Loading...
REVISED SWPPP PLAN-03-28-2019LEGENDSILT FENCE BACKED W/STRAW BALESCHANNELIZED FLOWTEMPORARY SEDIMENT BASINTEMPORARY SWALETEMPORARY STONE / COIR LOG CHECKDAMSCOIR LOGSCOMPLETED / IN CONSTRUCTIONSTRAW BALE CHECK DAM - SEE DETAILSHEET C1.31SWPPP SITE PLANDATED: 04/18/2017REVISED:12/06/17Eric M. Bernardin, PE, LEED AP,03/28/19 Inspection Program· Inspection during or immediately following initialinstallation of sediment controls.· Inspection following severe rainstorms to check fordamage to controls.· Inspection prior to seeding deadlines, particularlyin the fall.· Final inspection of projects nearing completion toensure that temporary controls have been removed, sta-bilization is complete, drainageways are in proper con-dition, and that the final contours agree with the pro-posed contours on the approved plan.In addition, interim inspections should be made as man-power and workload permit, giving particular attentionto the maintenance of installed controls.All inspections should be documented by a written re-port or log.These reports should contain the date and time of in-spections, dates when land-disturbing activities be-gin, comments concerning compliance or noncomplianceand notes on any verbal communications concerning theproject.Sequence:*Install all additional erosion & sediment controls*Stabilize (temporary or permanent) all exposed areas(14-day rule)*Inspect*Repair, maintain, as needed*Final stabilization*Remove temporary controlsEric M. Bernardin, PE, LEED APCLEAN OUT INLET.REMOVE DRAINAGEPLUGSREESTABLISH SWALE