48-013 (10) M.D.P.U. No. 1320
Canceling M.D.P.U. No. 1248
Sheet 103 of 141
STANDARDS FOR INTERCONNECTION OF DISTRIBUTED GENERATION
ATTACHMENT 2 `T e " 0l 3—U O l
Certificate of Completion for Expedited/Standard Process Interconnections
Installation Information: Check if owner-installed
Interconnecting Customer Name (print): Patrick Manning
Contact Person:
Mailing Address: 73 Loudville Rd
City: Northampton State: MA Zip Code: 01062
Telephone(Daytime): (508) 314-0806 (Evening):
Facsimile Number: E-Mail Address: pdeen.manning@gmail.com
Address of Facility (if different from above):
Electrical Contractor's Name (if appropriate): Anthony Alfano of All Enery Solar
Mailing Address: 159 Front Street
City: Chicopee State: MA Zip Code: 01013
Telephone(Daytime): 413-685-5000 (Evening):
Facsimile Number: E-Mail Address: tonyalfanoaes@gmail.com Gma�L�cR
License number: 22898A 4I(2022
Date of approval to install Facility granted by the Company: 6/1/2021
Application ID number: 00354333
Inspection:
The system has been installed and inspected in compliance with the local Building/Electrical Code
of
(City/County)
Si yip d(Li Electrical Wiring Inspector, or attach signed electrical inspection):
i
, ✓
Name (printed): Acoc.or., r fkl t 1 1-(0 Cs 1
Date: I — a(' a.)-
Exhibit C
M.D.P.U.No. 1320
Canceling M.D.P.U.No. 1248
Sheet 104 of 141
STANDARDS FOR INTERCONNECTION OF DISTRIBUTED GENERATION
License#
As a condition of interconnection you are required to send/fax a copy of this form along with a
copy of the signed electrical permit to(insert Company's name below):
Name:
Company:
Mail 1:
Mail 2:
City, State ZIP:
Fax No.:
Exhibit C