Loading...
Water Availability MUNICIPAL WATER AVAILABILITY APPLICATION Northampton Public Works Water Division 125 Locust Street Northampton, MA 01060 413-587-1097 A Department of Public Works Trench Permit shall be required prior to any construction or connection activity associated with this application. Location: Inquiry Made By: Date of Inquiry: Number of Units: (Applicant to fill out the above) Municipal Water Main in Front of Location: Existing service to site? Size of Water Main: Approximate Static Street Pressure: Size of Service Connection: Comments: - A corresponding water entrance fee shall be paid prior to making any connection to the municipal water system. - Arrangement of such installation shall be made with the Northampton Water Department within a minimum of 5 working days notification. - All work shall conform to Northampton Water Department specifications. Keith Snape (Water Superintendent) *Water Entry (Includes fire line if required) cc: NOTE: If this availability is for new construction, it must be submitted electronically or mailed to the Building mailed to the Building Inspector *Fees will be charged based on current fee structure at the time of entry application City of Northampton Building Dept./Commissioner The Water Department cannot guarantee adequate water pressure during peak demand times at elevations above 320' New tap in street required to be completed by a qualified contractor X 99 WATER STREET, LEEDS, MA ALLEN GUIEL (Name) 8/30/2022 1 ($1,250) Domestic 6 Yes 1" 65 Fire Line Type of Units: Material: Single Family Apartments Multi-Family Commercial *Meter $ (fee to be determined) Yes No Asbestos Cement Suggested Meter Size: X X Flow Test Conducted: (If flow test conducted attach results) Irrigation X 450 413-348-9154 (Telephone Number) No 10/27/2022 (Date) Type of Ownership: *Radio Read Private Condo Rental 5/8" Domestic Age: Yes 150 Director 1939 X X No X