Loading...
35-048 BP-2023-0091 972 RYAN RD COMMONWEALTH OF MASSACHUSETTS Map:Block:Lot: 35-048-001 CITY OF NORTHAMPTON Permit: Solar Build PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) BUILDING PERMIT Permit# BP-2023-0091 PERMISSION IS HEREBY GRAN ED TO: Project# 2023 SOLAR Contractor: License: Est. Cost: 12000 TRINITY SOLAR CSL1080 5 Const.Class: Exp.Date: 04/22/2024 Use Group: Owner: SENN MARGARET J Lot Size (sq.ft.) Zoning: WSP Applicant: TRINITY SOLAR Applicant Address hp one: Insurance: 32 GROVE ST (508)577-3391 WC 13588108 PLYMPTON, MA 02367 ISSUED ON: 01/26/2023 TO PERFORM THE FOLLOWING WORK: INSTALL 6 PANEL 2.4 KW ROOF MOUNT SOLAR SYSTEM WITH STRUCTURAL MODIFICATIONS POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House # Foundation: Final: Final: Final: Rough Frame: Gas: Fire Department Driveway Final: Fireplace/Chimney: Rough: Oil: Insulation: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Signature: CP 1 a Fees Paid: $75.00 212 Main Street,Phone(413)587-1240,Fax: (413)587-1272 Office of the Building Commissioner f' .`'"6 ,,,_ ;!_ = i The Commonwealth of Massachusetts B and of Building Regulations and Standards FOR !` 'L • M ssachusetts State Building Code, 780 CMR MUNICIPALITY 4N 2 6 USE Buil ii Pe it pplication To Construct,Repair,Renovate Or Demolish a Revised Mar 2011 _ One- or Two-Family Dwelling + u slur rtoczrNb This Section For Official Use Only MA 01060 Building Permit Number: r; 3 9i Date Applied: J(a)its."Z ,I �? 1• &-Zo23 Building Official(Print Name) Signature Date SECTION 1: SITE INFORMATION 1.1 Property Address: 1.2 Assessors Map&Parcel Numbers 972 Ryan Rd,Northampton, MA 1.1 a Is this an accepted street?yes no Map Number Parcel Number 1.3 Zoning Information: 1.4 Property Dimensions: Residential-Solar Zoning District Proposed Use Lot Area(sq ft) Frontage(ft) 1.5 Building Setbacks(ft) Front Yard Side Yards Rear Yard Required Provided Required Provided Required Provided 1.6 Water Supply: (M.G.L c.40,§54) 1.7 Flood Zone Information: 1.8 Sewage Disposal System: Public 0 Private 0 Zone: _ Outside Flood Zone? Municipal 0 On site disposal system 0 Check if yes❑ SECTION 2: PROPERTY OWNERSHIP' 2.1 Owner'of Record: Margaret Senn Northampton MA 01062 Name(Print) City,State,ZIP 972 Ryan Rd (413)265-8078 margsenn(h?aol.com No.and Street Telephone Email Address SECTION 3: DESCRIPTION OF PROPOSED WORK2(check all that apply) New Construction 0 Existing Building 0 Owner-Occupied 0 Repairs(s) 0 Alteration(s) 0 Addition 0 Demolition 0 Accessory Bldg. 0 Number of Units Other[]Specify:solar Brief Description of Proposed Work2: Install 2.4 kW DC solar on roof (6 panels) Will not exceed building footprint, but will add 6"to roof height. Strucutral upgrades as described in engineering letter. SECTION 4:ESTIMATED CONSTRUCTION COSTS Item Estimated Costs: Official Use Only (Labor and Materials) 1.Building $3,000 1. Building Permit Fee: $ Indicate how fee is determined: ❑Standard City/Town Application Fee 2.Electrical $9,000 ❑Total Project Costa(Item 6)x multiplier x 3.Plumbing $ 2. Other Fees: $ 4.Mechanical (HVAC) $ List: 5.Mechanical (Fire $ Suppression) Total All Fees: $ / Check No. I? heck Amount: / Cash Amount: 6.Total Project Cost: $12,000 0 Paid in Full 0 Outstanding Balance Due:_ SECTION 5: CONSTRUCTION SERVICES 5.1 Construction Supervisor License(CSL) CS-108025 4/22/2024 Phil Smith License Number Expiration Date Name of CSL Holder List CSL Type(see below) U 6 Torrey St No.and Street Type Description U Unrestricted(Buildings up to 35,000 cu. ft.) Easthampton,MA 01027 R Restricted 1&2 Family Dwelling City/To to ZIP M Masonry RC Roofing Covering ' WS Window and Siding SF Solid Fuel Burning Appliances 413-203-9088 x 1524 applications.westma@trinity-solar.com I Insulation Telephone Email address D Demolition 5.2 Registered Home Improvement Contractor(HIC) 170355 10/11/2023 Trinity Solar Inc DBA Trinity Solar HIC Registration Number Expiration Date HIC Company Name or HIC Registrant Name 20 Patterson Brook Road-Unit 10 applications.westma@trinity-solar.com No.and Street Email address West Wareham MA 02576 413-203-9088 x 1524 City/Town,State,ZIP Telephone SECTION 6:WORKERS' COMPENSATION INSURANCE AFFIDAVIT(M.G.L. c. 152.§ 25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the Issuance of the building permit. Signed Affidavit Attached? Yes El No . ❑ SECTION 7a:OWNER AUTHORIZATION TO BE COMPLETED WHEN OWNER'S AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I,as Owner of the subject property,hereby authorize Please See Attached to act on my behalf,in all matters relative to work authorized by this building permit application. Print Owner's Name(Electronic Signature) Date SECTION 7b: OWNER' OR AUTHORIZED AGENT DECLARATION By entering my name belo I hereby attest under the pains and penalties of perjury that all of the information contain i app ' Ton is true and to to the best of my knowledge and understanding. X 01/25/2023 Print Owner' or Authorized Agent's Name(Electronic Signature) Date NOTES: 1. An Owner who obtains a building permit to do his/her own work,or an owner who hires an unregistered contractor (not registered in the Home Improvement Contractor(HIC)Program),will not have access to the arbitration program or guaranty fund under M.G.L.c. 142A.Other important information on the HIC Program can be found at www.mass.gov/oca Information on the Construction Supervisor License can be found at www.mass.gov/dps 2. When substantial work is planned,provide the information below: Total floor area(sq.ft.) (including garage,finished basement/attics,decks or porch) Gross living area(sq.ft.) Habitable room count Number of fireplaces Number of bedrooms Number of bathrooms Number of half/baths Type of heating system Number of decks/porches Type of cooling system Enclosed Open 3. "Total Project Square Footage"may be substituted for"Total Project Cost"