Loading...
Sewer AvailabilityMUNICIPAL SEWER AVAILABILITY APPLICATION Northampton Public Works Streets Division 125 Locust Street Northampton, MA 01060 413-587-1570 A Department of Public Works Trench Permit and Sewer Entry Permit shall be required prior to any construction or connection activity associated with this application. ---------------------------------------- For Office Use Only Below This Line ---------------------------------------- Size of Service Connection: Type of Service Connection: Comments: MAY REQUIRE EASEMENT ON PROPERTY OF 104 WATER STREET FOR ACCESS City Requires 6" cleanout installed at City Property Line A corresponding "sewer entrance fee" shall be paid prior to making any connection to the municipal sewer system. Arrangements of such installation shall be made with the Northampton Streets Division with a minimum of 5 working days notificaiton. All work shall conform to Northampton Streets Division specifications. *Fees will be charged based on current fee structure at the time of entry application If this availability is for new construction, it must be submitted electronically or mailed to the Building Inspector. Location: Date of Inquiry: Inquirer with contact info: Reason for Request: Municipal Sewer Main in Front of Location: Size of Sewer Main: Depth of Sewer Main: Length of Sewer Main: Brendan Shea Sewer Foreman 99 WATER STREET, LEEDS 8/30/2022 ALLEN GUIEL CONSTRUCTION 348-9154 allen@guiel.com NEW CONSTRUCTION Single family home 15" 6' 261' 6" NEW TO MAIN Material: Domestic Tie In: $1,250 X Tie-in to Existing Sanitary Service: $1,250 Yes VC Date: *Sewer Entry $ X 10/26/2022 No 1250 Age: 1959 Director