installer .3':54. 6"m and homeowner with remote insight into system performance.This includes ses �q ^'` real-time efficiency,energy usage,and status of the refrigerant,air,and --~-- , ground loop circuits. y 2.42 '°` . ^^ `Yyam,,'' .--� 34.25 """Rat TM"d www.dandelionenergy.com i DANDELION April 23,2021 RE: Insulation requirements for shallow header trench installations To whom it may concern: Dandelion requires excavation and header pipe installation to a minimum depth of 4 ft. below grade,and that depth be maintained from the ground loop location to the building entry point.This requirement is consistent with industry-accepted best practices. However,there are cases where the minimum trench depth cannot be achieved without excessive complication,labor or cost.Dandelion has developed an alternative procedure for such cases,which is outlined in our Design&Installation Standards: When the site conditions prevent the header trench from being excavated to the minimum 4 ft.depth,the exterior header piping shall be insulated with closed-cell pipe insulation.Additionally,foam board insulation(min.R10)shall be installed directly above and along the outer edges of the piping in the bottom of the trench for additional freeze protection. The width of the foam board insulation shall be sufficient to completely cover the header piping so that it cannot be seen from above prior to backfill. The thermal conductivity of subsoil is typically on the order of 0.50-1.00 Btu/hr-ft°F,depending on compositioh,density and moisture content.The thermal resistance of foam board insulation is R=5 hr-ft�°F/Btu(per inch of thickness). Using the steady-state conduction equation to calculate thermal equivalence(R=L/kA),it can be shown that adding 2 inch (R10)foam board insulation is comparable to adding 60 inches of soil depth,at minimum. Although it is not ideal to install header piping at depths less than 4 ft.from the surface,the installation of foam board insulation in accordance with our Design&Installation Standards will compensate for the deficiency from a thermal performance and more importantly,from a freeze protection standpoint. If you have any questions,feel free to contact me ar rrarr♦aarlanrlalir nanar rnm. Sincerely, Ryan Carda,P.E. \\\‘`‘ NOFMgSf/%, Principal Engineer �o�..• #'- Dandelion Energy,Inc. 4:° RYAN J. '•, g:` CARDA "': No.55865 " )0\.gEGISTER• E� '4Y April 23,2021 O335 Madison Ave,4th Floor New York,NY 100 7 DANDELION September 15,2020 RE:Compliance with applicable codes and regulations To whom it may concern: Dandelion requires that all design and installation methods and materials comply with all applicable codes and standards, including ANSI/CSA/IGSHPA C448 Series-16(Design and installation of ground source hear pump systems for commercial and residential buildings)and Massachusetts State Building Code and State Energy Code. We provide a set of internal Design &Installation Standards, Permit Drawings,and Master Service Agreements to enforce this requirement with third party contractors and internal installation crews alike. Therefore,to the best of my knowledge, belief and personal judgment,our permit drawings,design and installation requirements and scope of work comply with Massachusetts State Building Code and State Energy Code. If you have any questions,feel free to contact me at rcarda@dandelionenergy.com. Sincerely, Ryan Carda, P.E Principal Engineer Dandelion Energy, Inc ",vii"i. uun,,, 0f Mq %% #` / RYAN J. o CARDA No.55865 1" ...... 'rF'.....ST.....•"\ ",, SS/ONAI ECG�,,\‘\ ///,iiniiiIII''"� O335 Madison Ave,14th Floor New York,NY 1007 DANDELION Re:Sediment control practices for permit application to install a ground loop as part of a geothermal heating and cooling system installation To whom it may concern: This letter summarizes Dandelion Energy's sediment control practices as part of our permit application for geothermal heating and cooling system installation.Dandelion implements industry accepted sediment control methods during drilling and trenching activities in general accordance with New York State Department of Conservation Standard Specifications for Erosion and Sediment Control. The sediment control method(s) implemented on each project vary depending on site-specific conditions, but include one or more of the following measures: • Mud Processor - Equipment used to manage and process drilling spoils by separating solid and fluid materials removed from the borehole. • Containers - Drilling spoils are typically discharged directly into containers such as heavy-duty woven polypropylene sacks, impermeable 3-ply plastic pools, geotextile filter bags or lined roll-off containers during drilling. • Stockpile Methods - In some instances,drilling spoils or excavated materials from trenching may be temporarily stockpiled and contained using silt fences and/or straw bale dikes to prevent runoff. Excavated material is typically returned to the trench on the same day. • Dust Control - Water is sprayed to wet drilling spoils or excavated materials for dust control as needed. These practices have been developed and are employed to ensure that the highest level of environmental protection is achieved as a normal part of system installation. Thanks in advance for your consideration. Sincerely, \\\,,n II IIIIIIII/// pNAHOFMq ............. S ~�` RYAN J. o CARDA No.55865 A AEGISTERE�_... \: 1Z0SI 6��\� S/ONAI EM � //11111111111\\\� � Ryan Carda, P.E Principal Engineer Dandelion Energy, Inc \I� O335 Madison Avel 4th Floor New York,NV 10017 PERFORMANCE RATINGS(AHRIOSO 13256-1) COOLING HEATING PRESSURIZED MODEL CAPACITY - FLOW CENTER RETURN AIR DUCT _CAPACITY(BTUMR)_ EER CAPACITY(BTUMR) COP CONNECTION (W/ FULL LOAD 27.100 _ 19 9 19.000 4 3 VIBRATION BREAK YT-024 S I AND FILTER RACK) PART LOAD 21.400 _ 28.2 15.200 0 8 YT -036 FULL LOAD 41,200 _ 20.9 29 100 4 5 a PART LOAD 31500 31.3 23.300 5.1 , o4,1 _ YT-048 FULL LOAD 53.300 _ 20.2 34.900 13 EXPANSION TANK a 't4. 4e '. PART LOAD 42.600 29.6 32.000 4.9 •'^ s: RYANJ. �, YT-060 FULL LOAD 64.300 - 19.3 49.200 6.1 } /o:: CARDA 1 PART LOAD 50.000 _ 28.0 37.700 46 I Na.55865 FULL LOAD 71.900 18.0 56.200 3 8 YT-072 - E 1! 'IFS%OINAL EM6��`` ' 3. PART LOAD 58,500 2d 8 65.800 4 4 1 X ' vnx ROUGH GRADE 1.TI.' 0 r,. X \ 111 ACCESS •LERD&ISTAND/ EAL BUILDING ENTR E X PANEL \ 'sS x • 4 FT. KE1 C.e 1 FT. RECOMMENDED ACCESS hI PANEL CHECK VALVE (WHEN REQUIRED, SEE NOTES) p ISOLATION BALL VALVES (REQUIRED) s A S I-I l l-I 111 1 1 I I (- LEGEND ID AIR SEPARATOR SYSTEM PRESSURIZATION DETAILS / CONDENSATE TO BALL VALVE-MANUAL RANGE MIN. MAX. APPROVED PUMP OR DRAIN START-UP PRESSURE 30 PSI 60 PSI PER AHJ(TRAP REQUIRED) DRAIN VALVE-MANUAL I'yyyyiw'flI FLEXIBLE PIPING NOTES: 1111'11„'1'I CONNECTION DANDEUON AIR OPERATION UMITS C1.y 90°ELBOW WITHPARAMETER COOLING HEATING • LEFT SIDE RETURN SHOWN.UNIT CAN BE CONFIGURED FOR EITHER LEFT-OR RIGHT-HAND RETURN.CONNECTIONS Y PT/SENSOR PORT MIN EAT 60'F 45'F MIRRORED FOR RIGHT HAND CONFIGURATION. TEE APPROVED INTERIOR PIPING MATERIALS:HOPE,PEX AND/OR RUBBER HEATER HOSE.REFER TO DANDELION'S DESIGN& CONNECTION-GENERAL MAX EAT S00•F REFINSTALLATION STANDARDS FOR SIZING REQUIREMENTS. PIPING MIN EWE 30'F 20'F SUPPLY-RETURN LINE SIZES SELECTED PER DANDELION'S DESIGN AND INSTALLATION STANDARDS. PIPING,TUBING, MAX EWT 11(YF 90•F • ALL INTERIOR PIPING INSULATED WITH CLOSED-CELL INSULATION(}MIN.THICKNESS). 4- HOSE-GENERAL • TARGET DEPTH FOR BUILDING ENTRY POINT IS 4 FT BELOW GRADE.REFER TO DANDELIONS DESIGN AND INSTALLATION MIN WATER FLOW 2.5 GPM/TON STANDARDS FOR PROVISIONS WHEN EXCEPTIONS OCCUR. TL=1 COUPLING-MALE z • THE USE OF CHECK VALVES IS REQUIRED WHEN MULTIPLE HEAT PUMPS ARE CONNECTED TO A COMMON(SHARED)GROUND FEMALE MAX WATER FLOW 35 GPM/ION LOOP. /�� MIN AIR FLOW 300 CFM/TON • SEE SHEETS 2,3,AND 4(OF 4)FOR ADDITIONAL DANDELION SYSTEM REQUIREMENTS. I I FI EXPANSION TANK CONTRACTOR NAME: PROJECT NAME: Andrew Crystal PROJECT ADDRESS: 51 Olander Dr,Northampton,MA DESCRIPTION: PAGE: DANDELION ry INTERIOR PIPING(DANDELION YT) 01060,USA MULTI-POSITION VERTICAL PACKAGED - 1 OF 4 VERSION V2021.08 PROJECT ID: 22-010-0318 DATE: 1/30/2023 SCALE:NTS SIZE:ISO B_11 X 17 ox O F M4s r , p? yG HEADER PIPE SIZE PER - / 4....__(;_4!,!_ CARDA 74 4- DESIGN DOCUMENTS No.55865 STEP-DOWN,STEP-UP REVERSE RETURN HEADER STEP-DOWN,STEP-UP 9 0 R REVERSE-RETURN HEADER ,�'POFFsE�ISTE0.M��0�� VERTICAL BOREHOLE(CITY AND (PER MI STANDARDS) S/ONAL E SPACING PER DESIGN DOCUMENTS) 111 ♦ -OUGH GRADE Ile 01M11111 1 ) -I—r / \ NDISTURBED SOIL —III / / / / �I A -1—'-'.'•1//\/\\j/\\j/\\ 1=TT Mr CALCULATED 4 FT. /\/\/\/\ 1-Tfi 1=1 I / / / / DEPTH T7-T-I-1Tf / 1_ 7-� -1 -1 . \ \ \ =1I APPROX. 8 IN. GRANULAR BACKFlLL ., . 11 (NO ROCKS OR LARGE CHUNKS) HEADER PIPIN TRENCH DETAIL HEADER PIPE SIZE U PER DESIGN DOCUMENTS TRENCHING NOTES- LOOP SUPPLY LOOP RETURN U-BEND CITY AND PIPE SIZE BWHEN SITE CONDMONS DO NOT ALLOW EXCAVATION TO THE REQUIRED 4 FT. DEPTH (FROM BUILDING) (TO BUILDING) C-C SPACING PER PER DESIGN DOCUMENTS INSULATE THE HEADER PIPING WITH R10 INSULATION (MUST BE RATED FOR DIRECT BURIAL). DESIGN DOCUMENTS INSTALL THE NSULATION DIRECTLY ABOVE AND ALONG THE OUTER EDGES OF THE PIPING GROUND LOOP LAYOUT OFTAII THE BOTTOM OF THE TRENCH FOR FREEZE PROTECTION. HEADER PIPING fFTAII GENERAL NOTES. SYSTEM ANTIFREEZE MUST MEET OR EXCEED AHl BUILDING CODES • ALL UNDERGROUND PIPE FITTINGS/CONNECTIONS MADE VIA HEAT FUSION PER ANSI/CSA/IGSHPA C448.0-16, SECTION 5.4.2 CORRESPOND WITH FREEZE POINT 12-13°F BELOW MIN EWT • ALL GROUND LOOP PIPING HDPE, MIN. 160 PSI RATING (PE 3608 OR 4710, DR11) PER ANSI/CSA/IGSHPA C448.0-16, SECTION 5.4.2 ANTIFREEZE CONCENTRATION%BY VOLUME • MINIMUM BORE SPACING AND CALCULATED BORE DEPTH PER LOOPLINK RLC • MIN. SEPARATION DISTANCE FROM ALL STRUCTURES AND UTILITIES (FOUNDATION, GAS, SEWER, SEPTIC, PROPERTY LINES, ETC.) IS 10 FT., MIN EWT(°F) UNLESS OTHERWISE SPECIFIED BY THE AHJ. ANTIFREEZE TYPE ° ° 25°F 30°F 35 F-45°F >45 F • INSTALL R2 (MIN.) PIPE INSULATION ON HEADER PIPING WHEN CROSSING A WATER/SEWER LINE — - • FULL LENGTH GROUTING REQUIRED, 1.20 BTU/HR-FT-F GROUT THERMAL CONDUCTIVITY VALUE PROPYLENE GLYCOL 25% 22% 20% 0% • HEADER PIPING MUST BE LAID OUT IN REVERSE-RETURN FASHION AS INDICATED IN THE HEADER DETAIL DRAWING. ETHANOL 25% 20% 15% 0% • ALTERNATIVE PIPING LAYOUT/DESIGN MUST BE PRE-APPROVED BY DANDEUON. METHANOL DO NOT USE 15% 10% 0% • SEE SHEETS 1, 3, AND 4 (OF 4) FOR ADDITIONAL DANDEUON STJILM REQUIREMENTS. • PRIOR TO STARTUP, THE GROUND LOOP SHALL BE FLUSHED AT 2 FPS TO REMOVE AIR/DEBRIS USING A 1.5 HP PURGE PUMP HEAT TRANSFER FLUID MUST COMPLY WITH ANSI/CSA/IGSHPA C448.0-16, SECTION 5.7 CONTRACTOR NAME: PROJECT NAME: PROJECT ADDRESS: DESCRIPTION: PAGE: Andrew Crystal DANDELION 51 Olander Dr,Northampton,MA 01060,USA GROUND LOOP AND HEADER PIPING 2OF4 • VERSION V2021.08 PROJECT ID: 22-010-0318 DATE: 1/30/2023 SCALE:NTS SIZE:ISO_B_11 X 17 COLD WATER SUPPLY ,,,,,u,n,,, HEAT PUMP WATER HEATER SPECIFICATIONS ELECTRICAL VOLTAGE/PHASE/HZ UPPER/LOWER ELEMENT WATTAGE MAX WATTAGE REQUIRED BREAKER SIZE HOT WATER ',yGc SUPPLY(TO RYAN 1 .-4::::.. . SPECS 230/1160 4500 4500 30 AMP HOUSE) o CARDA PERFORMANCE NOMINAL CAPACITY(GAL) RATED STORAGE VOLUME(82) LIEF FIRST HOUR RATING(GAL) I No.55865 RATINGS 80 62 3.45 86 / ' ''oFFJJ ONAI Ehl'',ss' 1 in HOT WATER (OUTLET)—\ 1 i 1 COLD WATER (INLET) 7 0 (NEW)HEAT PUMP WATER HEATER K — I 0 1 I TEMPERATURE AND PRESSURE 0 RELIEF VALVE (TPV) - , DRAIN / / / / CONDENSATE TO APPROVED DRAIN PER AHJ m'I�!/I rr' LEGEND BALL VALVE•MANUAL I DRAIN VALVE-MANUAL NOTES: HOT WATER LINE - • DOMESTIC HOT WATER CONNECTIONS SHALL MEET OR EXCEED ALL APPLICABLE BUILDING CODES. —— Cd.D WATER LINE • TEMPERATURE AND PRESSURE RELIEF VALVE(TPV)SHALL BE FACTORY INSTALLED AND — TERMINATED ACCORDING TO APPLICABLE BUILDING CODES • PIPING,TUBING, • ALL NEW PLUMBING 0}IN.(MIN.),PEX OR COPPER 4— HOSE GENERAL • THE NEW WATER HEATER SHALL TIE-INTO THE EXISTING DOMESTIC WATER PLUMBING. ' • SEE SHEETS 1,2,AND 4(OF 4)FOR ADDITIONAL DANDELION SYSTEM REQUIREMENTS. CONTRACTOR NAME: PROJECT NAME: Andrew Crystal PROJECT ADDRESS:51 Olander Or,Northampton,MA DESCRIPTION: PAGE: DANDELION 01060,USA HEAT PUMP WATER HEATER 3OF4 INSTALLATION DETAILS(ALL MODELS) VERSION V2021.08 PROJECT ID: -010-0318 DATE: 1/30/2023 SCALE:NTS SIZE:ISO_B_11 X 17 NOTES: (NEW)HEAT PUMP ELECTRICAL PANEL REFER TO TABLE FOR BREAKER REQUIREMENTS • ELECTRICAL WORK MUST MEET OR EXCEED ALL APPLICABLE (EXISTING)MAIN ELECTRICAL PANEL BUILDING&ELECTRICAL CODES • WHEN THE DISTANCE FROM THE SERVICE PANEL TO THE HEAT PUMP L FORIS FURTHERR REVIEW.TER THAN CONSULT WITH THE ENGINEERING TEAM Vp- ���. HEAT PUMP �p�1H OF MgJ'4-,, • SEE SHEETS 1,2,AND 3(OF 4)FOR ADDIONAL DANDELION SYSTEM L O • o� `G REQUIREMENTS. >F RYAN J. R, ' -0 o� CARDA No.55865 981M L le • AUX HEATER * •L (o) i---1 11011 O R , L-1- -.•Rh O G ,i _ 0 C - OV1 Y1 Nit HEAT PUMP Y2 1N2 - 0 Y2 THERMOSTAT OR ACC- TERMINAL BLOCK PEK ` ACC. O COM CD d 0 \_/.__-1./ 0 0 ODH ECOBEE THERMOSTAT(NEW) O W l CONDENSATE PUMP BREAK(C)WIRE IF CONDENSATE BACKS UP OR MALFUNCTIONS HEAT PUMP ELECTRICAL SPECIFICATIONS AUX HEAT ELECTRICAL SPECIFICATIONS(WHEN APPLICABLE) VOLTAGE/ LRA W/SOFT VOLTAGE/ AUX HEAT KW AUX HEAT AUX HEAT MODEL PHASE/HZ FLA(AMP) LRA(A) START(Al MCA(A) MOP(A) MODEL PHASE/HZ (240V) AMPS 240V) AUX HEAT MCA(A) MOP Y1-024 230/1160 209 58.3 17.5 23.8 35 YT-024 230/1/60 5 20.8 260 30 YT-036 230/1160 248 83.0 249 28.7 40 Y1-036 230/1)60 10 41.7 521 60 YT-048 230/1/60 31 9 104 0 31 2 37 2 50 YT-048 230/1/60 10 41.7 52.1 60 YT-060 230/1/60 395 _ 152.9 459 46.3 70 YT-060 230/1/60 10 41.7 52.1 60 YT-072 23071/60 421 1729 538 495 70 YT-072 230/1760 10 417 521 60 CONTRACTOR NAME: PROJECT NAME: Andrew Crystal PROJECT ADDRESS: DESCRIPTION:51 Olander Dr,Northampton,MA ELECTRICAL/THERMOSTAT/CONDENSATE PAGE: DANDELION 01060,USA PUMP WIRING(DANDELION VT) 4 OF 4 _ MULTI-POSITION VERTICAL PACKAGED VERSION V2021.08 PROJECT ID: 22-010-0318 DATE: 1/30/2023 SCALE:NTS SIZE:ISO_B_11 X 17 IC MOM GSHP Design Report Project: [22-010-0318, Andrew Crystal] (Project ID:31506) Prepared: 25-Jan-2023 Prepared By: Ameed Azar ink by Geo-Connections.Inc. System Loads System Loads or Peak Loads are calculated based on a variety of details for an individual residence. Assumed occupancy levels, the number of appliances operating, the number of doors & windows and the tightness of the construction all contribute to the amount of energy required to maintain the thermostat set points given the historical extreme weather conditions in your area. The peak loads used in this report were provided as listed in the following table. 1 kBtu/hr= 1,000 Btu/hr Total Total Heating Load Cooling Load Zone (kBtu/hr) (kBtu/hr) Zone SHF First&Second Floors 57.43 40.20 0.904 Total 57.43 40.20 1 of 7 I , New York Equipment Schedule Based on the provided loads, the recommended heat pump schedule for this system is as follows: 1 kBtu/hr= 1 4000 Btu/hr Heat Cool ' Water 2 Air 3 Cap. Cap. Flow Flow QTY (kBtu/hr) (kBtu/hr) (GPM) (CFM) Dandelion Energy- Enertech 56.70 70.50 18.0 2,170 First &Second Floors Multi-Position Vertical YT-072 1 48.00 60.87 High Capacity Totals 56.70 70.50 18.0 Low Capacity Totals 48.00 60.87 - 1. All capacities shown are total. 2. When applicable,hydronic source and load water flows are assumed equal. 3. Air flow rates are reported on a per heat pump basis. For total air flow in a zone,multiply the reported air flow by quantity. 2 of 7 I , New York First &Second Floors Zone Details The peak loads for each individual zone are used to calculate the total amount of heating & cooling capacity required for a space based on the set points and the climate data for your area. Peak Heating Load 57,427 Btu/hr Peak Cooling Load 40,203 Btu/hr Heating Set Point 72 °F Cooling Set Point 72 °F Heating Offset 0 Btu/hr Space SHF 0.904 GSHP Selection The ground source heat pump below has been selected to maintain comfortable heat- ing & cooling for this zone. Manufacturer Dandelion Energy Model Enertech Multi-Position Vertical YT-072 Heat Pump Type Water to Air Capacity Dual Capacity #Heat Pumps 1 Installed Capacity Check The installed capacity check describes the efficiency and total heating/cooling capacity of the selected ground source heat pump system. This information is used to ensure proper sizing of equipment based on the load represented by this zone. Heating (High Capacity) Cooling (High Capacity) Heating Capacity 56,700 Btu/hr Total Cooling Capacity 70,500 Btu/hr % Sizing 98.7% Sensible Cooling Capacity 52,875 Btu/hr % Energy From Geo 99.8% % ° Oversizing 45.5/° Installed COP 3.82 Installed EER 14.63 Balance Point Temp. 0.6 °F Heating (Low Capacity) Cooling (Low Capacity) Heating Capacity 48,000 Btu/hr Total Cooling Capacity 60,872 Btu/hr % Sizing 83.6% Sensible Cooling Capacity 45,654 Btu/hr Installed COP 4.16 % Oversizing 25.6% Installed EER 21.95 3 of 7 I , New York First &Second Floors Zone Operating Summary The Zone Operating Summary describes equipment runtime and the total annual power consumption for the GSHP operating in this zone. Heating Cooling High Capacity Runtin 264 hrs High Capacity Runtime 0 hrs Low Capacity Runtimt 2,071 hrs Low Capacity Runtime 653 hrs Supplemental Bin Hours 32 hrs Dual Fuel Bin Hours 0 hrs Heat Pump Energy Us' 8,169 kWh Heat Pump Energy Use 1,987 kWh Pumping Energy Us 749 kWh Pumping Energy Use 209 kWh Supplemental Energy Use 61 kWh Dual Fuel Energy Use 0 kWh GSHP Operating Cost BreaKuown for Zone Name Based on the annual power consumption of the system and the price per kilowatt hour in your area the estimated cost to maintain the set points for this zone are as follows: Heating Cooling HP Cos, $1,960.75 HP Cost $477.07 Supplemental Cost $14.82 Pumping Cost $50.34 Dual Fuel Cost $0.00 Total Cost $527.41 Pumping Cost $179.85 Total Cost $2,155.42 73.1% HP Heating Cost MI 6.7% Pumping Cost-Heating MINI 0.6% Supplemental Heating Cost 17.8% HP Cooling Cost 1.9% Pumping Cost-Cooling 4 of 7 I , New York Back-Up System Details Supplemental System Details Supplemental systems operate at the same time as the geothermal heat pump and provide additional heat when the space load is greater than the system capacity. Supplemental System Type Electric Resistance Ci. 1.0 Zone Load and Operating Profile 900 90 co 800 80 S. a .. r- 600 0 60.a °y = 500 ---- o c.— x m t mco 400 4 r c �c Q300 30= 200 20 r1 a 100 1 ! io ° 0 0 K n °n N .i '" ° „ N n n n S A S a $ A w °n n $ m R m $ Temperature(°F) — Heating Load — Low Capacity Heating Operation •• High Capacity Heating Operation — Cooling Load — Low Capacity Cooling Operation •• High Capacity Cooling Operation I Supplemental Heating I GSHP Heating I GSHP Cooling Heating Cooling Heating Start OAT 57.0 °F pooling Start OAT 65.0 °F High Capacity Runtime 264 hr High Capacity Runtime 0 hr Low Capacity Runtime 2,071 hr Low Capacity Runtime 653 hr Supplemental Bin Hours 32 hr 5 of 7 I , New York Vertical Bore 15ft cc Earth Temperature Data Location Deep earth (below 20ft) temperature is a function of the average annual air tempera- ture in your region and remains relatively constant regardless of season. Deep Earth Temp (TG) 53.0 °F Formation Details The thermal properties of your formation are based on the formation's composition and have a direct impact on the scale of your loopfield. Thermal Conductivity 1.41 Btu/hr ft°F GHEX Summary Heating is dominant. Grout is used inside of all bores in order to protect the deep earth environment from surface contaminants and to provide a more effective contact surface with GHEX piping that optimizes heat transfer between the fluid pumped through your GSHP and the earth. Grade Grout T.C. 1.20 Btu/hr ft °F EWTMIN 30.0 °F Q Backfill -=- -__ 0 Formation _-_-_ _=== EWTM( 90.0 °F Q Granular Backfill Ai . = p Grout = . ___ Bore Diameter(DB) 5.00 in GHEX Pipe 1.25"DR 11.0 HDPE 4710 DR11 el E ! 1 2 ... _- •___ Bores in Series (NBIS) I 1 OO �0 __ .:. = LB Layout Rows (nrows) F-SB� S t___ Bores per Row 4.3 2 0 0-�cc B == Number of Bores �B =_= Bore Spacing (SB) 15.0 ft to ,_1_70 0 .___________________- _� . 1-DB TOP VIEW DETAIL Design Depth (LB) 311 ft (GENERIC) (GENERIC) Header Pipe 1.50'DR 11.0 HDPE 4710 DR11 6 of 7 , New York Vertical Bore 18ft cc Earth Temperature Data Location Deep earth (below 20ft) temperature is a function of the average annual air tempera- ture in your region and remains relatively constant regardless of season. Deep Earth Temp (TG) 53.0 °F Formation Details The thermal properties of your formation are based on the formation's composition and have a direct impact on the scale of your loopfield. Thermal Conductivity 1.41 Btu/hr ft°F GHEX Summary Heating is dominant. Grout is used inside of all bores in order to protect the deep earth environment from surface contaminants and to provide a more effective contact surface with GHEX piping that optimizes heat transfer between the fluid pumped through your GSHP and the earth. Grade Grout T.C. 1.20 Btu/hr ft°F I.._._` W `-. ETMIN 30.0 °F DBar�cfll -- -- Li Formation =_=_ ==- E WTM, 90.0 °F 0 Granular Backfill Grout _ Bore Diameter(DB) 5.00 in _-__ -=-_ ,s;j GHEX Pipe 1.25"DR 11.0 HDPE 4710 DR11 nmax.) _ ___ 1:::::: 4 rows _ --= _-----___ ,:',.:1;_::_::_: 1 2 ... ____ #__- Bores in Series (NBIB) 1 0 1 DO 0Z. _= LB Layout Rows (nitW) 1 o F--SB- _= ir: _ Bores per Row 2 ® O-�- I_ SB __ Number of Bores co SB __ _ _ Bore Spacing (SB) 18.0 �impDB-of TOP VIEW DETAIL Design Depth (LB) 306 ft (GENERIC) (GENERIC) Header Pipe 1.50"DR 11.0 HDPE 4710 DR11 7 of 7 I , New York +I+ wrightsoft Building Analysis Job:. 22-010.0318 Entire House By. Dandelion Energy 333 North Bedford Road,Stile 220,Moat Kisco,NY 10549 Pore:833-GEO-4ALL Email:desigr@dardeliorerergycom Web:w.wvdardeliorerergy.com Pro'ect Information For: Andrew Crystal 51 Olander Dr,Northampton,MA 01060 Design Conditions Location: Indoor. Heating Cooling Westover Metro,MA,US Indoor temperature(°F) 72 72 Elevation: 241 ft Design TD(°F) 66 16 Latitude: 42°N Relative humidity(%) 30 50 Outdoor: Heating Cooling Moisture difference(grub) 29.3 31.2 Dry bulb(°F) 6 88 Infiltration: Daily range(°F) - 22 ( M ) Method Simplified Wet bulb(°F) - 71 Construction quality Average Wind speed(mph) 15.0 7.5 Fireplaces 1 (Average) Heatin. Component Btuh/ft2 Btuh %of load Walls 4.5 10826 18.9 Ducts Glazing 38.5 19840 34.5 Walls Doors 25.9 1088 1.9 Ceilings 2.1 3824 6.7 Infiltration Floors 2.7 4959 8.6 Infiltration 5.0 12908 22.5 Ducts 3983 6.9 Piping 0 0 Humidification 0 0 Floors Ventilation 0 0 Glazing Adjusts rents 0 Ceilings Other Total 57427 100.0 Coolin• Component Btuh/ftz Btuh %of load Walls 1.1 2563 7.1 Internal Gains Glazing47.5 24455 67.3 Walls` / Ducts Infiltration Doors 10.2 427 1.2 Floors Ceilings 1.7 3073 8.5 Floors 0.6 1048 2.9 i Ceilings Infiltration 0.5 1388 3.8 _.-,__other Ducts 1020 2.8 Ventilation 0 0 Internal gains 2350 6.5 Blower 0 0 Adjustments 0 Glazing Total 36323 100.0 Latent Cooling Load=3880 Btuh Overall U-value=0.095 Btuh/ft2-°F Data entries checked. +la- wrightscaft 2023Jan-2515:02:45 RigBt-Sute®Uriversal 2022 22.0.05 RSU28723 Page 1 (--z, .igN22-010-0318,Andrew Crystal]HeatLoad.n) CaIc=MJB Fmrt Door faces:W wrightsoftat Building Analysis Dobe: 22-010-0318 1st Floor By. Dandelion Energy 333 North Bedford Road,Sute 220,Moult Kisco,NY 10549 Phone:833-GEO-4ALL Email:desigr@dardelionenergy oom Web'wwwdardelionenergy.com Pro'ect Information For: Andrew Crystal 51 Olander Dr,Northampton,MA 01060 • Design Conditions Location: Indoor: Heating Cooling Westover Metro,MA,US Indoor temperature(°F) 72 72 Elevation: 241 ft Design TD(°F) 66 16 Latitude: 42°N Relative humidity(%) 30 50 Outdoor: Heating Cooling Moisture difference(gr/Ib) 29.3 31.2 Dry bulb(°F) 6 88 Infiltration: Daily range(°F) - 22 ( M ) Method Simplified Wet bulb(°F) - 71 Construction quality Average Wind speed(mph) 15.0 7.5 Fireplaces 1 (Average) # ',..., Heatin• Component Btuh/ft2 Btuh %of load Walls 4.5 5395 17.1 Ducts Glazing 38.2 10966 34.7 walls Doors 25.9 1088 3.4 Ceilings 2.1 729 2.3 Floors 2.5 3611 11.4Infiltration Infiltration 5.0 5809 18.4 Ducts 3983 12.6 Piping 0 0 Humidification 0 0 Glazing Ventilation 0 0 Floors Adjustments 0 p Ceilings Total 31580 100.0 Coolin• Component Btuh/ft2 Btuh %of load Walls 1.0 1177 5.4 Walls Internal Gains Glazing 54.6 15664 71.3 ucts Doors 10.2 427 1.9 nfiltration Ceilings 2.2 764 3.5 Floors Floors 0.6 854 3.9 Ceilings Other Infiltration 0.5 625 2.8 Ducts 1262 5.7 Ventilation 0 0 Aiv Internal gains 1200 5.5 i Blower 0 0 Adjuslirtents 0 Glazing Total 21971 100.0 Latent Cooling Load=1943 Btuh Overall U-value=0.105 Btuh/ft2-°F Data entries checked. wrightsaft' 2023-Jar-25 15:02:45 �'.- •-.•K-, -w., RigR-Sdte®Uriversal202222.0.05RSU28723 Page2 _Jgrt[12-010-0318,Andrew Crystal]Heat Load.n5 Calc=M,18 Fro/Door faces:W in B itd 9 Analysis Job: 22-010-0318 +I+ wrightsoftDab: 2nd Floor By. Dandelion Energy 333 North Bedford Road,Sute 220,Morn Kisoo,NY 10549 Ptxme:833-GEO-4ALL Email:desigr@dardelionerergy.com Web:wwwdardelionerergy.com Pro'ect Information For: Andrew Crystal 51 Olander Dr,Northampton,MA 01060 Design Conditions Location: Indoor. Heating Cooling Westover Metro,MA,US Indoor temperature(°F) 72 72 Elevation: 241 ft Design TD(°F) 66 16 Latitude: 42°N Relative humidity(%) 30 50 Outdoor: Heating Cooling Moisture difference(gr/Ib) 29.3 31.2 Dry bulb(°F) 6 88 Infiltration: Daily range(°F) - 22 ( M ) Method Simplified Wet bulb(°F) - 71 Construction quality Average Wind speed(mph) 15.0 7.5 Fireplaces 1 (Average) Heatin• Component Btuh/ft2 Btuh %of load Walls 4.5 5431 21.0 Glazing 39.0 8874 34.3 w. Doors 0 0 0 natation Ceilings 2.1 3095 12.0 Floors 3.3 1349 5.2 Infiltration 5.0 7099 27.5 Ducts 0 0 41 Piping 0 0 Floors Humidification 0 0 Ventilation 0 0 Glazing Ceilings Adjust)rents 0 Total 25847 100.0 Coolin• Component Btuh/ft2 Btuh %of load Walls 1.2 1386 6.5 ntemal Gains filGlazing 68.1 15501 72.8 Wal InOther n Doors 0 0 0 Ceilings Ceilings 1.6 2310 10.8 Floors 0.5 194 0.9 / Infiltration 0.5 763 3.6 Ducts 0 0 Siiimmooloif. Ventilation 0 0 Internal gains 1150 5.4 Blower 0 0 Adjustments 0 Glazing Total 21304 100.0 Latent Cooling Load=1937 Btuh Overall U-value=0.086 Btuh/f12--°F Data entries checked. ' w o rightsft 2023-Jan-2515:02:45 _ Right-Sute®Uriversai 2022 22.0.05 RSU28723 Page 3 -"-'�'— ...igrii22-010-0318,Andrew Crystal]Heat Load.ft Caic=MJ8 Frort Door faces:W 9 Load Short Form Job: 22-010-0318 wri htsoft Date: Entire House By: Dandelion Energy 333 North Bedford Road,Sate 220,Moat Kisco,NY 10549 Phone:833-GEO-4ALL Email:desigr@dardeliorerergyc°m Web:wwwdardelionerergy.com Project Information For: Andrew Crystal 51 Olander Dr,Northampton,MA 01060 Design Information Htg Clg Infiltration Outside db(°F) 6 88 Method Simplified Inside db(°F) 72 72 Construction quality Average Design TD(°F) 66 16 Fireplaces 1 (Average) Daily range - M Inside humidity(%) 30 50 Moisture difference(grub) 29 31 HEATING EQUIPMENT COOLING EQUIPMENT Make Enertech Make Enertech Trade Trade Model YT-072 Cond YT-072 AHRI ref Coil AHRI ref Efficiency 0 COP Efficiency 0 EER Heating input 0 kW Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 °F Total cooling 0 Btuh Actual airflow 2160 cfrn Actual airflow 2160 cfrn Air flow factor 0.038 cfm/Btuh Air flow factor 0.059 cfm/Btuh Static pressure 0.40 in H2O Static pressure 0.40 in H2O Space thermostat Load sensible heat ratio 0.90 Capacity balance point=0°F Backup: Input=0 kW, Output=0 Btuh,100 AFUE ROOM NAME Area Htg load Clg load HtgAVF ClgAVF (ft2) (Btuh) (Btuh) (cfm) (cfrn) 1st Floor 1416 31580 21971 1188 1307 2nd Floor 1479 25847 21304 972 1267 Entire House 2895 57427 36323 2160 2160 Other equip loads 0 0 Equip.@ 0.93 RSM 33672 Latent cooling 3880 TOTALS 2895 57427 37552 2160 2160 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. Pk- wrightsoft 2023-Jan-25 15:02:45 � ,�,..,•;�..,1...... RigFt-Suite®Uiversal202222.0.05RSU28723 Page 1 AC Jgrig2-010-0318,AndrewCrystal]Heat Load.rt Caic=MJ8 Frort Door faces:W Load Short Form Job: 22-010-0318 +}+ wrightsoft Date: 1st Floor By. Dandelion Energy 333 North Bedford Road,Siite 220,Maul Kisco,NY 10549 PI-one:833-GEO-4ALL Email:desigr@dardeliorenergy.com Web:wwwdardeliorerergy.com Project Information For: Andrew Crystal 51 Olander Dr,Northampton,MA 01060 Design Information Htg Clg Infiltration Outside db(°F) 6 88 Method Simplified Inside db(°F) 72 72 Construction quality Average Design TD(°F) 66 16 Fireplaces 1 (Average) Daily range - M Inside humidity(%) 30 50 Moisture difference(gr/Ib) 29 31 HEATING EQUIPMENT COOLING EQUIPMENT Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 °F Total cooling 0 Btuh Actual airflow 0 cfm Actual airflow 0 cfrn Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 ROOM NAME Area Htg load Clg load HtgAVF CIgAVF (ft2) (Btuh) (Btuh) (cfrn) (cfm) Room2 1416 31580 21971 1188 1307 1st Floor 1416 31580 21971 1188 1307 Other equip loads 0 0 Equip.@ 0.93 RSM 20368 Latent cooling 1943 TOTALS 1416 31580 22311 1188 1307 Calculations approved byACCAto meet all requirements of Manual J 8th Ed. wrightsoft 2023-Jan-25 15:02:45 Riga-Sute®Uriversal202222.0.05 RSL128723 Page 2 ACCP\ ...igrk22-010-0318,Ardrew Crystal]Heat Load.rrp Calc=MJ8 Fro rt Door faces:W +I+ 9 Load Short Form Job: 22-010-0318 wrightsoft Date: 2nd Floor By. Dandelion Energy 333 North Bedford Road,Sute 220,Mount Kisco,NY 10549 Phore:833-GEO-4ALL Email:design@@dandelionenergyoom Web.wwwdardeliooenergyoam Project Information For: Andrew Crystal 51 Olender Dr,Northampton,MA 01060 Design Information Htg Clg Infiltration Outside db(°F) 6 88 Method Simplified Inside db(°F) 72 72 Construction quality Average Design TD(°F) 66 16 Fireplaces 1 (Average) Daily range - M Inside humidity(%) 30 50 Moisture difference(grAb) 29 31 HEATING EQUIPMENT COOLING EQUIPMENT Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 °F Total cooling 0 Btuh Actual airflow 0 cfrn Actual airflow 0 dm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 ROOM NAME Area Htg load Clg load HtgAVF CIgAVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Room5 1479 25847 21304 972 1267 2nd Floor 1479 25847 21304 972 1267 Other equip loads 0 0 Equip.@ 0.93 RSM 19749 Latent cooling 1937 TOTALS 1479 25847 21685 972 1267 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. w r igh tsoft 2023-Jan-25 15:02:45 �- Right-Sute®Uriversal 2022 22.0.05 RSU28723 Page 3 ACCP, ...i 9 grAl22-010-0318,ArdrewCrystal]HeatLoad.np CaIc=MJB FrortDooriaces:W -4+ wrightsoft Right-J8® Form J1 Job: 22-010-0318 Entire House Date: By Dandelion Energy 333 North Bedford Road,Sate 220,Moat Kisco,NV 10549 Phore:833-GE0.4ALL Email:desigr@dardeliorenergy.com Web:Nwwdardelionerergy.com 1 Name of Room Entire House 1st Floor 2 Running Feet ofErposedWall 366.5 ft 1905 ft 3 Ceiling Ht(Ft)and Gross Wall kea(SgR) 8.0 ft 3283.0 if 8.0 it 1875.0 1F 4 Room Dimensions(R)and Roor Plan Area(SqR) 28952 fr 1416.1 ft' 5 Ceiling Slope(Deg.)and Gross Ceiling Area(SqR) 0 ' 28952 fF 0 ° 1416.1 1F Type of Corot, Panel HTM Area or Btuh Area or Btuh Flzdrmire Number Faces Length Length Ht. Clg. Heating S-Clg L-Clg Healing S-Clg L-Clg 6 Wall 12E-0sv n 4.52 1.15 654 2624 670 230 884 226 I Glaz 1 D-c2ow n 37.85 19.65 73 2753 1430 34 1296 673 . Wall 12E-0sw e 4.52 1.15 440 1515 387 160 438 112 -Glaz 10B-w e 39.84 3222 21 837 677 21 837 677 11 -Glaz 1 D-c2ow e 37.85 61.51 42 1571 2553 0 0 0 -Glaz 1E-c2fw e 37.18 70 74 42 1562 2971 42 1562 2971 Wall 12E-0sw s 4.52 1.15 848 2989 763 424 1323 338 Glaz 10B-w s 39.84 18.48 42 1673 776 42 1673 776 -Glaz 1D-2ow s 37.85 33.33 144 5450 4799 89 3368 2966 Vrall 12E-0sw w 4.52 1.15 618 2112 539 338 1165 297 az 1D-c2ow w 37.85 6151 129 4888 7944 59 2229 3623 Door 11D0 w 25.90 10.16 21 544 213 21 544 213 Wall 12E-0sw - 4.52 0.58 372 1585 204 372 1585 204 Door 11D0 n 25.90 10.16 21 544 213 21 544 213 Cell 16A-30ad - 2.12 223 343 729 764 343 729 764 Gnil 166-30ad - 2.12 1.59 1479 3095 2310 0 0 0 L C�Iaz 8Bcw-2w - 49.14 146.92 23 1106 3306 0 0 0 Ror 19A-19bswp - 2.55 0.60 1416 3611 854 1416 3611 854 Ror 20P-19w - 3.32 0.48 406 1349 194 0 0 0 rtrfiftration Heating Load(6hih) 046 i 12908 5809 Effect WAR WAR 12 Sensible Load(Btuh) ACH 1.00 1388 1.00 625 021 Latent Load(Bbjh) 1703 766 Internal a nnrpantsat230 and 200Btuh 5 1150 1000 0 0 0 b Scenario number 1200 1200 13 c Default Adjustments d Custom Appliarrc. 0 0 0 0 e Plants 0 0 14 Subtotals Sum lines 6 through 12 53444 35304 2703 27596 20709 766 Dud EHLFBESGF 0.045 0.089 3983 1020 3983 1262 15 Loads ELG 1177 1177 16 Ventilation Loads Vent Cfm 0 E Cfm 0 0 0 0 0 0 0 17 Winter Humidification Load Gal/Day 0 0 0 18 Piping Load 0 0 19 Blower Heat 0 0 20 AED Excursion&Latent Moisture Mgration Load 0 3978 21 Total Load Sum lines 13 through 19 57427 36323 3880 31580 21971 1943 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. -1 wrlgphtsoft 2023Jan-25150245 �* """" """ Right-Sage®Uriversal202222.0.05RSU28723 Page 1 ...igrk22-010-0318,Andrew Crystal]Heat Load.rp Caic=MJ8 Front Door faces:W +I+ wrightsoft Right-J8® Form J1 Job: 22-010-0318 Entire House Date: By: Dandelion Energy 333 North Bedford Road,Stite 220,Mout Kisco,NY 10549 Phone:833-GEO-4ALL Email:design@dandelionenergy.com Web:wawdardelionenergy.com 1 Name of Room 2nd Roor 2 Running Feet of Exposed Wall 176.0 It 3 Ceiling Ht(Ft)and Gross Wall Area(SqR) 8.0 ft 1408.0 ft 4 Room Dimensions(R)and Roor Plan Area(SgFt) 1479.1 IF 5 Ceiling Slope(Deg.)and Gobs Ceiling Area(SqR) 0 ° 1479.1 tt Type of Const, Panel HTM Area or Bhth Area or Btuh Fsriarre Number Faces Length Length H70. Clg. Heating S-Clg L-Clg Heating S-Clg L-Clg 6 Wall 12E-0sw n 4.52 1.15 424 1741 444 az 1 D-c2ow n 37.85 19.65 39 1457 757 . Wall 12E-0sw e 4.52 1.15 280 1077 275 -Glaz 10B-w e 39.84 3222 0 0 0 11 Glaz 1 D-r20w e 37.85 61.51 42 1571 2553 -Glaz 1E-c2fw e 37.18 70.74 0 0 0 Wall 12E-0sw s 4.52 1.15 424 1666 425 Glaz 10B-w s 39.84 18.48 0 0 0 --Glaz 1D-2ow s 37.85 33.33 55 2082 1833 y/all 12E-0sw w 4.52 1.15 280 947 242 az 1 D-2ow w 37.85 61.51 70 2659 4321 Door 11D0 w 25.90 10.16 0 0 0 Wall 12E 0 - 4.52 0.58 0 0 0 Door 1100 n 25.90 10.16 0 0 0 Cell 16A-30ad - 2.12 223 0 0 0 elG 'I 16B-30ad - 2.12 1.59 1479 3095 2310 t��laz 8Bow-2w 49.14 146.92 23 1106 3306 Ror 19A-19bswp - 2.55 0.60 0 0 0 Ror 20P-19w - 3.32 0.48 406 1349 194 Infittratian Heating Load(Btuh) 0.46 7099 Effect WAR 12 Sensible Load(Btuh) ACH 1.00 763 021 Latent Load(Btuh) 937 Internal a Occupants at 230 and 200 Btuh 5 1150 1000 b Scenario number 0 13 c Default Adjustments d Custom Appliances 0 0 e Plants 0 14 Subtotals Sum lines6through12 25847 21304 1937 r Dud EHLF&ESGF 0 0 0 0 15 Loads ELG 0 16 Ventilation Loads Vent Cfm 0 ECfm 0 0 0 0 17 Winter Humidification Load Gal/Day 0 0 18 Piping Load 0 19 Blower Heat 0 20 AED E ursion&Latent Maskire Migration Load 2731 21 Total Load Sum lines 13 through 19 25847 21304 1937 Calculations approved byACCAto meet all requirements of Manual J 8th Ed. -i"}r w, P tsott 2023Jan_2515:02:45 " '' ''" Right-Sute®Uriversal 2022 22.0.05 RSU28723 Page 2 At -010-0318,ArdrewCrystal]HeatLoad.n.p Calc=MJB Frort Door faces:W +I+ wrightsoft Right-J8® Form J1 Job: 22-010-0318 1st Floor Date: By Dandelion Energy 333 North Bedford Road,Sute 220,Mout Kisco,NY 10549 Phore:833-GEO-4ALL Email:desigri✓o dardeliorerergycom Web:wu✓wdardeliorerergy.00m 1 Name of Room 1st Roor Room2 2 Running Feet of Exposed Wall 190.5 ft 1905 ft 3 Ceiling Ht(Ft)and GrossWall Area(SqR) 8.0 it 1875.0 ft' 8.0 ft 1875.0 ft' 4 Room Dimensions(R)and Roor Plan Area(SgEt) 1416.1 ft' 1.0 x 1416.1 ft 1416.1 ft' 5 Ceiling Slope(Deg.)and Gross Ceiling Area(SqR) 0 ° 1416.1 ft' 0 ° 1416.1 ft' Type of Corot, Panel HTM Area or Ruh Area or Ruh Exposure Number Faces Length Length Htg. Clg. Heating S-Cig L-Clg Heating S-GIg L-Clg 6 Wall 12E-0sw n 4.52 1.15 230 884 226 230 884 226 I Glaz 1D-c20w n 37.85 19.65 34 1296 673 34 1296 673 . Wall 12E-0sw e 4.52 1.15 160 438 112 160 438 112 -Glaz 10B-w e 39.84 3222 21 837 677 21 837 677 11 Glaz 1D-c2ow e 0.00 0.00 0 0 0 0 0 0 -{31az 1 E-2fw e 37.18 70.74 42 1562 2971 42 1562 2971 Wall 12E-0sw s 4.52 1.15 424 1323 338 424 1323 338 Glaz 10B-w s 39.84 18.48 42 1673 776 42 1673 776 -Glaz 1D-c2ow s 37.85 33.33 89 3368 2966 89 3368 2966 Vj/all 12E-0sw w 4.52 1.15 338 1165 297 338 1165 297 az 1D-c2ow w 37.85 61.51 59 2229 3623 59 2229 3623 Door 11D0 w 25.90 10.16 21 544 213 21 544 213 Wall 12E-0sw - 4.52 058 372 1585 204 372 1585 204 I Door 11D0 n 25.90 10.16 21 544 213 21 544 213 Cell 16A-30ad - 2.12 223 343 729 764 343 729 764 eif 16B-30ad - 0.00 0.00 0 0 0 0 0 0 az 8Bcw-2w 0.00 0.00 0 0 0 0 0 0 Ror 19A-19bsnp - 2.55 0.60 1416 3611 854 1416 3611 854 Ror 20P-19w - 0.00 0.00 0 0 0 0 0 0 Infiltration Heating Load(Bhifi) 0.42 5809 5809 Effect WAR I WAR 12 Sensible Load(Btih) ACH 1.00 625 1.00 625 0.19 Latent Load(Btuh) 766 lido al a Occupant at230 and 200Btuh 0 0 0 0 0 0 b Scenario number 1200 1200 13 c DefaultAdjusiinents d Custom Appliances 0 0 0 0 e Plants 0 0 14 Subtotals Sum lines 6 through 12 27596 20709 766 27596 20709 Dud EHLF&ESGF 0.144 0.061 3983 1262 3983 1262 15 Loads ELG 1177 1177 16 Ventilation Loads VentCfm 0 E Cfm 0 0 0 0 17 Winter Humidification Load GalDay 0 0 18 Piping Load 0 19 Blaser Heat 0 20 AED Eanirsion&Latent Moisture Mgration Load 3978 3978 21 Total Load Sum lines 13 through 19 31580 21971 1943 31580 21971 Calculations approved byACCAto meet all requirements of Manual J 8th Ed. +lr wriest tsoft 2023-Jan-25 15:02:45 -.-- ----°._. Right-Sate®Uriversal 2022 22.0.05 RSLf28723 Page 3 _igrij22-010-0318,Andrew Crystal]Heat Load.rtq Calc=MJ8 Fmrt Door faces:W +1+ wrightsoft Right-J8® Form J1 Job: 22-010-0318 2nd Floor Date: By. Dandelion Energy 333 North Bedford Road,Sine 220,Moult Kisco,NY 10549 Phone:633-GEO-4ALL Email:desigr@dandeliorenergycom Web:wwwdardeliorerergy.com 1 Name of Room 2nd Roor Rooms 2 Running Feet of&osedWall 176.0 ft 176.0 ft 3 Ceiling Ht(Ft)and Gr us,Wall Area(SgFt) 8.0 ft 1408.0 f 8.0 ft 1408.0 IF 4 Room Dimensions(R)and Roc(Plan Area(SqR) 1479.1 ft' 1.0 x 1479.1 ft 1479.1 fF 5 Ceiling Slope(Deg.)and Gross Ceiling Area(SqR) 0 ° 1479.1 fF 0 ° 1479.1 1P Type of Const, Panel HTM Area or Btuh Area or Btuh Raxnire Number Faces Length Length Htg. Clg. Heating S-Clg L-Clg Heating S-Clg L-Clg 6 Wall 12E-0sw n 4.52 1.15 424 1741 444 424 1741 444 I Glaz 1 D-Qow n 37.85 19.65 39 1457 757 39 1457 757 . Wall 12E-0sw e 4.52 1.15 280 1077 275 280 1077 275 ---Glaz 10B-w e 0.00 0.00 0 0 0 0 0 0 11 -Glaz 1 D-22ow e 37.85 61.51 42 1571 2553 42 1571 2553 -Glaz 1E-c2fw e 0.00 0.00 0 0 0 0 0 0 all 12E-0sw s 4.52 1.15 424 1666 425 424 1666 425 II Glaz 10B-w s 0.00 0.00 0 0 0 0 0 0 az 1D-c2ow s 37.85 33.33 55 2082 1833 55 2082 1833 all12E-0sw w 4.52 1.15 280 947 242 280 947 242 az 1 D-2ow w 37.85 61.51 70 2659 4321 70 2659 4321 Door 11D0 w 0.00 0.00 0 0 0 0 0 0 'ran12E-0sw - 0.00 0.00 0 0 0 0 0 0 Door 11D0 n 0.00 0.00 0 0 0 0 0 0 Ceil 16A-30ad - 0.00 0.00 0 0 0 0 0 0 elGr 'I 16B-30ad - 2.12 1.59 1479 3095 2310 1479 3095 2310 Glaz 8Bcw-2w 49.14 146.92 23 1106 3306 23 1106 3306 Ror 19A-19besp - 0.00 0.00 0 0 0 0 0 0 Ror 20P-19w - 3.32 0.48 406 1349 194 406 1349 194 Infiltration Heating Load(Bhh) 0.50 7099 7099 Effed WAR WAR 12 Sensible Load(Btih) ACH 1.00 763 1.00 763 023 Latent Load(Btuh) 937 trrtemal a nmipants at 230 and 200 Btuh 5 1150 1000 5 1150 1000 b Scenario number 0 0 13 c Default Adjustments d Custom Appliances 0 0 0 0 e Plants 0 0 14 Subtotals Sum lires6llirough 12 25847 21304 1937 25847 21304 r Dud EHLF&ESGF 0 0 0 0 0 0 15 Loads ELG 0 0 16 VentilaliuiLoads VentCfm 0 ECfm 0 0 0 0 17 Winter Humidification Load Gal/Day 0 0 18 Piping Load 0 19 Blaner Heat 0 20 AED Excursion&Latent Mcistire Migration Load 2731 2731 21 Total Load Sum lines 13 through 19 25847 21304 1937 25847 21304 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. -rid- wriythtsoft 2023-Jan-25 15:02:45 Right-Sute®Uriversal 2022 22.0.05 RSU28723 Page 4 A c- ...ign422-010-0318,Andrew Crystal]Heat Load.rw Ca lc=W8 Front Door faces:W N 411\- 1' Below Grade • • • • Basement Job#:22-010-0318 Dandelion Energy Scale: 1 :88 Performed for: Page 1 Andrew Crystal 333 North Bedford Road,Suite 220 RightSuite®Universal 2022 51 Dander Dr Mount Kisco,NY 10549 22.0.05 RSU28723 Northamptco,MA01060 Phone:833-GE0-4ALL 20e 25 15: 1 8,Ardrew Ciyrystal]Heaatt Load.rup www.dandelionenergy.com design@dardelonenergy.... N 1/ First Floor Garage Room2 I Job#: 22-010-0318 Scale: 1 :88 Performed for: Dandelion Energy Page 2 Andrew Crystal 333 North Bedford Road, Suite 220 Right-Suite®Universal 2022 51 Dander Dr Mount Kisco,NY 10549 22.0.05 RSU28723 Northampton,MA01060 Phone:833 GE0-4ALL 20ewC y Crys25 tal] Heat L 2 8,Andrew Crystal]Heat Load nip wwwdandelionenergy.can design@d and el one nergy... N 11 Second Floor Room5 I J J Job#:22-010-0318 Dandelion Energy Scale: 1 :88 Performed for: Page 3 Andrew Crystal 333 North Bedford Road,Suite 220 RightSuite®Universal 2022 51 gander Dr Mount Kisco,NY 10549 22.0.05 RSU28723 2023-Northampton,MA01060 Phone:833-GE0-4ALL drew arr25 14eat L 2 8,Arcirew Crystal]Heat Load.rup wwwdandelionenergy.can design@d and el one nergy....