42 Rustlewood Ridge_L1.A Erosion Control Plan_10.14.22 stampedADJACENT ROLLS SK4L1L SILT FE NCB _ 1
' TIGHTLY ,4HT
1 2" D IA_ ST RAW'h�,�TTif i
ENTRENCHED 3" + � __--
. ;
Trff 22 J
SILT FENCE T1JCILEb �
UNDER STRAW RATTLE
ILT FENCE � � { r� , � �
r�rr � .
F ROPOSED DETACHED
CLEARING LI fV11T GARAGE _ 4W '
r
Erosion Control Barrier
nts
1
11
WORK AREA AREA TO BE FRIDTECTED
1 �I �;IIII— IIII��Ii LIIi1—I.IiI— III
tall fI'l l l � l'l ll:y l l �l tl l� � M iill 0111
SECnON
ORGANIC FILTER BERM NOTES:
1, ORGANIC FILTER BERMS MAY BE UTILIZED IN ADI)MON TO SILT SOCK.
2, THE E ROSIO N CONTROL M I4 USED IN THE FI LTER BE R NMS SHAL B E A
E LL-GRADE D M IXTU RE O F PARTICLE SIZES, MAY CONTAIN ROCKS LESS
THAN 4 IN DIAM ETER, STU NIP G R IN DING35, WOOD C H IPS, SH REDDE a O R
CONIPOSEDOARK, OR ACCEPTABLE MANl1FACTU# ED PRODU M,,AND SMALL
BE FREE OF REF U5E AN a P HY51 EAL CONTAMINANTS. AND MATERIAL TOXIC
TO PLAN 0 ROWTH, IT 5HIALL ME ET TH E FO LLOW ING STANDARDS;
A. THE ORGANIC CONTENT SHALL BE aO-100% BY DRY WEIGHT.
O, PARTICLE SIZE RY WEIGHT SHALL BE 100% RASSINO A E" SCREEN AND
70.8S% PA&SINO A 0.75" SCREEN.
C. THE ORGAN IC PORTION SHALL BE FI BROUS AN D E LONGATE Q.
0_ LARGE PORTIONS OF SILTS, CLaAY`S, OR FINF SANDS SHALL NOT eE
INCLUDED IN THE MIXIURCS.
3. ORGAN It FILTER BERMS SHALL BE: INSTALLED ALCINC3 A RELATIVELY LEVEL
CDNTOLIP.. IT MAY BE NECESSARY TO REMCYIE CUT WOODY VEGETATION To
AV4DI D CREATI N G VOI DS AND BRI DG ES THAT WDULD ENABLE FI N E$ TD
WASH UNDER THE BERM.
4. KROZE N G ROUND, OUTCROPS OF BE D ROCK, AN D VERY ROOT; D FORESTE I�
AREAS PRESENT THE M-D5T PRACTICAL AND EFFECTIVE LOCATI13N5 FOR
ORGAN IC FI LTE R BERMS. OTHE R BM PS 5 HOULD BE USED AT LOW PRINTS OF
CONCE NTRATED RU N O F F. BE LOW CU LVE RT OUTLfT APRONS, ARDU N D
CATCH BASINS AN D AT TH E 9=0 M OF STEE P P ERI M ETER SLOPES THAT
HAVE A LARGE CO NTR IBUTI N G AREA.
5_ SEDI M ENT SHALL BE RE MOVE D FROM BE H IN D TH E BERM WH EN IT HAS
ACCUMULATED TO ONE HALF TH E ORI GI NAL H EIGHT OF THE HE RM.
6_ 8ERMS SHALL OF BROADCAST ONCE THE SITE IS STABILIZED. NE ENGLAND Efl $I N NTF OL
/RESTO RATI ON M I X FO R DRY SITES.
INTENT IS TO SEED CURRENTLY
EXPOSE D AREAS AN D N OT RE MOVE
DOWNED ROOD DR CREATE
ADDITIONAL DIS7U RBANCE.
EROSION CONTROL BARRIER -
I
UP
�NFQSED LEACH FIELD ! I� � � WALK k r
r f
� r 100
TEMPORARY SEDIMENT r •
BASIN W/ DIVERSION ! I _ 0 BO Ider
S ALE
y y
}_ I nd5c;ale Light
rULDE#R RETAINING WALL
1 _
r � %
INSTALL ORGANIC FILTER ; �. ,_., , _ r : a T E -le
i
BERM BASE OF 'I I ; � � + 370.510
RETAINING WALL, TYP. -T — LANDSCAPE•� �
P I ANTI N 5 T BD
Organic Filter Bern
nts
(29,796 sf 1.68 acres)
SU BJ ECT TO C HANG E
DEPENDING ON FIELD
CONDITIONS.
PROPOSED SEPTIC TANK
TREES TO BE R
ALL 5TU M PS BEYO NO G RADI NG
LIMITS SHOWN SHALL BE CUT
FLUSH AND LEFT IN PLACE,
AREA TO BE HYDROSEEDED WITH
ADDITIDNA L BARRIER SHALL BE PLACE
AS DIRECTED BY TRIE ENGINEER
I I tuoucam
BJmIn_
I�1F I I1-==-::11IP1VI1=1111� I 11 1`11V Iki1 1911 N I1:�F III 1:�F II0I
�I III= I Mill 11 111111 11 ;2--ff111 I II �ftpI IItill I I1 �2I II III II
1",3" WASHED COARSE
AGGREGATE
GEC EUILE SEPAPAT1OH FABRIC
STA04LIZED CONSTRUCTIDN ACEE55 NOTES-- FO Ft FLIiL WIDTH AINU LENGTH
1.13IMEN51ONS: WIDTH: 15'f-LAREDTO25'ATIIOADWAY
LENGTH. 50' MIN.
riAAOt ANP CHOK SLOPE: Z*
2. CLEAR ACCESS OF ALL VEGETATION, ROOTS, AND OTH ER 01UECTIDIWAL KMAT€R AFL.
3. GRAVEL PAD 54JOGRADE 5HALL HE GRADED 50 THAT THE AC(f-1-5 WILL NOT GRAIN OFF SITE.
A. MAINTAIN I HE GRAVEL 1P413 IN A CONQI r ION TO PREVENT MUD, 5EOIMEW� ETC. FgOM
LEAVING THE 51TE_ SHIDLILD h UDISEDIMENT BE TRAEKEPOR WASHED IWM THE PIJHUC ROAD
IT $HALL t* REMOVE D IMMEIQIATUT.
('3--� Stabilized Construction Entrance
�.J1Ants
WET POOL ELEV- CRUSHED STONE Ripw
f Low 2 2
I.
''� III'• j1 1L rk-�:II1=1Ii•�= _
J'I I I �I — - I . —L L i-� I�-�11-1 I I� I-1 11= -
=1 I M 11-1 I E1 i A11=1 11=I I �I I I—' ' '— f I I �I 11=I 11
SECTION
'),Temp. Sediment Bair
4L- 'A nts
APRON
++ f • '' I _ y %L I I'S
N.
1 — 10'
pvc u 1
Tree 2 ti
1 FFE 371.00 1 `,
4• r � I /
II rj �ti =_ - I FUTURE PATPCM,,"`��
: , 1 PROP05ED SELL
LANDSCAPED r" f 1 ' LOCATI D N
EARTH ERN BERM I I
1
TREE CLUMP
� •� � � � ���� • �. � �..� � �..� :.� . � .� .. LOAM &SEED WITf-I�IAWN MIX. r
FOLLOWING
yi y FUTURE TREE I ti
� r £} �� PLANTING
1 } _ CONSTRUCTION ��'�' LOCATIONS �
Trei,Q 20'
Ilk. X. —
, , 1
t 2x _
I -
1 � SEDIMENT BASIN . � �• -� ��
1 1 _
A.
A
WOO
CONSTRUCTION SEQUENCE NOTES
1, THE PROJECT SMALL BE PHASE D SO AS TO LIMIT THE TOTAL LAND f f�
AREA DISTU RBE D AT ON E TFM E. f '
2, THE WORK ADJACENT TO THE HOUSE LOCATION SHALL NOT IBEGPN
- � U NTI L WO RK ARC U NEB THE OUT EIS PFIRI10ETE FL OF TMF- C7_E,ARIED �
AREA HAS BEEN STA4RILQED WITH TEMPORARY/PEAMANENT
f 3. WORK SHALL PROCEE D I N THE FOLLOW ING SEQUE NCE:
3.1_ LIMITED CLEARING AS NECESSARY TO INS7 LL EROSION
CONTROL DEVICES
Tree E?" � 3.2_ INSTALL EROS 10 N -CONTRO L DEVI CES I NCiU D IN-G, AT A
M I NI M UM, PE RI METE R EROSI ON CONTROL BARRI ER,
SERVICE FROM EX.
TFRAAN SFO RIVI ER
CONSTRUCTION
ENTRANCE
n crete Pad
mformer
o I Post and Board El
1
Iefpm
1
i
i
{ STABILIZE D CO N STRUCTION E NTRANC E, AND TEM PORAR'f SIGNIFICANT TREE 4r ~� SEDIMENTTRAPS_ _ —
J 3.3. REMOVE TREES AND CLEAR BR USH WITHM THE 1,1MITS OF CALI PE Ft TREE SPECIES
r + (i RAVIN-ri A i 5HQWN ON THE PLAN- 2011 White PinoHernlac €
f 3.4. PROCEED JTH CpFLA ZINC WORK. DISTURBED AREAS SHALL BE 22" Whit-e PlinefHernlock
STABILIZED AS THE ORADINO WORK IS COMPLETED. ALL 21" Maple
AIR THAT WILL 140T RE USED FOR FUTURE CONSTRUCTION 21" Maple
Graphic Scale ACCESS SHALL BE LOAM ED AN D S'EE D LID IMM EO'IATELY AFTE R 21" ma PIC
ACHIEVING FINAL GFLAIDE. FINAL SURFACING SHALL BE 21" Birch
20 (1 10 20 40 El0 I I NSTALLE D A5 SOO N AS P FLACTI CABLE AFTE R ACH I EVI N G FI N AL 34" ma rple
G RADE. ALL OTHE R AREAS SHALL BE STA 91 L IZED WITH 2511 maple
TEMPORARY SE EDI NG AFTER G FLAD I NC WORK IS CCFM P LETE D.
4. MAINTAIN ASTDCKPILE OF EROSION CONTROL DEVICES_ INSPECT 2311 While
fin fee�ta THE SITE WEEKLY, AND AFTER RAINFALL, FOR DAM�,GF, TO EROSION �D�� V4fhibe Pine/Hemlock
I inch a 20 feet CONTROL DEVICES AN D R FPAIR I M M FDIATELY. 23 Maple
20" _ VIrhF to Nnp{Hamlack
2FJ,'r—TEAL -- - ------ -- - -
The
Berkshire
Design
Group, Inc.
LandStape Architecture
Civil Engineering
Planning
Land Surveying
4Akn Platt, hlmharnptm, MassathL etts01 D
1413) 582-7DOO i FAQ€ {413) 592-7W5
Ernall; bdg@berk0iredese.cprq
Web, http;Ilwww.bL%rksblredest.com
,,F`
AI
Crr
• 51074
.4L
INO fti�q is mA FWed ncr etrdsl x to used Inr cms'Au4fnn pwpmB
ink$ the �%-cd prci wwal ml 0 a myMtrtd Wndiwpe ur&-H cl,
oMI erdkw or VAed swvpe r e mph* by 'he btriOire De4n Croup,
Inca.
Do- mA mIt draWq far qumULX mlod-corn 8r tafrylnxlion. Us dduw,
ors ' P 41irrRm*mf are k mp6lt. rm*l TIr &r W'Ire
{OoRfrkfit The SA!flrre Desip 6r+oup, Inc.
Tha v�mq cnd au of 'La cakrti& ore Lhe erpw prGNri} ur Thi
61erk�lin! f7rttign dmup, I�t., dnd shag not be copied or used n o-.y wy
vtithoat ihr rr Mm c-omsmt of Tie Brrtshkv D!* Croup, Ine.
42 Rustlewood Ridge
Northampton, MA
EROSION & SEDIMENT
CONTROL PLAN
RE�115fD115
f1ILL22
43re.
1Urzwn 0%
JQCC•
5hm Nimbe:
Le
1