Loading...
31A-331 (12) BP-2022-1542 97 VERNON ST COMMONWEALTH OF MASSACHUSETTS Map:Block:Lot: 31A-331-001 CITY OF NORTHAMPTON Permit: Solar Build PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) BUILDING PERMIT Permit# BP-2022-1542 PERMISSION IS HEREBY GRANTiD TO: Project# 2022 SOLAR Contractor: License: Est. Cost: 33150 GOT SUN GO SOLAR 091168 Const.Class: Exp.Date: 09/10/2024 Use Group: Owner: B SHUKLA SUNDEEP M &DEEPIKA Lot Size (sq.ft.) Zoning: URA Applicant: GOT SUN GO SOLAR Applicant Address Phone: Insurance: PO BOX 222 (877)772-6357 SOLE PROPRIETOR SEEKONK, MA 02771 ISSUED ON: 12/28/2022 TO PERFORM THE FOLLOWING WORK: INSTALL 25 PANEL 10 KW ROOF MOUNT SOLAR SYSTEM POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House # Foundation: Final: Final: Final: Rough Frame: Gas: Fire Department Driveway Final: Fireplace/Chimney: Rough: Oil: Insulation: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Signature: 1 t g II Fees Paid: $75.00 212 Main Street,Phone(413)587-1240,Fax: (413)587-1272 Office of the Building Commissioner -' tvoZi Cori -4 The Commonwealth of Massachusetts Board of Building Regulations and Standards FOR '" Massachusetts State Building Code,780 CMR MUNICIPALITY o� USE Building Permit Application To Construct,Repair,Renovate Or Demolish a Revised Mar 2011 `�'w One-or Two-Family Dwelling This Section For Official Use Only Building Permit Number: (3$).e. f 0... Date Applied: •=1)�r , a-ZS-ZOZZ BuildingOfficial(Print(Pn Name) ignature Date SECTION 1:SITE INFORMATION 1.1 Property Address: 1.2 A sessorf Map&Parcel Numbers 97 Vernon Street,Northampton,MA 01060 6 1.1 a Is this an accepted street?yes no Map Number Parcel Number 1.3 Zoning Information: 1.4 Property Dimensions: Zoning District Proposed Use Lot Area(sq ft) Frontage(ft) 1.5 Building Setbacks(ft) Front Yard Side Yards Rear Yard Required Provided Required Provided Required Provided 1.6 Water Supply:(M.G.L c.40,§54) 1.7 Flood Zone Information: 1.8 Sewage Disposal System: Public❑ Private❑ Zone: Outside Flood Zone? Municipal 0 On site disposal system ❑ Check if yes❑ SECTION 2: PROPERTY OWNERSHIP' 2.1 Owner'of Record: Sunny Shukla Northampton,MA 01060 Name(Print) City,State,ZIP 97 Vernon Street, 573-673-9164 smshukla32@gmail.com No.and Street Telephone Email Address SECTION 3:DESCRIPTION OF PROPOSED WORK2(check all that apply) New Construction 0 Existing Building® Owner-Occupied 0 Repairs(s) 0 Alteration(s) 0 Addition 0 Demolition 0 Accessory Bldg. 0 Number of Units Other ® Specify: Solar Brief Description of Proposed Work2: Installation of a 10 kW PV rooftop system using 25 solar modules.(No Battery or ESS) SECTION 4:ESTIMATED CONSTRUCTION COSTS Item Estimated Costs: (Labor and Materials) Official Use Only 1.Building $ 11,050 1. Building Permit Fee: $ Indicate how fee is determined: 0 Standard City/Town Application Fee 2.Electrical $ 22,100 0 Total Project Cost'(Item 6)x multiplier x 3.Plumbing $ 2. Other Fees: $ 4.Mechanical (HVAC) $ List: 5.Mechanical (Fire $ Suppression) Total All Fees:$ Check NoNO. Check Amount: I Cash Amount: 6.Total Project Cost: $ 33,150 0 Paid in Full 0 Outstanding Balance Due: SECTION 5: CONSTRUCTION SERVICES 5.1 Construction Supervisor License(CSL) CS-091168 9/10/2024 Ronald Bennett License Number Expiration Date Name of CSL Holder List CSL Type(see below) U P.O.Box 222 No.and Street Type Description U Unrestricted(Buildings up to 35,000 cu.ft.) Seekonk,MA 02771 R Restricted 1&2 Family Dwelling City/Town,State,ZIP M Masonry RC Roofing Covering WS Window and Siding SF Solid Fuel Burning Appliances (877)772-6357 projects(a),nuwattenergy.com I Insulation Telephone Email address D Demolition 5.2 Registered Home Improvement Contractor(HIC) 180717 4/26/23 Got Sun Go Solar HIC Registration Number Expiration Date HIC Company Name or HIC Registrant Name P.O.Box 222 projects@anuwattenergy.com No.and Street Email address Seekonk,MA 02771 (877)772-6357 City/Town,State,ZIP Telephone SECTION 6:WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152.§ 25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the Issuance of the building permit. Signed Affidavit Attached? Yes !$ No 0 SECTION 7a:OWNER AUTHORIZATION TO BE COMPLETED WHEN OWNER'S AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I,as Owner of the subject property,hereby authorize NuWatt Energy to act on my behalf,in all matters relative to work authorized by this building permit application. Sunny shukla � QS Oct 21 2022_ Print Owner's Name(Electronic Signature) Date SECTION 7b:OWNER'OR AUTHORIZED AGENT DECLARATION By entering my name below,I hereby attest under the pains and penalties of perjury that all of the information contained in this application is true and accurate to the best of my knowledge and understanding. Ronald Bennett .��CG �� Oct 21 202210:42 EST Print Owner's or Authorized Agent's Name(Electronic Signature) Date NOTES: 1. An Owner who obtains a building permit to do his/her own work,or an owner who hires an unregistered contractor (not registered in the Home Improvement Contractor(HIC)Program),will not have access to the arbitration program or guaranty fund under M.G.L.c. 142A.Other important information on the HIC Program can be found at www.mass.gov/oca Information on the Construction Supervisor License can be found at www.mass.gov/dps 2. When substantial work is planned,provide the information below: Total floor area(sq.ft.) (including garage,finished basement/attics,decks or porch) Gross living area(sq. ft.) Habitable room count Number of fireplaces Number of bedrooms Number of bathrooms Number of half/baths Type of heating system Number of decks/porches Type of cooling system Enclosed Open 3. "Total Project Square Footage"may be substituted for"Total Project Cost" City of Northampton „,"Amp, .. O,L, S`S ...S'C' Massachusetts � yk° g' DEPARTMENT OF BUILDING INSPECTIONS y z 212 Main Street • Municipal Building Jd D� "0r1v' r Northampton, MA 01060 swPJ CONSTRUCTION DEBRIS AFFIDAVIT (FOR ALL DEMOLITION AND RENOVATION PROJECTS) In accordance of the provisions of MGL c 40, S54, a condition of Building Permit Number is that all debris resulting from this work shall be disposed of in a properly licensed waste disposal facility, as defined by MGL c 111, S 150A. The debris will be disposed of in: Location of Facility: 41 Hawthorne Rd. Windham, NH 03087 The debris will be transported by: Name of Hauler: NuWatt Energy Signature of Applicant: ,p°` Date: Oct 21 202211I0:42 EST The Commonwealth of Massachusetts Department of Industrial Accidents 1 Congress Street, Suite 100 Boston,MA 02114-2017 www.mass.gov/dia Workers'Compensation Insurance Affidavit:Builders/Contractors/Electricians/Plumbers. TO BE FILED WITH THE PERMITTING AUTHORITY. A. .licant Information Please Print e''bl Name (Business/Organization/Individual): Ronald Bennett I GOT SUN GO SOLAR INC Address: PO Box 222 City/State/Zip: Seekonk, MA-02771 Phone#: 401-663-2532 Are you an employer?Check the appropriate box: Type of project(requ red): 1.0 I am a employer with 3 employees(full and/or part-time).* 7. ❑New constructicn 20 I am a sole proprietor or partnership and have no employees working for me in 8. ❑Remodeling any capacity.[No workers'comp.insurance required.] 9. ❑Demolition 3.a I am a homeowner doing all work myself.[No workers'comp.insurance required.]' 10❑ Building addition 4.❑I am a homeowner and will be hiring contractors to conduct all work on my property. I will ensure that all contractors either have workers'compensation insurance or are sole 11.0 Electrical repairs or additions proprietors with no employees. 12.❑Plumbing repairs or additions ❑I am a general contractor and I have hired the sub-contractors listed on the attached sheet. 13.❑Roof repairs These sub-contractors have employees and have workers'comp.insurance. 14.�✓ Other Solar 6.❑We are a corporation and its officers have exercised their right of exemption per MGL c. -- 152,§1(4),and we have no employees.[No workers'comp.insurance required.] *Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. ;Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job sire information. Insurance Company Name: PARTNERS INSURANCE GROUP LLC Policy#or Self-ins.Lic.#: VWC10060238042022A Expiration Date: 03/15/2023 Job Site Address: 97 Vernon Street, city/state/zip: Northampton, MA 01060 Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under MGL c. 152, §25A is a criminal violation punishable by a fine up to $1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator.A copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify under the pains and penalties of perjury that the information provided above is true and correct Signature: �` ' � ersr� Date: Dec-27-2022 Phone#: 401-663-2532 Official use only. Do not write in this area. to be completed by city or town official. City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: AC� DATE(MMIDD/YYYY) CERTIFICATE OF LIABILITY INSURANCE 07/06/2022 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT NAME: Josalyn Caradimos PARTNERS INSURANCE GROUP LLC fPA"/c°."No,Ezfl: (508)491-3698 TF-AX N,), E-MAIL caradimos artnersins Ilc.com ADDRESS: ) CP 9rP 560 WILBUR AVENUE INSURER(S)AFFORDING COVERAGE NAIC# _ SWANSEA MA 02777 INSURERA: AIM MUTUAL INS CO 33758 INSURED INSURER B: GOT SUN GO SOLAR INC INSURERC: INSURER D: PO BOX 222 INSURER E: _ SEEKONK MA 02771 INSURER F: COVERAGES CERTIFICATE NUMBER: 791290 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADDLISUBRI POLICY EFF POLICY EXP MITE LTRINSD WVD POLICY NUMBER (MMIDD/YYYY) (MM/DD/YYYY) COMMERCIAL GENERAL LIABILITY I EACH OCCURRENCE $ CLAIMS-MADE DAMAGE TO RENTED I OCCUR PREMISES(Ea occurrence $ • MED EXP(Any one person $ N/A PERSONAL&ADV INJURY $ GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ POLICY PRO- JECT LOC PRODUCTS-COMP/OP A3G $ OTHER: $ AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT :$ (Ea accident) • ANY AUTO BODILY INJURY(Per person) $ OWNED SCHEDULED AUTOS ONLY AUTOS I N/A BODILY INJURY(Per accident) $ HIRED NON-OWNED PROPERTY DAMAGE $ AUTOS ONLY AUTOS ONLY (Per accident) UMBRELLA LIAB OCCUR EACH OCCURRENCE $ EXCESS LIAB CLAIMS-MADE N/A AGGREGATE $ DED RETENTION$ $ WORKERS COMPENSATION X STATUTE OT - AND EMPLOYERS'LIABILITY ER Y/N ANYPROPRIETOR/PARTNER/EXECUTIVE E.L.EACH ACCIDENT $ 1,000,000 A OFFICER/MEMBEREXCLUDED? N/A N/A N/A , VWC10060238042022A 03/15/2022 03/15/2023 (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $ 1,000,000 If yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ 1,000,000 N/A DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space is required) Workers'Compensation benefits will be paid to Massachusetts employees only. Pursuant to Endorsement WC 20 03 06 B,no authorization is given to pay claims for benefits to employees in states other than Massachusetts if the insured hires,or has hired those employees outside of Massachusetts. This certificate of insurance shows the policy in force on the date that this certificate was issued(unless the expiration date on the above policy precedes the issue date of this certificate of insurance). The status of this coverage can be monitored daily by accessing the Proof of Coverage-Coverage Verification Search tool at www.mass.gov/Iwd/workers-compensation/investigations/. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN Town of Seekonk ACCORDANCE WITH THE POLICY PROVISIONS. 100 Peck Street AUTHORIZED REPRESENTATIVE Seekonk MA 02771 Daniel M.Crowley,CPCU,Vice President—Residual Market—WCRIBMA ©1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD pz s structu ra October 12,2022 ENGINEERS NuWatt Energy PO Box 4464 Windham,NH,03087 Subject:Structural Certification for Installation of Solar Panels Job Number:2022-13125 Client:Deepika&Sunny Shukla-007849 Address:97 Vernon Street,Northampton,MA 01060 Attn.:To Whom It May Concern PZSE's scope of work is limited to performing a structural evaluation of loading at the address above.After review, PZSE certifies that the alteration to the existing structure by installation of the PV system meets the requirements of the applicable codes and criteria shown below: Design Criteria: • Applicable Codes=780 CMR,ASCE 7-10,and NDS-15 • Ground Snow Load=40 psf;Roof Snow Load=35 psf ARRAY 1 • Basic Wind Speed=117 mph Exposure Category B • Existing Roof Dead Load:ARRAY 1=10 psf • Existing Roof Live Load:19.6 psf The existing structure is adequate to support the PV alteration per 2015 IEBC§402.3&402.4. PV System Assembly The PV module assembly including all structural supporting components shall be installed in accordance with the manufacturers specifications and meet or exceed all requirements set forth by the referenced codes above. Installation Requirements The PV system shall be mounted flush to the existing roof surface.The contractor shall notify PZSE of any signs of damage to the roof framing prior to commencing the installation. PZSE shall then determine if the existing roof is adequate to support the applied loads.The electrical engineering and system waterproofing shall be addressed by others. If you have any questions on the above,do not hesitate to call. _ytN OFMq � Prepared By: ' PAUL K. ,�. 1 . .ZACNER j ict PZSE,Inc.-Structural Engineers • STRUCTURAL :J.; Roseville,CA o ss % 1478 Stone Point Drive,Suite 190, Roseville, CA 95661 T 916.961.3960 F 916.961.3965 W www.pzse.com Experience I Integrity I Empowerment • tZr PLC1116 3VIS Commonwealth Ot Massachusetts Wft Division of Professional Licensure Board of Building Regulations and Standards .irr 5t)pgrvisor C S-09 t t 68 Eaptres:09/1012022 111 RONALD A BENNETT PO BOX 222 SEEKONK MA 02771 Commissioner Office of Consumer Affairs and Business Regulation 1000 Washington Street- Suite 710 Boston, Massachusetts 02118 Home Improvement Contractor Registration Type Corporation GOT SUN GO SOLAR.INC Registration 180717 P 0 BOX 222 Expiration. 04/26/2023 SEEKONK.MA 02771 Update Address and Return Card. Office of Consumer Affairs A Business Regulation HOME IMPROVEMENT CONTRACTOR Registration valid for individual use only TYPE:Corooratior before the expiration date. If found return to %IMMO/ Exotration Office of Consumer Affairs and Business Regulation 180717 04/26/2023 1000 Washington Street -Suite 710 GOT SUN GO SOLAR INC Boston,MA 02118 RONALD BENNETT 675 READ STREET SEEKONK.MA 02771 Undersecretary Not valid without signature 1 NuWatt Energy,LLC WoWadode Center.AO1 Suite 2900 TTre Grid-Tied Photovoltaic System ""'"° •.',,," ' , .. ..�.- —wlEnerg.com NuWatrEnetOy.com DC Rating: 10.0 kW NOTES Notes: • Deepika & Sunny Shukla Sheet List Sheet No.- Sheet Title- 97 Vernon Street, PV-000 COVER Northampton,MA-01060 PV-A01 SITE PLAN PV-A02 MODULE LAYOUT PV-A03 DETAILS PV-E01 ELECTRICAL DIAGRAM Jurisdiction: Town of Northampton, MA PV-E02 UTILITY METER Scope of Work: General Notes: HOUSE VIEW NuWatt Energy shall install a Grid-tied Photovoltaic("PV")System using Panasonic. 1. System follows any/all Fire Code Setbacks per Ordinances of the EVPV400H Modules with EnPhase Energy IQ8M-72-2-US microinverters. The Town of Northampton,MA. Modules shall be flush mounted on the Asphalt Comp. Shingle roof and 2.All projects will comply with the Ordinances of the Town of interconnected via line side tap connection. Northampton. 3. Construction Hours: 7am-8pm Monday-Friday, 9am-8pm Saturday. wril > Equipment Specifications: No time on Sunday or legal Holidays. FOR EXISTING p 4.Product Data Sheets shall be included. Modules: (25) Panasonic,EVPV400H 5. Rooftop penetrations shall be completed and sealed per code by a STRUCTURE ONLY Microinverters: (25)EnPhase Energy,IQ8M-72-2-US licensed contractor. . 411 Attachment Flashing. Eco-Fasten Green-Fasten with CP-SQ-Slotted Bracket and 6.All Photovoltaic modules shall be tested and listed by a recognized Aluminum Flashing laboratory. 7.Certifications shall include UL1703,IEC61646,IEC61730. P�-N CFM9SS 8. A continuous ground shall be provided for the Array and for all -'4 _ '9 Photovoltaic Equipment. 4 PAUL CHER K. C� 9.DC Wring shall be run in metal conduit or raceways within enclosed 74j. GN spaces in a building. • ZA 10.Conduit,Wre systems and Raceways shall be located as close as ' STRUCTURAL c possible to ridges,hips,and outside walls. �(nn 11. Conduit between Sub Arrays and to DC Combiners/Disconnects .867�y�b12 nl Site Specifications: shall use guidelines that minimize the total amount of conduit by taking ii, �\ the shortest path. O,(. Occupancy:2 MAP VIEW '8 G� 12.Space Requirements for electrical equipment shall comply with NEC SS EN Design Wind Speed.117 mph Article 110. r ONAL Exposure Category:B 13. Equipment grounding shall be sized in accordance with Table A Snow Load: 40 psf 250.122. 14.Connectors that are not readily accessible and that are used in the a circuits operating at or over 30V AC or DC shall require a tool for 9 A All Work to be in Compliance with: opening and are required to be marked"Do not disconnect under load" ,a Dawn. R am or"Not for current interrupting",per 690.33(c)&(e). `°° CONSTRUCTION ISSUE MA State Building Code-780 CMR Ninth Edition with Amendments,Inclusive of 15.All signage to be placed in accordance with local building code. a the Referenced 2015 Codes:The International Building Code(IBC);International 16.Signs or Directories shall be attached to the electrical equipment or aim Residential Code(IRC);International Mechanical Code(IMC);and Portions of the located adjacent to the identified equipment. Deepika&Sunny Shukla u 17. re'�wa+ 97 Vernon Street Fire Code(IFC). Signs should be of sufficient durability to withstand the environment. rww .+r.+ro Northampton.AAA-01060 18. Any plaques shall be metal or plastic with engraved or machine 2017 National Electrical Coderinted letters, or electro-plating, in a red background with white �� (NEC)( ) 9 NuWatt Energy ASCE/ANSI 7-10 Minimum Design Loads for Buildings and Other Structures lettering,a minimum of 3/8"height and all capital letters. 900 Trade Center,Suite 2900 Woburn,MA ola5t As amended and adopted by Town of Northampton,MA . 97 Vernon Street Northampton MA-01060 wa `'. COVER PAGE ~ as R Al 0.11 NAM r1®erd N.T.S :-SPY, B.- MINNp Them.MS Menem \ 20224aa0r2 PV-000 A I 1 PV ARRAY 1-MECHANICAL LOADS NuWatt Energy,LLC Array Area: 497.50 sqft Total Photovoltaic Dead Load 3 psf Y.4.4 a001 ado Center,Suite MO Array Weight: I 1125 lbs Avg.Dead Load per Anchor 11 lbs wobam.MA olaoi Anchor OW: 112 lane 772-6357 maimoW una;010*nuwattenergy.com www.scWattEnergy.com Design Values by Roof Zone: Corner Edge Interior NOS: - Max.Rail Suer,. -- 36tn.O.C. - -36in.O.C. - -36tn.O.C. - -- ------ - NOTES Max.Rail Cantilever: 12in.O.C. 12in.O.C. 12in.O.C. Adjusted Anchor Span: 16In.O.C. 16in.O.C. 16in.O.C. Downforce Point Load: 188.51bs 188.51bs 188.51bs Uplift Point Load: -79.51bs -79.5Ibs -64.21bs Minimum Anchor Strength: 7071bs Average Safety Factor: 10.15 • PANEL LAYOUT Meter VW)AC Oldearateet 4114Alli MIL IThe tatty wont*motor and VLLD are placed less than 10e apart. VLLD'.Malt ksu5aAIt.e5pe9d 01tco� . iloW 0 • filk illiihi FOR EXISTING STRUCTURE ONLY • : • ' s t O''' MASs4. q� * • * o ? PAU L K. "t * $ ° ! 1 ZACHER rn * o NIIMh. STRUCTURAL ti * * Component Qty Model Manufacturer 4SS/ONALENG\ Irril PV Panel 25 EVPV400H Panasonic ! c Micro-Inverter 25 IQ8M-72-2-US EnPhase Energ B „ A 4rUM�o an Ma w �! a "as CONSTRUCTION ISSUE Array#I#of Panels Pitch I Azimuth �i °'a DeepikaS Sunny Shukla 99 Vernon Sheet soc mWorc MA-01060 1 25 20 219 MUM NuWatt Energy 600 Trade Center.suite 29(IC Woburn,MA 01801 NOTES: a rr 97 Vernon street Northampton MA-01060 A * Roof Zones are defined by dimension,a=3.lM MECHANICAL LAYOUT • Attachment: Eco-Fasten Green-Fastenwith CR-SO-SlottedBracket and Aluminum Flashing attached with_516"x3-12"Lag Bolt,HexHead.18-8SS • All Dimensions shown are to module edges,including 1 in.Spacing between Modules required when using the Top Clamp Method. NSW r CA as rare as • The Rails Extend 3 in.Beyond the module edges in order to support the End Clamps. N.r um I.s osa Op AA • Attachment Locations,If shown,are approximate.Final adjustment of attachment location may be necessary depending on field conditions.All attachments are staggered amongst the framing members. ^O—NO 1111111116__ MOM 29224s30a PV-A02 A /J NuWatt Energy,LLC Ground WEEB& Wonm•c aez9oo Module Clamp ...Woburn. A 01801 meoi (91)I 1724357 Rail wL-foot Mow.a w..a'ntoWnu attenerw.°"^ .NV W ettEnerpyec n (VP) Notes: Pv Mod" - G en Fasten FTashing:— NOTES sti4.9\e ECO-GFI-BLK-812 With Comp. Module(TYP. ECO-CP-SQ Compression Bracket PksPha�t ��9 Rooftop 5/16"x 3.5"Lag Bolt W/ Roo( 2''.. 2.5"Minimum Penetration LEl Roo`Fta" © Attachment Profile © AttachmentDetail Scale:N.T.S. Scale:N.T.S. 12"Max 12"Max RoofFraming PVModule Rail Overhang — Tr z,.___....._,RailSplice RailOverhang Ir r t_.i Roof WO ii Attachment FOR EXISTING STRUCTURE ONLY Anchors located on alternate roof framing members ` ° �P� N OFMgSS MIMIStagger splice locations Min of 2 supports 90 within the each row of modules one either side of splice /'1 PAUHER mL K. tiN Solar Mount Rail with a max spacing of 48" ZAC Staggered Attachment T Detail STRUCTURAL y 0 gg ( yp.) 0 RailSpliceDetail `\ a6p9dI Scale:N.T.S. Scale:N.T.S. ` �\ %S/ONALNG\. c WEEBLug SSWasher B ModuleFrame &Nut A GroundWire SSBolt rEel Mkse e a � Mt_ aen SSBolt Rail was CONSTRUCTION ISSUE Nib !` rr_7 7 °�"'Deepika&Sunny Shukla 001,1�• 97 veman Street Northampton,MA-01060 � fti . �,NUWah Ener Washer SSBolt wWooe°m NA01801 Suite 2900 Rail gol / Op 97 Vernon Street 0 Grounding Clip & Module 0 Grounding Lug & Rail Norm°mpta""A-01060 Scale:N.T.S. Scale:N.T.S. MECHANICAL DETAILS Ai ftA MS Ma O N.T.S AV .T.S oe•uao= DF AA ender b ate MGM `1022-0N30r= PV-A03 A r Nuwatt Energy,LLC WIRE SCHEDULE S 1 r SOD trade center,Sal.2900 ...Woburn.MA 01e01 NOTES: Tag CITY Size Wire Type Ground Size&Type Conduit Length NW, 1e77,772.6057 enad..owt..w h1°anu.mt.n.r0r 1.All conduit to use water-tight expansion fittings. "°W°"`"" . °co 2..At-Rooftop conduit-to-be a minimum of-1'above the roof surface. A --3- 10 AWG-- -Engage cable 6 AWG BARE Cu __Freeair N/A - Notes: 3.PV Connection into Load Center shall be positioned at the opposite end from B 3 6 AWG THHN/THWN-2 6 AWG THWN-2 3/4"EMT SOft NOTES the Utility Input feeder location.(Where applicable) 4.All equipment exposed to the elements shall be rated NEMA-3R. C 3 6 AWG THHN/THWN-2 6 AWG THWN-2 3/4"EMT loft 5.All equipment installed inside the building shall be rated NEMA-12. 6.Lowest expected ambient temperature based on ASHRAE min.mean extreme dry bulb temperature for ASHRAE location most similar to installation. WIRE SIZING 7.Highest continuous ambient temperature based on ASHRAE highest month 2% dry bulb temperature for ASHRAE location most similar to installation. 90°C Derated Ampacity(Allowable Amps x Temp Am aci Tag Size P ty 8.All conductors to be copper unless noted otherwise. Derate) 9.Conductor sizing shall limit Voltage drop to 1.5%DC&2%AC. A 10 AWG 30A x 0.76 23A 10.Insulated Ground conductors shall have green color jacket. B 6 AWG 75A x 0.96 72A C 6 AWG 75A x 0.96 72A SOLAR PANELS WITH MICROINVERTERS SYSTEM LABELING SPECIFICATIONS Max.Vdc(21°C): 54.64 V DC Max.Current: 12.81 A t — e--� Operating Vdc: 42.10 V DC Operating Current: 9.51 A Nominal Vac: 240 V Max.AC Current: 1.35 A =le cornt6 SYSTEM SIZE MAIN SERVICE PANEL INTERCONNECTION EVPV400H q8M-72-2—US NEC 2017 Article 705.12(8)[2)(3)Ib)[120%Rule] DC: 10.000 kW STC Utility Feed+Solar Back Feed(125%) AC: 8.125 kW(max) 200A+43A=243A r>_' 2 —.1›. a-- Buss Rating x 120% Component Qty I Model I Manufacturer 200A x 120%=240A "u9 s oeurd:°coun 2S PV Panel MN EVPV400H Panasonic Mod Micro-Inverter ® IQ8M-72-2-US EnPhase Ener: 0 EVPV/OOMr NOTE qeM-72-2-us NOTE: C The Utility revenue meter and VLLD are placed leas than 101t apart. B The LINE is on the top and O A the LOAD is on the bottom. VELD:Visible Lockable Labeled Disconnect Une-Side tap-- ss eere.tae en ra I> t F>—_� s---/ � 6�_ CONSTRUCTION ISSUE ea j UtOlty Revenue Meter Old a� -j^�/ --p/'� Single Phase Deepika&Sunny Shukla Moa�ue seY11C 9 L- • • "`� 1 -- I ,2�/2�/—20a 97 Vernon Street T Northampton.MA•01060 Fused SLID AC Disconnect t pi/2�py NOTE:n Senie Panel — — ee�w q Combiner 4 240V—SOA EVPWOOH Nuwatt Energy A00 Trade Center.suite 29e0 IOBM-72-2-US Woburn.MA 01e01 0 W�� The Utility revenue meter i= Foelllt�Locde I Ground located outside. -- , ---- 97 Vernon Street Northampton MA•01060 I EXISTING ELECTRICAL SLD Exterior Electrical W'ta`us s rig — I Rooftop Electrical I I Interior Electrical I Exterior Electrical N rs 022 D.F. AA MOW Kt w.r 1O111016 -- -- `00r9 PV-E01 A • Licensee Details Demographic Information (Full Name: RONALD A BENNETT jOwner Name: License Address Information City: Seekonk State: MA Zipcode: 02771 Country: United States License Information License No: CS-091168 License Type: Construction Supervisor Profession: Building Licenses Date of Last Renewal: 10/13/2022 Issue Date: 9/10/2010 Expiration Date: 9/10/2024 License Status: Active Today's Date: 10/17/2022 Secondary License Type: Doing Business As: Got Sun Go Solar Status Change Reason: License Renewal Prerequisite Information No Prerequisite Information No Available Documents