Loading...
31C-082 (4) BP-2021-1990 140OLANDER DRIVE COMMONWEALTH OF MASSACHUSETTS Map:Block:Lot: 31C-082-001 CITY OF NORTHAMPTON Permit: Solar Build PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) BUILDING PERMIT Permit# BP-2021-1990 PERMISSIONISHEREBYGRANTED TO: Project# 2021 SOLAR SYSTEM Contractor: License: PIONEER VALLEY Est. Cost: 175000 PHOTOVOLTAICS 1 11266 Const.Class: Exp.Date:03/14/2023 Use Group: Owner: NORTH COMMONS AT VILLAGE HILL LLC Lot Size (sq.ft.) Zoning: Applicant: PIONEER VALLEY PHOTOVOLTAICS Applicant Address Phone: Insurance: 311 WELLS ST - SUITE B (413)772-8788 375928710101 GREENFIELD, MA 01301 ISSUED ON:10/06/2021 TO PERFORM THE FOLLOWING WORK: INSTALL 132 PANEL 58.74 KW ROOF MOUNTED SOLAR SYSTEM WITH INVERTERS IN ATTIC POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House # Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Signature: ( CSs fa • r . �4 '1 • Fees Paid: $441.00 212 Main Street, Phone(413) 587-1240,Fax:(413)587-1272 Office of the Building Commissioner Fig �,T a ommonwealth of Massachusetts o�,, �0(9, Department of Public Safety Npn'.PGU Massachusetts State Building Code(780 CMR) �ryq • ermit Appl' ation for any Building other than a One-or Two-Family Dwelling •44.107(r7ON (This Section For Official Use Only) 6 Building Permit Number:•3/- OD to Applied: Building Official: SECTION 1:LOCATION 140 OLANDER DR NORTHAMPTON 01000 NORTH COMMONS AT VILLAGE HILL No.and Street City/Town Zip Code Name of Building(if applicable) Assessors Map# Block#and/or Lot # SECTION 2 PROPOSED WORK Edition of MA State Code used If New Construction check here 0 or check all that apply in the two rows below Existing Building 0 Repair 0 Alteration 0 Addition❑ Demolition ❑ (Please fill out and submit Appendix 2) Change of Use 0 Change of Occupancy 0 Other O Specify:Roof Mounted Solar Are building plans and/or construction documents being supplied as part of this permit application? Yes 0 No O Is an Independent Structural Engineering Peer Review required? Yes 0 No a Brief Description of Proposed Work:_installation of 132 solar panels on new TPO roof. - SECTION 3:COMPLETE THIS SECTION IF EXISTING BUILDING UNDERGOING RENOVATION,ADDITION,OR CHANGE IN USE OR OCCUPANCY Check here if an Existing Building Investigation and Evaluation is enclosed(See 780 CMR 34) ❑ Existing Use Group(s): Proposed Use Group(s): SECTION 4:BUILDING HEIGHT AND AREA Existing Proposed No.of Floors/Stories(include basement levels)&Area Per Floor(sq.ft.)Total Area(sq.ft.)and Total Height(ft.) SECTION 5:USE GROUP(Check as applicable) A: Assembly A-1 0 A-2 0 Nightclub 0 A-3 ❑ A-4 0 A-5 0 B: Business 0 E: Educational 0 F: Factory F-1 0 F2❑ H: High Hazard H-1❑ H-2 0 H-3 0 H-4 0 H-5 0 I: Institutional I-1 0 I-2❑ I-3 0 I-4❑ M: Mercantile 0 R: Residential R-10 R-2 0 R-3 0 R-4 0 S: Storage S-1 0 S-2 0 U: Utility 0 Special Use 0 and please describe below: Special Use Description: SECTION 6:CONSTRUCTION TYPE(Check as applicable) IA IB ❑ HA LIB IIIA ❑ IIIB ❑ IV VA CI VB ❑ SECTION 7:SITE INFORMATION(refer to 780 CMR 105.3 for details on each item) Water Supply: Flood Zone Information: Sewage Disposal: Trench Permit Debris Removal: Public 0 Check if outside Flood Zone 0 Indicate municipal 0 A trench will not be Licensed Disposal Site 0 required O or trench or specify:WA Private 0 or indentify Zone: or on site system❑ permit is enclosed 0 Railroad right-of-way: Hazards to Air Navigation: MA Historic Commission Review Process: Not Applicable O Is Structure within airport approach area? Is their review completed? or Consent to Build enclosed 0 Yes 0 or No O Yes 0 No 0 SECTION 8:CONTENT OF CERTIFICATE OF OCCUPANCY Edition of Code: Use Group(s): Type of Construction: Does the building contain an Sprinkler System?: Special Stipulations: Design Occupant Load per Floor and Assembly space: SECTION 9: PROPERTY OWNER AUTHORIZATION Name and Address of Property Owner THE COMMUNITY BUILDERS,INC. 35 VILLAGE HILL RD NORTHAMPTON, MA 01060 Name(Print) No.and Street City/Town Zip Property Owner Contact Information: RACHANA CROWLEY 413 _923 _9022 rcrowley@tcbinc.org Title Telephone No.(business) Telephone No. (cell) e-mail address If applicable,the property owner hereby authorizes: Pioneer Valley PhotoVoltaics,Coop LCC 311 Wells Street Greenfield MA 01301 Name Street Address City/Town State Zip to apply for and act on the property owner's behalf,in all matters relative to work authorized by this building permit application. SECTION 10:CONSTRUCTION CONTROL(Please fill out Appendix 1) If a building is less than 35,000 cu.ft.of enclosed space and/or not under Construction Control then check here❑. Otherwise provide construction control forms(see section 107 in the code)as required. 10.1 Registered Professional Responsible for Construction Control(the professional coordinating document submittals) N/A Name(Registrant) Telephone No. e-mail address Registration Number Street Address City/Town State Zip Discipline Expiration Date 10.2 General Contractor Pioneer Valley Photovoltaics Coop Company Name Daniel Gomez-Gonzalez CS-111266 Name of Person Responsible for Construction License No. and Type if Applicable 43 Hatfield Street Northampton MA 01060 Street Address City/Town State Zip 413 772 8788 danielg@pvsquared.coop Telephone No.(business) Telephone No.(cell) e-mail address SECTION 11:WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152.§25C(6)) A Workers'Compensation Insurance Affidavit from the MA Department of Industrial Accidents must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Is a signed Affidavit submitted with this application? Yes 0 No 0 SECTION 12:CONSTRUCTION COSTS AND PERMIT FEE Item Estimated Costs:(Labor 175000 and Materials) Total Construction Cost(from Item 6)=$ 1.Building $74487 Building Permit Fee=Total Construction Cost x•007(Insert here 2.Electrical $100513 appropriate municipal factor)_$1,22s 3.Plumbing $ 4.Mechanical (I IVAC) $ Note:Minimum fee=$50 (contact municipality) 5.Mechanical (Other) $ Endose check payable to 6.Total Cost $175000 (contact municipality)and write check number here SECTION 13:SIGNATURE OF BUILDING PERMIT APPLICANT By entering my name below,I hereby attest under the pains and penalties of perjury that all of the information contained in this application is true and accurst wledge and understanding. Daniel Gomez Gonzalez CSL 413 772 8788 9/21i2021 Please print and sign name Title Telephone No. Date 311 Wells Street Greenfield MA 01301 buildingpermitsQ'pvsquared.coop Street Address City/Town State Zip Email Address 1 � Municipal Inspector to fill out this section upon application approval: � I"I - . t I d al Name Da e _ '\ The Commonwealth of Massachusetts ,, 1� 1, Department of Industrial Accidents _;d► 1 Congress Street, Suite 100 ".=.f j_ Boston,MA 02114-2017 '•,At . www.mass.gov/dia Corkers' Compensation Insurance Affidavit:Builders/Contractors/Electricians/Plumbers. TO BE FILED WITH THE PERMITTING AUTHORITY. Applicant Information Please Print Leeibly Name (Business/Organization/Individual):Pioneer Valley PhotoVoltaics Cooperative Inc. DBA PV Squared Solar Address: 311 Wells Street, SuiteB City/State/Zip:Greenfield MA 01301 Phone#:413-772-8788 Are you an employer?Check the appropriate box: Type of project(required): 1.is I am a employer with 48 employees(full and/or part-time).* 7. 0 New construction 2.0 I am a sole proprietor or partnership and have no employees working for me in 8. ❑Remodeling any capacity.[No workers'comp.insurance required.] 3.0 I am a homeowner doing all work myself.[No workers'comp.insurance required.]r 9. ❑Demolition 10❑Building addition 4.❑I am a homeowner and will be hiring contractors to conduct all work on my property. I will ensure that all contractors either have workers'compensation insurance or are sole 11.0 Electrical repairs or additions proprietors with no employees. 12.❑Plumbing repairs or additions 5.0 I am a general contractor and I have hired the sub-contractors listed on the attached sheet. ]3.❑Roof repairs These sub-contractors have employees and have workers'comp.insurance.t 6.0 We are a corporation and its officers have exercised their right of exemption per MGL c. 14.0 Other Solar PV 152,§1(4),and we have no employees.[No workers'comp.insurance required.] 'Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. tContractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name:Continental Indemnity/AUW Policy#or Self-ins.Lic.#:37-592871-01-01 Expiration Date:01/01/2022 Job Site Address: 140 OLANDER DR City/State/Zip:NORTHAMPTON MA 01060 Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under MGL c. 152,§25A is a criminal violation punishable by a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator.A copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby ce .i :r t e`. is 'nd penalties of perjury that the information provided above is true and correct. op Signal - . %�%' --_ �, Date: 9/21/2021 \ Phone#:413-7 -87 8 Official use only. Do not write in this area,to be completed by city or town official City or Town: \ Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: DocuSign Envelope ID:5E196009-EDB8-4COD-B2AE-A02BE8503096 Attachment A AUTHORIZATION TO PROCEED AND SERVE AS AUTHORIZED AGENT I hereby agree to the Project as set out above, and I agree to pay the contract price according to the Terms of Payment.I further agree to the Terms and Conditions attached hereto as a part of this Proposal and Agreement. I hereby authorize Pioneer Valley PhotoVoltaics Cooperative to proceed with the above-referenced Project in accordance with this Agreement. I further authorize Pioneer Valley PhotoVoltaics Cooperative, or its designated representative,to obtain required permits for this project on behalf of the Owner. I will allow any photographs or videos of this project to be used by Pioneer Valley PhotoVoltaics Cooperative for marketing purposes.A check for the First Payment is enclosed and I am returning this Agreement within 21 days of the Proposal date. Rachana Crowley 8/13/2020 I 7:18 AM PDT Printed Name Date L '� Doausigned by: AOh`""` thowli, Authorized Agent Pnacnn383=4.6 . Signature Title Proposal and Agreement 8 00015847 Page 7 of 12 North Commons at Village Hill LLC.-August 4,2020 Commonwealth at Massachusetts Division of Professional Licensure Board of Building Regulations and Standards Constra4&YSit ipirvisor CS-111266 xepires: 03114/2023 DANIEL GOMEZ-GONZALEZ 43 HATFIELD STREET NORTHAMPTON MA 01060 f 46.0 Commissioner Chas..; . 1/e Y1 mo,weieadiV .A'af)e)o-i4emihi- Office of Consumer Affairs and Business Regulation 1000 Washington Street - Suite 710 Boston, Massachusetts 02118 Home Improvement Contractor Registration Type: Supplement Card PIONEER VALLEY PHOTOVOLTAICS COOP Registration: 140077 311 WELLS ST SUITE B Exxpipi ration: 09115!2021 GREENFIELD,MA 01301 Update Address and Return Card. SCA 1 O 2oA1.psr17 Office of Consumer Affairs&Business Regulation HOME IMPROVEMENT CONTRACTOR Registration valid for individual use only TYPE:Supplement Card before the expiration date. If found return to. Registration Expiration Office of Consumer Affairs and Business Regulation 140077 09115t2021 1000 Washington Street Suite 710 ( PIONEER VALLEY PHOTOVOLTAICS COOP Boston,MA 02118 MAYA FULFORD 311 WELLS ST SUITE B <</ �� lR GREENFIELD,MA 01301 Ot vall lthOut sl riot Undersecretary Mass.gw Office of Consumer Affairs a n d Business Regulation (OCABR) Home Improvement Contractor Registration Lookup To search by registration number,enter the registration number in the textbox below and click the'Search'button. Please note pressing the Enter key will clear fields. Search by Registration Number 140077 Search 1 You must click the"Search Registrant"button to search by name or location. Please note pressing the Enter key will clear fields. Search by Registrant Company name Search Registrant Search by Registrant Last name Search by Registrant First name Note: HIC account 140077 is current, but our new cards have City/Town not arrived yet. This is a printout of the MA HIC Lookup tool on the mass.gov website. Please call us with questions. Thanks! State Zip code Click on the registration number to view complaint history.You can also view arbitration and Guaranty Fund history. The list Is current as of Wednesday,September 15,2021. Search Results RegistrantName RESPONSIBLE INDIVIDUAL REGISTRATION ADDRESS I EXPIRATION DATE STATUS NUMBER PIONEER VALLEY PHOTOVOLTAICS 'Dick,Evan 140077 I311 WELLS ST SURE B 109/15/2023 (Current COOPERATIVE,INC. 'GREENFlELD,MA 01301 PV Squared Solar j Site Policies Contact Us ©2018 Commonwealth of Massachusetts. Mass.Gov®is a registered service mark of the Commonwealth of Massachusetts. AC^ ® DATE(MMIDD/YYYY) ��//�D CERTIFICATE OF LIABILITY INSURANCE 12/22/2020 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Kathy Parker NAME: Webber&Grinnell PHONE (413)586-0111 FAX (413)586-6481 JAIC,No,Extl: (A/C,No): 8 North King Street E-MAILSS: kparker@webberandgrinnell.com ADDRESS INSURER(S)AFFORDING COVERAGE NAIC# Northampton MA 01060 INSURER A: Ohio Casualty/Liberty 24074 INSURED INSURER B: Ohio Security/Liberty 24082 Pioneer Valley PhotoVoltaics Cooperative,Inc. INSURER C: Continental Indemnity/AUW Attn:Kim Pinkham INSURER D: 311 Wells Street,Suite B INSURER E: Greenfield MA 01301 INSURER F: COVERAGES CERTIFICATE NUMBER: CL20122214681 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS_ INSR TYPE OF INSURANCE ADOL SUER POLICY NUMBER POLICY EFF POLICY EXP LIMITS LTR INSR WVD (MM/DD/YYYY) (MM/DD/YYYY) X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 1.000,000 CLAIMS-MADE XI OCCUR PREMISESO(Ea occu ence) $ 300,000 MED EXP(Any one person) $ 15,000 A BKS57072282 01/01/2021 01/01/2022 PERSONAL BADVINJURY $ 1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ 2,000,000 POLICY n PNT n LOC PRODUCTS-COMPIOP AGG $ 2.000,000 _ OTHER: $ AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ 1,000,000 ,(Ea accident) — ANY AUTO BODILY INJURY(Per person) $ B OWNED X• SCHEDULED BAS57072282 01/01/2021 01/01/2022 BODILY INJURY(Per accident) $ AUTOS ONLY AUTOS X AUHIREDTOS ONLY /,. NON-OOWNESONLY D PROPERTY DAMAGE (Per accident) $ _� AUT Underinsured motorist $ 300,000 UMBRELLA LIAR """"" """R N E 5,000,000 X _ OCCUR EACH OCCURRENCE $ A EXCESS LIAB CLAIMS-MADE US057072282 01/01/2021 01/01/2022 AGGREGATE $ 5,000,000 DED >RETENTION$ 10,000 $ WORKERS COMPENSATION PER OTH- AND EMPLOYERS'LIABILITY STATUTE ER v/N 1,000000 C ANY PROPRIETOR/PARTNER/EXECUTIVE N N/A 375928710101 01/01/2021 01/01/2022 E.L.EACH ACCIDENT $ , OFFICER/MEMBER EXCLUDEED? (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $ 1,000,000 If yes.describe under 1,OOQ000 DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ _ Business Pers Property $1,820,700 Commercial Property A B KS57072282 01/01/2021 01/01/2022 Installation $25,000 Transportation $75,000 DESCRIPTION OF OPERATIONS/LOCATIONS I VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space is required) Worker's compensation includes MA and NY CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,NOTICE WILL BE DELIVERED IN Proof of Insurance ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE bllln_ - 'V 2--:—)I1j I ©1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD you4R Ell--; 4' 4( 10 z Q O ���`.. •� i i i • • • i,T a so. 0�101������� �--.--.--ram • • • • • • r V S R D SOL R • _r N `r, tc� — •• • I,I I • - • r • •• i • • •`�• • • • ♦ • 311 W LLS STR T.S IT e I L `•® I ~ R Nil I D.M 01076 l �� 413` N72 8788 R D.000 `a' Miti NORTH COMMONS o MU fan X - - 124 q^ - TVILL HILL of ND RDRIV - MOV TI INS 16" - ROOF C NT RLIN NORTH M TON.M I jai tat TOW RDS C NT RLIN Ian MNFOR RR CL R NC tin Ian ,� Wel Nay fin 3 3 " f;, f illi lairto lel 1*1 ISM 1*1 *i s' ► N NOT S Ile M I i7 •e 1. TT CHM NTS TO B INST LL D LON to le INDIC T D LIN B. CT L OSITIONINOF TT CHM NTS ON INDIC T D LIN S TO B till 411 D T RMIN DON SIT ni 2. TT CHM NTS TO B F ST N D TO ROOF ��, U�• D C IN THRO H FO M INS L TION TT CHM NTS TO B '�� � OSITION D S N D D LON CCORDIN TOM N F CT R R INSTR CTIONS. TTT CHM NT WO 11 INDIC T D LIN S S NOT 1. 3. F ST N R CO NT TO B D T RMIN D B S D tan E `7 S SH T V M2 FOR S CTION ON D C IN M T RI L ND THIC N SS. L 0 T *1 VI W ND SH T V M3 FOR 4. TT CHM NT FL SHIN TO B INST LL DIN D r as zox+ • CCORD NC WITH M N F CT R RS D T ILS S INSTR CTIONS B INST LL R OF ORI IN L 24 ROOF S ST M. SC L 1 16' 1 Cl. FL SHIN MOD L TO B D T RMIN D B S DON SI 11 17 ROOF M MBR N MOD L.THIC N SS, ND COLOR. V M 1 6. DIM NSION R CISION IS}" NL SS OTH RWIS NOT D SH T1OF1 NOT S 1. DIM NSION R CISIONIS}" NL SS ZaV4 OTH RWIS NOT D. Q ^ 43 4kr so- VS R DSOL R 311W LISSTR T.S n B R IFI 1D.M 01376 VMW VS R D.000 • 413 772 67W NORTH COMMONS T VILL HILL -__ _ 01 ND RDRIV __ _— __..---- - NORTH M TCN.M 4 " 3 3" / 3 . 4 " \ ROOF C NT RLIN TT CHM NT L 0 T S CTION 12" 1 0" /N.non 0 ❑ © ❑❑❑ ® a ❑ -1:1- NI n n rn -11-1 j -❑-� a � S CTION VI WS D T J62M1 SC L S SHOWN 11 17 OST L V TION O SO _TH L V TION V M2 116" 1 0" 116" 1 0" SO T20F4 NOT S 1. DIM NSION R CISIONIS}" NL SS J Snu4R� OT}i RIMS NOT D. Q � Q k �744Z4 f 1wr ` gam SO TH TILT VS R DSOL R L y R IL 311W LLSSTR T.S IT B jr_1 4" �I R KI ID.M 01]76 NORTH TILT W VS R DC00 na n2ISM L '1 " NORTH COMMONS I`-1 4" 6 FOOT �� TVILL HILL a NO R MN - FL TROOF NORTH M TCµM TT CHM NT a 74" . ■ ,r 4 " ,t' 6 3" k 4 " X ,r 6 8" k 4 ,r 6 8" k OTILT SS MBL D T IL 1 2" 1 0" • ,I` 214" - ,� - "1 1Z"*1 Q?".� R ILCL M �, / RN rN� j j Y JO� j j O :� v. j j j j j j j j j OD T IL VI WS 14" x ..k.�. 6 41" Q��..® X / \ o r S e 2021 El SC L S SHORN Si 11 17 OSOL 1 Ro" N L D T IL O FL;ZT ROOF TT CHM NT D T IL V M3 SH T20F4 Snug �^10 T RIOR W LL - TTIC INT RIOR W LL 0000 4Ar • gO� VS RDSOLR 311W LLSSTR T.S IT B R NFI LD.M 01370 WNW.VS R D.COO 413 772 8710 l NORTH COMMONS 4 1" MT COND IT I I I I T VILL HILL FROM ROOF INTO TTIC OL ND RORIV '- -- — NORTH M TdJ.M ar SOL R ROD CTION M T R ND TILIT DISCONN CT ON T RIOR W LL 0 OSIT SOL R RR ON ROOF L V L 1 M ROOM - LL OTH R SOL R arg TTIC INT RIOR W C L I M LL ON 611 MIR Mr, Ejr wri aft L CTRIC L I M NT L N D T 312021 B SC L 704' 1B 11 IT V M4 SH T4OF. SOLAR'S MOST TRUSTED R C C ) A' 101\4:1). 2 t s ;( ' A Not .., ,vill 41 :0` ii agi- (14 REE ALPHOC 72 SERIES PRODUCT SPECIFICATIONS i 450 sinterolar EXPERIENCE award WP 2020 POWER WINNER PERFORMANCE i REC PRODUCT SPECIFICATIONS SOLAR'S MOST TRUSTED t CERTIFICATIONS 206332.5[8120t0.1] i., IEC 61215:2016,IEC 61730:2016,UL61730 28 1.11 _. .� 1058[41.7] 0- _. _. s02.5[19.8] IEC 62804 PID IEC 61701 Salt Mist ❑ � " • + / IEC 62716 Ammonia Resistance lzoo[47] UL 1703 Fire Type 2 IEC 62782- Dynamic Mechanical Load ...___ ti IEC612152:2016 Hailstone(35mm) 7-7 g' 102430A:1 AS4040.2 NCC 2016 Cyclic Wind Load ■ R. ISO14001:2004.ISO9001:2015,OHSAS18001:2007,IEC 62941 1.1 11:01 4. .0- C E n 10.43s0A11 I l - �IKl1lk 1oies0.o1' .-1++-. 1 s�os f WARRANTY tI0azOD2I a A MIM - Standard REC ProTrust F * 1300[51] } Installed byan REC Certified 2 s[091 • Solar Professional No Yes Yes ✓ 45[1.8] ►' J i System Size All 425 kW 25-500 kW 22.5 761 t3[29.930.1] Product Warranty(yrs) 20 25 25 r '.._30[121 -----._..._...__....-.____..____ Power Warranty(yrs) 25 25 25 Measurements in mm(in) Labor Warranty(yrs) 0 25 10 `, GENERAL DATA Power in Year 1 98% 9896 98% 144 half-cut cells with REC Staubli MC4Evo2 Annual Degradation 0.25% 025% 025% Cell type: heterojunctioncelltechnology Connectors: PV-KBT4-EVO-2/PV-KST4-EVO-2(4mm2) Power inYear25 92% 92% 92% 6 strings of 24 cells in series n accordance with IEC 62852 See warranty documents for details.Conditions apply. IP68 only when connected 0.13in(3.2 mm)solar glass with Cable: ( ( ) `'t MAXIMUM RATINGS Glass: anti reflection surface treatment 12AWG 4mm)PVwire,47+Slim 1 2+1.3m in accordance with EN 50618 Highly resistant Operational temperature: -40...+185°F(-40...+85°C) Backsheet: Dimensions: 81.2x40.39x1.18in 2063x1026x30mm polymeric construction ( ) Maximum system voltage: 1500V Frame: Anodized aluminum Weight: 52lbs(23,5 kg) Maximum test load(front): +5400 Pa(112. s/sq ft)' o 8lb Maximum test load(rear): -2400 Pa(50.1 lbs/sq ft)' g Junction box: 3-part,3bypass diodes,IP67rated Origin: Made in Singapore in accordance with IEC 62790 Max series fuse rating: 25A .; e ELECTRICAL DATA d Product Code':RECxxxAA 72 Max reverse current: 25A m 'See installation manual for mountin instructions. 5 Power Output-PM1111(Wp) 430 435 440 445 450 Design load-Test load/1.5(safetyfactor) Watt Class Sorting-(W) -0/.5 -0/.5 -0/+5 -0/+5 -0/+5 , 0 Nominal Power Voltage-Vmpp(V) 44.1 44.5 44.8 45.3 45.6 TEMPERATURE RATINGS' F Nominal Power Current-IMnp(A) 9.76 9.79 9.84 9.85 9.88 Nominal Module Operating-emperature: 44°C(t2°C) A Open Circuit Voltage Temperature coefficient of P '0.26%Vor(V) 52.6 52.8 52.9 53.0 53.1 P MAx /°C g a Short Circuit Current-Isr(A) 10.46 10.50 10.52 10.54 10.55 Temperature coefficient ofVor: -0.24%/°C Power Density(W/sgft) 18.9 19.1 19.3 19.5 19.8 Temperature coefficient oflsc: 0.04%/°C Panel Efficiency(%) 20.3 20.6 20.8 21.0 21.3 'The temperature coefficients stated are linear values Output (W LOW LIGHT BEHAVIOUR Power Out P M,u P) 328 332 336 339 343 Typical low irradiance performance of module atSTC: ;� 1- Nominal Power Voltage 41.6 41.9 42.2 42.7 43.0 O Z Nominal Power Current-IMn,(A) 7.88 7.91 7.95 7.95 7.98 ' L..,Open Circuit Voltage-Vor(V) 49.6 49.8 49.8 49.9 50.0 4, 0 Short Circuit Current-Isc(A) 8.45 8.48 8.50 8.51 8.52 le . 1" . th Values at standard test conditions(STG air mass AM1.S,irradiance10.75W/sgft(1000W/m'I temperature 77T(25'0,based onaproduction rz 0 spread with a tolerance of PM"„Vo,&Is,±3%within onewatt class. .. '.. a Nominal module operating temperature(NMOT:air mass AM 1.5,irradiance 800 W/m',temperature 68'F(20°C),windspeed 33 ft/s(I m/s). Irradiance(W/m2) ti 'Where non indicates the nominal power class(Pt,,,,)at SIC above and is followed by the suffix XV for 1500V rated modules. Founded in 1996,REC Group is an international pioneering solar energy r company dedicated to empowering consumers with clean,affordable I� solar power.As Solar's Most Trusted,REC is committed to high quality, innovation,and a low carbon footprint in the solar materials and solar wwwrecgroup.com panels it manufactures. Headquartered in Norway with operational ID.', ❑� headquarters in Singapore,REC also has regional hubs in North America, '„ti Europe,and Asia-Pacific. If 1 IRONRIDGE XR100 Rail See Descri tion / Length i A Rail Section Properties _ Property Value _ Total Cross-Sectional Area 0.582 in2 .66 Section Modulus (X-axis) 0.297 in3 1p.46 Moment of Inertia (X-axis) 0.390 in4 Moment of Inertia (Y-axis) 0.085 in4 Torsional Constant 0.214 in3 Polar Moment of Inertia 0.126 in4 1.99 APPROVED MATERIALS: 2.44 6005-T6, 6005A-T61, 610545, 6N01-T6 2.34 (34,000 PSI YIELD STRENGTH MINIMUM) i J .58 1 1 r -- 1.25 _ .--- Clear Part Black Part Description/Length Material Weight Number Number XR-100-132A XR-100-132B XR100, Rail 132 (11 Feet) 7.50 lbs. XR-100-168A XR-100-168B XR100, Rail 168"(14 Feet) 6000 Series 9.55 lbs. XR-100-204A XR-100-204B XR100, Rail 204"(17 Feet) Aluminum 11.60 lbs. 0.1 ., . Y , mu IRON RIDGE Tilt Mount System 111 Trust your system at every angle. The IronRidge Tilt Mount System supports a wide range of solar module tilting angles, while also resisting the extreme wind and snow forces experienced over a building's lifetime. Every component has been carefully engineered and rigorously tested, and the entire system uses only aluminum and stainless steel materials to resist corrosion. Roof Friendly PE Certified Lightweight and compatible with Pre-stamped engineering letters industry-standard attachments. available in most states. Strength Tested Design Assistant All components evaluated for superior 1;3 Online software makes it simple to structural performance. create, share, and price projects. UL 2703 Listed System 25-Year Warranty Meets newest effective UL 2703 Products guaranteed to be free standard. of impairing defects. Datasheet XR Rails & Tilt Legs XR Rails Tilt Legs Q kill isliall 14\ .. ' Attach directly to Tilt Legs.Available in three targeted Tilt assembly to desired angle, up to 30 degrees. Kits sizes to support specific wind and snow loads. include South and North Tilt Leg and all hardware. • Unique curved profile • Available in multiple lengths for a wide angle range • Spanning capabilities up to 12' • Assembled South Tilt Legs include angle indicators • Clear and black finish • Legs are electrically bonded to rails Grounding Clamps — UFOs Q Stopper Sleeves CAMO 0 j I . ''.- 6--- _....... i ......._ L __;..., Universal Fastening Objects Snap onto the UFO to transform Bond modules to rails while secure and bond modules to rails. into a bonded end clamp. staying completely hidden. • Fully assembled and lubricated • Bonds modules to rails • Universal end-cam clamp • Single, universal size • Sized to match modules • Tool-less installation • Clear and black finish • Clear and black finish • Fully assembled Accessories -- BOSS."' Bonded Splices 0 Grounding Lugs Ends Caps &Wire Clips ----------.. lig 7 Bonded Structural Splices connect Connects Tilt Mount system to Provide a finished look and and bond XR Rails together. equipment ground. organize electrical wires. • Integrated bonding • Low profile • Simple snap-in installations • No tools or hardware • Single tool installation • Clips hold up to ten 5mm wires • Self-centering stop tab • Mounts in any direction • UV-stabilized polymer Resources --- ______ __ _ .247 _ ' Design Assistant ` > NABCEP Certified Training 17-7-7 -_ _- Go from rough layout to fully ' r ,, Earn free continuing education credits, - - engineered system. For free. 4 1 while learning more about our systems. Go to IronRidge.com/design 1 V Go to IronRidge.com/training 4. i ®2020 IronRidge,Inc.All rights reserved.U.S.Patents:#8,695,290;#9,819,303;#9,865,938;Others Pending.Version 1.45 ,��_ Pioneer Valley PhotoVoltaics Cooperative POLICY DOCUMENT #9 Current version adopted by the Board of Directors on April 28, 2011 INSTALLATION CREW OPERATING POLICY This policy applies to all PV Squared employees in Massachusetts, but is particularly directed at those involved in the installation of solar electric and other renewable energy systems (licensed electrician, learner/apprentice electrician, licensed constructor supervisor, supervised carpenter and laborer). When engaged in this work as an employee of PV Squared on a PV Squared project site, activities of PV Squared employees are covered under the General Liability Insurance maintained by the Cooperative. It is the intent of this policy to provide clarity to installation situations where the applicable codes and regulations are unclear, ambiguous, or silent. It is possible that a municipal building or electrical inspector could interpret the codes and regulations in a manner that differs from what appears here. But this policy sets out, in writing, how the cooperative interprets legal work requirements and unclear details. It is an internal consensus working model, intended to be revised and improved from time to time. As a general matter, a city's or town's Building Commissioner is charged with enforcing the State Building Code, Plumbing and Gas Code, Electrical Code and Architectural Access Code. The commissioner addresses concerns about the safety, accessibility and security of construction of homes and businesses. The commissioner also enforces zoning bylaws. In accordance with Massachusetts General Law, employees of the cooperative who perform electrical tasks and activities must hold a Massachusetts journeymen's electrician license or be under the direct supervision of such licensed personnel. These tasks and activities include installing electrical wiring, conduits, apparatus, devices, fixtures or other appliances for carrying or using the electricity associated with Renewable Energy Generators (electrically active solar photovoltaic modules, wind turbine-generators, hydroelectric generators, etc.). In no circumstances shall the Massachusetts licensed journeymen have more than one learner or apprentice working with him/her or under his/her supervision. Mounting structures come in a variety of configurations and have differing functional and physical characteristics. A structural component or assembly becomes associated with electrical work as the Renewable Energy Generator is electrically bonded to the mounting structure. Unless otherwise noted in M.G.L. c.143 §53 through §560 inclusive, all structural work defined as follows shall not be required to be performed by a Massachusetts licensed journeymen electrician: • Structural improvements • Elements of a Renewable Energy Generator's support structure that fall under a building permit (e.g., assembly of top-of-pole mounting structure on steel pole with concrete foundation prior to execution of any required electrical bonding of the support structure and associated renewable energy generator (solar electric module) to the support structure Policy # 9 Installation Crew Operating Policy FLASHLOGTM RM N I RAC THE STRONGEST ATTACHMENT FOR EVERY FLAT ROOF BETTER SOLAR STARTS HERE Unirac's FLASHLOCTM RM is a lightweight, durable, powder-coated cast aluminum roof attachment solution that provides fast,easy installation and helps save labor cost.FLASHLOCTM RM is compatible with most roofing materials and is applicable for almost all solar racking form factors. Rigorous mechanical, sealing, and ease-of-install testing has been successfully completed for assurance of long-term reliability. FEATURES I ,PUNIRAC FLASHLOCTM Technology—no more membrane SKUs or heat welding • Works for all roof types—see Chemlink M-1's compatibility for details • Labor and attachment savings • Industry-leading install time YEAR • 6,600-lb.uplift offset (ultimate) RI-SYSTEM NIAIIRANTV • Includes 8 fastener holes ----. • Attachment can accommodate roofing screw sizes#12 -#15 ' • 25-year warranty . , ,) PRODUCT SPECIFICATIONS 0• 1.5"diameter X 0.94"height +f .. • Included hardware:1 preassembled bolt and washer • Chemlink M-1 and 1-Part included in kit PART NUMBER I DESCRIPTION I LIST PRICE I PACK SIZE 310999 FLASHLOC RM KIT S44.00 ea. 10 *Check with your local distributor for finalized pricing. fifi mit i i 4, .., . kl , kok.k., aN. l „., \N.,„,______ ••................_ \.,..,.....„...._.. _ . ____ _ _ \ .....____ \ FASTER INSTALLATION . 25 -YEAR WARRANTY. IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIItIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII FOR QUESTIONS OR CUSTOMER SERVICE VISIT UNIRAC.COM OR CALL (505) 248-2702 FLASHLOCTM RM :PUNIRAC INSTALLATION GUIDE BETTER SOLAR STARTS HERE STEP 1 STEP ONE CLEAN SURFACE AND MARK LOCATION -IMPORTANT: Thoroughly clean roof surface with isopropyl alcohol or denatured alcohol. Bonding surfaces should be clean, dry and free of dirt or contamination. Remove all previously applied caulk, mastic or other contaminants with a wire brush. i Brush away all gravel or loose granules. -Mark center point locations on the roof. NOTE: We recommend locating Flashloc RM after your equipment has been installed or layout is confirmed. CLEAN SURFACE&MARK LOCATION STEP 2 . STEP TWO APPLY M1 SEALANT ,F--- -Apply a 5/16" bead of Chemlink M1 sealant to the entire bottom perimeter AND to the bottom of each bolt location to be used. Tool M1 sealant bead to form a smooth kti,„,:-160-��'• 4 surface along the entire bottom perimeter. Refer to Chemlinks application guidelines �_ with temperatures below 40 degrees F. -IMPORTANT: CHEMLINK TPO PRIMER MUST BE USED ON TPO SINGLE-PLY ROOF SUBSTRATES MEMBRANES PRIOR TO INSTALLATION. APPLY CHEMLINK M1 SEALANT STEP 3 STEP THREE SECURE ATTACHMENT i - Align mount using alignment marks on roof and base. Using fasteners specified by • ,�,�= your P.E. of record, securely fasten attachment to the roof. Drive screws down until { -" l' the base is firmly attached to the roof and the M1 sealant expands beyond the outer perimeter of the base. - Tool M1 sealant bead around entire perimeter to form a smooth fillet. TIP: Use caution to avoid over-torqueing the screws. SECURE ATTACHMENT STEP 4 •�• STEP FOUR FILL BASE WITH CHEMLINK 1-PART -Completely fill base with Chemlink 1-Part sealant. Sealant must completely cover all screw heads. Do NOT overfill. • _ -'"'� -Place cap on base and secure racking to mount with Unirac provided 3/8"hardware or other 3/8"-16 threaded hardware as specified by the P.E.of record. -IMPORTANT: To ensure robust sealing over the life of the product,the maximum allowed gap FILL WITH CHEMLINK 1-PART&PLACE CAP between attachment kit strut and the top surface of the flat roof attachment is 1/16". FASTER INSTALLATION . 25 -YEAR WARRANTY. IIII I I I I I I I I I I I I I I I I Ii I II I I I I I I I I I I I I I I I I I I I I I I IIIIIIIIIIIII I II I I I I II I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I IIIIII III II I IIII I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I1111111111111111I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I II11111111111III I I I III IIII I I I I II I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I11111IIIIIIIIIII I I I I I I I I I I I I I I I I I I I I I I II I I I I I I I I I I I I I FOR QUESTIONS OR CUSTOMER SERVICE VISIT UNIRAC.COM OR CALL (505) 248-2702 Pioneer Valley PhotoVoltaics Cooperative POLICY DOCUMENT #9 Current version adopted by the Board of Directors on April 28, 2011 • Roof-top mounting support structures including but not limited to posts, stand-offs, flashings, feet, and mounting rails • Operation of heavy equipment involved in moving, hoisting, digging and other tasks • Earth work, excavation and concrete work • Manual labor involved in moving loading and unloading of equipment • Moving, hoisting, and attaching an electrically bonded panel assembly (defined as one or more assembled and electrically bonded solar electric modules) to an existing structural support designed to host the panel assembly. Note however that construction of a panel assembly is an electrical task due to the required electrical bonding activities. Repair and Servicing of Installed Equipment Repair or replacement of an electrically bonded and/or energized renewable energy generator (e.g., installed solar electric panel) will be performed by a licensed electrician or properly supervised learner or apprentice working with the licensed electrician. Replacement of an installed inverter must be performed by a licensed electrician or properly supervised learner or apprentice working with the licensed electrician, if the work requires removal of AC and/or DC conduit and associated wiring that originates outside of the installed inverter (e.g., removal of external AC conduit and wiring between the inverter and point of interconnection with the on-site electrical service). Note that this activity may require a wiring permit in some local jurisdictions. This requirement also applies to the servicing of an installed inverter that involves replacement or repair of components and wiring internal to the pre-manufacturer inverter (i.e., factory installed components that were originally shipped with the inverter) even though such activity may not require a wiring permit. Replacement of an installed inverter may also be performed by a qualified technician who may or may not be a licensed electrician or properly supervised learner or apprentice working with a licensed electrician if the inverter is of a "plug and play" design. Such a qualified technician can also performed other tasks that include installation and servicing inverter-based performance monitoring systems (e.g., replacing internal communication cards, making "plug and play" ethernet connections, etc.), assuming these activities do not require creation of a new AC power source circuit to operate the communication system(s). Policy # 9 Installation Crew Operating Policy Non Electrical Work at a typical PV Squared installation: • All Material Handling tasks o Module prep and moving o Ladder lift set up o Ladder set up o Trash/recycling removal and sorting • Structural Improvements o All carpentry work • Roof Mount Array o Fall protection anchor setup and removal o Layout and mounting bases o Racking up to but not including"bonding/grounding related activities" o Leveling of racking o Sealing seams/patching roofing/additional flashing • Ground mount array o Site work,earth moving o Trenching/digging o Construction of racking up to but not including "bonding/grounding related activities" • Conduit run o Making holes in structure o Fire blocking,sealing penetrations o Stickers • Power Board o Build wall, hang plywood o Stickers • Interconnection o Stickers • Monitoring o Wifi options o Any"plug and play"devices o Programming of monitoring devices o Computer based activities • Installation completion o Final building inspections o Install pictures-See checklist o Update one line and roof drawings to reflect as built o Completion checklist o Notes for others o COC left onsite • Misc o Truck Organizing o Material List,ordering o Daily check-in o Customer interaction and training activities PV Permit Fee Calculator for Commercial Systems Written by Scott Troyer& Kurt Newick Jurisdiction Name: City of Northampton Project Address: 140 Olander Drive PV Project Size (kW DC): 59 Select Separate Input Average Hours Computed Reviews Review Hours for PV Project Size Required 10 kW 100 kW 59 kW PV Plan Reviews Electrical Plan Review N/A ❑ FALSE 0.5 1.5 Structural Plan Review (1st cycle) p TRUE 0.5 1.5 1.3 Clerical Time for 1st cycle IA TRUE 0.4 0.5 0.5 Subtotal, Plan Review(1st cycle) 1.4 3.5 1.7 2nd Cycle Review% 20% 0.1 0.4 0.2 Total, Plan Review (nearest 1/2 hr.) 1.5 3.9 2.0 PV Inspections Rooftop Array D TRUE 0.5 1.0 0.9 Ground Array ❑ FALSE 0.5 1.0 0.0 Electrical Inspection N/A ❑ FALSE 0.5 2.0 Subtotal, Inspection (1st cycle) 1.5 4.0 0.9 Inspection Turn Down Rate% 20% 0.225 0.6 0.1 Total, Inspection (round to 1/2 hr.) 1_7 4_6 1.00 Jurisdiction's Billable Rates Permit Issuance Fee: $55.00 Plan Reviewer Billable Hourly Rate $145.00 Inspector Billable Hourly Rate $150.00 Clerical Billable Hourly Rate $50.00 Total Hours (Plan Review& Inspection), nearest 1/2 hr. 3c5 8_5 3_0 Total Calculated PV Permit Fee $441 SQUq 4 R* PV Squared Solar I www.pvsquared.coop Phone:413-772-8788 I Fax:413-772-8668 311 Wells St.,Ste. B I Greenfield,MA 01301 4'lRi a g0"' MA Elec.Lic.A13764 I MA HIC 140077 Dear Town Inspections Officials, Please see our enclosed applications to permit a Solar Photovoltaic System in your jurisdiction. As you are likely aware, PV Squared is a worker-owned-cooperative B-Corp, employing 40+ people in Greenfield. We have installed thousands of PV Systems out of our Greenfield, MA Headquarters since 2002. PV Squared is committed to complying with all Commonwealth laws and regulations. Our worksite guidelines are created with the intention of exceeding all safety, electrical, and building requirements as defined by their respective jurisdictional entities. This includes the work of people from multiple disciplines, including electrical engineering, structural engineering, civil engineering, electricians, construction supervisors, roofers, and their associated helpers. We are a company that values training and education. We make certain that every individual is qualified for the roles and responsibilities that they assume. It is our policy to pay for the employees travel and training time and cost of the education, including CSL and Journeyman and Master Electrician classes. As an electrical contractor we are furthermore guided by the January 30, 2009 Massachusetts Board of State Examiners of Electricians (BSEE)judgements, and rulings that have followed. We pay strict adherence to these mandates and all electrical work is conducted by an electrician and an electrician's apprentice in a 1:1 ratio. We also understand that non-electrical tasks associated with a Solar installation can be completed by non-electrical workers, such as CSLs and others. I have attached our installation policy for your review, as well as a list of example non-electrical tasks. Should you have any questions or concerns regarding this policy or delineation of work, please let us know. We are a learning organization that is always trying to improve on what we do. Respectfully, Maya Fulford Installation Manager