Loading...
42 Rustlewood Ridge_L1.A Erosion Control Plan_10.14.22 stampedADJACENT ROLLS SK4L1L SILT FE NCB _ 1 ' TIGHTLY ,4HT 1 2" D IA_ ST RAW'h�,�TTif i ENTRENCHED 3" + � __-- . ; Trff 22 J SILT FENCE T1JCILEb � UNDER STRAW RATTLE ILT FENCE � � { r� , � � r�rr � . F ROPOSED DETACHED CLEARING LI fV11T GARAGE _ 4W ' r Erosion Control Barrier nts 1 11 WORK AREA AREA TO BE FRIDTECTED 1 �I �;IIII— IIII��Ii LIIi1—I.IiI— III tall fI'l l l � l'l ll:y l l �l tl l� � M iill 0111 SECnON ORGANIC FILTER BERM NOTES: 1, ORGANIC FILTER BERMS MAY BE UTILIZED IN ADI)MON TO SILT SOCK. 2, THE E ROSIO N CONTROL M I4 USED IN THE FI LTER BE R NMS SHAL B E A E LL-GRADE D M IXTU RE O F PARTICLE SIZES, MAY CONTAIN ROCKS LESS THAN 4 IN DIAM ETER, STU NIP G R IN DING35, WOOD C H IPS, SH REDDE a O R CONIPOSEDOARK, OR ACCEPTABLE MANl1FACTU# ED PRODU M,,AND SMALL BE FREE OF REF U5E AN a P HY51 EAL CONTAMINANTS. AND MATERIAL TOXIC TO PLAN 0 ROWTH, IT 5HIALL ME ET TH E FO LLOW ING STANDARDS; A. THE ORGANIC CONTENT SHALL BE aO-100% BY DRY WEIGHT. O, PARTICLE SIZE RY WEIGHT SHALL BE 100% RASSINO A E" SCREEN AND 70.8S% PA&SINO A 0.75" SCREEN. C. THE ORGAN IC PORTION SHALL BE FI BROUS AN D E LONGATE Q. 0_ LARGE PORTIONS OF SILTS, CLaAY`S, OR FINF SANDS SHALL NOT eE INCLUDED IN THE MIXIURCS. 3. ORGAN It FILTER BERMS SHALL BE: INSTALLED ALCINC3 A RELATIVELY LEVEL CDNTOLIP.. IT MAY BE NECESSARY TO REMCYIE CUT WOODY VEGETATION To AV4DI D CREATI N G VOI DS AND BRI DG ES THAT WDULD ENABLE FI N E$ TD WASH UNDER THE BERM. 4. KROZE N G ROUND, OUTCROPS OF BE D ROCK, AN D VERY ROOT; D FORESTE I� AREAS PRESENT THE M-D5T PRACTICAL AND EFFECTIVE LOCATI13N5 FOR ORGAN IC FI LTE R BERMS. OTHE R BM PS 5 HOULD BE USED AT LOW PRINTS OF CONCE NTRATED RU N O F F. BE LOW CU LVE RT OUTLfT APRONS, ARDU N D CATCH BASINS AN D AT TH E 9=0 M OF STEE P P ERI M ETER SLOPES THAT HAVE A LARGE CO NTR IBUTI N G AREA. 5_ SEDI M ENT SHALL BE RE MOVE D FROM BE H IN D TH E BERM WH EN IT HAS ACCUMULATED TO ONE HALF TH E ORI GI NAL H EIGHT OF THE HE RM. 6_ 8ERMS SHALL OF BROADCAST ONCE THE SITE IS STABILIZED. NE ENGLAND Efl $I N NTF OL /RESTO RATI ON M I X FO R DRY SITES. INTENT IS TO SEED CURRENTLY EXPOSE D AREAS AN D N OT RE MOVE DOWNED ROOD DR CREATE ADDITIONAL DIS7U RBANCE. EROSION CONTROL BARRIER - I UP �NFQSED LEACH FIELD ! I� � � WALK k r r f � r 100 TEMPORARY SEDIMENT r • BASIN W/ DIVERSION ! I _ 0 BO Ider S ALE y y }_ I nd5c;ale Light rULDE#R RETAINING WALL 1 _ r � % INSTALL ORGANIC FILTER ; �. ,_., , _ r : a T E -le i BERM BASE OF 'I I ; � � + 370.510 RETAINING WALL, TYP. -T — LANDSCAPE•� � P I ANTI N 5 T BD Organic Filter Bern nts (29,796 sf 1.68 acres) SU BJ ECT TO C HANG E DEPENDING ON FIELD CONDITIONS. PROPOSED SEPTIC TANK TREES TO BE R ALL 5TU M PS BEYO NO G RADI NG LIMITS SHOWN SHALL BE CUT FLUSH AND LEFT IN PLACE, AREA TO BE HYDROSEEDED WITH ADDITIDNA L BARRIER SHALL BE PLACE AS DIRECTED BY TRIE ENGINEER I I tuoucam BJmIn_ I�1F I I1-==-::11IP1VI1=1111� I 11 1`11V Iki1 1911 N I1:�F III 1:�F II0I �I III= I Mill 11 111111 11 ;2--ff111 I II �ftpI IItill I I1 �2I II III II 1",3" WASHED COARSE AGGREGATE GEC EUILE SEPAPAT1OH FABRIC STA04LIZED CONSTRUCTIDN ACEE55 NOTES-- FO Ft FLIiL WIDTH AINU LENGTH 1.13IMEN51ONS: WIDTH: 15'f-LAREDTO25'ATIIOADWAY LENGTH. 50' MIN. riAAOt ANP CHOK SLOPE: Z* 2. CLEAR ACCESS OF ALL VEGETATION, ROOTS, AND OTH ER 01UECTIDIWAL KMAT€R AFL. 3. GRAVEL PAD 54JOGRADE 5HALL HE GRADED 50 THAT THE AC(f-1-5 WILL NOT GRAIN OFF SITE. A. MAINTAIN I HE GRAVEL 1P413 IN A CONQI r ION TO PREVENT MUD, 5EOIMEW� ETC. FgOM LEAVING THE 51TE_ SHIDLILD h UDISEDIMENT BE TRAEKEPOR WASHED IWM THE PIJHUC ROAD IT $HALL t* REMOVE D IMMEIQIATUT. ('3--� Stabilized Construction Entrance �.J1Ants WET POOL ELEV- CRUSHED STONE Ripw f Low 2 2 I. ''� III'• j1 1L rk-�:II1=1Ii•�= _ J'I I I �I — - I . —L L i-� I�-�11-1 I I� I-1 11= - =1 I M 11-1 I E1 i A11=1 11=I I �I I I—' ' '— f I I �I 11=I 11 SECTION '),Temp. Sediment Bair 4L- 'A nts APRON ++ f • '' I _ y %L I I'S N. 1 — 10' pvc u 1 Tree 2 ti 1 FFE 371.00 1 `, 4• r � I / II rj �ti =_ - I FUTURE PATPCM,,"`�� : , 1 PROP05ED SELL LANDSCAPED r" f 1 ' LOCATI D N EARTH ERN BERM I I 1 TREE CLUMP � •� � � � ���� • �. � �..� � �..� :.� . � .� .. LOAM &SEED WITf-I�IAWN MIX. r FOLLOWING yi y FUTURE TREE I ti � r £} �� PLANTING 1 } _ CONSTRUCTION ��'�' LOCATIONS � Trei,Q 20' Ilk. X. — , , 1 t 2x _ I - 1 � SEDIMENT BASIN . � �• -� �� 1 1 _ A. A WOO CONSTRUCTION SEQUENCE NOTES 1, THE PROJECT SMALL BE PHASE D SO AS TO LIMIT THE TOTAL LAND f f� AREA DISTU RBE D AT ON E TFM E. f ' 2, THE WORK ADJACENT TO THE HOUSE LOCATION SHALL NOT IBEGPN - � U NTI L WO RK ARC U NEB THE OUT EIS PFIRI10ETE FL OF TMF- C7_E,ARIED � AREA HAS BEEN STA4RILQED WITH TEMPORARY/PEAMANENT f 3. WORK SHALL PROCEE D I N THE FOLLOW ING SEQUE NCE: 3.1_ LIMITED CLEARING AS NECESSARY TO INS7 LL EROSION CONTROL DEVICES Tree E?" � 3.2_ INSTALL EROS 10 N -CONTRO L DEVI CES I NCiU D IN-G, AT A M I NI M UM, PE RI METE R EROSI ON CONTROL BARRI ER, SERVICE FROM EX. TFRAAN SFO RIVI ER CONSTRUCTION ENTRANCE n crete Pad mformer o I Post and Board El 1 Iefpm 1 i i { STABILIZE D CO N STRUCTION E NTRANC E, AND TEM PORAR'f SIGNIFICANT TREE 4r ~� SEDIMENTTRAPS_ _ — J 3.3. REMOVE TREES AND CLEAR BR USH WITHM THE 1,1MITS OF CALI PE Ft TREE SPECIES r + (i RAVIN-ri A i 5HQWN ON THE PLAN- 2011 White PinoHernlac € f 3.4. PROCEED JTH CpFLA ZINC WORK. DISTURBED AREAS SHALL BE 22" Whit-e PlinefHernlock STABILIZED AS THE ORADINO WORK IS COMPLETED. ALL 21" Maple AIR THAT WILL 140T RE USED FOR FUTURE CONSTRUCTION 21" Maple Graphic Scale ACCESS SHALL BE LOAM ED AN D S'EE D LID IMM EO'IATELY AFTE R 21" ma PIC ACHIEVING FINAL GFLAIDE. FINAL SURFACING SHALL BE 21" Birch 20 (1 10 20 40 El0 I I NSTALLE D A5 SOO N AS P FLACTI CABLE AFTE R ACH I EVI N G FI N AL 34" ma rple G RADE. ALL OTHE R AREAS SHALL BE STA 91 L IZED WITH 2511 maple TEMPORARY SE EDI NG AFTER G FLAD I NC WORK IS CCFM P LETE D. 4. MAINTAIN ASTDCKPILE OF EROSION CONTROL DEVICES_ INSPECT 2311 While fin fee�ta THE SITE WEEKLY, AND AFTER RAINFALL, FOR DAM�,GF, TO EROSION �D�� V4fhibe Pine/Hemlock I inch a 20 feet CONTROL DEVICES AN D R FPAIR I M M FDIATELY. 23 Maple 20" _ VIrhF to Nnp{Hamlack 2FJ,'r—TEAL -- - ------ -- - - The Berkshire Design Group, Inc. LandStape Architecture Civil Engineering Planning Land Surveying 4Akn Platt, hlmharnptm, MassathL etts01 D 1413) 582-7DOO i FAQ€ {413) 592-7W5 Ernall; bdg@berk0iredese.cprq Web, http;Ilwww.bL%rksblredest.com ,,F` AI Crr • 51074 .4L INO fti�q is mA FWed ncr etrdsl x to used Inr cms'Au4fnn pwpmB ink$ the �%-cd prci wwal ml 0 a myMtrtd Wndiwpe ur&-H cl, oMI erdkw or VAed swvpe r e mph* by 'he btriOire De4n Croup, Inca. Do- mA mIt draWq far qumULX mlod-corn 8r tafrylnxlion. Us dduw, ors ' P 41irrRm*mf are k mp6lt. rm*l TIr &r W'Ire {OoRfrkfit The SA!flrre Desip 6r+oup, Inc. Tha v�mq cnd au of 'La cakrti& ore Lhe erpw prGNri} ur Thi 61erk�lin! f7rttign dmup, I�t., dnd shag not be copied or used n o-.y wy vtithoat ihr rr Mm c-omsmt of Tie Brrtshkv D!* Croup, Ine. 42 Rustlewood Ridge Northampton, MA EROSION & SEDIMENT CONTROL PLAN RE�115fD115 f1ILL22 43re. 1Urzwn 0% JQCC• 5hm Nimbe: Le 1