31B-285 (2) CONSTRUCTION CONTROL AFFIDAVIT /0^2 5
PROJECT NUMBER: DATE: 3/30/89
PROJECT TITLE: Verson Property — 100 King Street
PROJECT LOCATION: 100 King Street, Northampton, MA
NAME OF BUILDING: 100 King Street
SCOPE OF PROJECT: Construct a three story office/residential building
IN ACCORDANCE WITH SECTION 127.0 OF THE MASSACHUSETTS STATE BUILDING CODE,
I. William V. Gillen MASS. REGISTRATION NO. 2657
BEING A REGISTERED PROFESSIONAL ENGINEER/ARCHITECT HEREBY CERTIFY THAT I HAVE
PREPARED OR DIRECTLY SUPERVISED THE PREPARATION OF ALL DESIGN PLANS, COMPUTATIONS
AND SPECIFICATIONS CONCERNING:
ENTIRE PROJECT l ARCHITECTURAL 11 STRUCTURAL n MECHANICAL 0
FIRE PROTECTION D ELECTRICALS] OTHER (specify)
•
FOR THE ABOVE NAMED PROJECT AND THAT, TO THE BEST OF MY KNOWLEDGE, SUCH PLANS,
COMPUTATIONS AND SPECIFICATIONS MEET THE APPLICABLE PROVISIONS OF THE MASSACHUSETTS
STATE BUILDING CODE, ALL ACCEPTABLE ENGINEERING PRACTICES AND ALL APPLICABLE LAWS
FOR THE PROPOSED PROJECT.
I FURTHER CERTIFY THAT I SHALL PERFORM THE NECESSARY PROFESSIONAL SERVICES AND BE
PRESENT ON THE CONSTRUCTION SITE ON A REGULAR AND PERIODIC BASIS TO DETERMINE THAT
THE WORK IS PROCEEDING IN ACCORDANCE WITH THE DOCUMENTS APPROVED FOR THE BUILDING
PERMIT AND SHALL BE RESPONSIBLE FOR THE FOLLOWING AS SPECIFIED IN SECTION 127.2.2:
1. Review of shop drawings, sa nles and other submittals of the contractor as required by the
construction contract documents as submitted for building permit, and approval for conformance
to the design concept.
2. Review and approval of the quality control procedures for all code—required controlled
materials.
3. Special architectural or engineering professional inspection of critical constructs coroonents
requiring controlled materials or construction specified in the accepted engi e irlg, dice
standards listed in Appendix B. 5 ^ a, ,,
PURSUANT TO SECTION 127.2.3, I SHALL SUBMIT PERIODICALLY, A PROGRE S It• V Z,TOL�£� H�E
. a.�J]
WITH PERTINENT COMMENTS TO THE BUILDING INSPECTOR. `�'.is Cl,PVO,,_:ICZE ri
MASS x,
UPON COMPLETION OF THE WORK, I SHALL SUBMIT A FINAL REPORT AS TOT S. ISFAC'�O
COMPLETION AND READINESS OF THE PROJECT FOR OCCUPANCY. tgiLA1l C 'Y it OF t<1A '
Signature
SUBSCRIBED D SWORN TO BED REME THIS 30th DAY OF March 19 89
��r�— � �1, "7p 12 18 92
NOTARY PUBLIC p/ MY COMMISSION EXPIRES ON / /