Loading...
48-013 (10) M.D.P.U. No. 1320 Canceling M.D.P.U. No. 1248 Sheet 103 of 141 STANDARDS FOR INTERCONNECTION OF DISTRIBUTED GENERATION ATTACHMENT 2 `T e " 0l 3—U O l Certificate of Completion for Expedited/Standard Process Interconnections Installation Information: Check if owner-installed Interconnecting Customer Name (print): Patrick Manning Contact Person: Mailing Address: 73 Loudville Rd City: Northampton State: MA Zip Code: 01062 Telephone(Daytime): (508) 314-0806 (Evening): Facsimile Number: E-Mail Address: pdeen.manning@gmail.com Address of Facility (if different from above): Electrical Contractor's Name (if appropriate): Anthony Alfano of All Enery Solar Mailing Address: 159 Front Street City: Chicopee State: MA Zip Code: 01013 Telephone(Daytime): 413-685-5000 (Evening): Facsimile Number: E-Mail Address: tonyalfanoaes@gmail.com Gma�L�cR License number: 22898A 4I(2022 Date of approval to install Facility granted by the Company: 6/1/2021 Application ID number: 00354333 Inspection: The system has been installed and inspected in compliance with the local Building/Electrical Code of (City/County) Si yip d(Li Electrical Wiring Inspector, or attach signed electrical inspection): i , ✓ Name (printed): Acoc.or., r fkl t 1 1-(0 Cs 1 Date: I — a(' a.)- Exhibit C M.D.P.U.No. 1320 Canceling M.D.P.U.No. 1248 Sheet 104 of 141 STANDARDS FOR INTERCONNECTION OF DISTRIBUTED GENERATION License# As a condition of interconnection you are required to send/fax a copy of this form along with a copy of the signed electrical permit to(insert Company's name below): Name: Company: Mail 1: Mail 2: City, State ZIP: Fax No.: Exhibit C