Sewer AvailabilityMUNICIPAL SEWER AVAILABILITY APPLICATION
Northampton Public Works
Streets Division
125 Locust Street
Northampton, MA 01060
413-587-1570
A Department of Public Works Trench Permit and Sewer Entry Permit shall be required prior to any construction or connection activity associated with this application.
---------------------------------------- For Office Use Only Below This Line ----------------------------------------
Size of Service Connection:
Type of Service Connection:
Comments: MAY REQUIRE EASEMENT ON PROPERTY OF 104 WATER STREET
FOR ACCESS
City Requires 6" cleanout installed at City Property Line
A corresponding "sewer entrance fee" shall be paid prior to making any connection to the municipal sewer system. Arrangements of such installation shall be made with the Northampton
Streets Division with a minimum of 5 working days notificaiton. All work shall conform to Northampton Streets Division specifications.
*Fees will be charged based on current fee structure at the time of entry application
If this availability is for new construction, it must be submitted electronically or mailed to the Building Inspector.
Location:
Date of Inquiry:
Inquirer with contact info:
Reason for Request:
Municipal Sewer Main in Front of Location:
Size of Sewer Main:
Depth of Sewer Main:
Length of Sewer Main:
Brendan Shea
Sewer Foreman
99 WATER STREET, LEEDS
8/30/2022
ALLEN GUIEL CONSTRUCTION 348-9154 allen@guiel.com
NEW CONSTRUCTION Single family home
15"
6'
261'
6"
NEW TO MAIN
Material:
Domestic Tie In: $1,250 X
Tie-in to Existing Sanitary Service: $1,250
Yes
VC
Date:
*Sewer Entry $
X
10/26/2022
No
1250
Age:
1959
Director