Loading...
31C-019 (5) BP- 022-1314 71 OLANDER DR COMMONWEALTH OF MASSACHUSETTS Map:Block:Lot: 31C-019-001 CITY OF NORTHAMPTON Permit: Alts Renovations Repair PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) BUILDING PERMIT Permit # BP-2022-1314 PERMISSION IS HEREBY GRANT:D TO: Project# GEO HT PUMP Contractor: License: Est. Cost: 11250 DANDELION ENERGY INC 106523 Const.Class: Exp.Date: 12/03/2024 Use Group: Owner: HEALY VICTORIA A& LAWRENCE DANIELE Lot Size (sq.ft.) Zoning: PV/SG_a/SG_b Applicant: DANDELION ENERGY INC Applicant Address Phone: Insurance: 333 NORTH BEDFORD RD SUITE 220 (860)301-7100 WC 053425881 MOUNT KISCO, NY 10549 ISSUED ON: 10/13/2022 TO PERFORM THE FOLLOWING WORK: INSTALL 3 TON GEOTHERMAL HEAT PUMP POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Final: Final: Final: Rough Frame: Gas: Fire Department Driveway Final: Fireplace/Chimney: Rough: Oil: Insulation: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIO' ATION OF ANY OF ITS RULES AND REGULATIONS. Signature: ( i • r • • Fees Paid: $73.00 212 Main Street,Phone(413)587-1240,Fax:(413)587-1272 Office of the Building Commissioner The Commonwealth of Massa uset °C1- 2 tl° Board of Building Regulations an Sta ards 2022 OR Massachusetts State Building Co e, 78 UN IPALITY NpR nurinrnr c. USE Building Permit Application To Construct, Repair,Reno—Vata '7Aoq/61i rpN Revi d Mar 2011 One-or Two-Family Dwelling Win,°��? S This Section For Official Use Only Building Permit Number: 6P— 3 Z — 13/ Date Applied: .‘y pi; Building Official(Print Name) Signature I �D SECTION 1:SITE INFORMATION 1.1 Property Address: 1.2 Assessors Map&Parcel Numbers 71 Olander Dr, Northampton, MA 01060, USA 3 i c, Q I / 1.1 a Is this an accepted street?yes no Map Number Parcel Number 1.3 Zoning Information: 1.4 Property Dimensions: Zoning District Proposed Use Lot Area(sq ft) Frontage(ft) 1.5 Building Setbacks(ft) Front Yard Side Yards Rear Yard Required Provided Required Provided Required Provided 1.6 Water Supply: (M.G.L c.40,§54) 1.7 Flood Zone Information: 1.8 Sewage Disposal System: Public 0 Private 0 Zone: Outside Flood Zone? Municipal 0 On site disposal system 0 Check ifyes❑ SECTION 2: PROPERTY OWNERSHIP' 2.1 Owner'of Record: Lawrence Daniele Northampton,MA 01060,USA Name(Print) City,State,ZIP 71 Olander Dr,Northampton,MA 01060,USA (413)522-2695 larry.daniele@gmail.com No.and Street Telephone Email Address SECTION 3:DESCRIPTION OF PROPOSED WORK2(check all that apply) New Construction 0 Existing Building 0 Owner-Occupied 0 Repairs(s) ❑ Alteration(s) 0 Addition 0 Demolition ❑ Accessory Bldg. 0 Number of Units Other 0 Specify:Geothermal Brief Description of Proposed Work': Install one 3-ton geothermal heat pump,closed loop system. SECTION 4: ESTIMATED CONSTRUCTION COSTS Item Estimated Costs: • Official Use Only (Labor and Materials) 1. Building $ 1. Building Permit Fee: $ Indicate how fee is determin-d: 2. Electrical $ 0 Standard City/Town Application Fee 0 Total Project Cost- (Item 6)x multiplier x 3. Plumbing $ 2. Other Fees: $ 4. Mechanical (HVAC) $$11,250 List: 5. Mechanical (Fire $ � Suppression) Total All F s: Check No.bIheck Amount: ✓� Cash Amount: 6.Total Project Cost: $$11,250 ❑ Paid in Full 0 Outstanding Balance Due: SECTION 5: CONSTRUCTION SERVICES 5.1 Construction Supervisor License(CSL) CSFA-106523 12/3/2024 Wyatt Roberts License Number Expiration Date Name of CSL Holder List CSL Type(see below) R 333 North Bedford Road,Suite 220 No.and Street Type Description Mount Kisco U Unrestricted(Buildings up to 35,000 cu. ft.) R Restricted 1&2 Family Dwelling City/Town,State,ZIP M _ Masonry RC Roofing Covering WS Window and Siding SF Solid Fuel Burning Appliances 860-301-7100 hkowalski@dandelionenergy.com I Insulation Telephone Email address D Demolition 5.2 Registered Home Improvement Contractor(HIC) 201508 2023/04/11 Dandelion Energy HIC Registration Number Expiration Date HIC Company Name or HIC Registrant Name 333 North Bedford Road,Suite 220 hkowalski@dandelionenergy.com No.and Street Email address Mount Kisco,NY 10549 860-301-7100 City/Town,State,ZIP Telephone SECTION 6:WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152.§ 25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the Issuance of the building permit. Signed Affidavit Attached? Yes l No .0 SECTION 7a:OWNER AUTHORIZATION TO BE COMPLETED WHEN OWNER'S AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I,as Owner of the subject property,hereby authorize Hannah Kowalski or John DeVore of Dandelion Energy to act on my behalf,in all matters relative to work authorized by this building permit application. See Attached Authorization Print Owner's Name(Electronic Signature) Date SECTION 7b:OWNER'OR AUTHORIZED AGENT DECLARATION By entering my name below,I hereby attest under the pains and penalties of perjury that all of the information contained in this application is true and accurate to the best of my knowledge and understanding. Hannah Kowalski of Dandelion Energy 9/26/2022 Print Owner's or Authorized Agent's Name(Electronic Signature) Date NOTES: 1. An Owner who obtains a building permit to do his/her own work,or an owner who hires an unregistered contractor (not registered in the Home Improvement Contractor(HIC)Program),will not have access to the arbitration program or guaranty fund under M.G.L.c. 142A.Other important information on the HIC Program can be found at www.mass.gov/oca Information on the Construction Supervisor License can be found at www.mass.gov/dps 2. When substantial work is planned,provide the information below: Total floor area(sq.ft.) (including garage,finished basement/attics,decks or porch) Gross living area(sq.ft.) Habitable room count Number of fireplaces Number of bedrooms Number of bathrooms Number of half/baths Type of heating system Number of decks/porches Type of cooling system Enclosed Open 3. "Total Project Square Footage"may be substituted for"Total Project Cost" ACCP CERTIFICATE OF LIABILITY INSURANCE DATE(MMIDD/YYYY) k- 06/20/2022 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Marsh Affinity y PHNE Marsh Affinity (NC,,No,Ext): 866.237-4079 FAX No): a division of Marsh USA Inc. E-MAIL ADDRESS: ADPTotalsource@marsh.com PO Box 14404 Des Moines,IA 50306-9686 INSURER(S)AFFORDING COVERAGE NAIL# INSURER A: New Hampshire Insurance Co. 23841 INSURED INSURER B: ADP TotalSource CO XXIII,Inc. INSURER C: 5800 Windward Parkway INSURER D: Alpharetta,GA 30005 '. Alternate Employer: INSURER E: • Dandelion Energy Inc INSURER F: 333 N Bedford Rd • Mt Kisco,NY 10549 COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: 1.� THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE foOLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INTR ADDUBR POLICY EFF POLICY EXP TYPE OF INSURANCE NSDL SWVD POLICY NUMBER (MMIDD/YYW) (MM DDIYYYY) LIMITS COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ CLAIMS-MADE OCCUR DAMAGE TO RENTED $ PREMISES(Ea occurrence) MED EXP(Any one person) $ PERSONAL&ADV INJURY $ GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ PRO POLICY JECT LOC PRODUCTS-COMP/OP AGG $ OTHER: $ AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ (Ea accident) ANY AUTO BODILY INJURY(Per person) $ OWNED SCHEDULED BODILY INJURY(Per accident) $ _AUTOS ONLY AUTOS HIRED NON-OWNED PROPERTY DAMAGE $ AUTOS ONLY AUTOS ONLY (Per accident) $ UMBRELLA LIAB _OCCUR EACH OCCURRENCE $ EXCESS LIAB CLAIMS-MADE AGGREGATE $ DED RETENTION$ $ WORKERS COMPENSATION PER ON - AND EMPLOYERS'LIABILITY YIN X !STATUTE ER ANYPROPRIETOR/PARTNERJXECUTIVE E.L.EACH ACCIDENT $ 2,000,000 OFFICER/MEMBER EXCLUDED? NIA WC 053425881 MA 07/01/2022 07/01/2023 A (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $ 2,000,000 If yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ 2,000,000 DESCRIPTION OF OPERATIONS/LOCATIONS I VEHICLES(ACORD 101,Additional Remarks Schedule,may be attached if more space is required) All worksite employees working for Dandelion Energy Inc paid under ADP TOTALSOURCE,INC.'s payroll,are covered under the above stated policy.Dandelion Energy Inc is an alternate employer under this policy. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE Dandelion Energy Inc THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. 333 N Bedford Rd Mt Kisco,NY 10549 AUTHORIZED REPRESENTATIVE . i A• tia ACORD 25(2016/03) ©1988-2015 ACORD CORPO ION. All rights reserved. The ACORD name and logo are registered marks of ACORD DANDENE-01 CZHANG ACORO MM/D(DATE D/YYYY) CERTIFICATE OF LIABILITY INSURANCE MM!D22 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT NAME: York International Agency,LLC 500 Mamaroneck Avenue iac°NN,EXt):(914)376-2200 (A1C,No):(914)376-2891 Suite 220 ADDRESS:certificate©yorkintl.com •Harrison,NY 10528 INSURER(S)AFFORDING COVERAGE NAIC# INSURER A:Hamilton Insurance Designated Activity Company INSURED INSURER B: Dandelion Energy,Inc. INSURER C: 333 N Bedford Rd,Suite 220 INSURER D: Mount Kisco, NY 10549 INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADDL SUER POLICY NUMBER POLICY EFF POLICY EXP LIMIT LTR INSD WVD lMM/DD/YYYYI (MM/DD/YYYYI A X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 CLAIMS-MADE X OCCUR ENVPKGHI803226 9/8/2022 9/8/2023 DAMAGETORENTED 50,000 PREMISES(Ea occurrence) $ MED EXP(Any one person) $ 5,000 PERSONAL&ADV INJURY $ 1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ 2,000,000 X POLICY PRO- JECT LOC PRODUCTS-COMP/OP AGG $ 2,000,000 OTHER $ AUTOMOBILECOMBINED SINGLE LIMIT LIABILITY (Ea accident) $ ANY AUTO BODILY INJURY(Per person) $— OWNED SCHEDULED _ AUTEO�S ONLY AUTOS SSyyN BODILYOR INJURY(Per accident) $ AUTOS ONLY NON-OWNED ONLY (Perr acGdentDAMAGE UMBRELLA LIAB _ OCCUR EACH OCCURRENCE $ EXCESS LIAB CLAIMS-MADE AGGREGATE $ DED RETENTION$ PER $ WORKERSCOMPENSATION AND EMPLOYERS'LIABILITY Y/N STATUTE EERH ANY PROPRIETOR/PARTNER/EXECUTIVE E.L.EACH ACCIDENT $ OFFICER/MEMBER EXCLUDED? N/A (Mandatory In NH) E.L.DISEASE-EA EMPLOYEE $ If yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ DESCRIPTION OF OPERATIONS I LOCATIONS/VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached If more space Is required) CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE DANDELION ENERGY INC. THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. 333 N Bedford Rd#220 Mount Kisco,NY 10549 AUTHORIZED REPRESENTATIVE ACORD 25(2016/03) ©1988-2015 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD anti• `"W7' �., urn- Commonwealth of Massachusetts Division of Professional Licensure Board of Building Regulations and Standards. Construction Supervisor 1 & 2 Family �"� ' � ...,..N. CSFA-106523 Expires: .,s. xpires. 12103/2024 , WYATT ROBERTS i N NORTH BEDFORD RD STE 220 \ L ., 4, MOUNT KISCO NY 10549N ----, • •04, .',`:.`;:,.., -‘.',,,. - '' * %.'7 //, , ...,„, ' ' •N• -411* ,..,,, . ',,,,,,,,,,,,,,,:••• •.:, ,, N. ., ,,,....: . Commissioner u� ' ►. � -- �`��- , .ems. ..\ DocuSign Envelope ID:E11947FB-AB5D-4722-BAFO-F18E0907AB7B DANDELION Date: 7/27/2022 ATTN: Building Department: Subject Property: 71 Olander Dr,Northampton, MA 01060, USA 1, Lawrence Daniele , as Owner of the subject property hereby authori.e Dandelion Energy, and its representatives,to act on my behalf in all matters relative to work authorized by'the enclosed building permit application. X CDoeuSiignedby: zum-k-a- tA1t310t13AVVIt3400. .. (Signature of Property Owner(s)) The Commonwealth of Massachusetts I Department of Industrial Accidents !�! —;� ►= Office of Investigations . :: = Lafayette City Center E = 2 Avenue de Lafayette, Boston,MA 02111-1750 ,,,Y www.mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name (Business/Organization/Individual): Dandelion Energy Address:333 North Bedford Rd, Suite 220 City/State/Zip: Mount Kisco, NY 10549 Phone #:860-301-7100 Are you an employer? Check the appropriate box: Type of project(required): 1.❑l I am a employer with 200 4. ❑ I am a general contractor and I6. ❑New construction employees (full and/or part-time).* have hired the sub-contractors 2.❑ I am a sole proprietor or partner- listed on the attached sheet. 7. ❑ Remodeling ship and have no employees These sub-contractors have 8. ❑ Demolition working for me in any capacity. employees and have workers' [No workers' comp. insurance comp. insurance.* 9. El Building addition required.] 5. ❑ We are a corporation and its l 0.❑ Electrical repairs or additions 3.❑ I am a homeowner doing all work officers have exercised their 1 1.❑ Plumbing repairs or additions myself. [No workers' comp. right of exemption per MGL 1 2.DRoof repairs insurance required.] t c. 152, §1(4),and we have no employees. [No workers' 13.11I Other Geothermal comp. insurance required.] *My applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. :Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: New Hampshire Insurance Co. Policy#or Self-ins. Lic. #:WC 053425881 MA Expiration Date: 7/1/2023 Job Site Address: 71 Olander Dr, Northampton, MA 01060, USA City/State/Zip: Northampton, MA 0106 Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify under the pains and penalties of perjury that the information provided above is true and correct. Signature: �� Icatutihileat.; Date: 9/26/2022 Phone#: 860-301-7100 Official use only. Do not write in this area,to be completed by city or town official. City or Town: Permit/License# Issuing Authority(check one): 10Board of Health 2❑Building Department 31:City/Town Clerk 4.0 Electrical Inspector 5E'lumbing Inspector 6.0Other Contact Person: Phone#: _ .. ,. lip* t ...._ ,,......_ --- A - 114 ). V;' Sri ,* j� "°a tit '° :-r -- C)ate ' �• `i- / E:3: -----— .;411,0**Vit 1. lili 1 ,k.k.'. :: , r l .. ...11r:' ' ,...'%'i, I kill I 001 I 1 4- . -*,.._-.,.11::::, t . \SI 111_ c•P Ow .�.-i ...it, ! S ti-.•� 4 , • . .... ... .._ . • • _ . ,, y ti4er ....... lir. _ kilapi_r ' .- 1 f a` CONTRACTOR NAME: STAMP: „"uiu,„ PROJECT NAME: PROJECT ID: \o'�Fp�.-............gJJ4`yG' DANIELE,LAWRENCE 21-010-0116 DANDELION R"" o' CAADA DA `;�= PROJECT ADDRESS: DESCRIPTION: PAGE: "`r No.55865 "= 71gEANDER O1960- SITE PLAN - - - _ - °o, 6ISTEPE�•' „- 1 of 8 �,,,spoMAL to\i IN o m: sPROFESSIONAL a ENGINEERING. VERSION V2022.08 DRAWN BY: MKK ',,,,,,,,,,,,,,,���° DATE: 2022-09-19 ENGINEER s,,"SURVEYOR iO4TERTMs SCALE:SEE NTS SIZE:ISO_B_11X17 ID LOOP 1 TYPE VERTICAL BORE BORE 9 NO.OF BORES 1 e i BORE DEPTH 373 i BORE SPACING 18 FT - _ ' EST.DEPTH TO BEDROCK 91 FT A I -Screened Porch: 1 N , U-BEND DIAMETER 1-1/4 IN i % t-P6 � U-BEND MATERIAL HDPE 4710 DR-11 1 _ GROUT CONDUCTIVITY 1.2 BTU/HR-FT-F I I HEADER DIAMETER .1-1/2 IN HEADER: 1 HEADER MATERIAL HDPE 4710 DR-11 I EST.HEADER LENGTH 50 FT I --_, Attached Garage: HEADER TRENCH DEPTH 2 FT I 661 ft2 I TIE-IN TYPE f BELOW GROUND BOREHOLE TRIANGULATION 1 10_....-••"'�� 1 ? LOOP# BORE# A B 1-_ ` 1 1 13.5 FT .11.5 FT 3 $ 1st Floor: r 761 ft2 I DESIGN NOTES FOR DRILLING: 2nd Floor: -_ _ • 761x0.5 = 381ft2 DESIGN NOTES FOR TRENCHING: • WASTE(SEWER I ELECT&COMM 1 WATER SUPPLY 1 CONTRACTOR NAME: STAMP: uuww,,, PROJECT NAME: PROJECT ID: �p��H OF Mqf�., DANIELE,LAWRENCE 21-010-0116 / \ \off' ...,s I� DANDELION ;o CARDA i f.= PROJECT ADDRESS: DESCRIPTION: PAGE: ."` No.55865 il�_ 71_01 A NDFR DR,-NORTHAMPTOLIAA 01060 - DETAILED SITE PI_AN_ N o 90.;IN/STW-.7.. r`��, FFSS/ONAL E'Af°V�.` ARTICLE ice LE.5 PROFESSIONAL ROFES IO wANG."EERIN 2 Of 8 VERSION V2022.08 DRAWN BY: MKK n,, „"" DATE: 2022-09-19 ENGINEER TO ALTER `' SCALE:SEE NTS SIZE:ISO_B_11X17 PROFESSIONAL on.rnrvc w nrr war 1 PERFORMANCE RATINGS(ANNITSO 13258a) YODEL CAPACITY COOLING HEATING PRESSURIZED FLOW CENTER RETURN MR DUCT CAPACITY(BTUIHR) EER CAPACITY(BTUMR) COP n CONNECTION (W/ FULL LOAD 27,100 19.9 19,000 4.3 VIBRATION BREAK IT-024 PART LOAD 21,400 28.2 15.200 4.8 _ f S { - AND FILTER RACK) FULL LOAD 41,200 20.9 29,100 4.5 z PART LOAD 31,500 31.3 23.300 5.1 °��`A%BF p4",''0 FULL LOAD 53.300 20.2 39.900 4.3 EXPANSION TANK ii �'t `� ''% YT-048 PART LOAD 42,600 29.6 32.000 4.9 `�� AYAN J. 'yam, FULL LOAD 64,300 19.3 49,200 4.1 Z i1 YT-060 PART LOAD 50,000 26:0 37.700 4.6 FI -o• CARDA FULLLOAD 71,900 180 56,200 3.8 ,"`: No.55865 YT-072 S 1."-..9p EO 'O FART LOAD 58,500 24.8 45.800 4.4 ` X ` .,,pfF.GISTER_,.`;'S��• ''n�SPONAL`EM6````�� �O•O` >�n�c x u // ROUGH GRADE 4� \ \ !r x ACCESS SEAL BUILDING ENTRY I A \ x PANEL c PER D8:1 STANDARDS x 4 FT. 1:'''o 1 FT. RECOMMENDED ACCESS PANEL CHECK VALVE ED— - (WHEN REQUIRED, SEE NOTES)ts ISOLATION BALLVALVES (REQUIRED) • D. Q1-715 i --1--I I -1--11 i LEGEND H`/�s H MR SEPARATOR SYSTEM PRESSURIZATION DETAILS ..P.r' CONDENSATE TO H6— BALL VALVE-MANUAL __ RANGE MIN. MAX. APPROVED PUMP OR DRAIN - START-UP PRESSURE 30 PSI 60 PSI PER AHJ(TRAP REQUIRED) DRAIN VALVE-MANUAL ______ FLEXIBLE PIPING NOTES: I'1I"„II11T�_ CONNECTION DANDELION AIR OPERATION UMITS 'Cr90'ELBOW WITH PARAMETER COODNG HEATING • LEFT SIDE RETURN SHOWN.UNIT CAN BE CONFIGURED FOR EITHER LEFT-OR RIGHT-HAND RETURN.CONNECTIONS Y PT/SENSOR PORT MIN EAT 60'F 45•F MIRRORED FOR RIGHT HAND CONFIGURATION. • APPROVED INTERIOR PIPING MATERIALS:HDPE,PEX AND/OR RUBBER HEATER HOSE-REFER TO DANDELION'S DESIGN& TEE MAX EAT MIN EWT 100'F 30'F 20'F 0'F INSTALLATION STANDARDS FOR SIZING REQUIREMENTS. CONNECTION-GENERAL PIPING • SUPPLY-RETURN LINE SIZES SELECTED PER DANDELION'S DESIGN AND INSTALLATION STANDARDS. MAX EWT 110'F 90•F • ALL INTERIOR PIPING INSULATED WITH CLOSED-CELL INSULATION 6MIN.THICKNESS). PIPING,TUBING, • TARGET DEPTH FOR BUILDING ENTRY POINT IS 4 FT BELOW GRADE.REFER TO DANDELION'S DESIGN AND INSTALLATION 4- HOSE-GENERAL MIN WATER FLOW 2.5 GPM/TON STANDARDS FOR PROVISIONS WHEN EXCEPTIONS OCCUR. ,� COUPLING-MALE z • THE USE OF CHECK VALVES IS REQUIRED WHEN MULTIPLE HEAT PUMPS ARE CONNECTED TO A COMMON(SHARED)GROUND FEMALE MAX WATER FLOW 3.5 GPM/TON LOOP. / I � MIN AIR FLOW 300 CFM/TON • SEE SHEETS 2,3,AND 4(OF 4)FOR ADDITIONAL DANDELION SYSTEM REQUIREMENTS. I I EXPANSION TANK CONTRACTOR NAME: PROJECT NAME: PROJECT ADDRESS: 71 Olander Dr,Northampton.MA DESCRIPTION: PAGE: Lawrence Daniele INTERIOR PIPING(DANDELION YT) --DANDELION . 01060,USA MULTI-POSITION VERTICAL PACKAGED 1 OF 4 VERSION V2021.08 PROJECT ID: 21-010-0116 DATE: 9/26/2022 SCALE:NTS I SIZE:ISO_B_11 X 17 `'`�N.OF N.S* A o•� � f�ry'S CARDS ,?1 ! HEADER PIPE SIZE PER o DESIGN DOCUMENTS I,L_ u' STEP-DOWN,STEP-UP \II/ Jo��`. No.55865 1 REVERSE RETURN HEADER STEP-DOWN,STEP-UP %49p'9E6155865''j�.�`�� REV RSE-RETURN VERTICAL BOREHOLE(QTY AND (PERED&I STANDARDS) '''',?S:•OMRI F'R6�+``` SPACING PER DESIGN DOCUMENTS) Ill 111L__ 1 ROUGH GRADE it • ...,- [ ) ' f-l 1 I II l iI //lair\\\%\\j\\j,\\� I I I I- UNDISTURBED SOIL :I 1 I I I I�//\\//\\//\\//\\ 11=1 I 4 Fr. III- /\\/\\/\\/\\�11=1 I ID CALCULATED 1=III //\//\//\//\4-III- BACKFILL BORE -III—I I I DEPTH 1—IIIN // II- --I I I I\` \\ \\ \\\ I I—I I APPROX. 6 IN. GRANULAR BACKFILL I I—III ,,,, ^:! _ .. ;;�4;,._—I I (NO ROCKS OR LARGE CHUNKS) HEADER PIPING ENCH pFTAII HEADER PIPE SIZE-A _J PER DESIGN DOCUMENTS TRENCHING NOTFS- LOOP SUPPLY LOOP RETURN U-BEND QTY AND PIPE SIZE ®WHEN SITE CONDITIONS DO NOT ALLOW EXCAVATION TO THE REQUIRED 4 FT. DEPTH (FROM BUILDING) (TO BUILDING) DC-C SPACING PER "jESIGN DOCUMENTS PER DESIGN DOCUMENTS INSULATE THE HEADER PIPING WITH R10 INSULATION (MUST BE RATED FOR DIRECT BURIAL). INSTALL THE NSULATION DIRECTLY ABOVE AND ALONG THE OUTER EDGES OF THE PIPING AT GROUND LOOP LAYOUT DETAIL THE BOTTOM OF THE TRENCH FOR FREEZE PROTECTION. HEADER PIPING DETAIL GENERAL NOTES SYSTEM ANTIFREEZE MUST MEET OR EXCEED AH.I BUILDING CODES • ALL UNDERGROUND PIPE FITTINGS/CONNECTIONS MADE VIA HEAT FUSION PER ANSI/CSA/IGSHPA C448.0-16, SECTION 5.4.2 CORRESPOND WITH FREEZE POINT 12-13°F BELOW MIN EWT • ALL GROUND LOOP PIPING HOPE, MIN. 160 PSI RATING (PE 3608 OR 4710, DR11) PER ANSI/CSA/IGSHPA C448.0-16, SECTION 5.4.2 ANTIFREEZE CONCENTRATION%BY VOLUME • MINIMUM BORE SPACING AND CALCULATED BORE DEPTH PER LOOPUNK RLC • MIN. SEPARATION DISTANCE FROM ALL STRUCTURES AND UTILITIES (FOUNDATION, GAS, SEWER, SEPTIC, PROPERTY LINES, ETC.) IS 10 FT., MIN EWT(°F) ANTIFREEZE TYPE UNLESS OTHERWISE SPECIFIED BY THE AHJ. 25°F 30°F 35°F-45°F >45°F • INSTALL R2 (MIN.) PIPE INSULATION ON HEADER PIPING WHEN CROSSING A WATER/SEWER LINE ' . FULL LENGTH GROUTING REQUIRED, 1.20 BTU/HR-FT-F GROUT THERMAL CONDUCTIVITY VALUE PROPYLENE GLYCOL 28% 22% 20% 0% • HEADER PIPING MUST BE LAID OUT IN REVERSE-RETURN FASHION AS INDICATED IN THE HEADER DETAIL DRAWING. ETHANOL 25% 20% 15% 0% • ALTERNATIVE PIPING LAYOUT/DESIGN MUST BE PRE-APPROVED BY DANDELION. - - • SEE SHEETS 1. 3. AND 4 (OF 4) FOR ADDITIONAL DANDEUON SmILM REQUIREMENTS. METHANOL DO NOT USE 15% 10% 0% • PRIOR TO STARTUP, THE GROUND LOOP SHALL BE FLUSHED AT 2 FPS TO REMOVE AIR/DEBRIS USING A 1.5 HP PURGE PUMP I HEAT TRANSFER FLUID MUST COMPLY WITH ANSI/CSA/IGSHPA C448.0-16, SECTION 5.7 CONTRACTOR NAME: PROJECT NAME: PROJECT ADDRESS' DESCRIPTION: PAGE: Lawrence Daniele 71 Olander Dr,Northampton,MA D e N DEL"�J IA D H � 01060,USA GROUND LOOP ANEADER PIPING OF 4 VERSION V2021.08 PROJECT ID: 21-010-0116 DATE: 9/26/2022 SCALE:NTS SIZE:ISO_B_11 X 17 COLD WATER SUPPLY `00,11UNIUUphi 0 OF HEAT PUS WATER HEATER SPECIFICATIONS HOT WATER/ �p'!/ '''C'1G ELECTRICAL VOLTAGE/PHASE/HZ UPPER/LOWER FT FMFNT WATTAGE MAX WATTAGE REQUIRED BREAKER SIZE SUPPLY(TO :` RYAN J. \ %S. SPECS 230/1/60 4500 4600 30 AMP HOUSE) CARDA � at I '= PERFORMANCE NOMINAL CAPACITY(GAL) RATED STORAGE VOLUME(82) UEF FIRST HOUR RATING(GAL) 1 =u' No.55865 i ? RATINGS 80 82 3.46 86 -,-!0,ErS/ONiLIEM6,+�`�` 1 HOT WATER (OUTLET)—\ I I COLD WATER (INLET) 0 (NEW)HEAT PUMP I WATER HEATER - /1 I V I TEMPERATURE AND PRESSURE O RELIEF VALVE (TPV) DRAIN .L CONDENSATE TO APPROVED DRAIN PER AHJ r LEGEND BALL VALVE-MANUAL I DRAIN VALVE-MANUAL NOTES: HOT WATER LINE • DOMESTIC HOT WATER CONNECTIONS SHALL MEET OR EXCEED ALL APPLICABLE BUILDING CODES. • TEMPERATURE AND PRESSURE RELIEF VALVE(TPV)SHALL BE FACTORY INSTALLED AND —— COLD WATER LINE TERMINATED ACCORDING TO APPLICABLE BUILDING CODES PIPING,TUBING. • ALL NEW PLUMBING 03 IN.(MIN.),PEX OR COPPER 4— HOSE-GENERAL • THE NEW WATER HEATER SHALL TIE-INTO THE EXISTING DOMESTIC WATER PLUMBING. • SEE SHEETS 1,2,AND 4(OF 4)FOR ADDITIONAL DANDELION SYSTEM REQUIREMENTS. CONTRACTOR NAME: PROJECT NAME: PROJECT ADDRESS: DESCRIPTION: PAGE: Lawrence Daniele 71 Olander Dr,Northampton,MA DANDELION _ 01060,USA HEAT PUMP WATER HEATER 3 OF 4 INSTALLATION DETAILS(ALL MODELS) VERSION V2021.08 PROJECT ID: 21-010-0116 DATE: 9/26/2022 SCALE:NTS SIZE:ISO_B_11 X 17 NOTES: (NEW)HEAT PUMP ELECTRICAL PANEL REFER TO TABLE FOR BREAKER REQUIREMENTS • ELECTRICAL WORK MUST MEET OR EXCEED ALL APPLICABLE (EXISTING)MAIN ELECTRICAL PANEL BUILDING 8 ELECTRICAL CODES • WHEN THE DISTANCE FROM THE SERVICE PANEL TO THE HEAT PUMP L %,)1n1111/tr�,, IS GREATER THAN 100 FT,CONSULT WITH THE ENGINEERING TEAM •n• \s.�`��`,VN OF/yq FOR FURTHER REVIEW. HEAT PUMP . E1;.....-'•-•;r�'''' • SEE SHEETS 1,2,AND 3(OF 4)FOR ADDITIONAL DANDELION SYSTEM <- L �9 • * ` `.ry REQUIREMENTS. v. -0 e' CARDA _ 'MEI No.55865 1 L ' • HEATER �''FE1 5/ONAL,,,,• ` I- AUXL ■e • coy n Rc �f` O O R / �' Rh O G G C OY1 Y1 W 1 HEAT PUMP Y2 W2 O Y2 THERMOSTAT 0/B / ACC- TERMINAL BLOCK 0 COM PEK ACC+ ( ) 00 \ / ..../ O DH Owl ECOBEE THERMOSTAT(NEW) CONDENSATE PUMP BREAK(C)WIRE IF CONDENSATE BACKS UP OR MALFUNCTIONS HEAT PUMP ELECTRICAL SPECIFICATIONS AUX HEAT ELECTRICAL SPECIFICATIONS(WHEN APPLICABLE) VOLTAGE/ LRA W/SOFT VOLTAGE) AUX HEAT KW AUX HEAT AUX HEAT MODEL PHASE/HZ FLA(AMP) LRA(A) START(A) MCA(A) MOP(A) MODEL PHASE/HZ (240V) AMPS 240V) AUX HEAT MCA(A) MOP YT-024 230/1/60 20.9 58.3 17.5 23.8 35 YT-024 230f1/60 5 20.8 26.0 30 YT-036 230/1/60 24.8 83.0 24.9 28.7 40 VT-036 23011I60 10 41.7 52.1 60 YT-048 230/1/60 31.9 104.0 31.2 37.2 50 YT-048 230/1/60 10 41.7 52.1 60 YT-060 230/1/60 39.5 152.9 45.9 46.3 70 YT-060 230/1160 10 41.7 5Z1 60 YT-072 230/1/60 42.1 172.9 53.8 49.5 70 YT-072 230/1/60 10 41.7 521 60 CONTRACTOR NAME: PROJECT NAME: PROJECT ADDRESS: 71 Olander Dr,Northampton,MA DESCRIPTION: PAGE: DANDEL10H Lawrence Daniele ELECTRICAL/THERMOSTAT/CONDENSATE 01060,USA _PUMP WIRING(DANDELION_YI,_ MULTI-POSITION VERTICAL PACKAGED 4 OF 4 VERSION V2021.08 PROJECT ID: 21-010-0116 DATE: 9/26/2022 SCALE:NTS SIZE:ISO_B_11 X 17 DANDELION April 23,2021 RE: Insulation requirements for shallow header trench installations To whom it may concern: Dandelion requires excavation and header pipe installation to a minimum depth of 4 ft. below grade,and that depth be maintained from the ground loop location to the building entry point.This requirement is consistent with industry-accepted best practices. However,there are cases where the minimum trench depth cannot be achieved without excessive complication, labor or cost. Dandelion has developed an alternative procedure for such cases,which is outlined in our Design& Installation Standards: When the site conditions prevent the header trench from being excavated to the minimum 4 ft.depth, the exterior header piping shall be insulated with closed-cell pipe insulation.Additionally,foam board insulation(min. R10)shall be installed directly above and along the outer edges of the piping in the bottom of the trench for additional freeze protection. The width of the foam board insulation shall be sufficient to completely cover the header piping so that it cannot be seen from above prior to backfill. The thermal conductivity of subsoil is typically on the order of 0.50-1.00 Btu/hr-ft-°F,depending on composition,density and moisture content.The thermal resistance of foam board insulation is R=5 hr-ft'-°F/Btu(per inch of thickness). Using the steady-state conduction equation to calculate thermal equivalence(R= L/kA), it can be shown that adding 2 inch (R10)foam board insulation is comparable to adding 60 inches of soil depth,at minimum. Although it is not ideal to install header piping at depths less than 4 ft.from the surface,the installation of foam board insulation in accordance with our Design& Installation Standards will compensate for the deficiency from a thermal performance and more importantly,from a freeze protection standpoint. If you have any questions,feel free to contact me at rrardarpldandPlinnpnargy rnm. Sincerely, Ryan Carda, P.E. H.�, .MA, 0,, Principal Engineer �. : 4�. off.:.. yG Dandelion Energy, Inc. RYAN J. o CARDA . No.55865• April 23, 2021 \I� 0335 Madison Ave,4th Floor New York,NY 10017 DANDELION September 15,2020 RE: Compliance with applicable codes and regulations To whom it may concern: Dandelion requires that all design and installation methods and materials comply with all applicable codes and standards, including ANSI/CSA/IGSHPA C448 Series-16 (Design and installation of ground source hear pump systems for commercial and residential buildings) and Massachusetts State Building Code and State Energy Code. We provide a set of internal Design & Installation Standards, Permit Drawings, and Master Service Agreements to enforce this requirement with third party contractors and internal installation crews alike. Therefore,to the best of my knowledge, belief and personal judgment, our permit drawings, design and installation requirements and scope of work comply with Massachusetts State Building Code and State Energy Code. If you have any questions, feel free to contact me at rcarda@dandelionenergy.com. Sincerely, Ryan Carda, P.E Principal Engineer Dandelion Energy, Inc \�owlitiun,,,,,, . tp OF M '%, RYAN J. !�" itle.e.....C..... o: CARDA :LI_ E "'-. No.55865 °"f .e q ED " 1 `•.FGISTEa... /'';' �1SS/ONAI Ebb\-\\‘\ ,''',,,, AI.,- ��0� 4I O335 Madison A e,4th Floor New York,NY 1 017 DANDELION Re:Sediment control practices for permit application to install a ground loop as part of a geothermal heating and cooling system installation To whom it may concern: This letter summarizes Dandelion Energy's sediment control practices as part of our permit application for geothermal heating and cooling system installation. Dandelion implements industry accepted sedi ent control methods during drilling and trenching activities in general accordance with New York State De artment of Conservation Standard Specifications for Erosion and Sediment Control. The sediment control method(s) implemented on each project vary depending on site-specific conditions, but include one or more of the following measures: • Mud Processor - Equipment used to manage and process drilling spoils by separating solid and fluid materials removed from the borehole. • Containers - Drilling spoils are typically discharged directly into containers such as heavy-duty woven polypropylene sacks, impermeable 3-ply plastic pools, geotextile filter bags or lined roll-off containers during drilling. • Stockpile Methods - In some instances, drilling spoils or excavated materials from trenchinig may be temporarily stockpiled and contained using silt fences and/or straw bale dikes to prevent runoff. Excavated material is typically returned to the trench on the same day. • Dust Control - Water is sprayed to wet drilling spoils or excavated materials for dust control as needed. These practices have been developed and are employed to ensure that the highest level of environmental protection is achieved as a normal part of system installation. Thanks in advance for your consideration. Sincerely, `0%"'I Iuu,,,' �... . OF...................., (vre......C(\ y . RYAN J. yR, _ o CARDA No.55865'- A l'o'' 'PFC/ST EO-c-/�`�" ,SS/ONAL ENS„ Ryan Carda, P.E Principal Engineer Dandelion Energy, Inc ,i j O 335 Madison Ave,4th Floor New York,NY 1i:1017 Dandelion Heat Pump Packaged Unit Performance Ease of Maintenance II • Two-stage Copelands UltraTecha • Real-time performance moni ring and compressor with efficiency values up to advanced diagnostic capabili ies with home wifi OE 4.5/20.9(COP/EER) connection.Comes standard ith every unit. • Unique compressor isolation technology • Removable cabinet panels an removable and high-density foam cabinet insulation control box providing easy a ess to internal for ultra-quiet operation components. • EnergyStar certified and made in the USA • Aluminum microchannel air c it which eliminates • Qualifies for the federal tax credit and the potential for failure due t corrosion, E' other state/local incentives enhancing reliability and effic; ncy fib:: _ ._ _ • Corrosion-proof plastic drain .an and conden- ' sate overflow sensor to prote. against potential, overflows due to clogged co densate drains ' • • 3-year workmanship warranty and 10-year I Simple Installation limited parts warranty ra • Vertical air supply with multi-position,field selectable left or right side return • Digital controls which provi• : a variety of field selectable settings for each in-tallation,and ENERGY STAR • Universal connection sizes for ground loop, advanced safety controls to p •tect the desuperheater and condensate connections equipment • Variable speed,constant cfm ECM blower • Factory-installed soft start whi h reduces the designed to adapt to connected ductwork start-up power of the heat pu p by 70%. and operate at a fraction of the cost of a • Optional field-installed internal auxiliary heating conventional blower motor Performance Ratings Heating Cooling I MODEL LOAD SIZE CAPACITY(BTU/HR) COP CAPACITY(BTU/HR) EER BR 'KER SIZE(AMPS) Full 19,000 4.3 27,100 19.9 YT 024 2 Ton 30 Part 15,200 4.8 21,400 28.2 Full 29,100 4.5 41,200 20.9 YT-036 3 Ton 40 Part 23,300 5.1 31,500 31.3 Full 39,900 4.3 53,300 20.2 YT-048 4 Ton 40 Part 32,000 4.9 42,600 29.6 Full 49,200 4.1 64,300 19.3 YT-060 5 Ton 50 Part 37,700 4.6 50,000 28.0 YT-072 Full b Ton 56,200 3.8 71,900 18.0 60 Part 45,800 4.4 58,500 24.8 Rated in accordance with AHRI/ISO standard 13256-1,which includes pump penalties www.dandelionenergy.com Dimensions 1.00 •.--0© H-4D 160 • i 15 Nv t6.0 _ jyA �. • . . 0111 I, 1 .l - - of -I 6.56 - I O I } . • - _.._1 ♦ . _ • En•n•ch It•comos•n0.•K.:rnum o/2 to 2.5 lost d 5•64661net•14Yon _..-.--_-.- ■ h ' ' 1 Atom la Front and p„Coll Fd•..-. TOP VIEW ■ r R too TOP VIEW Showing Optional Filler Rack 0 . 1.00 El 0 EMII III 4 SOURCEHWG WATERHATER • 9OOlnSOURCE HWG i WATERWATER IN 1711129 ;0 our CONFIGURED AS CONFIGURED AS SIDE DISCHARGE BACK DISCHARGE 0 Note:Side and Back Discharge configurations are only available in 036 through 072 models. LEFT VIEW FRONT VIEW Unit Dimensional Data MODEL WITHOUT WITH RETURN SUPPLY OPTIONAL CONTROL BOX CONTROL BOX AIR FLANGE AIR FLANGE FILTER RACK Al *B C A2 D E F G H J K L M N P R 024 46.0 23.0 26.5 53.25 25.0 20.0 19.1 1.92 3.63 11.62 12.5 7.44 1.05 2.3 3.00 3.63 036-048 54.0 25.4 30.5 61.2 28.0 26.0 23.7 2.34 2.25 16.0 16.0 7.26 1.60 2.3' 3.29 2.25 060-072 58.4 25.4 30.5 65.6 32.0 26.0 24.0 2.34 2.25 16.0 16.0 7.26 1.60 2.3' 3.29 2.25 Notes: All measurements are in inches. Electrical connect.are 1" for high voltage, 1/2" for low voltage. *B(Unit Width)excludes field installed factory supplied flanges. mwn.tw. v.«co,,'.,..„,m„• Performance Monitoring 38.19 "- Heat pump comes standard with real-time monitoring to provide the installer _ 4 g•' and homeowner with remote insight into system performance.This includes /y\ real-time efficiency,energy usage,and status of the refrigerant,air,and ---- OM ground loop circuits. 2.42 34.25 Fran,n.. I www.dandelionenergy.com wrightsoft Building Analysis Job: 21-010-0116 Entire House By: Dandelion Energy 333 North Bedford Road,Sute 220,Moult Kisco,NW 10549 Phone:833-GE0-4ALL Email:desigrx dardelionenergycom Web:eww..dardelionenergy.com Pro'ect Information For: Lawrence Daniele 71 Olander Dr,Northampton,MA 01060 Design Conditions Location: Indoor: Heating Cooling Westover Metro,MA,US Indoor temperature(°F) 72 72 Elevation: 241 ft Design TD(°F) 66 16 Latitude: 42°N Relative humidity(%) 30 50 Outdoor: Heating Cooling Moisture difference(grub) 29.3 31.2 Dry bulb(°F) 6 88 Infiltration: Daily range(°F) - 22 ( M ) Method Simplified Wet bulb(°F) - 71 Construction quality Average Wind speed(mph) 15.0 7.5 Fireplaces 1 (Semi-tight) • Component Btuh/ft2 Btuh %of load Walls 4.1 13356 43.7 Glazing 17.3 4635 15.2 Doors 25.9 544 1.8 Infiltration Ceilings 1.7 2254 7.4 Floors 1.2 1494 4.9 Walls Infiltration 3.8 8309 27.2 Ducts 0 0 Piping 0 0 Floors Humidification 0 0 Ventilation 0 0 Ceilings Adjustments 0 Other Glazing Total 30593 100.0 Coolin. Component Btuh/ft2 Btuh %of load Walls 0.7 2190 19.1 Glazing 18.0 4835 42.3 Doors 10.2 213 1.9 Walls Internal Gains Ceilings 0.9 1182 10.3 Floors 0.0 8 0.1 Infiltration Infiltration 0.4 895 7.8 Ducts 0 0 Ventilation 0 0 Ceilings Internal gains 2120 18.5 Blower 0 0 Glazing Other Adjustments 0 Total 11443 100.0 Latent Cooling Load=1898 Btuh Overall U-value=0.079 Btuhlft2-°F Data entries checked. wr ightsca 2 22-Sep-22 08.51.22 ..C� •,....--- Right-Sute:4)Urrversal 2022 22.0.04 RSU63755 Page 1 ..0116J•Design121-010-0116 Daniele]Manual J.rup Cale=MJ8 Frort Door faces:W - 9 wri htsot Load Short Form Job: 21-010-0116 Date: Entire House By: Dandelion Energy 333 North Bedford Road,Sute 220,Mount Kisco,NY 10549 Phone:833-GEO-4ALL Email:designdardelionenergycom Web.wwv.dardelionenergy.com Project Information For: Lawrence Daniele 71 Olander Dr,Northampton,MA 01060 Design Information Htg Clg Infiltration Outside db(°F) 6 88 Method Simplified Inside db(°F) 72 72 Construction quality Average Design TD(°F) 66 16 Fireplaces 1 (Semi-tight) Daily range - M Inside humidity(%) 30 50 Moisture difference(gr/Ib) 29 31 HEATING EQUIPMENT COOLING EQUIPMENT Make Enertech Make Enertech Trade Trade Model YT-072 Cond YT-072 AHRI ref Coil AHRI ref Efficiency 0 COP Efficiency 0 EER Heating input 0 kW Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 °F Total cooling 0 Btuh Actual airflow 1380 Lfrrl Actual airflow 1380 Lim Air flow factor 0.045 c,frriBtuh Arflowfactor 0.121 cfm/Btuh Static pressure 0.40 in H2O Static pressure 0.40 in H2O Space thermostat Load sensible heat ratio 0.86 Capacity balance point=0°F Backup: Input=0 kVV, Output=0 Btuh, 100 AFUE ROOM NAME Area Htg load Clg load HtgAVF CIgAVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Basement 1295 7109 347 321 42 2nd Floor 440 8698 2821 392 340 West 1st Floor 312 5990 3484 270 420 Under 2nd Floor 440 2432 2125 110 256 East 1st Floor 547 6364 2666 287 321 Entire House 3034 30593 11443 1380 1380 Other equip loads 0 0 Equip.@ 0.93 RSM 10607 Latent cooling 1898 TOTALS 3034 30593 12505 1380 1380 Bold/italic values have been manually ovemdden Calculations approved byACCA to meet all requirements of Manual J 8th Ed. _ wrightsoft- 21•22-Sep-2208:51:22 iw• �»•hi••ii-i ,-,-. Right-Sute®Uriversal 2022 22.0.04 RSU63755 Page 1 1/CCK ..0116]1Design1[21-010-0116 Dariele]Manual J.rrp Calc=MJ8 Front Door faces W 4 wrightsoft. Right-J8® Form J1 Job: 21-010-0116 Entire House Date. By: Dandelion Energy 333 North Bedford Road.Sute 220,Monk Kisco,NY 10549 Phone:833-GE0-4ALL Email:design@dardelionenergy.com Web:wMedardelionenergy.com 1 Name of Room Entire House Basement 2 Running Feet of Exposed Wall 446.3 ft 170.4 ft 3 Ceiling Ht(Ft)and Gross Wall Area(SgFt) 8.0 ft 5132.7 ft' 8.0 ft 1363.3 ft' 4 Room Dimensions(Ft)and Floor Plan Area(SgFt) 3033.6 ft' 1.0 x 1294.6 ft 1294.6 fF 5 Ceiling Slope(Deg.)and Gross Ceiling Area(SgFt) 0 ° 3033.6 ft' 0 ° 1294.6 ft' Type of Const., Panel HTM Area or Btuh Area or Btuh Exposure Number Faces Length Length Htg. Clg. Heating S-Clg L-Clg Heating S-Clg L-Clg 6 Vail 12F 0sry n 4.32 0.97 582 2224 497 0 0 0 I Glaz 2 glazing,dr out, n 1726 8.86 67 1152 591 0 0 0 . Wall 15821-0wa6 n 3.20 0.17 420 1346 71 420 1346 71 Wall 12F-Osw e 4.32 0.97 402 1609 360 0 0 0 11 I Glaz 2 glazing,dr outr, e 1726 27.55 29 505 806 0 0 0 Wall 15B21-0 w-6 e 3.20 0.17 252 807 43 252 807 43 UVali 12F-Osv s 4.32 0.97 366 1163 260 0 0 0 Glaz 2 glazing,dr out, s 17.26 14.96 97 1666 1444 0 0 0 Wall 15B21-zinc 6 s 3.20 0.17 420 1346 71 420 1346 71 1/+Jall 12F 0svv sw 4.32 0.97 30 91 20 0 0 0 laz 2 glazing,dr out, sw 17.26 24.13 9 149 208 0 0 0 Wall 15B21-O c-6 sw 3.20 0.17 30 95 5 30 95 5 all 12F-0sw w 4.32 0.97 464 1658 371 0 0 0 az 2 glazing,dr outr, w 17.26 27.55 59 1014 1618 0 0 0 oor 11 D0 w 25.90 10.16 21 544 213 0 0 0 Wall 15B21-0v -6 w 3.20 0.17 212 679 36 212 679 36 tall 12F-osv ow 4.32 0.97 30 91 20 0 0 0 Glaz 2 glazing,dr out, nw 17.26 19.39 9 149 167 0 0 0 Wall 15B21-0,n -6 ow 3.20 0.17 30 95 5 30 95 5 Wall 126-0sw - 6.44 1.29 334 2151 429 0 0 0 Cell 16B-56ad - 1.20 0.89 859 1027 766 0 0 0 Cell 16X30-0ad - 2.79 0.94 440 1228 416 0 0 0 For 19A-0bs p - 7.36 1.74 5 33 8 0 0 0 For 21 B-24w - 1.13 0.00 1295 1461 0 1295 1461 0 Infiltration Heating Load(Btuh) 0.42 8309 1279 Effect WAR WAR 12 Sensible Load(Btuh) ACH 1.00 895 0.15 138 0.19 Latent Load(Btuh) 1098 Internal a'Occupants at230and 200 Btuh 4 920 800 0 0 0 b Scenario number 1200 0 13 c Default Adjustments d Custom Appliances 0 0 0 0 e Plants 0 0 14 Subtotals Sum lines through 12 30593 11443 1898 7109 347 Dud EHLF&ESGF 0 0 0 0 0 0 15 Loads ELG 0 0 16 Ventilation Loads Vent Cfm 0 E Cfm 0 0 0 0 17 Wnter Humidification Load Gal/Day 0 0 18 Piping Load 0 19 Blower Heat 0 ` 20 AED Excursion&Latent Moisture Migration Load 0 i -22 21 Total Load Sum lines 13 through 19 30593 11443 1898 7109 347 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. -tt w rig htsoft- 2922-Sep-22 08:51:22 A&- k- "'""' """ Right-Sutes)Universal 202222.0.04RSU63755 Page 1 ...01161\Desigr421-010-0116 Danele]Manual J.rup Calc=MJ8 Front Door faces:W +ii- wrightsoft" Right-J8® Form J1 Job: 21-010-0116 Entire House Date` ey: Dandelion Energy 333 North Bedford Road,Stile 220,Moot Kisco,NY 10549 Phone:833-GE0-4ALL Email:design@dandelionenergy.com Web:www.dandelionenergy.com 1 Name of Room 2nd Floor West'st Floor 2 Running Feet of Exposed Wall 103.5 ft 58.9 ft 3 Ceiling Ht(Ft)and Gross Wall Area(SgFt) 8.0 ft 828.0 ft' 8.0 ft 815.3 ft' 4 Room Dimensions(Ft)and Floor Plan Area(SgFt) 1.0 x 440.0 ft 440.0 ft 1.0 x 312.3 ft 312.3 ft' 5 Ceiling Slope(Deg.)and Gross Ceiling Area(SgFt) 0 ° 440.0 ft' 0 ° 312.3 ft Type of Const.. Panel HTM Area or Btuh Area or Btuh Exposure Number Faces Length Length Htg. Clg. Heating S-Clg L-Clg Heating S-Clg L-Clg 6 WJall 12F-0 n 4.32 0.97 162 602 135 96 388 87 l GI sw az 2 glazing,dr outr, n 17.26 8.86 23 388 199 6 104 53 . Wall 15B21-0va6 n 3.20 0.17 0 0 0 0 0 0 Wall 12F-0sv e 4.32 0.97 252 1088 243 0 0 0 11 I Glaz 2 glazing,dr outr. e 17.26 27.55 0 0 0 0 0 0 Wall 15B21-Oeo-6 e 3.20 0.17 0 0 0 0 0 0 Wall 12F-0sv s 4.32 0.97 162 602 135 104 281 63 I Glaz 2 glazing,dr out, s 17.26 14.96 23 388 337 39 673 584 Wall 15B21-0 o-6 s 3.20 0.17 0 0 0 0 0 0 Vr_a_H G 12F Osw sw 4.32 0.97 0 0 0 30 91 20 laz 2 glazing,dr outr. sv 1726 24.13 0 0 0 9 149 208 Wall 15B21-CMG-6 sN 3.20 0.17 0 0 0 0 0 0 W,all 12F-0s✓v w 4.32 0.97 252 1019 228 212 640 143 Glaz 2 glazing,dr outr, w 17.26 27.55 16 276 441 43 738 1178 Door 1100 w 25.90 10.16 0 0 0 21 544 213 Wall 15B21-& -6 w 3.20 0.17 0 0 0 0 0 0 Nall 12F-0sv MN 4.32 0.97 0 0 0 30 91 20 Glaz 2 glazing,dr out, ow 17.26 19.39 0 0 0 9 149 167 Wall 15B21-Onc6 nw 3.20 0.17 0 0 0 0 0 0 Wall 12B-09N - 6.44 1.29 0 0 0 0 0 0 Ceil 16B-56ad - 1.20 0.89 0 0 0 312 373 279 Ceil 16X30-13ad - 2.79 0.94 440 1228 416 0 0 0 Flor 19A-0bsvp - 7.36 1.74 0 0 0 0 0 0 for 21B-24w - 1.13 0.00 0 0 0 0 0 0 Infiltration Heating Load(Btuh) 0.42 3107 1769 Effed WAR WAR 12 Sensible Load(Btuh) AC H 0.37 335 0.21 190 0.19 Latent Load(Btuh) Internal a Oocupants at 230 and 200 Btuh 2 460 400 0 0 0 b Scenario number 0 0 13 c Default Adjustments d Custom Appliances 0 0 0 0 e Plants 0 0 14 Subtotals Sum lines 6 through 12 8698 2821 5990 3484 Dud EHLF&ESGF 0 0 0 0 0 0 15 Loads ELG 0 0 16 Ventilation Loads Vent Cfm 0 E Cfrn 0 17 Winter Humidification Load Gal/Day 0 18 Piping Load 19 Blower Heat 20 AED Exairson&Latent Moisture Migration Load -107 279 21 Total Load Sum lines 13 through 19 8698 2821 5990 3484 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. -"4f wrtghts oft` 2022-Sep-2208:51:22 ` '-'"-'""""" Right-Sute®Universal 202222.0.04RSU63755 �4CZ`p� Page 2 ...0116J\Desigr121-010-0116 Dartiele]Manual J.rup Calc=MJ8 Fronk Door faces:W -+f wrightsoft Right-J8® Form J1 Job: 21-0104116 Entire House Date: By: Dandelion Energy 333 North Bedford Road,Sute 220.Mart Kisco,NY 10549 Phone:833-GE0-4ALL Email:design@dardelionenergycom Web:ww sdandelionenergy.com 1 Name of Room Under 2nd Floor Easr,lstFloor 2 Running Feet of Exposed Wall 26.8 ft 88.8 ft 3 Ceiling Ht(Ft)and Gross Wall Area(SgFt) 8.0 ft 828.0 ft' 8.0 ft 1298.0 ft' 4 Room Dimensions(Ft)and Floor Plan Area(SgFt) 1.0 x 440.0 ft 440.0 ft' 1.0 x 546.8 ft i 546.8 ft 5 Ceiling Slope(Deg.)and Gross Ceiling Area(SgFt) 0 ° 440.0 ft 0 ° 546.8 ft' Type of Const, Panel HTM Area or Btuh Area or Btuh Exposure Number Faces Length Length Htg. Clg. Heating S-Clg L-Clg Heating S-Clg L-Clg 6 NJall 12F-0s v n 4.32 0.97 108 382 85 216 851 190 I Glaz 2 glazing,drout, n 17.26 8.86 20 337 173 19 324 I 166 Wall 15B21-0wo-6 n 3.20 0.17 0 0 0 0 0 0 . Wall 12F-osv e 4.32 0.97 6 26 6 144 495 111 11 I Glaz 2 glazing,drout, e 17.26 27.55 0 0 0 29 505 806 Wall 15B21-& -6 e 3.20 0.17 0 0 0 0 0 0 /Uall 12F Osw s 4.32 0.97 100 281 63 0 0 0 I Glaz 2 glazing,drout, s 1726 14.96 35 604 524 0 0 0 Wall 15B21-Ow -6 s 3.20 0.17 0 0 0 0 0 0 Wall 12F-osv sv 4.32 0.97 0 0 0 0 0 0 L .Glaz 2 glazing,droutr, sw 1726 24.13 0 0 0 0 0 0 Ov Wall 15B21- c-6 sw 3.20 0.17 0 0 0 0 0 0 �j all 12F-osv w 4.32 0.97 0 0 0 0 0 0 laz 2 glazing,dr out, w 17.26 27.55 0 0 0 0 0 0 door 11DO w 25.90 10.16 0 0 0 0 0 0 Wall 15B21-0w -6 w 3.20 0.17 0 0 0 0 0 0 gall 12F-Osw nw 4.32 0.97 0 0 0 0 0 0 az 2 glazing,drou7, nw 17.26 19.39 0 0 0 0 0 0 Wall 15B21-0ea6 nw 3.20 0.17 0 0 0 0 0 0 Wall 126-0sw - 6.44 1.29 0 0 0 334 2151 429 Ceil 163-56ad - 1.20 0.89 0 0 0 547 653 488 Ceil 16X30-oad - 2.79 0.94 0 0 0 0 0 0 for 19A-0bsnp - 7.36 1.74 0 0 0 5 33 8 for 21B-24w - 1.13 0.00 0 0 0 0 0 0 Infiltration Heating Load(Btuh) 0.42 803 1351 Effect WAR WAR - 12 Sensible Load(Btuh) ACH 0.10 86 0.16 145 0.19 Latent Load(Btuh) Internal a Ooaipants at 230 and 200 Btuh 0 0 0 2 460 400 b Scenario number 1200 0 13 c DefaultAdjus'nents d Custom Appliances 0 0 0 0 e Plants 0 ) 0 14 Subtotals Sum lines 6 through 12 2432 2125 6364 2666 Dud EHLF&ESGF 0 0 0 0 0 0 15 Loads ELG 0 0 16 Ventilation Loads Vent Cfm 0 E Cfm 0 17 WIntr Humidification Load Gal/Day 0 18 Piping Load 19 Blower Heat 20 AED Excursion&Latent Moisture Migration Load -12 -137 21 Total Load Sum lines 13 through 19 2432 2125 6364 2666 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. -rid- wrIgt1tsoft 2022-Sep-22 08:51:22 '""""'"" "" Right-Sute/c Universal 202222.0.04RSU63755 4GA Page 3 _ J\D.0116esigri[21-010-0116 Dariele)Manual J.rup Calc=MJ8 Front Door faces W N e Below Grade $ Basement Job#:21-010-0116 Dandelion Energy le: 1 :92 Performed for: Page 1 Lawrence Daniele 333 North Bedford Road,Suite 220 Right-Sui Universal 2022 71 Olander Dr Mount Kisco,NY 10549 22.0. RSU63755 Northampton,MA01060 Phone:833-GEo-4ALL 2022 p-2208:51:31 1 010 0116 Daniele]Manual J.rup www.dandelionenergy.com design@dandelionenergy.com N First Floor IIIMININI East 1st Floor Under 2nd Floor 1 West 1st Floor Garage Job#:21-010.4116 Dandelion Energy le: 1 :92 Performed for: Page 2 Lawrence Daniele 333 North Bedford Road, Suite 220 Right-Sui Universal 2022 71 Olander Dr Mount Kisco, NY 10549 22.0.04 RSU63755 Northampton,MA01060 Phone:833-GEO-4ALL 2022-Sep-22 08:51:31 1-010-0116 Daniele]Manual J.rup wwwdandelionenergy.com design@dandelionenergy.com N Second Floor • 2nd Floor Job#:21-010-0116 Dandelion Energy Scae: 1 :92 Performed for: Page 3 Lawrence Daniele 333 North Bedford Road,Suite 220 Right-Suite®Universal 2022 71 OlanderDr Mount Kisco, NY 10549 22.0.04RSU63755 Northampton,MA01060 Phone:833-GEO-4ALL 2022-Sep-22 08:51:31 1 010 0116 oaniele]Manual J.rup wdandelionenergy.com design@dandelionenergy.com wu. N I' Third Floor Job#: 21-010-0116 Dandelion Energy Scale: 1 :92 Performed for: Page 4 Lawrence Daniele 333 North Bedford Road,Suite 220 Right-Suite®Universal 2022 71 Olander Dr Mount Kisco, NY 10549 22.0.04 RSU63755 Northampton,MA01060 Phone: 833-GEO-4ALL 2022-Sep-22 08:51:31 www.dandelionenergy.com design@dandelionenergy.com 1-010 0116 Daniele]Manual J.rup Dandelion Energy GSHP Design Report Project: Daniele [21-010-0116] (Project ID:30446) Prepared: 22-Sep-2022 Prepared By: Madison Knox LuLlrri k by Geo-Connections,Inc Dandelion Energy System Loads System Loads or Peak Loads are calculated based on a variety of details for an individual residence. Assumed occupancy levels, the number of appliances operating, the number of doors & windows and the tightness of the construction all contribute to the amount of energy required to maintain the thermostat set points given the historical extreme weather conditions in your area. The peak loads used in this report were provided as listed in the following table. 1 kBtu/hr= 1,000 Btu/hr Total Total Heating Load Cooling Load Zone (kBtu/hr) (kBtu/hr) Zone SHF System 1 (Whole Home) 30.59 13.34 0.900 Total 30.59 13.34 1 of 7 I Mt Kisco, New York Dandelion Energy Equipment Schedule Based on the provided loads, the recommended heat pump schedule for this system is as follows: High Cap. Low Cap. 1 kBtu/hr= 1,000 Btu/hr Heat ' Cool ' WatelIr 2 Air 3 Cap. Cap. Floe, Flow Zone GSHP QTY (kBtu/hr) (kBtu/hr) (GPM) (CFM) Dandelion Energy- Enertech 30.90 39.40 9.0 1,420 System 1 (Whole Home) Multi-Position Vertical YT-036 1 24.60 31.44 High Capacity Totals 30.90 39.40 9.0 Low Capacity Totals 24.60 31.44 - 1. All capacities shown are total. 2. When applicable,hydronic source and load water flows are assumed equal. 3. Air flow rates are reported on a per heat pump basis. For total air flow in a zone,multiply the reported air flow by quantity. 2of7 I Mt Kisco, New York Dandelion Energy System 1 (Whole Home) Zone Details The peak loads for each individual zone are used to calculate the total amount of heating & cooling capacity required for a space based on the set points and the climate data for your area. Peak Heating Load 30,593 Btu/hr Peak Cooling Load 13,341 Btu/hr Heating Set Point 72 °F Cooling Set Point 72 °F Heating Offset 0 Btu/hr Space SHF 0.900 GSHP Selection The ground source heat pump below has been selected to maintain comfortable heat- ing & cooling for this zone. Manufacturer Dandelion Energy Model Enertech Multi-Position Vertical YT-036 Heat Pump Type Water to Air Capacity Dual Capacity # Heat Pumps 1 Installed Capacity Check The installed capacity check describes the efficiency and total heating/cooling capacity of the selected ground source heat pump system. This information is used to ensure proper sizing of equipment based on the load represented by this zone. Heating (High Capacity) Cooling (High Capacity) Heating Capacity 30,900 Btu/hr Total Cooling Capacity 39,400 Btu/hr % Sizing 101.0% Sensible Cooling Capacity 29,550 Btu/hr % Energy From Geo 99.6% % Oversizing 146.1% Installed COP 4.12 Installed EER 15.33 Balance Point Temp. 12.7 °F Heating (Low Capacity) Cooling (Low Capacity) Heating Capacity 24,600 Btu/hr Total Cooling Capacity 31,440 Btu/hr % Sizing 80.4% Sensible Cooling Capacity 23,580 Btu/hr Installed COP 4.45 % Oversizing 96.4% Installed EER 23.25 3 of 7 I Mt Kisco, New York Dandelion Energy System 1 (Whole Home) Zone Operating Summary The Zone Operating Summary describes equipment runtime and the total annual power consumption for the GSHP operating in this zone. Heating Cooling High Capacity Runtime 413 hrs High Capacity Runtime 0 hrs Low Capacity Runtime 2,145 hrs Low Capacity Runtime 377 hrs Supplemental Bin Hours 113 hrs Dual Fuel Bin Hours 0 hrs Heat Pump Energy Use 4,397 kWh Heat Pump Energy Use 562 kWh Pumping Energy Use 335 kWh Pumping Energy Use 49 kWh Supplemental Energy Use 72 kWh Dual Fuel Energy Use 0 kWh GSHP Operating Cost Breakdown for Zone Name Based on the annual power consumption of the system and the price per kilowatt hour in your area the estimated cost to maintain the set points for this zone are as follows: Heating Cooling HP Cost $1,055.44 HP Cost $135.06 Supplemental Cost $17.51 Pumping Cost $11.90 Dual Fuel Cost $0.00 Total Cost $146.96 Pumping Cost $80.58 Total Cost $1,153.53 81.2% HP Heating Cost 6.2% Pumping Cost-Heating INN 1.3% Supplemental Heating Cost 10.4% HP Cooling Cost MN 0.9% Pumping Cost-Cooling 4 of 7 Mt Kisco, New York Dandelion Energy Back-Up System Details Supplemental System Details Supplemental systems operate at the same time as the geothermal heat pump and provide additional heat when the space load is greater than the system capacity. Supplemental System Type Electric Resistance COP 1.0 Zone Load and Operating Profile loon Sp c a 800 ` r o �a 600 ih° VI g N 0 p S 0 r O R a Temperature(°F) - Heating Load - Low Capacity Heating Operation •• High Capacity Heating Operation - Cooling Load - Low Capacity Cooling Operation •• High Capacity Cooling Operation I Supplemental Heating I GSHP Heating I GSHP Cooling Heating Cooling Heating Start OAT 57.0 °F Cooling Start OAT 65.0 °F High Capacity Runtime 413 hr High Capacity Runtime 0 hr Low Capacity Runtime 2,145 hr Low Capacity Runtime 377 hr Supplemental Bin Hours 113 hr 5 of 7 I Mt Kisco, New York Dandelion Energy Vertical Bore 15ft cc Earth Temperature Data Location Deep earth (below 20ft) temperature is a function of the average annual air tempera- ture in your region and remains relatively constant regardless of season. Deep Earth Temp (TG) 54.0 °F Formation Details The thermal properties of your formation are based on the formation's composition and have a direct impact on the scale of your loopfield. Thermal Conductivity 1.41 Btu/hr ft °F GHEX Summary Heating is dominant. Grout is used inside of all bores in order to protect the deep earth environment from surface contaminants and to provide a more effective contact surface with GHEX piping that optimizes heat transfer between the fluid pumped through your GSHP and the earth. Grade Grout T.C. 1.20 Btu/hr ft °F ----- . . .- --- - .-.,.�---- EWTMIN 30.0 °F D Backfill ==_ --- Formation -__ EWTMAX 90.9 °F Granular Back(dl } II Grout - ___' Bore Diameter(DB) 5.00 in GHEX Pipe 1.25'DR 11.0 HDPE 4710 nrows(4 max.) --_ 1 2 ... __ __:_ Bores in Series (NBIB) 1 1 �0 DO �B Layout Rows (nrows) 1 SB-1 S Bores per Row 1 2 0 (J H Number of Bores 1 a I SB Bore Spacing (SB) 15. 0 m H DB-1 TOP VIEW DETAIL Design Depth (LB) 37c ft (GENERIC) (GENERIC) Header Pipe 1.50"DR 11.0 HDPE 710 6 of 7 I Mt Kisco, New York Dandelion Energy Vertical Bore 18ft cc Earth Temperature Data Location Deep earth (below 20ft) temperature is a function of the average annual air tempera- ture in your region and remains relatively constant regardless of season. Deep Earth Temp (To) 54.0 °F Formation Details The thermal properties of your formation are based on the formation's composition and have a direct impact on the scale of your loopfield. Thermal Conductivity 1.41 Btu/hr ft °F GHEX Summary Heating is dominant. Grout is used inside of all bores in order to protect the deep earth environment from surface contaminants and to provide a more effective contact surface with GHEX piping that optimizes heat transfer between the fluid pumped through your GSHP and the earth. Grade ______ _ __ Grout T.C. 1.20 Btu/hr ft °F ------1. ::. :-: :::T::I:::. `:: :;::: ::;':::'::�:::::�:;`�:: :::.�---- EWTMIN 30.0 °F i Backfill -- __ El Formation -_- -= EWTM,ix 90.0'°F El Granular Backfill Ili In Grout Bore Diameter(DB) 5.0l in _-="--_- GHEX Pipe 1.25"DR110HDPE-710 _ nr.(4 max.) X 2I ... {--= ------- Bores in Series (NBIs) 1 tn 1 (j t L __= B Layout Rows (nrows) 1 __ 1.—SB—H Bores per Row 1 45 2 �" ____ Number of Bores 1 E SB :_-_ _.:_:____- Bore Spacing (SB) 18.E ft m° 3...0 01 1— DB TOP VIEW DETAIL Design Depth (LB) 37 ft (GENERIC) (GENERIC) Header Pipe 1.50"DR 11.0 HDPE 4r 10 7117 I Mt Kisco, New York DANDELION To whom it may concern, Enclosed is the check for the geothermal permit at 71 Olander Dr, Northampton, MA 01060, USA. Please email me a pdf of the permits when it is ready (hkowalski(@..Dandelionenergy.com). If you cannot email the permits, can you please mail a copy to our office at the address below. Dandelion Permitting Team 333 North Bedford Rd Suite 220 Mount Kisco, NY 10549 Thank you for your help! Hannah Kowalski Permit and Inspection Coordinator (860)301-7100 DANDELION 333 North Bedford Road, Suite 220 Mount Kisco, NY 10549