30B-130 RECORDS REQUEST 4/1/2021 City of Northampton Mail-Building plan request
/1) ."1;'711.-4 f
ii°74Northamp'66'1 cif Kim Carson <kcarson@northamptonma.gov>
Building p request 17, a
�
erd/c&
2 messages 30 6 -
Laurel Bickar Thu, Apr 1 , 2021 at 2:49 PM
<dysisjoan@gmail.com>
To: kcarson@northamptonma.gov
Hi Kim,
I'm looking for the plans for the site of what is currently all 291
Riverside Drive. I'm told that it was recently divided and sold to a
contractor and I would like to get an idea of what the plans are.
I'm also curious as to what the requirements are for posting
permits in Northampton. My understanding is that it has to be
visible from the street, is that correct?
Best,
Laurel
Kim Carson Thu, Apr 1 , 2021 at 2:52
<kcarson@northamptonma.gov> PM
To: Jonathan Flagg <jflagg@northamptonma.gov>
Kim Carson
Northampton Building Department
[Quoted text hidden]
https://mail.google.com/mail/u/0?ik=28605c8627&view=pt&search=all&permthid=thread-f%3A1695865062759832407&simpl=msg-f%3A16958650627... 1/1
R105.4 Validity of Permit. The issuance or granting of a permit shall not be construed
to be a permit for, or an approval of, any violation of any of the provisions of 780 CMR
or of any other law or ordinance. Permits presuming to give authority to violate or cancel
the provisions of 780 CMR or other laws or ordinances shall not be valid. The issuance
of a permit based on construction documents and other data shall not prevent the building
official from requiring the correction of errors in the construction documents and other
data. The building official is also authorized to prevent occupancy or use of a structure
where in violation of 780 CMR or of any other laws or ordinances.
R105.5 Expiration. Every permit issued shall become invalid unless the work on the site
authorized by such permit is commenced within 180 days after its issuance, or if the work
authorized on the site by such permit is suspended or abandoned for a period of 180 days
after the time the work is commenced. The building official is authorized to grant, in
writing, one or more extensions of time, for periods not more than 180 days each. The
extension shall be requested in writing prior to the permit expiration date and justifiable
cause demonstrated.
R105.6 Suspension or Revocation. The building official is authorized to suspend or
revoke a permit issued under the provisions of 780 CMR wherever the permit is issued in
error or on the basis of incorrect, inaccurate or incomplete information, or in violation of
any ordinance or regulation or any of the provisions of 780 CMR.
,rirR105.7 Placement of Permit. The permit or copy shall be kept on the site of the work
until the completion of the project.
R105.8 Notice of Start. The building official may require to be notified at least one
business day before the start of work.
R105.9 Reserved
SECTION 106 Reserved
SECTION 107 CONSTRUCTION DOCUMENTS
R107.1 Submittal Documents. Submittal documents consisting of construction
documents, and other data shall be submitted in two or more sets with each application
for a permit. Where special conditions exist, the building official is authorized to require
additional construction documents to be prepared by a registered design professional.
Plans and specifications for work requiring a registered design professional shall bear a
seal and signature of the responsible registered design professional in accordance with
M.G.L. c. 143, § 54A. See also www.mass.gov/dp1 for policy on electronic seal and
signature for certain registered design professionals. Professional engineering services
shall be required for activities which are deemed to constitute the practice of engineering
as defined in M.G.L. c. 112, § 81D, except as provided in M.G.L. c. 54A and any legally
required profession or as provided in M.G.L. c. 112, § 81R.Where work is performed by
licensed trades people pursuant to M.G.L. c. 112, § 81R, plans and specifications