Loading...
CDH - MRI Replacement Sheet Metal Permit DrawingsCLOSET B-128A MRI ROOM B-128 MRI EQUIPMENT ROOM B-127 CORRIDOR B-125 S O V CLOSET B-128A MRI ROOM B-128 MRI EQUIPMENT ROOM B-127 CORRIDOR B-125 T T T TT ROOF A C 6 5 EXISTING 1" PCW EXISTING 1/2" O2 AND 3/4" MV 1"1/2"3/4"1/2"1 8 2 6 5 5 7 4 3 11 11 11 11 12 7 3/4"9 10 13 12 CRAC-2 CRAC-1 1 2 3 2 2 2 2 4 5 6 5 6 7 7 2 2 2 2 8 8 AL-4-300 B-1200 AL-4-300AL-4-300 A4-500 A4-500 A4-500 A4-500 B-1000 B-1000 12 13 REFREFS S 9 10 11 AL-4-300 B-AL CU-1 CU-2 NEW QUENCH VENT WITH HORIZONTAL ORIENTATION EXISTING EXHAUST FAN NEW PROCESS CHILLER, PROVIDED BY GE AND INSTALLED BY MECHANICAL CONTRACTOR REF REF 2 3 1 FD FD FDVC FDVC MGC V XFC FD XFC XFC FD FD FD FD FD FDFDFD PACS PROJECT AREA ELEVATOR #1 ELEVATOR #1 AREAWAY VI EWER VI EWER BENCH BENCH BENCH BENCH F. F. ELEV. = 218'- 6" F. F. ELEV. = 218'- 11" F. F. ELEV. = 218'- 6" F. F. ELEV. = 218'- 11" F. F. ELEV. = 218'- 11" F. F. ELEV. = 218'- 5 3/ 4"F. F. ELEV. = 218'- 6" LI NE O F RO OM ABO VE C.G. C.G.C.G.C. G.C. G. C. G. C. G. FD SUMP RAMP U P 1:12 SL O P E M A X . T Y P . RAMP UP1:12 SLOPE MAX. TYP. RAM P DN DN KEYPADENTRY 64 GOTHIC STREET, SUITE 1 NORTHAMPTON, MA 01060 T 413.585.1512 F 413.586.7945 www.haiarchitecture.com Tel: (860) 286-9171 www.bvhis.com 206 West Newberry Road Bloomfield, CT 06002 servicesintegrated H AI Architecture, Inc. SEAL: PROJECT NO: BVH PROJECT NO: PROJECT MANAGER: DRAWN BY: COPYRIGHT: XX-XXXX 21-20-207 SHEET TITLE: CONSULTANT: MRI Replacement Cooley Dickinson Hospital 30 Locust Street Northampton, MA 01060 Renovation for: PROJECT: REFER TO MEP DRAWINGS FOR ADDITIONAL INFORMATION. DATE: PROJECT AREA KEY PLAN M101 02.15.2021 MECHANICAL PLANS NMP/GDB CheckerPLANNORTH1/4" = 1'-0" PLUMBING, FIRE PROTECTION AND MEDICAL GAS GROUND GLOOR PLAN PLANNORTH1/4" = 1'-0" HVAC GROUND FLOOR PLAN HVAC DRAWING NOTES: NEW 8" QUENCH VENT FROM EQUIPMENT CONNECTION TO HORIZONTAL DISCHARGE ABOVE ROOF. SEE DETAIL. CONNECT NEW SUPPLY DIFFUSERS, EXHAUST AND RETURN GRILLES TO EXISTING DUCTWORK. ALIGN WITH NEW CEILING GRID LAYOUT WITH NEW FLEX DUCT CONNECTIONS AS NEEDED. BALANCE TO AIRFLOW INDICATED. 24x24 NON-FERROUS EGGCRATE RETURN AIR GRILLE FOR PRESSURE EQUALIZATION. EXISTING EXHAUST AND RETURN DUCT AND ASSOCIATED DAMPERS TO REMAIN. BALANCE AIRFLOW TO 1200 CFM IN BOTH RETURN AND EXHAUST MODE. TEST SYSTEM OPERATION WITH MANUAL EXHAUST PURGE SWITCH IN BOTH MRI ROOM AND CONTROL ROOM. CONFIRM PROPER DAMPER OPERATION AND AIRFLOW IN BOTH MODES OF OPERATION. LIEBERT FURNISHED 3-WAY SUPPLY DIFFUSERS. RETURN AIR PLENUM WITH FILTER GRILLE, 24x24 "TITUS 350FLF1". LIEBERT FURNISHED CONDENSATE PUMPS, WIRED INTERNALLY THROUGH CRAC UNIT. UNIT SHALL AUTOMATICALLY STOP ON HIGH LEVEL. CONNECT NEW RETURN GRILLES TO EXISTING FACILITY RETURN BRANCH. EXTEND RETURN DUCT AS NEEDED. REMOVE AND REINSTALL EXISTING MANUAL PURGE EXHAUST SWITCH TO ACCOMMODATE NEW SHIELDING INSTALLATION. INSTALL NEW SELECTOR SWITCH TO MATCH EXISTING IN MRI ROOM TO MANUALLY START PURGE EXHAUST. EITHER SWITCH SHALL INITIATE PURGE. REMOVE AND INSTALL NEW WAVE GUIDES AT EXISTING SUPPLY, RETURN AND EXHAUST DUCTS AT PENETRATIONS OF NEW SHIELDING. CONFIRM DUCT SIZES IN FIELD AND REFER TO SHIELDING VENDOR DRAWINGS FOR REQUIREMENTS. RUN NEW REFRIGERANT PIPING UP HIGH OVER TO NEW ROOF PENETRATION. COORDINATE EXACT ROUTING AND LOCATION IN FIELD. NEW EXHAUST GRILLE SHALL BE NON-FERROUS. 1 PLUMBING, FIRE PROTECTION AND MEDICAL GAS DRAWING NOTES: REPLACE EXISTING MEDICAL GAS INLET/OUTLET AND SLIDE AND MODIFY PIPING TO ACCOMMODATE NEW SHIELDING. EXISTING 1" BFP AND 1/2" DRAIN TO REMAIN. PROVIDE NEW 1/2" O2 AND 3/4" MV PIPING THROUGH NEW PENETRATION PANEL. CONNECT 1/2" CW TO EXISTING 1" PCW AND EXTEND TO NEW CRAC UNIT HUMIDIFIERS. NEW 1/2" CW TO CRAC UNIT HUMIDIFIER CONNECTION. NEW CONCEALED PENDENT NON-FERROUS SPRINKLER HEAD. CONNECT TO EXISTING BRANCH PIPING. CONFIRM EXISTING PRE-ACTION SYSTEM PIPING MATERIAL IN THE FIELD. TYPICAL. NEW UPRIGHT PENDENT SPRINKLER HEAD IN EQUIPMENT ROOM WITH NO CEILING. CONNECT TO EXISTING BRANCH PIPING. VERIFY LAYOUT WITH EXISTING UTILITIES AND OBSTRUCTIONS. TYPICAL. PROVIDE NEW 1" BACKUP TO GE HEAT EXCHANGER PROCESS CHILLED WATER AND 1/2" BACKUP TO GE CRYO MANUAL BACKUP BOX. CONNECT DOWNSTREAM OF EXISTING BACKFLOW PREVENTER. REFER TO DETAIL FOR ADDITIONAL INFORMATION. PROVIDE 1/2" MEDICAL AIR DROP AND CAP WITH A BLANK COVER PLATE FOR FUTURE OUTLET INSTALLATION. PROVIDE 1/2" MEDICAL AIR PIPING THROUGH PENETRATION PANEL AND CAP IN EQUIPMENT ROOM FOR FUTURE USE. PROVIDE UPRIGHT SPRINKLER HEADS UNDER OBSTRUCTIONS PER NFPA 13 REQUIREMENTS. PROVIDE 3/4" COOLING COIL CONDENSATE CONNECTION AT CRAC UNIT CONDENSATE PUMP. PIPE 3/4" COOLING COIL CONDENSATE DISCHARGE TO EXISTING DRAIN. 1 2 3 4 5 6 7 8 9 10 PLANNORTH1/4" = 1'-0" MEP ROOF PLAN MEP ROOF DRAWING NOTES: PROVIDE NEW NEMA-3R, 3-PHASE, 100A FUSED DISCONNECT FOR NEW AIR COOLED CHILLER. CIRCUIT TO NEW 100A BREAKER IN PANEL P1. PROVIDE (3) #4 AND (1) #8G IN 1-1/4" CONDUIT. PROVIDE NEW NEMA-3R, 3-PHASE, 30 A FUSED DISCONNECT FOR CU-1. CIRCUIT TO NEW 20A BREAKER IN PANEL EE-US1. PROVIDE (3) #10 & (1) #10G IN 1" CONDUIT. PROVIDE NEW NEMA-3R, 3-PHASE, 30 A FUSED DISCONNECT FOR CU-2. CIRCUIT TO NEW 20A BREAKER IN PANEL EE- US1.PROVIDE (3) #10 & (1) #10G IN 1" CONDUIT. 1 2 3 2 3 4 5 6 7 8 HVAC GENERAL NOTE: ALL MATERIALS USED INSIDE THE MRI ROOM SHALL BE NON-FERROUS. 11 12 13 TEMPERATURE CONTROL NOTES: 1. EXISTING AUTOMATIC TEMPERATURE CONTROLS FOR THE SCOPE OF WORK AREA ARE THROUGH THE EXISTING JCI METASYS SYSTEM. EXISTING SYSTEMS ARE TO REMAIN EXCEPT AS NOTED. 2. PROVIDE A NEW RELATIVE HUMIDITY SENSOR IN THE RETURN DUCT SERVING THE MRI ROOM CONNECTED TO THE EXISTING JCI SYSTEM. MODIFY THE EXISTING AIR HANDLING UNIT HUMIDITY CONTROLS TO INCLUDE THIS POINT AND BASE HUMIDITY CONTROL (STEAM VALVE POSITION) UPON THE FURTHEST OUT OF RANGE FOR THE EXISTING POINT OR THIS SETPOINT. SET CONTROL TO 30% RH (ADJUSTABLE) WITH LOW HUMIDITY ALARM AT 25% RH (ADJUSTABLE) AND HIGH HUMIDITY ALARM AT 65% RH (ADJUSTABLE). PROVIDE GRAPHIC OF SPACE RH AT WORKSTATION. 3. NEW EQUIPMENT CRAC UNITS SHALL OPERATE UNDER PACKAGED CONTROLS. PROVIDE STAGED SETPOINTS BETWEEN THE ROOM VAV CONTROLS AND CRAC UNITS (VAV SHALL BE LEAD COOLING SOURCE). BMS SHALL MONITOR ALARM CONDITION AT EACH CRAC UNIT WITH GRAPHIC AT OPERATOR WORKSTATION. 4. BMS SHALL MONITOR PROCESS CHILLER SUPPLY AND RETURN WATER TEMPERATURES WITH BMS TEMPERATURE SENSORS. PROVIDE GRAPHIC DISPLAY OF TEMPERATURES WITH ADJUSTABLE HIGH AND LOW TEMPERATURE ALARM INDICATION BASED ON SYSTEM SETPOINTS REQUIRED BY GE. MONITOR ALARM STATUS OF CHILLER. 5. INSTALL PROCESS CHILLER REMOTE DISPLAY PANEL (PROVIDED WITH CHILLER) IN EXISTING CONTROL ROOM (COORDINATE LOCATION IN FIELD WITH OWNER). REFER TO CHILLER INSTALLATION INSTRUCTIONS FOR REQUIREMENTS. 10 11 12 13 9 MARK DATE ISSUE 02.15.2021 PERMIT SET 21-20-207 2/12/2021 T T T MRI ROOM B-128 MRI EQUIPMENT ROOM B-127 CORRIDOR B-125 F. E. CAB. F C.G. C.G. ROOF A C 6 5 MRI ROOM B-128 MRI EQUIPMENT ROOM B-127 CORRIDOR B-125 F. E. CAB. F C.G. C.G. * * * * * * * * O V S 1 2 3 4 1 6 5 5 5 5 5 5 5 5 5 5 5 5 7 7 1 3 2 5 4 6 1 3 2 2 2 1 1 4 5 EXISTING 1" PCW EXISTING 1/2" O2 AND 3/4" MV 1 FD FD FDVC FDVC MGC V XFC FD XFC XFC FD FD FD FD FD FDFDFD PACS PROJECT AREA ELEVATOR #1 ELEVATOR #1 AREAWAY VI EWER VI EWER BENCH BENCH BENCH BENCH F. F. ELEV. = 218'- 6" F. F. ELEV. = 218'- 11" F. F. ELEV. = 218'- 6" F. F. ELEV. = 218'- 11" F. F. ELEV. = 218'- 11" F. F. ELEV. = 218'- 5 3/ 4"F. F. ELEV. = 218'- 6" LI NE O F RO OM ABO VE C.G. C.G.C.G.C. G.C. G. C. G. C. G. FD SUMP RAMP U P 1:12 SL O P E M A X . T Y P . RAMP UP1:12 SLOPE MAX. TYP. RAM P DN DN KEYPADENTRY 64 GOTHIC STREET, SUITE 1 NORTHAMPTON, MA 01060 T 413.585.1512 F 413.586.7945 www.haiarchitecture.com Tel: (860) 286-9171 www.bvhis.com 206 West Newberry Road Bloomfield, CT 06002 servicesintegrated H AI Architecture, Inc. SEAL: PROJECT NO: BVH PROJECT NO: PROJECT MANAGER: DRAWN BY: COPYRIGHT: XX-XXXX 21-20-207 SHEET TITLE: CONSULTANT: MRI Replacement Cooley Dickinson Hospital 30 Locust Street Northampton, MA 01060 Renovation for: PROJECT: REFER TO MEP DRAWINGS FOR ADDITIONAL INFORMATION. DATE: PROJECT AREA KEY PLAN MD101 02.15.2021 MEP DEMOLITION PLANS NMP/GDB/BPW JSCPLANNORTH1/4" = 1'-0" MEP GROUND FLOOR DEMOLITION PLAN PLANNORTH1/4" = 1'-0" MEP ROOF DEMOLITION PLAN MEP ROOF DEMOLITION NOTES: ALL ASSOCIATED DISCONNECTS, CONDUIT, FEEDERS TO BE DEMOISHED AND REPLACED WITH NEW. REFER TO MEP DRAWING NOTES FOR NEW EUIPMENT CIRCUIT REQUIREMENTS. REMOVE EXISTING LIEBERT AIR COOLED CONDENSING UNIT AND ASSOCIATED REFRIGERANT PIPING BACK TO AIR HANDLER IN EQUIPMENT ROOM. REMOVE EXISTING AIR COOLED PROCESS CHILLER AND ASSOCIATED PIPING DOWN TO SOURCE. EXISTING EXHAUST FAN TO REMAIN. REMOVE EXISTING QUENCH VENT. 1 MEP GROUND FLOOR DEMOLITION NOTES: ALL EXISTING WALL MOUNTED ELECTRICAL FIXTURES INCLUDING BUT LIMITED TO TEL/DATA DEVICES, FIRE ALARM DEVICES, ETC. SHALL BE REMOVED, CLEANED, STORED, AND REINSTALLED UPON NEW CONSTRUCTION. ALL BOXES, CONDUIT, AND ASSOCIATED WIRING SHALL BE MAINTAINED. RECEPTACLES SHALL BE REMOVED AND REPLACED WITH NEW, EXISITNG BACK BOX AND CONDUIT SHALL BE REUSED. ALL CEILING MOUNTED FIRE ALARM DEVICES SHALL BE REMOVED, CLEANED, STORED, AND REINSTALLED UPON NEW CONSTRUCTION. REFER TO SHEET E102 FOR NEW DEVICE LOCATION. ALL LIGHT FIXTURES AND LIGHTING CONTROL DEVICES SHALL BE REMOVED AND REPLACED WITH NEW. EXISTING BRANCH CIRCUITING SERVING ARE SHALL BE MAINTAINED AND REUSED. REFER TO SHEET E101 FOR NEW FIXTURE AND DEVICE LAYOUT. EXISING MECHANICAL AC UNITS IN EXISTING EQUIPMENT ROOM AND ALL ASSOCIATED DISCONNECTS, CONDUIT, FEEDERS TO BE DEMOISHED AND REPLACED WITH NEW. REFER TO SHEET E102 FOR NEW EUIPMENT LAYOUT AND CIRCUITNG. REMOVE ALL EXISTING SUPPLY IFFUSERS, RETURN AND EXHAUST GRILLES IN EXAM AND EQUIPMENT ROOMS. REMOVE EXISTING LIEBERT VERTICAL AIR HANDLING UNIT, TOP DISCHARGE PLENUM, ASSOCIATED REFRIGERANT PIPING THROUGH CEILING SPACE AND UP TO ROOF, WIRING AND CONTROLS. REMOVE EXISTING CHILLED WATER PIPING BACK TO CHILLER ON ROOF. VALVE AND CAP EXISTING COLD WATER PIPING FOR REUSE. CONFIRM EXISTING CHILLER GLYCOL CONTENT PRIOR TO DISPOSAL. 1 2 3 4 5 6 MEP GROUND FLOOR GENERAL NOTES: 1. PRIOR TO ANY DEMOLITION, CONTRACTOR TO RECORD ALL AIRFLOW VALUES ON EXISTING DIFFUSERS AND GRILLES IN SCOPE OF WORK AND REPORT FINDINGS TO ENGINEERS. 2. DISCONNECT AND REMOVE ALL EXISTING ELECTRICAL LIGHTING EQUIPMENT WITHIN DESIGNATED AREA FOR SCOPE OF WORK. EXISTING BRANCH CIRCUIT SHALL REMAIN AND BE REUSED FOR NEW SCOPE OF WORK. REFER TO FLOOR PLANS FOR ADDITIONAL SCOPE WITH REGARDS TO POWER AND SPECIAL SYSTEMS. THIS WORK DOES NOT INCLUDE COMPLETE DEMO AND SHALL BE COORDINATED WITH THE HOSPITAL PROJECT MANAGER. 3. DISCONNECT AND REMOVE EXISTING WIRING, CONDUIT, BOXES, ETC. SERVING ALL EQUIPMENT BEING REMOVED BY MECHANICAL AND OTHER TRADES. REFER TO PLUMBING, MECHANICAL AND ARCHITECTURAL DRAWINGS FOR COORDINATION OF REQUIRED WORK. REMOVALS SHALL BE COMPLETE BACK TO SOURCE PANEL. 4. DISCONNECT AND REMOVE ALL ELECTRICAL FEEDERS AND ASSOCIATED EQUIPMENT FOR THE REMOVAL OF THE EXISTING ‘MRI’ IMAGING SYSTEM. COORDINATE SYSTEM SHUTDOWN WITH HOSPITAL FACILITIES AND CLINICIANS PRIOR TO START OF DEMOLITION WORK. 7PLANNORTH1/4" = 1'-0" PLUMBING, FIRE PROTECTION & MEDICAL GAS DEMOLITION PLAN PLUMBING, FIRE PROTECTION AND MEDICAL GAS GROUND FLOOR DEMOLITION NOTES: REMOVE EXISTING PRE-ACTION SPRINKLER HEAD TO ACCOMMODATE NEW CEILING INSTALLATION. EXISTING BRANCH PIPING TO REMAIN AND BE REUSED. TYPICAL. REMOVE EXISTING PRE-ACTION SYSTEM SPRINKLER HEAD TO ACCOMMODATE CEILING REMOVAL. RETAIN BRANCH PIPING FOR INSTALLATION OF NEW UPRIGHT PENDENT HEAD. TYPICAL. REMOVE EXISTING 1/2" CW LINE TO EXISTING CRAC UNIT. REMOVE EXISTING CW BACKUP PIPING TO PROCESS COOLING SYSTEM AND CRYO COOLING SYSTEM. EXISTING BFP AND 1" PIPING TO REMAIN. REMOVE EXISTING 1/2" O2 AND 3/4" MV PIPING AT EXISTING PENETRATION PANEL TO ACCOMMODATE INSTALLATION OF NEW PENETRATION PANEL. REMOVE EXISTING MED GAS INLET, OUTLET, AND SLIDE AND ASSOCIATED PIPING TO ACCOMMODATE INSTALLATION OF NEW RF SHIELD. 1 2 3 4 5 6 2 3 4 5 MARK DATE ISSUE 02.15.2021 PERMIT SET 21-20-207 2/12/2021