Loading...
31B-285 (2) CONSTRUCTION CONTROL AFFIDAVIT /0^2 5 PROJECT NUMBER: DATE: 3/30/89 PROJECT TITLE: Verson Property — 100 King Street PROJECT LOCATION: 100 King Street, Northampton, MA NAME OF BUILDING: 100 King Street SCOPE OF PROJECT: Construct a three story office/residential building IN ACCORDANCE WITH SECTION 127.0 OF THE MASSACHUSETTS STATE BUILDING CODE, I. William V. Gillen MASS. REGISTRATION NO. 2657 BEING A REGISTERED PROFESSIONAL ENGINEER/ARCHITECT HEREBY CERTIFY THAT I HAVE PREPARED OR DIRECTLY SUPERVISED THE PREPARATION OF ALL DESIGN PLANS, COMPUTATIONS AND SPECIFICATIONS CONCERNING: ENTIRE PROJECT l ARCHITECTURAL 11 STRUCTURAL n MECHANICAL 0 FIRE PROTECTION D ELECTRICALS] OTHER (specify) • FOR THE ABOVE NAMED PROJECT AND THAT, TO THE BEST OF MY KNOWLEDGE, SUCH PLANS, COMPUTATIONS AND SPECIFICATIONS MEET THE APPLICABLE PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE, ALL ACCEPTABLE ENGINEERING PRACTICES AND ALL APPLICABLE LAWS FOR THE PROPOSED PROJECT. I FURTHER CERTIFY THAT I SHALL PERFORM THE NECESSARY PROFESSIONAL SERVICES AND BE PRESENT ON THE CONSTRUCTION SITE ON A REGULAR AND PERIODIC BASIS TO DETERMINE THAT THE WORK IS PROCEEDING IN ACCORDANCE WITH THE DOCUMENTS APPROVED FOR THE BUILDING PERMIT AND SHALL BE RESPONSIBLE FOR THE FOLLOWING AS SPECIFIED IN SECTION 127.2.2: 1. Review of shop drawings, sa nles and other submittals of the contractor as required by the construction contract documents as submitted for building permit, and approval for conformance to the design concept. 2. Review and approval of the quality control procedures for all code—required controlled materials. 3. Special architectural or engineering professional inspection of critical constructs coroonents requiring controlled materials or construction specified in the accepted engi e irlg, dice standards listed in Appendix B. 5 ^ a, ,, PURSUANT TO SECTION 127.2.3, I SHALL SUBMIT PERIODICALLY, A PROGRE S It• V Z,TOL�£� H�E . a.�J] WITH PERTINENT COMMENTS TO THE BUILDING INSPECTOR. `�'.is Cl,PVO,,_:ICZE ri MASS x, UPON COMPLETION OF THE WORK, I SHALL SUBMIT A FINAL REPORT AS TOT S. ISFAC'�O COMPLETION AND READINESS OF THE PROJECT FOR OCCUPANCY. tgiLA1l C 'Y it OF t<1A ' Signature SUBSCRIBED D SWORN TO BED REME THIS 30th DAY OF March 19 89 ��r�— � �1, "7p 12 18 92 NOTARY PUBLIC p/ MY COMMISSION EXPIRES ON / /