Loading...
1093-O&M Plan - lot only1093 Westhampton Road September 7, 2022 Northampton, Massachusetts Stormwater Management Report Berkshire Design Group Page 1 Stormwater Management System Operation & Maintenance Plan Post-Construction Stormwater Management System Owner: Thomas and Patricia Cummings 1093 Westhampton Road Northampton, MA 01060 Party Responsible for Operation & Maintenance: Same as owner Inspection & Maintenance Schedule: 1) Roof Infiltration Units The roof infiltration units will be inspected quarterly immediately following a rainstorm and 48 hours thereafter. Inspections will be conducted at the roof leader discharge where it enters the elbow at ground level. If water is standing in the elbow after 48 hours, the unit must be cleaned. Cleaning may require sediment removal using water and vacuum equipment. Replacement of the units may be required. 2) Driveway Swales The driveway swales will be inspected twice a year in spring and late fall as well as after heavy rains. Any erosion of the ditch lining or dislodged stones shall be repaired immediately. Woody vegetation shall be removed if growing through riprap. Any slumping side slopes shall also be repaired. The owner will maintain records of inspections and cleanings. Sediments shall be removed and disposed of in accordance with local, state, and federal guidelines and regulations.