Loading...
Martin Building Permit App The Commonwealth of Massachusetts Board of Building Regulations and Standards Massachusetts State Building Code, 780 CMR Building Permit Application To Construct, Repair, Renovate Or Demolish a One- or Two-Family Dwelling FOR MUNICIPALITY USE Revised Mar 2011 This Section For Official Use Only Building Permit Number: _____________________ Date Applied: ______________________________ ___________________________________ ____________________________________________ ___________ Building Official (Print Name) Signature Date SECTION 1: SITE INFORMATION 1.1 Property Address: ____________________________________________ 1.1a Is this an accepted street? yes_____ no_____ 1.2 Assessors Map & Parcel Numbers _____________________ ____________________ Map Number Parcel Number 1.3 Zoning Information: _______________ ___________________ Zoning District Proposed Use 1.4 Property Dimensions: _____________________ ____________________ Lot Area (sq ft) Frontage (ft) 1.5 Building Setbacks (ft) Front Yard Side Yards Rear Yard Required Provided Required Provided Required Provided 1.6 Water Supply: (M.G.L c. 40, § 54) Public  Private  1.7 Flood Zone Information: Zone: ___ Outside Flood Zone? Check if yes 1.8 Sewage Disposal System: Municipal  On site disposal system  SECTION 2: PROPERTY OWNERSHIP1 2.1 Owner1 of Record: ________________________________________ _________________________________________________ Name (Print) City, State, ZIP _____________________________________________ _________________ ___________________________________ No. and Street Telephone Email Address SECTION 3: DESCRIPTION OF PROPOSED WORK2 (check all that apply) New Construction  Existing Building  Owner-Occupied  Repairs(s)  Alteration(s)  Addition  Demolition  Accessory Bldg.  Number of Units_____ Other  Specify:________________________ Brief Description of Proposed Work2:_________________________________________________________________ _______________________________________________________________________________________________ _______________________________________________________________________________________________ SECTION 4: ESTIMATED CONSTRUCTION COSTS Item Estimated Costs: (Labor and Materials) Official Use Only 1. Building $ 1. Building Permit Fee: $_______ Indicate how fee is determined:  Standard City/Town Application Fee  Total Project Cost3 (Item 6) x multiplier _______ x _______ 2. Other Fees: $_________ List:_________________________________________________ ____________________________________________________ Total All Fees: $_______________ Check No. ______Check Amount: _______Cash Amount:______  Paid in Full  Outstanding Balance Due:__________ 2. Electrical $ 3. Plumbing $ 4. Mechanical (HVAC) $ 5. Mechanical (Fire Suppression) $ 6. Total Project Cost: $ SECTION 5: CONSTRUCTION SERVICES 5.1 Construction Supervisor License (CSL) ________________________________________________________Name of CSL Holder _________________________________________________________ No. and Street _________________________________________________________City/Town, State, ZIP _________________________________________________________ __________________ ______________________________________ Telephone Email address _____________________ ______________License Number Expiration Date List CSL Type (see below) _______________ Type Description U Unrestricted (Buildings up to 35,000 cu. ft.) R Restricted 1&2 Family Dwelling M Masonry RC Roofing CoveringWS Window and Siding SF Solid Fuel Burning Appliances I Insulation D Demolition 5.2 Registered Home Improvement Contractor (HIC) ______________________________________________________________HIC Company Name or HIC Registrant Name______________________________________________________________ No. and Street________________________________________ ____________________City/Town, State, ZIP Telephone _____________________ ______________ HIC Registration Number Expiration Date _______________________________________Email address SECTION 6: WORKERS’ COMPENSATION INSURANCE AFFIDAVIT (M.G.L. c. 152. § 25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the Issuance of the building permit. Signed Affidavit Attached? Yes ………. † No ……….. † SECTION 7a: OWNER AUTHORIZATION TO BE COMPLETED WHENOWNER’S AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I, as Owner of the subject property, hereby authorize_____________________________________________________ to act on my behalf, in all matters relative to work authorized by this building permit application. ______________________________________________________ ______________________ Print Owner’s Name (Electronic Signature) Date SECTION 7b: OWNER1 OR AUTHORIZED AGENT DECLARATION By entering my name below, I hereby attest under the pains and penalties of perjury that all of the information contained in this application is true and accurate to the best of my knowledge and understanding. _____________________________________________________________ ______________________ Print Owner’s or Authorized Agent’s Name (Electronic Signature) Date NOTES: 1. An Owner who obtains a building permit to do his/her own work, or an owner who hires an unregistered contractor(not registered in the Home Improvement Contractor (HIC) Program), will not have access to the arbitration program or guaranty fund under M.G.L. c. 142A. Other important information on the HIC Program can be found atwww.mass.gov/oca Information on the Construction Supervisor License can be found at www.mass.gov/dps 2. When substantial work is planned, provide the information below: Total floor area (sq. ft.) _________________________ (including garage, finished basement/attics, decks or porch)Gross living area (sq. ft.) __________________ Habitable room count ______________________ Number of fireplaces______________________ Number of bedrooms _____________________Number of bathrooms ____________________ Number of half/baths ______________________ Type of heating system ___________________ Number of decks/ porches __________________Type of cooling system_____________________ Enclosed ______________Open _____________ 3. “Total Project Square Footage” may be substituted for “Total Project Cost” 5LFKDUG-7RELQ-U 10DLQ6W 1RUWK8[EULGJH0$ &6 'HPDUVH(OHFWULF,QF 0DLQ6W 4XHHQVEXU\1<  1RUWK8[EULGJH0$ 5LFKDUG-7RELQ-U 10DLQ6W &6 413-203-9088 applications.westma@trinity-solar.com U 413-203-9088 applications.westma@trinity-solar.com Please See Attached X X X x x 1508 1508 Nicholas D Casavant 149 Dunnbrook Rd East Brookfield, MA 01515 CS-111552 2/20/2023 fetto»:d fetto»:d NJ,ElectricalContractor business permitnumber34EB01547400 NJ,HIC reg.#13VH01244300Forotherjurisdictions,please visit:http://www.trinity-solar.com/about-us/locations-and-licenses HOMEOWNERS AUTHORIZATION FORM I,, (print name) am the owner of the property located at address: . (print address) I hereby authorize Trinity Solar Inc. (“Trinity Solar”) and its employees,agents,and subcontractors,including without limitation,,to act as my Agent for the limited purpose of applying for and obtaining local building and other permits from the Authority Having Jurisdiction as required for the installation of a Photovoltaic System,Battery System,roofing or other Trinity Solar offerings located on my property,applying and obtaining permission and approval for interconnection with the electric utility company,and registration with any state and/or local incentive program(s). This authorization includes the transfer/re-administering,and/or cancellation of any existing permits on file for the purpose of updating/applying with an alternate subcontractor. Without limitation to the generality of the foregoing I specifically authorize Trinity Solar et al.to populate technical details,fill-in,edit,compile,attach drawings,plans,data sheets and other documentation to,date,submit,re-submit,revise,amend and modify application,submission and certification documents (“Approvals Paperwork”), including those for which signature pages are included herewith for my signature,in furtherance of the related transaction,and I am providing any signatures to Approvals Paperwork for purposes of the foregoing.Trinity Solar will provide copies of Approvals Paperwork when submitted.My authorizations memorialized herein shall remain in full force and effect until revoked.I acknowledge that these authorizations are not required to proceed with the transaction and are not a condition of the related agreement included herewith but are being given for my own convenience and benefit in order to expedite the approvals processes. Electric Utility Company: Electric Utility Account No.: Name on Electric Utility Account: Customer Signature Print Name Date Corporate Headquarters 1-877-SUN-SAVES 2211 Allenwood Road Ph: 732-780-3779 Wall, New Jersey 07719 Fax: 732-780-6671 www.trinity-solar.com FOR INFORMATION ABOUT CONTRACTORS AND THE CONTRACTORS’ REGISTRATION ACT,CONTACT THE NEW JERSEY DEPARTMENT OF LAW AND PUBLIC SAFETY,DIVISION OF CONSUMERS AFFAIRS AT 1-888-656-6225. Northampton, MA August 26, 2021 212 Main St. Northampton, MA 01060 Trinity Solar No. 58 Autumn Drive 2021-08-610797 Northampton, MA 01062 Trinity Solar | 4 Open Square Way, Suite 410 | Holyoke, MA | (413) 203-9088 MA License No. 56687 RE: MARTIN, BRUCE S; MARTIN, SOPIE H To the Building Official: The following information constitutes a summary of the relevant design criteria and recommendations for the support of a new photovoltaic [PV] system on the existing roof framing components at the above-referenced location. Criteria is as follows: 1. Existing roof framing: Conventional roof framing is 2x6 at 16 o.c.; existing rafter span= 12' 0"; (horizontal projection) 2. Roof Loading: • 4.33psf dead load (pounds per square foot - PV panels, mounting rails & hardware) • 5.7 psf - existing roof loads (1.7 psf - 2x6 framing, 1.5psf roof sheathing, 2.5 psf shingles) • Ground Snow Load - 40psf - per AHJ (Authority Having Jurisdiction) • Wind criteria - Exposure Category B, 117 mph wind equivalent to 23.09psf wind pressure 3. Existing roof modification - provide 2x4 (@16" o.c.) "knee wall" reinforcing to limit the maximum span of the existing rafter to 10'-10". Locate bottom of "knee wall" within one foot of existing bearing wall below. Alternatively, existing roof rafters may be "sistered" with the new 2x6 rafters extending the full length of the existing rafters and terminated before the existing rafter support connection. This installation design is in general conformance with the manufacturers’ specifications and complies with all applicable laws, codes, and ordinances – specifically the International Building Code (2015 edition) and the International Residential Code (2015 edition), including all Massachusetts regulations and amendments. The spacing and fastening of the mounting brackets is a maximum of 48” o.c. between mounting brackets (staggered) and is secured using 5/16” diameter corrosive-resistant steel lag bolts. A minimum of 2½” of penetration (embedment) per lag bolt is required, which will resist all stated loads above – including wind shear. Per NDS Section 11.1.4, clearance holes - equal to the diameter of the shank - need to be bored into a primary framing member for the full-length of the threaded portion of the bolt to avoid splitting of the framing member. Regards, Ihor Bojcun, PE Structural Engineer - Trinity Solar INSTALLATION OF NEW ROOF MOUNTED PV SOLAR SYSTEM 58 AUTUMN DRIVE NORTHAMPTON, MA 01062 42.297763,-72.675896 AUTUMN DRIVE P1 ISSUED TO TOWNSHIP FOR PERMIT 8/25/2021 NO.DESCRIPTION DATE MARTIN, SOPHIE- TRINITY ACCT #: 2021-08-610797 58 AUTUMN DRIVE NORTHAMPTON, MA 01062 42.297763,-72.675896 PROPOSED PV SOLAR SYSTEM DRAWING DATE:8/25/2021 DRAWN BY:MD REVISED BY: DC SYSTEM SIZE:9.52kW AC SYSTEM SIZE:7.6kW MODULE COUNT:28 MODULES USED:HANWHA 340 MODULE SPEC #:Q.PEAK DUO BLK-G6+ 340 UTILITY COMPANY:NAT'L GRID UTILITY ACCT #:51459-64008 UTILITY METER #:37368786 DEAL TYPE:SUNNOVA P1 VICINITY MAP SCALE: NTS Project Title: System Information: Drawing Information Rev. No.Sheet Issued / Revisions Project Address: Drawing Title: PV - 1 SITE GENERAL NOTES IF ISSUED DRAWING IS MARKED WITH A REVISION CHARACTER OTHER THAN "A", PLEASE BE ADVISED THAT FINAL EQUIPMENT AND/OR SYSTEM CHARACTERISTICS ARE SUBJECT TO CHANGE DUE TO AVAILABLITY OF EQUIPMENT. GENERAL NOTES CONTINUED 14. B)CURRENT PREVAILING UTILITY COMPANY SPECIFICATIONS, STANDARDS, AND REQUIREMENTS 15 THIS SET OF PLANS HAVE BEEN PREPARED FOR THE PURPOSE OF MUNICIPAL AND AGENCY REVIEW AND APPROVAL. ONCE APPROVED, THE INSTALLATION CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL SYSTEM COMPONENTS AS DESCRIBED IN THE DRAWING PACKAGE. 16 ALL INFORMATION SHOWN MUST BE CERTIFIED PRIOR TO USE FOR CONSTRUCTION ACTIVITIES. AMPERE ALTERNATING CURRENT ALUMINUM AMP. FRAME ABOVE FINISHED FLOOR ABOVE FINISHED GRADE AMERICAN WIRE GAUGE CONDUIT (GENERIC TERM OF RACEWAY, PROVIDE AS SPECIFIED) COMBINER BOX CIRCUIT CURRENT TRANSFORMER COPPER DIRECT CURRENT DISCONNECT SWITCH DRAWING ELECTRICAL SYSTEM INSTALLER ELECTRICAL METALLIC TUBING FUSIBLE SWITCH FUSE GROUND GROUND FAULT INTERRUPTER FREQUENCY (CYCLES PER SECOND) AMP AC AL AF AFF AFG AWG C CB CKT CT CU DC DISC DWG EC EMT FS FU GND GFI HZ ABBREVIATIONS JUNCTION BOX THOUSAND CIRCULAR MILS KILO-VOLT AMPERE KILO-WATT KILO-WATT HOUR LINE MAIN CIRCUIT BREAKER MAIN DISTRIBUTION PANEL MAIN LUG ONLY MOUNTED MOUNTING NEUTRAL NATIONAL ELECTRICAL CODE NOT IN CONTRACT NUMBER NOT TO SCALE OVER CURRENT PROTECTION POLE PULL BOX PHASE POLY-VINYL CHLORIDE CONDUIT POWER QUANTITY RIGID GALVANIZED STEEL SOLID NEUTRAL SWITCHBOARD TYPICAL UNLESS OTHERWISE INDICATED WEATHERPROOF TRANSFORMER MOUNT 72 INCHES TO BOTTOM OF ABOVE FINISHED FLOOR OR GRADE JB kCMIL kVA kW kWH L MCB MDP MLO MTD MTG N NEC NIC NO # NTS OCP P PB PH Ø PVC PWR QTY RGS SN JSWBD TYP U.O.I. WP XFMR +72 ABBREVIATIONS CONTINUEDGENERAL NOTES 1.THE INSTALLATION CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL EQUIPMENT AND FOLLOWING ALL DIRECTIONS AND INSTRUCTIONS CONTAINED IN THE DRAWING PACKAGE AND INFORMATION RECEIVED FROM TRINITY. 2.THE INSTALLATION CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL EQUIPMENT AND FOLLOWING ALL DIRECTIONS AND INSTRUCTION CONTAINED IN THE COMPLETE MANUAL. 3.THE INSTALLATION CONTRACTOR IS RESPONSIBLE FOR READING AND UNDERSTANDING ALL DRAWINGS, COMPONENT AND INVERTER MANUALS PRIOR TO INSTALLATION. THE INSTALLATION CONTRACTOR IS ALSO REQUIRED TO HAVE ALL COMPONENT SWITCHES IN THE OFF POSITION AND FUSES REMOVED PRIOR TO THE INSTALLATION OF ALL FUSE BEARING SYSTEM COMPONENTS. 4.ONCE THE PHOTOVOLTAIC MODULES ARE MOUNTED, THE INSTALLATION CONTRACTOR SHOULD HAVE A MINIMUM OF ONE ELECTRICIAN WHO HAS ATTENDED A SOLAR PHOTOVOLTAIC INSTALLATION COURSE ON SITE. 5.FOR SAFETY, IT IS RECOMMENDED THAT THE INSTALLATION CREW ALWAYS HAVE A MINIMUM OF TWO PERSONS WORKING TOGETHER AND THAT EACH OF THE INSTALLATION CREW MEMBERS BE TRAINED IN FIRST AID AND CPR. 6.THIS SOLAR PHOTOVOLTAIC SYSTEM IS TO BE INSTALLED FOLLOWING THE CONVENTIONS OF THE NATIONAL ELECTRICAL CODE. ANY LOCAL CODE WHICH MAY SUPERSEDE THE NEC SHALL GOVERN. 7.ALL SYSTEM COMPONENTS TO BE INSTALLED WITH THIS SYSTEM ARE TO BE "UL" LISTED. ALL EQUIPMENT WILL BE NEMA 3R OUTDOOR RATED UNLESS INDOORS. GENERAL NOTES CONTINUED 8.THE DC VOLTAGE FROM THE PANELS IS ALWAYS PRESENT AT THE DC DISCONNECT ENCLOSURE AND THE DC TERMINALS OF THE INVERTER DURING DAYLIGHT HOURS. ALL PERSONS WORKING ON OR INVOLVED WITH THE PHOTOVOLTAIC SYSTEM ARE WARNED THAT THE SOLAR MODULES ARE ENERGIZED WHENEVER THEY ARE EXPOSED TO LIGHT. 9.ALL PORTIONS OF THIS SOLAR PHOTOVOLTAIC SYSTEM SHALL BE MARKED CLEARLY IN ACCORDANCE WITH THE NATIONAL ELECTRICAL CODE ARTICLE 690 & 705. 10.PRIOR TO THE INSTALLATION OF THIS PHOTOVOLTAIC SYSTEM, THE INSTALLATION CONTRACTOR SHALL ATTEND A PRE-INSTALLTION MEETING FOR THE REVIEW OF THE INSTALLATION PROCEDURES, SCHEDULES, SAFETY AND COORDINATION. 11.PRIOR TO THE SYSTEM START UP THE INSTALLATION CONTRACTOR SHALL ASSIST IN PERFORMING ALL INITIAL HARDWARE CHECKS AND DC WIRING CONDUCTIVITY CHECKS. 12.FOR THE PROPER MAINTENANCE AND ISOLATION OF THE INVERTERS REFER TO THE ISOLATION PROCEDURES IN THE OPERATION MANUAL. 13.THE LOCATION OF PROPOSED ELECTRIC AND TELEPHONE UTILITIES ARE SUBJECT TO FINAL APPROVAL OF THE APPROPRIATE UTILITY COMPANIES AND OWNERS. 14.ALL MATERIALS, WORKMANSHIP AND CONSTRUCTION FOR THE SITE IMPROVEMENTS SHOWN HEREIN SHALL BE IN ACCORDANCE WITH: A)CURRENT PREVAILING MUNICIPAL AND/OR COUNTY SPECIFICATIONS, STANDARDS AND REQUIREMENTS SHEET INDEX COVER SHEET W/ SITE INFO & NOTES ROOF PLAN W/ MODULE LOCATIONS ELECTRICAL 3 LINE DIAGRAM APPENDIX PV-1 PV-2 PV-3 AP R 2211 Allenwood Road Wall, New Jersey 07719 877-786-7283 www.Trinity-Solar.com ROOF 1 MODULES: 28 PITCH: 22 ORIENTATION: 246 ROOF 2 MODULES: 0 PITCH: 22° ORIENTATION: 66° ROOF 3 MODULES: 0 PITCH: 20° ORIENTATION: 156° ROOF 4 MODULES: 0 PITCH: 21° ORIENTATION: 336° ROOF 5 MODULES: 0 PITCH: 20° ORIENTATION: 340° ROOF 6 MODULES: 0 PITCH: 20° ORIENTATION: 160° R5R6 R2 R3 R4 R1 FRONT BACK D UD epM P DC AC ***NOTE: PV DISCONNECT 24/7 ACCESSIBLE AND LOCKABLE NS270 90135225 45315 16'-10"SOLAR MODULES SHALL NOT EXCEED PEAK HEIGHT. HEIGHT FROM GROUND LEVEL TO PEAK OF ROOF SCALE: NOT TO SCALE ATTACHMENT & CLIP DETAIL SCALE: NOT TO SCALE 6"MAXSOLAR MODULE EXISTING RAFTER (REFER TO ENGINEERS LETTER FOR SPECS) ECOFASTEN "L" FOOT (REFER TO SPEC SHEET FOR DETAILS) SOLAR MODULE ECOFASTEN CLAMP (REFER TO SPEC SHEET FOR DETAILS) PV MODULE ATTACHMENT ON ASPHALT SHINGLE ROOF SCALE: NOT TO SCALE APOC SEALANT EXISTING ASPHALT SHINGLES (REFER TO ENGINEERS LETTER FOR SPECS) S.S. LAG BOLT (REFER TO ENGINEERS LETTER FOR SPECS) ECOFASTEN FLASHING (REFER TO SPEC SHEET FOR DETAILS) ECOFASTEN RAIL (REFER TO SPEC SHEET FOR DETAILS) NEW PV SOLAR MODULE, TYPICAL (REFER TO EQUIPMENT SCHEDULE FOR SPECS AND QUANTITIES) NEW ECOFASTEN RAIL,TYPICAL TO BE MOUNTED PERPINDICULAR TO STRUCTURE(REFER TO ECOFASTEN SPECIFICATION / DATA SHEET FOR DETAILS ) NEW MOUNTING FOOT/ ATTACHMENT POINTS, TYPICAL (REFER TO ENGINEERING LETTER FOR SPACING AND DETAILS) NEW END CLIP, TYPICAL (REFER TO ECOFASTEN SPECIFICATION / DATA SHEET FOR DETAILS ) NEW MID CLIP, TYPICAL (REFER TO ECOFASTEN SPECIFICATION / DATA SHEET FOR DETAILS ) NOTES : *REFER TO MODULE SPECS FOR MODULE DIMENSIONS *DEPICTED MODULES MAY BE PORTRAIT OR LANDSCAPE 42.297763,-72.675896 28 HANWHA 340 (Q.PEAK DUO BLK-G6+ 340) 1 SE7600H-US000BNC4 INDICATES NEW PRODUCTION METER TO BE INSTALLED INDICATES NEW INVERTER TO BE INSTALLED REFER TO EQUIPMENT SCHEDULE FOR SPECS INDICATES EXISTING ELECTRICAL PANEL LOCATION: INSIDE OUTSIDE. OUTSIDE (UTILITY ACCESSIBLE)OUTSIDE. P1 ISSUED TO TOWNSHIP FOR PERMIT 8/25/2021 NO.DESCRIPTION DATE MARTIN, SOPHIE- TRINITY ACCT #: 2021-08-610797 58 AUTUMN DRIVE NORTHAMPTON, MA 01062 42.297763,-72.675896 PROPOSED PV SOLAR SYSTEM DRAWING DATE:8/25/2021 DRAWN BY:MD REVISED BY: DC SYSTEM SIZE:9.52kW AC SYSTEM SIZE:7.6kW MODULE COUNT:28 MODULES USED:HANWHA 340 MODULE SPEC #:Q.PEAK DUO BLK-G6+ 340 UTILITY COMPANY:NAT'L GRID UTILITY ACCT #:51459-64008 UTILITY METER #:37368786 DEAL TYPE:SUNNOVA P1 Project Title: System Information: Drawing Information Rev. No.Sheet Issued / Revisions Project Address: Drawing Title: PV - 2 NOTES: 1.) ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. 2.) ARRAY BONDING TO COMPLY WITH MANUFACTURER SPECIFICATION. 3.) ALL LOCATIONS ARE APPROXIMATE AND REQUIRE FIELD VERIFICATION. 4.)AN AC DISCONNECT SHALL BE GROUPED WITH INVERTER(S )NEC 690.13(E). 5.)ALL OUTDOOR EQUIPMENT SHALL BE RAIN TIGHT WITH MINIMUM NEMA 3R RATING. 6.)ROOFTOP SOLAR INSTALLATION ONLY PV ARRAY SHALL NOT EXTEND BEYOND THE EXISTING ROOF EDGE. SYMBOL LEGEND EQUIPMENT SCHEDULE QTY SPEC # EQUIPMENT SCHEDULE ARRAY SCHEDULE PLUMBING SCHEDULE OTHER OBSTRUCTIONS M UD INDICATES EXISTING METER LOCATION INDICATES ROOF DESIGNATION . REFER TO ARRAY SCHEDULE FOR MORE INFORMATION INDICATES NEW PV SOLAR MODULE. RED MODULES INDICATE PANELS THAT USE MICRO INVERTERS. REFER TO EQUIPMENT SCHEDULE FOR SPECS. R1 SP INDICATES NEW PV ONLY SUBPANEL TO BE INSTALLED INDICATES NEW UNFUSED PV DISCONNECT TO BE INSTALLED OUTSIDE (UTILITY ACCESSIBLE ) P DC AC ep D INDICATES NEW FUSED PV DISCONNECT TO BE INSTALLED DC INDICATES NEW DC DISCONNECT R 2211 Allenwood Road Wall, New Jersey 07719 877-786-7283 www.Trinity-Solar.com SD INDICATES EXISTING SERVICE DISCONNECT TS INDICATES EXISTING TRANSFER SWITCH CALCULATIONS FOR CURRENT CARRYING CONDUCTORS REQUIRED CONDUCTOR AMPACITY PER STRING [NEC 690.8(B)(1)]: (15.00*1.25)1 = 18.75A AWG #10, DERATED AMPACITY AMBIENT TEMP: 33°C, TEMP DERATING FACTOR: .96 RACEWAY DERATING = 4 CCC: 0.80 (40*.96)0.80 = 30.72A 30.72A >_ 18.75A, THEREFORE WIRE SIZE IS VALID TOTAL AC REQUIRED CONDUCTOR AMPACITY 32.00A*1.25 = 40.00A AWG #8, DERATED AMPACITY AMBIENT TEMP: 30°C, TEMP DERATING: 1.0 RACEWAY DERATING <_ 3 CCC: N/A 55A*1.0 = 55A 55A >_ 40.00A, THEREFORE AC WIRE SIZE IS VALID CALCULATION FOR PV OVERCURRENT PROTECTION TOTAL INVERTER CURRENT: 32.00A 32.00A*1.25 = 40.00A --> 40A OVERCURRENT PROTECTION IS VALID ARRAY CIRCUIT WIRING NOTES 1.) LICENSED ELECTRICIAN ASSUMES ALL RESPONSIBILITY FOR DETERMINING ONSITE CONDITIONS AND EXECUTING INSTALLATION IN ACCORDANCE WITHNEC 2020 2.) LOWEST EXPECTED AMBIENT TEMPERATURE BASED ON ASHRAE MINIMUM MEAN EXTREME DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. LOWEST EXPECTED AMBIENT TEMP = -16°C 3.) HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED ON ASHRAE HIGHEST MONTH 2% DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. HIGHEST CONTINUOUS TEMP = 33°C 4.) 2005 ASHRAE FUNDAMENTALS 2% DESIGN TEMPERATURES DO NOT EXCEED 47°C IN THE UNITED STATES (PALM SPRINGS, CA IS 44.1°C). FOR LESS THAN 9CURRENT-CARRYING CONDUCTORS IN A ROOF-MOUNTED SUNLIT CONDUIT AT LEAST 0.5" ABOVE ROOF AND USINGTHE OUTDOOR DESIGN TEMPERATURE OF 47°C OR LESS(ALL OF UNITED STATES) 5.) PV SYSTEM CIRCUITS INSTALLED ON OR IN BUILDINGSSHALL INCLUDE A RAPID SHUTDOWN FUNCTION THATCONTROLS SPECIFIC CONDUCTORS IN ACCORDANCE WITHNEC 690.12(A) THROUGH (D) 6.) PHOTOVOLTAIC POWER SYSTEMS SHALL BE PERMITTEDTO OPERATE WITH UNGROUNDED PHOTOVOLTAICSOURCE AND OUTPUT CIRCUIT AS PER NEC 690.41 (A)(4) 7.) UNGROUNDED DC CIRCUIT CONDUCTORS SHALL BEIDENTIFIED WITH THE FOLLOWING OUTER FINISH: POSITIVE CONDUCTORS = REDNEGATIVE CONDUCTORS = BLACK NEC 210.5(C)(2) 8.) ARRAY AND SUB ARRAY CONDUCTORS SHALL BE #10 PV WIRE TYPE RHW-2 OR EQUIVELANT AND SHALL BE PROTECTED BY CONDUIT WHERE EXPOSED TO DIRECT SUNLIGHT. SUB ARRAY CONDUIT LONGER THAN 24” SHALL CONTAIN ≤ 20 CURRENT CARYING CONDUCTORS AND WHERE EXPOSED TO DIRECT SUNLIGHT SHALL CONTAIN ≤ 9 CURRENT CARRYING CONDUCTORS. 9.) ALL WIRE LENGTHS SHALL BE LESS THAN 100' UNLESS OTHERWISE NOTED 10.) FLEXIBLE CONDUIT SHALL NOT BE INSTALLED ON ROOFTOP AND SHALL BE LIMITED TO 12” IF USED OUTDOORS 11.)OVERCURRENT PROTECTION FOR CONDUCTORS CONNECTED TO THE SUPPLY SIDE OF A SERVICE SHALL BE LOCATED WITHIN 10' OF THE POINT OF CONNECTION NEC 690.9(A)(3)(2) 12.) WHERE TWO SOURCES FEED A BUSSBAR, ONE A UTILITY AND THE OTHER AN INVERTER, PV BACKFEED BREAKER(S) SHALL BE LOCATED OPPOSITE FROM UTILITY NEC 705.12(B)(3)(2) 13.) ALL SOLAR SYSTEM LOAD CENTERS TO CONTAIN ONLY GENERATION CIRCUITS AND NO UNUSED POSITIONS OR LOADS 14.) ALL EQUIPMENT INSTALLED OUTDOORS SHALL HAVE A NEMA 3R RATING SQUARE D DU222RB 60A UNFUSED DISCONNECT ISOLATED NEUTRAL 240V 1Ø B LOCKABLE 60A DISCONNECT FUSED W/ 40A FUSES SQUARE D PN: D222NRB ISOLATED NEUTRAL 240V 1Ø B NOTE: INTERNAL REVENUE GRADE MONITORING CONTAINED WITHIN SOLAR EDGE INVERTER SOLAR EDGE PN. RWND-3D-240-MB SMART METER PRODUCTION METER M ISOLATED NEUTRAL LINE SIDE LOAD SIDENEUTRAL EXISTING MAIN BREAKER LOAD CENTER INSULATED LINE TAPS INSTALLED ON MAIN FEEDERS NEC 705.12(A) M 2p200AMAIN240V 1Ø 200A MAIN BREAKER 200A BUSBAR EXISTING 1Ø 120/240V UTILITY METER EG INVERTER #1 - SE7600H-US000BNC4 DC AC Imp 20 Pout 7600 Vmp 400 Imax 32 Voc 480 OCPDmin 40 Isc 30 Vnom 240 PV MODULE SPECIFICATIONS HANWHA 340 (Q.PEAK DUO BLK-G6+ 340) Imp 10.2 Vmp 33.94 Voc 40.66 Isc 10.52 A #6 THWN-2 GEC TO EXISTING GROUND ROD B 3/4'' CONDUIT W/ 2-#8 THWN-2, 1-#10 THWN-2, 1-#10 THWN-2 GROUND C 3/4'' CONDUIT W/ 4-#10 THWN-2, 1-#10 THWN-2 GROUND D 3/4'' CONDUIT W/ 4-#10 THWN-2, 1-#10 THWN-2 GROUND E 3/4'' CONDUIT W/ 2-#8 THWN-2, 1-#10 THWN-2, 1-#10 THWN-2 GROUND F #10 PV WIRE (FREE AIR) W/ #6 BARE COPPER BOND TO ARRAY G 3/4'' CONDUIT W/ 2-#6 THWN-2, 1-#6 THWN-2, 1-#8 THWN-2 GROUND NOTE: CONDUIT TYPE SHALL BE CHOSEN BY THE INSTALLATION CONTRACTOR TO MEET OR EXCEED NEC AND LOCAL AHJD REQUIREMENTS INVERTER #1 PV+L1 L2 N PV-D SOLAR MODULES MOUNTED TO ROOF ON 1 ARRAY 28 - 340W MODULES W/ 1 SOLAR EDGE P340 PER MODULE 15 ADC MAX PER STRING 1 STRING OF 14 MODULES IN SERIES - 400 Vmax 1 STRING OF 14 MODULES IN SERIES - 400 Vmax *2 STRINGS TO BE TERMINATED IN PARALLEL INSIDE INVERTER 1 f 8"x8" JUNCTION BOX P1 ISSUED TO TOWNSHIP FOR PERMIT 8/25/2021 NO.DESCRIPTION DATE MARTIN, SOPHIE- TRINITY ACCT #: 2021-08-610797 58 AUTUMN DRIVE NORTHAMPTON, MA 01062 42.297763,-72.675896 PROPOSED PV SOLAR SYSTEM DRAWING DATE:8/25/2021 DRAWN BY:MD REVISED BY: DC SYSTEM SIZE:9.52kW AC SYSTEM SIZE:7.6kW MODULE COUNT:28 MODULES USED:HANWHA 340 MODULE SPEC #:Q.PEAK DUO BLK-G6+ 340 UTILITY COMPANY:NAT'L GRID UTILITY ACCT #:51459-64008 UTILITY METER #:37368786 DEAL TYPE:SUNNOVA P1 Project Title: System Information: Drawing Information Rev. No.Sheet Issued / Revisions Project Address: Drawing Title: PV - 3 Engineer / License Holder: R 2211 Allenwood Road Wall, New Jersey 07719 877-786-7283 www.Trinity-Solar.com Apex Solar Power, LLC 64 Main Street Queensbury, NY 12804 413-203-9088 x Solar installation x 30 New York Marine and General Insurance Company WC202000020409 4 Open Square Way 10/1/2021 2/17/2021 413-203-9088fetto»:d Holyoke, MA 01040 Details https://madpl.mylicense.com/Verification/Details.aspx?result=c7c35c2c-4696-4191-87df-0d23598f7822[2/15/2021 11:05:35 AM] The Official Website of the Executive Office of EOHED, the Divsion of Professional Licensure, and the Division of Standards Licensee Details Demographic Information Full Name:Nicholas D CasavantOwner Name: License Address Information City:East BrookfieldState:MAZipcode:01515Country:United States License Information License No:CS-111552 License Type:Construction SupervisorProfession:Building Licenses Date of Last Renewal:2/11/2021Issue Date:10/13/2017 Expiration Date:2/20/2023License Status:Active Today's Date:2/15/2021Secondary License Type:Doing Business As:Status Change Reason:License Issuance Prerequisite Information No Prerequisite Information No Available Documents © 2011 Commonwealth of Massachusetts Site Policies | Contact Us Mass.Gov Home State Agencies INVERTERSsolaredge.com Optimized installation with HD-Wave technology Specifically designed to work with power optimizers Built-in module-level monitoring Outdoor and indoor installation Optional: Revenue grade data, ANSI C12.20 Class 0.5 (0.5% accuracy) Record-breaking efficiency Fixed voltage inverter for longer strings Integrated arc fault protection and rapid shutdown for NEC 2014 and 2017, per article 690.11 and 690.12 Extremely small UL1741 SA certified, for CPUC Rule 21 grid compliance Single Phase Inverter with HD-Wave Technology for North America SE3000H-US / SE3800H-US / SE5000H-US / SE6000H-US / SE7600H-US / SE10000H-US / SE11400H-US 12-25 YEARWARRANTY SE3000H-US SE3800H-US SE5000H-US SE6000H-US SE7600H-US SE10000H-US SE11400H-US OUTPUT Rated AC Power Output 3000 3800 @ 240V3300 @ 208V 5000 6000 @ 240V5000 @ 208V 7600 10000 11400 @ 240V10000 @ 208V VA Maximum AC Power Output 3000 3800 @ 240V3300 @ 208V 5000 6000 @ 240V5000 @ 208V 7600 10000 11400 @ 240V10000 @ 208V VA AC Output Voltage Min.-Nom.-Max. (211 - 240 - 264)Vac AC Output Voltage Min.-Nom.-Max. (183 - 208 - 229)----Vac AC Frequency (Nominal)59.3 - 60 - 60.5(1)Hz Maximum Continuous Output Current @240V 12.5 16 21 25 32 42 47.5 A Maximum Continuous Output Current @208V -16 -24 --48.5 A GFDI Threshold 1 A Utility Monitoring, Islanding Protection, Country Configurable Thresholds Yes INPUT Maximum DC Power @240V 4650 5900 7750 9300 11800 15500 17650 W Maximum DC Power @208V -5100 -7750 --15500 W Transformer-less, Ungrounded Yes Maximum Input Voltage 480 Vdc Nominal DC Input Voltage 380 400 Vdc Maximum Input Current @240V(2)8.5 10.5 13.5 16.5 20 27 30.5 Adc Maximum Input Current @208V(2)-9 -13.5 --27 Adc Max. Input Short Circuit Current 45 Adc Reverse-Polarity Protection Yes Ground-Fault Isolation Detection 600k Sensitivity Maximum Inverter Efficiency 99 99.2 % CEC Weighted Efficiency 99 99 @ 240V98.5 @ 208V % Nighttime Power Consumption < 2.5 W ADDITIONAL FEATURES Supported Communication Interfaces RS485, Ethernet, ZigBee (optional), Cellular (optional) Revenue Grade Data, ANSI C12.20 Optional(3) Rapid Shutdown - NEC 2014 and 2017 690.12 Automatic Rapid Shutdown upon AC Grid Disconnect STANDARD COMPLIANCE Safety UL1741, UL1741 SA, UL1699B, CSA C22.2, Canadian AFCI according to T.I.L. M-07 Grid Connection Standards IEEE1547, Rule 21, Rule 14 (HI) Emissions FCC Part 15 Class B INSTALLATION SPECIFICATIONS AC Output Conduit Size / AWG Range 3/4” minimum / 14-6 AWG 3/4” minimum /14-4 AWG DC Input Conduit Size / # of Strings / AWG Range 3/4” minimum / 1-2 strings / 14-6 AWG 3/4” minimum / 1-3 strings / 14-6 AWG Dimensions with Safety Switch (HxWxD)17.7 x 14.6 x 6.8 / 450 x 370 x 174 21.3 x 14.6 x 7.3 / 540 x 370 x 185 in / mm Weight with Safety Switch 22 / 10 25.1 / 11.4 26.2 / 11.9 38.8 / 17.6 lb / kg Noise < 25 <50 dBA Cooling Natural Convection Operating Temperature Range -40 to +140 / -25 to +60(4) (-40˚F / -40˚C option)(5)˚F / ˚C Protection Rating NEMA 4X (Inverter with Safety Switch) (1) For other regional settings please contact SolarEdge support (2) A higher current source may be used; the inverter will limit its input current to the values stated (3) Revenue grade inverter P/N: SExxxxH-US000NNC2(4) For power de-rating information refer to: https://www.solaredge.com/sites/default/files/se-temperature-derating-note-na.pdf(5) -40 version P/N: SExxxxH-US000NNU4 Single Phase Inverterwith HD-Wave Technology for North AmericaSE3000H-US / SE3800H-US / SE5000H-US / SE6000H-US/ SE7600H-US / SE10000H-US / SE11400H-US © SolarEdge Technologies, Inc. All rights reserved. SOLAREDGE, the SolarEdge logo, OPTIMIZED BY SOLAREDGE are trademarks or registered trademarks of SolarEdge Technologies, Inc. All other trademarks mentioned herein are trademarks of their respective owners. Date: 12/2018/V01/ENG NAM. Subject to change without notice. Q.PEAK DUO-G5 305-330 1 APT test conditions according to IEC/TS 62804-1:2015, method B (−1500 V, 168 h) 2 See data sheet on rear for further information. Q.ANTUM SOLAR MODULE  Quality Tested ID. 40032587 high reliabilitylow degradationfrequent product surveillance EN The new Q.PEAK DUO-G5 solar module from Q CELLS impresses thanks to innovative Q.ANTUM DUO Technology, which enables particularly high performance on a small surface. Q.ANTUM's world-record-holding cell concept has now been combined with state-of-the-art circuitry half cells and a six-busbar design, thus achieving outstanding performance under real conditions - both with low-intensity solar radiation as well as on hot, clear summer days. THE IDEAL SOLUTION FOR: Rooftop arrays on residential buildings Q.ANTUM TECHNOLOGY: LOW LEVELIZED COST OF ELECTRICITY Higher yield per surface area, lower BOS costs, higher power classes, and an efficiency rate of up to 19.9 %. INNOVATIVE ALL-WEATHER TECHNOLOGY Optimal yields, whatever the weather with excellent low-light and temperature behavior. ENDURING HIGH PERFORMANCE Long-term yield security with Anti LID and Anti PID Technology1, Hot-Spot Protect and Traceable Quality Tra.Q™. EXTREME WEATHER RATING High-tech aluminum alloy frame, certified for high snow (5400 Pa) and wind loads (4000 Pa) regarding IEC. A RELIABLE INVESTMENT Inclusive 12-year product warranty and 25-year linear performance guarantee2. STATE OF THE ART MODULE TECHNOLOGY Q.ANTUM DUO combines cutting edge cell separation and innovative wiring with Q.ANTUM Technology. ANTI PID TECHNOLOGY(APT) HOT-SPOT PROTECT(HSP) TRACEABLE QUALITY(TRA.Q™) YIELD SECURITY ANTI LID TECHNOLOGY(ALT) Rooftop arrays on commercial / industrial buildings UL 1703; VDE Quality Tested; CE-compliant; IEC 61215 (Ed.2); IEC 61730 (Ed.1) application class A Specifications subject to technical changes © Hanwha Q CELLS Q.PEAK DUO-G5_305-330_2017-09_Rev01_NAAt least 98 % of nominal power during first year. Thereafter max. 0.54 % degradation per year. At least 93.1 % of nominal power up to 10 years.At least 85 % of nominal power up to 25 years. All data within measurement tolerances. Full warranties in accordance with the warranty terms of the Q CELLS sales organization of your respective country. Typical module performance under low irradiance conditions in comparison to STC conditions (25 °C, 1000 W/m2). Hanwha Q CELLS America Inc.300 Spectrum Center Drive, Suite 1250, Irvine, CA 92618, USA | TEL +1 949 748 59 96 | EMAIL inquiry@us.q-cells.com | WEB www.q-cells.us MECHANICAL SPECIFICATION Q CELLS PERFORMANCE WARRANTY PERFORMANCE AT LOW IRRADIANCE IRRADIANCE [W/m²]RELATIVE EFFICIENCY [%] 200 400 600 800 1000 110 100 90 80 Irradiance [W/m²]Relative efficiency [%]Format 66.3 in × 39.4 in × 1.26 in (including frame) (1685 mm × 1000 mm × 32 mm) Weight 41.2 lbs (18.7 kg) Front Cover 0.13 in (3.2 mm) thermally pre-stressed glass with anti-reflection technology Back Cover Composite film Frame Black anodized aluminum Cell 6 × 20 monocrystalline Q.ANTUM solar half-cells Junction box 2.76-3.35 in × 1.97-2.76 in × 0.51-0.83 in(70-85 mm × 50-70 mm × 13-21 mm), decentralized, IP67 Cable 4 mm² Solar cable; (+) ≥ 43.3 in (1100 mm), (−) ≥ 43.3 in (1100 mm) Connector Multi-Contact MC4, IP65 and IP68 PROPERTIES FOR SYSTEM DESIGN Maximum System Voltage VSYS [V]1000 (IEC) / 1000 (UL)Safety Class II Maximum Series Fuse Rating [A DC]20 Fire Rating C (IEC) / TYPE 1 (UL) Design load, push (UL)2 [lbs/ft2]75 (3600 Pa)Permitted module temperature on continuous duty − 40 °F up to +185 °F (− 40 °C up to +85 °C) Design load, pull (UL)2 [lbs/ft2]55.6 (2666 Pa)2 see installation manual NOTE: Installation instructions must be followed. See the installation and operating manual or contact our technical service department for further information on approved installation and use of this product. EN RELATIVE EFFICIENCYCOMPARED TO NOMINAL POWER [%]100 95 90 85 80 75 155 2520010YEARS 98 Q CELLS Industry standard for tiered warranties* Industry standard for linear warranties* *Standard terms of guarantee for the 10 PV companieswith the highest production capacity in 2014 (as at: September 2014) DE DETAIL A 16mm 8.5mm24.5mm 980mm1685mm 4 × Befestigungspunkte (DETAIL A) Rahmen 1000mm 951mm 32mm 8 × Entwässerungslöcher 352.5mm ELECTRICAL CHARACTERISTICS POWER CLASS 305 310 315 320 325 330 MINIMUM PERFORMANCE AT STANDARD TEST CONDITIONS, STC1 (POWER TOLERANCE +5 W / −0 W)MinimumPower at MPP2 PMPP [W]305 310 315 320 325 330 Short Circuit Current*ISC [A]9.93 9.98 10.04 10.09 10.14 10.20 Open Circuit Voltage*VOC [V]39.35 39.61 39.87 40.13 40.40 40.66 Current at MPP*IMPP [A]9.44 9.50 9.55 9.60 9.66 9.71 Voltage at MPP*VMPP [V]32.30 32.64 32.98 33.32 33.65 33.98 Efficiency2 η [%]≥18.1 ≥18.4 ≥ 18.7 ≥ 19.0 ≥ 19.3 ≥ 19.6 MINIMUM PERFORMANCE AT NORMAL OPERATING CONDITIONS, NOC3 MinimumPower at MPP2 PMPP [W]226.0 229.7 233.4 237.2 240.9 244.6 Short Circuit Current*ISC [A]8.00 8.05 8.09 8.14 8.18 8.22 Open Circuit Voltage*VOC [V]36.80 37.05 37.30 37.54 37.79 38.04 Current at MPP*IMPP [A]7.43 7.47 7.51 7.56 7.60 7.64 Voltage at MPP*VMPP [V]30.43 30.75 31.07 31.39 31.70 32.01 11000 W/m², 25 °C, spectrum AM 1.5 G 2 Measurement tolerances STC ± 3 %; NOC ± 5 % 3 800 W/m², NOCT, spectrum AM 1.5 G * typical values, actual values may differ CertifiedUL 1703(254141) TEMPERATURE COEFFICIENTS Temperature Coefficient of ISC α [% / K]+ 0.04 Temperature Coefficient of VOC β [% / K]− 0.28 Temperature Coefficient of PMPP γ [% / K]− 0.37 Normal Operating Cell Temperature NOCT [°F]113 ± 5.4 (45 ± 3 °C) QUALIFICATIONS AND CERTIFICATES PACKAGING INFORMATION Number of Modules per Pallet 32 Number of Pallets per 53' Trailer 30 Number of Pallets per 40' High Cube Container 26 Pallet Dimensions (L × W × H)69.3 in × 45.3 in × 46.9 in (1760 mm × 1150 mm × 1190 mm) Pallet Weight 1415 lbs (642 kg)