31A-221 BP-2021-2321 64 HARRISON AVE COMMONWEALTH OF MASSACHUSETTS Map:Block:Lot: 31 A-221-001 CITY OF NORTHAMPTON Permit: Alts Renovations Repair PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) BUILDING PERMIT Permit # BP-2021-2321 PERMISSION IS HEREBY GRANTED TO: Project# additions/reno Contractor: License: RENAISSANCE BUILDERS DBA Est. Cost: 281565 GILL BUILDING CORP 013302 Const.Class: Exp.Date:08/17/2023 Use Group: Owner: FISHMAN ROBERT M &MARY ANNE MCKENNA Lot Size (sq.ft.) RENAISSANCE BUILDERS DBA GILL BUILDING Zoning: URB Applicant: CORP Applicant Address Phone: Insurance: 390 MAIN RD (413)863-8316 MCC20020004972021 GILL,MA 01354 ISSUED ON:12/27/2021 TO PERFORM THE FOLLOWING WORK: ADDITIONS AND RENOVATIONS POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House # Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Signature: ç 6 Fees Paid: $1,833.00 212 Main Street,Phone(413)587-1240,Fax:(413)587-1272 Office of the Building Commissioner RECEIVEI-) DEC 1 7 2021 DE-PT.OF-buitDIMG IPI�PE IONS r10RTHAMPTON,MA(*lj Commonwealth of Massachusetts , Board of Building Regulations and Standards FOR ��44Massachusetts State Building Code, 780 CMR MUNICIPALITY .J' USE Building Permit Application To Construct, Repair, Renovate Or Demolish a Revised Mar 2011 One- or Two-Family Dwelling This Section For Official Use Only Building Permit Number: CiP (- 3-� I Date Applied: Building Official(Print Name) I Signature Da SECTION 1:SITE INFORMATION 1.1 Property Address: 1.2 Assessors Map& Parcel Numbers 64 Harrison Avenue 31A-221-001 1.la Is this an accepted street?yes no Map Number Parcel Number 1.3 Zoning Information: 1.4 Property Dimensions: *see attached plans and manual* Zoning District Proposed Use Lot Area(sq ft) Frontage((l) 1.5 Building Setbacks(ft) *see attached plans and manual* Front Yard Side Yards Rear Yard Required Provided Required Provided Required Provided 1.6 Water Supply: (M.G.L c.40,§54) 1.7 Flood Zone Information: 1.8 Sewage Disposal System: Public 0 Private 0 Zone: Outside Flood Zone? Municipal 0 On site disposal system 0 Check if yes❑ SECTION 2: PROPERTY OWNERSHIP' 2.1 Owner'of Record: Northampton, MA 01060 Robert Fishman & Mary Anne Mckenna p Name(Print) City,State,ZIP 64 Harrison Avenue (413) 584-6059 bob.fishman@me.com No. and Street Telephone Email Address SECTION 3:DESCRIPTION OF PROPOSED WORK2(check all that apply) New Construction 0 Existing Building 04 Owner-Occupied t Repairs(s) 0 Alteration(s) XI Addition l Demolition 0 Accessory Bldg. 0 Number of Units Other 0 Specify: Brief Description of Proposed Workz:Additions and renovations at 64 Harrison Avenue in accordance with the Contract Documents prepared by Austin Designs, Inc. Specifications as outlined in Bid dated September 1_5,202.1, an_dAddensium to Bid dated September 28, 2021. SECTION 4: ESTIMATED CONSTRUCTION COSTS Item Estimated Costs: Official Use Only (Labor and Materials) 1. Building $251,103.75 1. Building Permit Fee: $ Indicate how fee is determined: 2. Electrical $12,342.00 ❑ Standard City/Town Application Fee included in ❑Total Project Cost3(Item 6)x multiplier x 3. Plumbing $mechanical 2. Other Fees: $ 4. Mechanical (HVAC) $18,119.75 List: 5. Mechanical (Fire Suppression) Total All Fees: $ ,j� Check No.4171 Check Amount:1, 233 Cash Amount: 6. Total Project Cost: $281,565.50 0 Paid in Full 0 Outstanding Balance Due: SECTION 5: CONSTRUCTION SERVICES 5.1 Construction Supervisor License(CSL) 013302 08/17/2023 Stephen Greenwald License Number Expiration Date Name of CSL Holder U PO Box 272 List CSL Type(see below) No. and Street Type Description Turners Falls, MA 01376 U Unrestricted(Buildings up to 35,000 cu. ft.) R Restricted 1&2 Family Dwelling City/Town, State,ZIP M Masonry RC Roofing Covering WS Window and Siding SF Solid Fuel Burning Appliances (413)863-8316 info@renbuild.net I Insulation Telephone Email address D Demolition 5.2 Registered Home Improvement Contractor(HIC) 199409 08/23/2022 Stephen Greenwald HIC Registration Number Expiration Date HIC Company Name or HIC Registrant Name PO Box 272 info@renbuild.net No.and Street Email address Turners Falls, MA 01376 (413)863-8316 City/Town, State,ZIP Telephone SECTION 6:WORKERS' COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c. 152.§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the Issuance of the building permit. Signed Affidavit Attached? Yes No .0 SECTION 7a: OWNER AUTHORIZATION TO BE COMPLETED WHEN OWNER'S AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I,as Owner of the subject property, hereby authorize to act on my behalf, in all matters relative to work authorized by this building permit application. **see attached owner authorization page** Print Owner's Name(Electronic Signature) Date SECTION 7b: OWNER'OR AUTHORIZED AGENT DECLARATION By entering my name below, I hereby attest under the pains and penalties of perjury that all of the information contained in this application is true and accurate to the best of my knowledge and understanding. Stephen Greenwald 12/09/2021 Print Owner's or Authorized Agent's Name(Electronic Signature) Date NOTES: 1. An Owner who obtains a building permit to do his/her own work,or an owner who hires an unregistered contractor (not registered in the Home Improvement Contractor(HIC) Program),will not have access to the arbitration program or guaranty fund under M.G.L. c. 142A. Other important information on the HIC Program can be found at www.mass.gov/oca Information on the Construction Supervisor License can be found at www.mass.gov/dps 2. When substantial work is planned,provide the information below: Total floor area(sq. ft.) (including garage, finished basement/attics,decks or porch) Gross living area(sq. ft.) Habitable room count Number of fireplaces Number of bedrooms Number of bathrooms Number of half/baths Type of heating system Number of decks/porches Type of cooling system Enclosed Open 3. "Total Project Square Footage" may be substituted for"Total Project Cost" FISHMAN RESIDENCE ADDITIONS AND RENOVATIONS 64 HARRISON AVENUE NORTHAMPTON, MA 01060 JANUARY 26, 2021 CD SET Fishman Residence PROJECT MANUAL JANUARY 26, 2021 FISHMAN RESIDENCE ADDITIONS AND RENOVATIONS 64 HARRISON AVENUE NORTHAMPTON, MA 01060 OWNER: BOB AND MARY ANNE FISHMAN 64 HARRISON AVENUE NORTHAMPTON, MA 01060 bob.fishman(a�me.corn ARCHITECT: AUSTIN DESIGN, INC 167 MAIN STREET BRATTLEBORO, VT 05301 0-413-624-9669 M-617-538-7886 JANUARY 26, 2021 Project Manual Page 1 Fishman Residence TABLE OF CONTENTS: Title sheet 1 Table of Contents 2 Form for General Bid 3 Bid Breakdown Sheet 4 General Conditions 5 Summary of the Work 7 Demolition 8 Sitework, Excavation and Grading 9 Paving and Surfacing 11 Concrete 10 Masonry 13 Rough Carpentry 13 Finish Carpentry and Millwork 14 Roofing and Flashing 15 Insulation 17 Windows, Doors and Hardware 17 Drywall 18 Wood Flooring 18 Resilient Flooring 19 Painting 20 Plumbing 22 HVAC 23 Electrical 24 End of Specification 24 Project Manual January 26, 2021 Page 2 Fishman Residence FORM FOR GENERAL BID To: BOB AND MARY ANNE FISHMAN 64 HARRISON AVENUE NORTHAMPTON, MA 01060 bob.fishman(a,me.com A. The undersigned agrees to furnish all labor and materials required for additions and renovations at 64 Harrison Avenue, Northampton, Ma 01060, in accordance with the Contract Documents prepared by Austin Design, Inc., 16 Call Road, Colrain, MA 01340 for the contract price stated below, subject to additions and deductions according to the terms of the specifications. B. The bid includes addenda number and C. The proposed contract price is dollars ($ 1. The price shall be broken down according to the attached bid breakdown sheet. D. The undersigned agrees that, if he is selected as General Contractor, he will within five days, Saturdays, Sundays and Legal Holidays excluded, after presentation thereof by the owners, execute a contract in accordance with the terms of the General Bid, and in accordance with AIA Document 107 Abbreviated Form of Agreement Between Owner and Contractor, or a mutually agreed upon contract form. (Name of general Bidder) By (Signature and Title) (Business Address) (City, State and Zip Code) Project Manual January 26, 2021 Page 3 Fishman Residence BID BREAKDOWN SHEET BID BREAKDOWN I. DEMOLITION 2. SITEWORK, EXCAVATION, GRADING 3. PAVING AND SURFACING 4. CONCRETE 5. MASONRY 6. ROUGH CARPENTRY 7. FINISH CARPENTRY 8. ROOFING AND FLASHING 9. INSULATION 10. WINDOWS, DOORS, HDWRE 11. DRYWALL 12. WOOD FLOORING 13. RESILIENT FLOORING 14. PLUMBING 15. HVAC 16. ELECTRICAL ALTERNATES A. ALTERNATE DECK CONFIGURATION B. SITE WORK REMOVAL AND REPAVING Project Manual January 26, 2021 Page 4 Fishman Residence 1.01. GENERAL CONDITIONS: l. All work to be done in a clean, orderly and workman-like manner. 2. Permits: The General contractor (GC) shall arrange for, obtain and pay fees for the Building Permit and all other permits that may be required. 3. Codes: All work shall be in accordance with Federal, Massachusetts, and local Building, Mechanical, Plumbing, Fire and Electrical Codes. 4. Documents: Contract documents are this document and all drawings, specifications, schedules and product cuts issued by the owner/architect, plus a signed contract negotiated by owner and Contractor. 5. Bid Submission and Project Schedule: Please submit bids to the owner on or before XXXXXXXXX. Bids should be broken down and itemized following the bid breakdown sheet included in this manual. Include a payment schedule and construction progress schedule showing proposed start-up and completion dates. 6. Site Inspection: Contractor shall visit the site before submitting a written bid and shall be responsible for assessing all site conditions that pertain to the work described in the drawings and the specifications including all work reasonably inferred to achieve a structurally sound finished product. Contact Owner to arrange a site visit. 7. GC's price to include all materials and labor for a complete job. All new and existing equipment must be connected to utilities and made functional. Where products and materials are furnished by the owner, the contractor must provide all labor and accessory materials for a complete installation. "Accessory Materials"will include but not be limited to: mastic, grout, utility connections, piping, valves, wiring, and all else required to complete installation of owner-supplied products. 8. Field Measurements: Any and all measurements necessary for ordering materials, fixtures or equipment shall be by GC and their subcontractors. GC shall be responsible for such measurements and shall bring to the attention of the architect any conflicts or inconsistencies that occur. 9. Submittals: GC is encouraged to review and compare window, door and casework sizes and rough openings and with dimensions and clearances on drawings and make submittals to architect for review to insure fit and avoidance of conflict. All finishes and colors to be confirmed with Owner and architect before proceeding. 10. Occupation: It is the intention of the owner that the residence be occupied for the majority of the construction period. As the work affects the first floor and rear yard, the contractor is requested to carefully work out a schedule and phase the work to achieve a minimum of disruption and insure the safe and convenient use of the building by the owners. Such schedule shall be presented to and approved by the owner prior to starting the work. a. GC is to partition off the construction area from the living areas of the house, providing and maintaining a secure and dust free barrier. Protect floor surfaces that must be traveled to provide access to upper floor work areas. b. Construct as much as possible of the addition prior to opening up to the existing house and commencing interior work. Project Manual January 26, 2021 Page 5 Fishman Residence 11. Utilities: The Contractor will be allowed to use the existing utilities in the building for construction purposes. This includes existing electric service, existing water service, and existing heating. The Owner will continue to pay the cost of these services. The contractor shall deliver and maintain a portable toilet on site. Coordinate location with owner. 12. Protection: The contractor shall protect existing conditions from damage during construction and if damage occurs shall make all repairs or replacements as necessary to return surfaces or equipment to original condition. Such protection shall include but not be limited to the following: a. GC is responsible for all temporary shoring and bracing as needed. b. GC is to take special precautions to protect the existing structure from water damage during construction with particular attention to the time between removal of the existing roof and completion of new enclosure. c. GC must secure the building against possible theft, vandalism or fire during the construction period. d. GC must exercise the utmost caution to maintain the building dry and well heated at all times. Construction area must be heated during plaster and finish carpentry operations. e. GC is to protect existing landscape and plant material (bushes, trees, grass walkways, steps, etc.) f. GC is to cover and protect existing exterior and interior exposed surfaces, siding, woodwork, floor, appliances, etc. against scratches, nicks spills, etc. g. All newly installed surfaces, built-ins, fixtures, accessories shall be covered/protected until work is completed. 13. Payments: a. The owner and contractor are to establish as part of the contract a mutually agreeable amount of deposit to be made prior to start of the work. b. Progress payments are to be made on a regular basis based on invoices submitted by the contractor reflecting work completed to date. 1. Payments are to be made bi-weekly, or upon completion of a major portion of the work based on a schedule of values submitted at the start of the job. 2. Owner reserves the right to withhold a retainage until work is complete and final payment is made. c. Final payment , constituting the entire unpaid balance of the Contract Sum shall be made when the Contractor has fully completed the work and a certificate of occupancy has been obtained from the Building Department. 14. Changes in the Work: a. The owner may order changes in the Work consisting of additions, deletions or other revisions and the Contract sum and Contract Time shall be equitably adjusted. b. If concealed or unknown physical conditions are encountered at the site that differ materially from those indicated in the documents or from those conditions ordinarily found to exist, Contract sum and Contract Time shall be equitably adjusted. Project Manual January 26, 2021 Page 6 Fishman Residence 15. Insurance: a. The Contractor shall purchase and maintain standard Contractor's General, Property Damage, Personal Liability and Workman's Compensation insurance. The owner shall purchase and maintain standard property insurance for the property affected. 16. Warranty: a. The Contractor shall warrant to the Owner that the materials, equipment and workmanship shall be free from defects for a period of one year from final completion. 17. Cleaning: GC shall maintain the project site clean and free of loose debris at all times and arrange for prompt removal of all demolition and construction debris and other rubbish to approved dumping sites. a. When work is completed, all new surfaces and any existing surfaces that may have been affected during the course of the construction shall be thoroughly cleaned with appropriate cleaning agents and removed of any labels, signs, etc. 1.02. SUMMARY OF THE WORK: 1. The project consists of the removal of existing deck and three season porch and construction of a new insulated and heated addition and new deck. Openings into the hall and kitchen are altered: a. Demolition of three season porch, decks and walks. b. Work associated with the addition and renovations includes excavation and new foundation, structural framing, rough and finish carpentry, siding, roofing and insulation, new windows and doors, fabrication of millwork and shelving, blueboard and plaster, painting, flooring, plumbing, heating and electrical work. c. Existing house roof is stripped and new roof installed. Water damaged areas at 3rd and 2nd floor ceilings are to be repaired d. Electrical service is upgraded to new 250 amp service and new disconnect and breaker panels. 2. The contractor's price is to include all labor and materials necessary to complete the work indicated in the documents as qualified below: 3. The owner anticipates furnishing to the job site the following items for installation by the contractor: Contractor to verify dimensions against field conditions, accuracy of the material order, receive material and fixtures and store on site until installation. a. Rubber floor tile for mud room floor. b. Light fixtures. 4. The following material and equipment are to be salvaged and reused: a. Walkway paver stones. 5. The following work is to be performed as Add Alternates : a. Alternate A: Alternate Deck Configuration. b. Alternate B: Removal replacement of broken concrete paving at rear of driveway. 6. The contractor is responsible for all labor and installation accessories required for a complete installation of owner supplied and allowance materials and equipment. Project Manual January 26, 2021 Page 7 Fishman Residence 1.03. DEMOLITION: 1. Scope of work includes the Following: a. Demolition of three season porch. b. Demolition of decks, footings and walk and portion of walkway paving. c. Opening up of exterior wall at addition including all shoring, removal of framing and finishes. d. Selective demolition as required for exterior and interior work. e. Removal of interior finishes as indicated on drawings. f. Removal of electrical outlets, switches, fixtures and wiring as required for new work, including reconnection of existing equipment as required to keep systems operating after demolition. g. Under Alternate B: removal of concrete paving at driveway. h. All other items shown on drawings or required for completion of new work. 2. Demolition must be carried out so that there is a minimum discharge of dust and debris in to the air and so that there is no debris on adjacent properties. Protection of interior surfaces is specified under the general conditions. 3. All material and equipment not required for reuse nor directed to be saved by the owner must be removed and disposed of off site in an approved and legal manner. 4. Items intended for reuse are to be set aside and stored in a dry and secure location on site until required for reuse. If such items are damaged during construction due to inadequate protection they are to be repaired or replaced. At no cost to the Owner. Items scheduled for reuse include: a. Walkway paver stones. 5. Carefully investigate the structure prior and during demolition to insure provision of all temporary shoring and bracing required so as to prevent any and all settlement or movement of structure during demolition. Notify Architect upon exposure of existing structure for purposes of verifying loads and questionable bearing conditions. Notify architect immediately of any existing conditions that conflict or contradict the drawings. 6. Demolition of plumbing, HVAC and electrical is to be carried out by trades experienced with these systems and coordinated with scheduling and other requirements of new work. All wiring, piping and accessories serving demolished equipment or fixtures are to be removed back to active branches and capped off. Where residence is occupied, all remaining systems must remain operational at conclusion of demolition. 1.04. EARTHWORK, EXCAVATION AND GRADING I. The scope of work without limiting the generality thereof consists of the following: a. Excavation for new foundations. b. Excavation and grading for enlargement and repaving of walkway. c. Grading and preparation for pavements and pads. Project Manual January 26, 2021 Page 8 Fishman Residence d. Filling and backfilling with compacted structural fill under structures, and ordinary fill and topsoil over disturbed areas. e. Rough site grading. f. Finish grading, application of loam and lawn reseeding after excavation. g. Under Alternate B: grading and prep base for repaving of concrete paving at driveway. h. Removal of existing foundation materials and all unsuitable materials off site at a proper and approved location. 2. Materials shall be as follows: a. Material for all structural fill shall be sound durable gravel and sand in from off the site, free of loam, peat and clay, well grade as follows in accordance with AASHO T-11 and T-27: U.S. Sieve No. Percent Passing Percent Passing Maximum Minimum 2" - 100 1" 85 55 3/4" 80 50 No. 4 60 30 No. 40 25 10 No. 100 12 3 No. 200 5 0 b. Crushed Stone shall consist of durable crushed rock or durable crushed gravel stone, free from ice and snow, sand, clay, loam or other deleterious material. The crushed stone shall be uniformly blended to conform to the following requirements: Sieve Size Percent Passing 1" 100% 3/4" 90-100 3/8" 0-20 #4 0-5 c. Ordinary fill shall be a natural granular soil, free from debris, organic, silty or frozen materials, and contain no stone larger than 3 inches in maximum dimension. Excavated material may be used with the approval of the Architect. Sieve No. Percent Passing Percent Passing Maximum Minimum 100 No. 4 75 20 No. 40 25 0 No. 200 5 0 d. Loam for finish grading must be screened, free of stones and other non organic debris. It must be mixed with peat moss at the rate of 6 cu-ft of unexpanded peat/cu-yd. of loam. Project Manual January 26, 2021 Page 9 Fishman Residence e. Lawn seed shall be composed of the following varieties which shall be mixed in the proportions and shall test to the minimum percentages and germination specified: Scientific Name Common Name By Weight%P. %G. Festuca rubra: failax Chewing Fescue 30% 98 85 Poa prantensis: Merion Bluegrass 15% 87 85 Lolium perenne: var. Manhatten Per. Rye 15% 98 90 Argostis tenuis Highland Colonia Bent 10% 98 90 Festuca rubra Pennlawn Creeping: Pennlawn Red Fescue 30% 98 90 3. Excavation: Excavate to a minimum of 4' below adjacent grade for new foundation walls or to depths required to match existing basement slab grades or as indicated on drawings. Stockpile excavated material on site for re-use as ordinary fill against foundation and basement walls. Remove all excess or unsuitable fill, concrete and debris. a. Retaining Structure: Provide bracing, shoring, sheeting, temporary tie-backs, sheet piling, underpinning or other retaining structures necessary to prevent any movement or settlement of existing or new construction, utilities, paving, light standards, piping or conduit. Responsibility for the strength and adequacy of retaining structures, and for the safety and support of construction, utilities or paving, and for any movement, settlement or damage thereto shall be the Contractor's responsibility. 4. Backfilling to be carried out in 9" lifts, using structural graded fill beneath footings and slabs, individually compacted. Ordinary fill free of large stones may be used against the foundation and basement wall. 5. Finish grading around the new addition, sloping away from walls and to promote drainage away from building and walks. a. Loam for finish grading must be screened, free of stones and other non organic debris. It must be mixed with peat moss at the rate of 6 cu-ft of unexpanded peat/cu-yd. of loam. 6. Catch basin and recharge area to consist of the following: a. Concrete catch basin with inlet for foundation drain and gutter drains. See site drawing for catch basin specifications. 1.05. PAVING AND SURFACING I. Scope of work includes the following a. Reconfiguration of existing walk from driveway to rear steps including salvaged and new paver stones to match existing. b. Under Alternate B repave concrete area at driveway. Concrete to be 4,000 psi with 6x6 wwf reinforcement, broom finish. 1.06. CONCRETE I. Scope of work includes the following a. New foundation wall footings. b. New foundation walls. c. New concrete mud slab. Project Manual January 26, 2021 Page 10 Fishman Residence d. All required reinforcing as shown on drawings or as required by code. e. All forming for concrete work, including door openings. 2. Footings shall rest on undisturbed earth or compacted structural fill. 3. Concrete shall be ready-mixed from an approved mixing plant, and shall be composed of portland cement, fine aggregate, course aggregate and water. Design strength shall be: a. Footings and Foundations: 3,000 psi. b. Floor slabs: 4,000 psi 4. Pour concrete according to accepted standards of practice. Concrete shall be thoroughly compacted by vibration to insure that there are no voids. 5. Slabs to receive a "troweled finish" except where noted otherwise. a. Finished surfaces shall not vary more than 1/4 in. when measured by a 10 ft.-0 in. straight edge. 6. In hot weather, all concreting shall be done in accordance with ACI 305, "Recommended Practice for Hot Weather Concreting". When temperature rises above 70 degrees F., all surfaces of concrete shall be protected against rapid drying. Concrete delivered to the forms shall have a temperature of not over 90 degrees. The temperature of the forms shall be not over 90 degrees 7. In cold weather, all concreting shall be done in accordance with ACI 306, "Recommended Practice for Cold Weather Concreting". When the average daily temperature falls below 40 degrees F., all surfaces of concrete shall be maintained at a temperature of at least 50 degrees F, and not over 90 degrees F, for seven (7) days. Concrete delivered to the forms shall have a temperature of at least 60 degrees F, and not over 90 degrees F. 8. Protection and Curing: a. Protect newly placed concrete against low and high temperature effects and against rapid loss of moisture. Moist cure all concrete for at least seven days at a temperature of at least 50 degrees F. by curing methods approved by the Architect b. For vertical or near-vertical surfaces, moist cure by keeping the form in contact with the concrete, or by other effective means approved by the Architect. Intermittent wetting and drying does not provide acceptable curing. c. Cure floor slabs by covering with sisal or other waterproof curing paper conforming to ASTM Specifications C 171, lapped 4 inches at edges and sealed with tape at least 3 inches wide. The paper shall be weighted to prevent displacement, and holes or tears shall be immediately repaired. 1.07. MASONRY Scope of work includes the following a. New brick veneer applied to face of foundation wall at new addition. 2. Samples: Submit the following samples to the Owner in accordance with requirements of the General Conditions: a. Face brick to match existing. b. Mortar to match existing. Project Manual January 26, 2021 Page 11 Fishman Residence 3. Masonry Work- Brick: a. Lay new brick to match existing coursing, bonding, color and texture. Layout walls in advance for accurate spacing of surface bond patterns, with uniform joint widths to properly locate openings, returns and offsets. Avoid the use of less than half size units at corners,jambs and wherever possible at other locations. b. Cut masonry units with motor driven saw designed to cut masonry with clean, sharp and unchipped edges. Cut units as required to provide pattern shown and to fit adjoining work neatly. Do not cut brick to form special shapes required, but use manufactured shapes at these locations. Use full units without cutting whenever possible. Use die cutting saws to cut concrete masonry units. No cut edges shall be left exposed. c. Wet brick made from clay or shale which have ASTM C67 initial rates of absorption of more than 30 grams per 30 square inches per minute. Use wetting methods which insure each clay masonry unit being nearly saturated but surface dry when laid. d. Lay brick with completely filled bed, head and collar joints; butter ends with sufficient mortar to fill head joints and shove into place. Do not slush head joints. e. Maintain joint widths to match existing coursing, except for minor variations required to maintain bond alignment. Cut joints flush for masonry walls which are to be concealed or to be covered by other materials. Tool exposed joints slightly concave to match existing using a jointer larger than joint thickness. Rake out mortar joints in preparation for application of caulking or sealants where shown. 4. Cleaning a. Promptly as work proceeds and upon completion, remove excess mortar, smears, droppings. b. Clean adjacent and adjoining surface of marks arising out of execution of work of this Section. c. Sweep up and remove daily sand, cleaning compounds and mixtures, dirt, debris and rubbish. 1.08. ROUGH CARPENTRY: 1. Scope of work includes the Following: a. All rough carpentry as required for demolition and rough framing of new work including all lumber, plywood, connectors and accessories and all cutting and patching, securing of existing framing, and construction of new framing as required to complete the work. b. Framing includes structural wood, composite and steel beams and columns, floor framing and sheathing, wall framing and sheathing, rafter framing and sheathing, suspended ceiling framing, and plywood subfloor underlayment. 2. Lumber shall be of sound stock, free of defects, straight and furnished in longest practical lengths. All framing lumber shall be subject to approval and be kiln dried. 3. Lumber specifications shall be as follows: Project Manual January 26, 2021 Page 12 Fishman Residence a. Lumber 2 inch nominal thickness or better: Hem fir or southern yellow pine#2 structural or better. b. Plywood sheathing and sub floor shall be exterior group 1, exposure 1, APA rated of types and sizes shown on drawings. c. Framing lumber for wood beams shall be Douglas Fir or Southern Yellow pine No. 1 grade (Fb 1200 psi, E 1,500,000) or better, free of knots or imperfections that will compromise structural integrity. d. I-Joists to be as indicated on drawings, manufactured by Trus Joist MacMillan or equal. e. All sills, bottom plates, framing for deck and other material in contact with concrete or ground shall be certified pressure treated lumber. 4. Manufactured LVL beams shall be Parallam PSL as manufactured by Georgia Pacific, Gang-Lam LVL by Louisiana Pacific or 2.OE Parallam PSL by Trus Joist MacMillan or equal having a flexural stress (Fb) of 2,900 psi min. Furnish beam hangers approved by LVL manufacturers for flush connections to wood and steel beams. 5. Supply all other miscellaneous rough hardware including bolts, hangars, ties and connectors as required and as specified below: a. Use post bases and post caps at all post and beam connections. b. Use joist hangers where indicated or required by bearing conditions. 6. Wrap plywood sheathing with Tyvek building paper, minimize joints, staple and tape. 7. Construct all rough carpentry work plumb, level and true with close-fitting joints, securely anchored, attached, and braced to adjoining members and surrounding construction, all in first-class workman-like manner. 1.09. FINISH CARPENTRY AND MILLWORK: Scope of work includes the Following: a. New Hardi-Plank clapboard siding on addition and at patched areas on existing house required by new work. b. All exterior trim including fitting to existing work. c. Installation of doors,windows and hardware. d. Exterior decks and stairs. e. Deck and stair railing, balusters and posts as indicated on drawings. £ All interior wood trim, including fitting to existing work. g. Furnish, fabricate and install all custom millwork including shelving, benches, table tops, and other millwork shown on drawings and not part of stock cabinets. h. Miscellaneous hardware and fittings as required. i. Submit shop drawings of custom casework for review by owner and architect. 2. Lumber specifications shall be as follows: a. Exterior siding to be pre finished Hardi-Plank clapboard siding. a. Wood for exterior moldings, trim, fascias shall be wood composite material, Miratek or Boral or equal. b. Wood for interior trim shall be"D" Select Pine or Poplar. c. Casework scheduled to be painted to be fabricated from 3/4" paint grade birch plywood with solid poplar edge banding as detailed. Project Manual January 26, 2021 Page 13 Fishman Residence d. Casework scheduled to receive clear poly finish to be fabricated from 3/4" paint maple, cherry or oak plywood with matching solid hardwood edge banding as detailed and confirmed in shop drawings e. Deck and railing materials to be as noted on drawings. 3. Millwork and lumber to have initial low moisture content. Material to be brought on site only after plaster has cured and premises are low in moisture. Material to be left on site for adequate period to acclimate to conditions prior to final installation. 4. Miscellaneous Materials shall be as follows: a. Furnish all miscellaneous hardware as required, including hinges on fabricated casework. Owner to select knobs and deliver to contractor for installation on all cabinet doors and drawers. 5. Construct all finish carpentry work plumb, level and true with close-fitting joints, securely anchored, attached, and braced to adjoining members and surrounding construction, all in first-class workman-like manner. Fill all nail holes, dings and cracks with wood filler equal to Durham's Rock Hard Water Putty in preparation for paint finish and with color matched wood filler for natural finish. All surfaces and joints between plywood and edge banding to be belt sanded and finish sanded smooth. Caulk all joints at windows and doors and at trim/wall connections where gap exists. Leave all surfaces in ready to finish condition, requiring minimum touch-up sanding or filling at isolated locations according to acceptable industry standards. 1.10. ROOFING AND FLASHING: Scope of work includes: A. New asphalt shingles on addition. B. Removal and replacement of roofing on existing house. C. Investigation and repairs as necessary to existing roof sheathing where water damage or dry rot is in evidence. 2. Asphalt Roofing: A Scope of work includes removal of existing roofing, temporary protection of existing structure and installation of new asphalt shingle roof including underlayment, shingles, flashings, accessories and aluminum gutters and downspouts on new and existing roofs. B. Materials are to be as follows: a. Shingles are to be asphalt fiberglass mat shingles to match existing: GAF Timberline Ultra premium Architectural Shingles. b. Underlayment to be Bituthane, Ice and Watershield or equal Self adhering membrane. Apply over entire roof. c. Use aluminum drip and rake edges. 3. Install new aluminum 5" .032" gutters and downspouts where indicated on the drawings. Provide 4' horizontal run from house foundation. Material to be both 5" .032 aluminum half round gutters and 4" round downspouts, and 5" "K" style gutters and 4" downspouts with hangers and all accessories as manufactured by Berger building products or equal, in white. 4. Install aluminum flashing and counter flashing at sidewalls. Project Manual January 26, 2021 Page 14 Fishman Residence 5. Install all roofing and flashing in a workmanlike manner according to manufacturers' instructions to achieve a completely watertight installation. 6. Protect existing structure to prevent water penetration into the house during the course of the work. 1.11. INSULATION: 1. Scope of work includes the Following: a. Application of insulation at all exterior walls and band joists in new addition and at existing areas exposed during renovation. b. Application of insulation to addition rafters. 2. Insulation Materials: a. Close cell spray foam insulation in thickness indicated on drawings. b. Dense pack cellulose to fill wall and ceiling cavities after foam installation. c. Foam-in-place insulation for sealing around perimeter wall penetrations. d. Vapor barrier: 6 mil polyethylene. 3. Insulation Schedule: a. Walls to receive spray foam and cellulose as detailed on drawings . b. Floor joists at crawl space to receive closed cell spray foam. c. Roof cavity to receive spray foam and cellulose as detailed on drawings . 4. Insulation Installation: a. Where insulation is installed it is to provide an unbroken insulation and moisture barrier at the entire exposed perimeter of the building, filling or fitting snugly into all framing voids. b. Closed cell spray foam to be applied according to industry standards, with particular care with respect to mix, temperature, humidity and application depth. c. Where vapor barrier is called for it shall be installed so as to form a continuous seal, with all joints overlapped, stapled and taped. 1.12. WINDOWS, DOORS AND HARDWARE: 1. Windows to be Pella Wood Clad double hung, awning or casement as indicated on the window schedule. Sizes and configurations are as shown on window schedule. 2. Doors and hardware to be as indicated on the door schedule. 3. Hardware to be as scheduled on the door schedule and to include be the following: a. Hinges are to be full mortise, Stanley FBB 191m brass for exterior, and FBB 179, steel for interior doors. b. Locksets and latchsets to be Schlage F Series in knob design as selected by owner. Deadbolts to be Schlage F Series.. Project Manual January 26, 2021 Page 15 Fishman Residence c. Bi Passing and pocket door hardware to be manufactured by L.E. Johnson products, Inc., heavy duty for 1 3/6" doors up to 200 Ibs, with all hardware. d. All locksets and deadbolts to be keyed to existing key system. 1.13. DRYWALL: 1. Scope of work includes the Following: a. New gypsum board and tape and spackle finish on new walls and ceilings, on existing walls and ceilings where indicated and patching of existing surfaces where new work meets old, where partitions have been removed and where surfaces have been damaged during construction. 2. Standard gypsum plastering baseboards: %"thick; 48"wide with tapered edges; maximum permissible lengths; ends square cut. Equal to tapered edge Kal-Kore regular by National Gypsum Company. 3. Boards shall be installed in largest practical continuous pieces. All finished walls and ceilings are to be rendered smooth with no joint or screw marks visible. Particular attention must be paid to patched areas on ceiling where partitions have been removed and where openings have been made for new mechanical or electrical work. Clean plaster from all adjacent materials and surfaces. 4. Leave all surfaces in ready to paint condition, requiring minimum touch-up sanding or filling at isolated locations according to acceptable industry standards. The contractor shall review the work with the painter prior to the painter's acceptance and starting of work and correct imperfections identified at that time. After acceptance, painter shall assume responsibility for correcting imperfections with the exception of any major items requiring repair or adjustment which shall be made by the contractor at no cost to the owner. 1.14. WOOD FLOORING 1. Scope of work includes a new solid wood flooring, patching of existing flooring, sanding and finishing of new flooring and refinishing of existing under allowance. Install thresholds and transitions where new material meets existing conditions as required. 2. Materials a. Solid wood flooring to be Red Oak, select plain, tongue and groove, end matched, milled and graded according to National Oak Flooring Manufacturers Association (NOFMA) b. Paper slip sheet shall be 5 lb rosin sized building paper. c. Nails and accessories shall be as recommended by NOFMA. d. Finish to be highest grade clear satin polyurethane, 38% solids by volume, ICI Woodpride Interior Polyurethane Satin Varnish, Benjamin Moore Benwood Low Luster Polyurethane or equal Project Manual January 26, 2021 Page 16 Fishman Residence 3. Flooring shall be stored under dry conditions and not delivered to site if exposure to high humidity or moisture is expected, including curing of plaster. Condition wood for 5 days at appropriate temperature and humidity planned for occupancy, but no less than 65 F. 4. Floors shall be installed in accordance with NOFMA recommendations, blind nailed, sanded and matched. Nail all existing subfloors securely prior to installing new wood. Flooring shall extend under all cabinets. 5. Sand floor with heavy duty sander, parallel to the grain,with final sanding leaving floor completely free of marks. Remove all dust, sand and grease prior to application of finish coats. 6. Apply 1 coat of sealer and 2 coats of floor finish in accordance with manufacturer's instructions. Allow recommended time for curing before walking on floors. Protect floor until completion of the work. 1.15. RESILIENT FLOORING 1. Scope of Work a. New rubber floor tile where indicated on finish schedule. al. Tile to be furnished by owner. 2. Underlayment preparation, adhesives and installation according to manufacturer's recommendations and instructions. 1.16. PAINTING: 1. Scope of work includes the Following: a. One finish coat on Hardi-Plank siding. b. Painting of all new exterior wood surfaces including trim and fascias. Windows and patio doors are clad. c. Painting of all new interior surfaces including walls, ceilings, trim, sash and millwork to be painted. d. Painting of previously painted surfaces where indicated and as necessary to blend with new and to correct damage. 1. Thoroughly prepare by sanding and scraping and paint all shingles and trim on existing house. e. Thorough cleaning and preparation of all surfaces to be painted. f. Back priming of all exterior non factory primed trim material. g. Colors: I. Match all existing exterior siding and trim colors. 2. Interior colors as directed by owner. 2. Paint materials shall be equal to products by Benjamin Moore (Listed) or Sherwin Williams. a. Exterior Finishes: I. Primers: a Wood: BM Fresh Start Acrylic or Alkyd Primer b Metal Moorcraft Super Spec Alkyd Metal Primer 2. Project Manual January 26, 2021 Page 17 Fishman Residence 3. Painted Finish: a Wood Siding: BM Moorgard or Moorlife Acrylic House Paint b Wood Trim: BM Moorglo Acrylic House and Trim Paint 4. Stained Finish: a Transparent BM Hardwood Finish b Semi Transparent BM Alkyd Semi- Transparent stain c Solid Siding BM Alkyd Solid Siding Stain d Solid Decking BM Acrylic Solid Deck Stain 5. Natural Finish (Transparent Finish): a Wood BM Impervo Spar varnish 440 b. Interior Finishes: 1. Primers: a Woodwork and BM Fresh Start Acrylic metals: or Alkyd Primer. b Wallboard and BM Universal Wall-Grip Plaster: Primer-Sealer-sizer 2. Painted Finish: a Woodwork: BM Regal Semi-Gloss or BM Waterborne Satin Impervo. b Wallboard and BM Regal Flat, Matte, Plaster: Eggshell or Pearl Finish c Ceilings: BM Muresco Ceiling White or Regal Flat Finish d Metals BM Satin Impervo Enamel e Concrete basement Modac Acrylic Coatings floor and walls breathable concrete coating, Modac Products Company, 1- 800-62-MODAC 3. Natural Finish (Transparent Finish): a First Coat: Stain and Paste Wood Filler as required b Second and Third BM Benwood Coats: Polyurethane, Flat, Low Lustre or High Gloss Finish 3. All new interior and exterior surfaces shall be prepared so as to form a smooth, clean, even surface free of imperfections. Fill all nail holes, sand all wood, spackle and sand all plaster imperfections. All existing surfaces to be washed and sanded to de-gloss. Project Manual January 26, 2021 Page 18 Fishman Residence 4. Interior work to be painted with one coat of primer as follows: a. Woodwork primer on all wood to be painted. b. Plaster primer on all plaster or drywall. 5. Interior work to be painted with two coats of finish paint as designated in the Finish Schedule as follows: a. Semi-gloss enamel on all painted trim including wood trim, painted doors, metal radiation, window frames& sashes. b. Eggshell enamel on all walls. c. Flat paint on all ceilings. 6. Exterior work will be painted as follows: a. All exterior woodwork including, siding, trim and doors shall be painted with 2 coats of exterior paint. Prime all unprimed trim, including backs with one coat of primer. Backprime all cut ends. Window sash and casing are clad and are not to be painted 7. All edges of all doors (interior and exterior) including tops and bottoms are to be painted. 8. Cover and protect all surfaces and all hardware prior to painting and clean paint from all surfaces upon completion. 9. Colors to be selected by owner from full line of manufacturer's color chips. Prepare samples as necessary for selection by owner. 1.17. PLUMBING: I. Scope of Work includes the following: b. Disconnect, extend reconnect outside gas service for grille at deck. c. Plumbing related to new HVAC boiler and domestic hot water work. d. Permits. e. Cleaning and testing. 2. Materials to include all cast iron, copper and PVC piping, hangers and supports, valves, sleeves, fixtures, drains, hot and cold water pipe insulation and other materials as necessary for a complete job. b. Iron gas piping. c. Plumbing contractor to furnish all necessary accessories including valves, shut-offs, hose bib, and other items necessary for a complete installation. 3. Demolition of plumbing is to be carried out by trades experienced with these systems and coordinated with scheduling and other requirements of new work. All piping and accessories serving demolished equipment or fixtures are to be removed back to active branches and capped off. All systems must remain operational at conclusion of demolition. 4. All plumbing work to be carried out by licensed mechanics according to all codes and accepted standards of practice. Project Manual January 26, 2021 Page 19 Fishman Residence 1.18. HVAC 1. Scope of work includes the following: a. General: existing heating system consists of two boilers: one steam, one hydronic. Scope of work includes the following: b. Existing gas hydronic boiler be replaced with new high efficiency (>90% min) hydronic boiler servicing existing zones plus: 1. New zone for addition 2. New zone for basement laundry 3. New zone for new superstor indirect water heater 4. Offer two pricing options: a Conventional vented boiler b Condensing direct vent boiler for highest efficiency. c. Existing gas steam boiler to be maintained to service existing zones, except, disconnect service to hot water tank. Clean and service boiler. d. Existing water tank to be disconnected from steam boiler as source. Evaluate existing tank and if in suitable condition and lifetime expectancy reconnect to new hydronic boiler. If deemed necessary recommend new superstore replacement. e. New radiation to include steel panel radiators and fin tube radiation as per drawings. f. Include all power supply and connections, controls, pumps, piping, venting and disconnect and removal of existing system components g. Heating contractor responsible for all sizing of boiler, and radiation components. 1. Heating contractor is responsible for determining size and capacities of equipment, location of equipment and radiation, controls, etc. as part of bid process. Thorough heat loss calculations and sizing of all components must be completed to insure adequate capacity and distribution. h. Cleaning, testing and balancing of systems. 2. Demolition of existing equipment to be coordinated with the General Contractor and carried out so as to minimize disruption to existing services. All obsolete piping and accessories are to be removed. Existing systems are to be reconnected in working condition. 3. Heating Contractor is responsible for visiting the site and for determining size and capacities of equipment, location of controls and routing of piping/ductwork and required size and location of radiation as part of bid process. Thorough heat loss calculations and sizing of all components must be completed to insure adequate capacity and distribution. The radiation locations shown on the drawings are schematic only and are subject to review and alteration. Review runs and locations with Architect and coordinate with framing layout. As part of bid submit proposal identifying approach, boiler manufacturer etc. to owner. 4. All work is to be carried out by experienced mechanics according to all codes and accepted standards of practice. Project Manual January 26, 2021 Page 20 Fishman Residence 1.19. ELECTRICAL: Scope of work includes the Following: a. Demolition of existing wiring, switches, receptacles, fixtures including disconnecting, splicing, capping and removal as required. b. Upgrade electrical service to new 250 amp service. Include coordination with utility, new disconnect, new breaker panel and breaker, and all conduit and accessories required for a complete installation. Disconnect time to be kept to a minimum as new service and panel/circuit breakers are installed. Coordinate with owner. c. New branch circuit wiring including lighting, switching, receptacles and connections to existing. 1. Layout and arrange circuits to meet load and code requirements. d. Telephone, category 6 data and cable wiring for computer and TV use as indicated on drawings. e. Light fixtures to be supplied by owner except as noted. Installation by EC. f. Permits and inspections. 2. All wiring and equipment shall be by electricians licensed in the State of Massachusetts and conform to all local, state and national codes. All circuits shall be sized and laid out to meet the code. 3. Furnish all wiring devices, plates,junction boxes, hangers, supports, breakers as shown or required for completion of the work. 4. Demolition of electrical is to be carried out by trades experienced with these systems and coordinated with scheduling and other requirements of new work. All wiring accessories serving demolished equipment or fixtures are to be removed back to active branches and capped off. All systems must remain operational at conclusion of demolition. End of Specification Project Manual January 26, 2021 Page 21 N RENAISSANCE J BUILDERS P.O.Box 272,Turners Falls,MA 01376 (413)863-8316.Fax(413)863-9712 www.renbuild.net To: Building Inspector City of Northampton We, Bob Fishman and Mary Anne Fishman, certify that we are the Owners of the property located at 64 Harrison Avenue, Northampton, MA 01060. We hereby authorize Stephen Greenwald of Renaissance Builders, 390 Main Road, Gill, MA 01376 to submit a building permit application on my behalf for the construction of additions and renovations in accordance with Contract Documents prepared by Austin Design, Inc. We agree to conform to all applicable laws of the town and state, and we believe the work proposed to be in compliance with all zoning regulations and the Massachusetts State Building Code 780CM A) I Y 9 Signature of Owner. Printed Name: Pn b-P P f I ► s h ma ri Date: L Z/Z ,020 Signature of Owner: Ql" /---vt LQ Printed Name: aa/4h n-e- l"1 C Ke{'1 Date: 12 /2/2 0 2 , ..-\ The Commonwealth of Massachusetts Department of Industrial Accidents —3 Office of Investigations i1 r600Imam Washington Street Boston,MA 02111 www.mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name (Business/Organization/Individual): RENAISSANCE BIJII,DERS Address: PO BOX 272 City/State/Zip: TURNERS FALLS, MA 01376 Phone #: 413-_8.63-8316 Are you an employer? Check the appropriate box: Type of project(required): 1.[a I am a employer with 22 4. ❑ I am a general contractor and I employees(full and/or part-time).* have hired the sub-contractors 6. ❑New construction 2.❑ I am a sole proprietor or partner- listed on the attached sheet. 7. ❑ Remodeling ship and have no employees These sub-contractors have 8. ❑ Demolition workingfor me in anycapacity. employees and have workers' P h 9. ❑ Building addition [No workers' comp. insurance comp. insurance.: required.] 5. ❑ We are a corporation and its 10.0 Electrical repairs or additions 3.❑ I am a homeowner doing all work officers have exercised their 11.0 Plumbing repairs or additions myself. [No workers' comp. right of exemption per MGL 12.❑ Roof repairs insurance required.] t c. 152, §1(4),and we have no employees.[No workers' 13.❑ Other comp. insurance required.] __ *Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. I.Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. :Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: AIM MUTUAL INSURANCE CO. Policy#or Self-ins. Lic.#: MCC20020004972021A Expiration Date: 01/01/2022 Job Site Address:64 Harrison Avenue Cityistate/zip:Northampton, MA 01060 Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. 1 do hereby ee ify under the pains and penalties of perjury that the information provided above is true and correct. Signature: , /2--toef( Date: 12/09/2021 Phone#: 413-863-8316 Official use only. Do not write in this area, to be completed by city or town Vidal City or Town: Permit/License# Issuing Authority(circle one): 1. Board of Health 2. Building Department 3.City/Town Clerk 4. Electrical Inspector 5. Plumbing Inspector 6. Other Contact Person: Phone#: A! ® DATE(MM/DD/YYYY) CERTIFICATE OF LIABILITY INSURANCE 12/09/2021 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND.EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Andrea Feeley NAME: Webber&Grinnell PHONE Eau: (413)586-0111 FAX No): (413)586-6481 8 North King Street E-MAIL afeeley@webberandgrinnell.com ADDRESS: INSURER(S)AFFORDING COVERAGE NAIC a Northampton MA 01060 IN5URERA: Arbella Protection 41360 INSURED INSURER B: MA Employers/A.I.M. 12886 Renaissance Builders,DBA:Gill Building Corporation INSURER C: GuideOne National/BRECK Attn:Stephen Greenwald INSURER D: PO Box 272 INSURER E: Turners Falls MA 01 376 INSURER F: _ COVERAGES CERTIFICATE NUMBER: Exp 01/2022 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR ADDL SUBR POLICY EFF POLICY EXP LTR TYPE OF INSURANCE INSD WVD POLICY NUMBER (MM/DD/YYYY) (MM/DD/YYYY) UNITS X COMMERCIAL GENERAL LIABIUTY EACH OCCURRENCE $ 1,000,000 DAMAGE IRENTED CLAIMS-MADE X OCCUR PREM SESO(Ea occurrence) $ 100,000 MED EXP(Any one person) $ 5,000 A 8500066134 08/01/2021 08/01/2022 PERSONAL BADVINJURY $ 1,000,000 GEN'LAGGREGAATEE LIMIT APPLIES PER: GENERAL AGGREGATE $ 2,000,000 I POLICY I5 PRO- f�l Loc 2,000,000 JECT I PRODUCTS-COMP/OP AGG $ OTHER: $ AUTOMOBILE LIABIUTY COMBINED SINGLE LIMIT $ 1,000,000 (Ea accident) ANY AUTO BODILY INJURY(Per person) $ A OWNED SCHEDULED 1020057016 08/01/2021 08/01/2022 BODILY INJURY(Per accident) $ AUTOS ONLY _ AUTOS .. _ HIRED NON-OWNED PROPERTY DAMAGE $ X AUTOS ONLY AUTOS ONLY (Per accident) UMBRELLA LIAB OCCUR EACH OCCURRENCE $ 5,000,000 A EXCESS LIAB CLAIMS-MADE 4620085703 08/01/2021 08/01/2022 AGGREGATE $ 5,000,000 DED I XI RETENTION$ 10.000 $ WORKERS COMPENSATION Xl PER STATUTE I I ERH AND EMPLOYERS'LIABILITY Y/N 1,000,000 B ANY PROPRIETOR/PARTNER/EXECUTIVE -N N/A MCC20020004972021A 01/01/2021 01/01/2022 E.L.EACH ACCIDENT $ OFFICER/MEMBER EXCLUDED? 10 ,00000 (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $ , If yes,describe under 1,000,000 DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ _ Each Occurrence Limit $500,000 C Contractors Pollution Liability POL/TBD 08/01/2021 08/01/2022 Aggregate Limit $500,000 Deductible $2,500 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES(ACORD 101,Additional Remarks Schedule,may be attached if more space is required) CERTIFICATE HOLDER CANCELLATION Bob and Mary Anne Fishman SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE 64 Harrison Avenue THE EXPIRATION DATE THEREOF,NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. Northampton, MA 01060 AUTHORIZED REPRESENTATIVE ©1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD AFFIDAVIT FOR DISPOSAL OF DEMOLITION DEBRIS Supplement to Permit Application As a result of the provisions of MGL c. 40, s54, I acknowledge that as a condition of the issuance of a Building Permit, all debris resulting from the construction activity governed by this Building Permit shall be disposed of in a properly licensed solid waste disposal facility, as defined by MGL c. 111, s150A. I certify that debris resulting from this demolition will be disposed of as listed below: Job Site Location: 64 Harrison Ave,Northampton, MA 01060 Name of Permit Applicant: Renaissance Builders Disposal Facility: F & G Recycling Address of Facility: 15 Mullen Rd., Enfield, Ct 06082 IF SAID FACILITY IS OTHER THAN WHAT I HAVE LISTED, I CERTIFY THAT I WILL NOTIFY THE BUILDING OFFICIAL OF THE CORRECT LOCATION OF THE SOLID WASTE DISPOSAL FACILITY WITHIN TWO MONTHS OF THE DATE OF THIS APPLICATION. tass...6(? 10/25/2021 Signature of Applicant Date Commonwealth of Massachusetts Division of Professional Licensure Board of Building Regulations and Standards Construetfollil�t pp.rvisor ti CS-013302 Ejcpires:08/17/2023 STEPHEN J GREENWALD PO BOX 272 TURNERS FALLS MA 01376 .01 Commissioner (,n.,v� f fOremiirq 00 J Construction Supervisor Unrestricted -Buildings of any use group which contain less than 35,000 cubic feet(991 cubic meters) of enclosed space. Failure to possess a current edition of the Massachusetts State Building Code is cause for revocation of this license. For information about this license Call (617)727-3200 or visit www.mass.gov/dpl e 0 rneru1eeci%I o Y& r)cr/C4c)-e/4- Office of Consumer Affairs and Business Regulation 1000 Washington Street - Suite 710 Boston, Massachusetts 02118 Home Improvement Contractor Registration z Type: Corporation ` r Registration: 199409 GILL BUILDING CORPORATION 1.j i `• &:, Expiration: OB(23/2022 D/B/A RENAISSANCE BUILDERS fat V 3x M P.O.BOX 272 I „r. TURNERS FALL,MA 01376 ,lAA1 _ ' i Update Address and Return Card. SCA 1 C? 20M-05/17 Office of Consumer Affairs&Business Regulation HOME IMPROVEMENT CONTRACTOR Registration valid for individual use only TYPE:Corporation before the expiration date. If found return to: (Registration Expiration Office of Consumer Affairs and Business Regulation 199409 08/23/2022 1000 Washington Street -Suite 710 GILL BUILDING CORPORATION Boston,MA 02118 D/B/A RENAISSANCE BUILDERS STEPHEN GREENWALD 390 MAIN ROAD e `0(a I GILL,MA 01354 Undersecretary Not valid without signature .1-VN RENAISSANCE BUILDERS PO BOX 272, TURNERS FALLS, MA 01376,413.863.8316 INFO@RENBUILD.NET, WWW.RENBUILD.NET December 10, 2021 Jonathan Flagg, Building Commissioner City of Northampton 212 Main Street Northampton, MA 01060 Jonathan, Enclosed is a permit application for additions and renovations at 64 Harrison Avenue in accordance with the contract documents prepared by Austin Design, Inc. Stephen is the project manager. His cell phone number is 772-9430 if you have questions or concerns. Also included is: ❑ A scope of the work (Fishman Project Manual) ❑ An Owner Authorization signature page ❑ A Worker's Compensation Insurance Affidavit and current COI ❑ Demolition Affidavit ❑ A copy of Stephen Greenwald's Construction Supervisor License and HIC ❑ Additional Supporting Documents (Fishman Plans) ❑ A check for $1,833.00 ($6.50 per $1,000 of estimated cost) Please call Stephen if you have any questions. Thank you, Madeline p er-Orrell Administrative Assistant madeline(a�renbuild.net