Loading...
32C-057 HAMPTON CT (7) ROGER A. SEWARD 122 BUNGALOW AVENUE GREENFIELD. MASSACHUSETTS 0130 (' TELEPHONE:(41 3) 773-991 8 n EAr Em Wf3ige DEPT. OF BUILDING INSPECTIONS NORTHAMPTON, MA.01060 TO: David Yuan, Vitals Wayne Weaver, Weaver Associates Matt TaFond, Fontaine Bros. Dick Brill, Fontaine Bros. Rich Anderson, MHFA Ted Trewhill, Northampton Building Inspector FROM: Roger Seward DATE: 1 !3 b/ RE: Hampton Court Northampton MHFA #87-027S Concrete/Masonry Testing Reports ****************************************** Enclosed please find M+y-SDNA 1 Inspection and Testing report No. 3 - 9 for this project. ALLIED TESTING LABORATORIES, INC. 115 St. George Road • Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 3 of Masonry Inspection Date: 1/19/89 Client: Hampton Housing Associates Project: Hampton Court MHFA87-027S Subject: Masonry Inspection Reported to: Hampton Housing Associates Inspector on site this date for fabrication of grout specimen for use on west wall, 2nd floor. See separate report ''for compressive strength results when they become due. Respectfully submitted, ALLIED TESTING LABORATORIES, INC. OZ4' .4°1".;414. By: Chester V. Dawicki Director of Testing Services , ALLIED TESTING LABORATORIES, INC. 115 St. George Road • Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Report No. 4 of Masonry Tests Date: 1/26/89 Client: Hampton Housing Associates Project: Hampton Court MHFA87-027S Subject: Masonry Tests Reported to: Hampton Housing Associates COMPRESSIVE STRENGTH - 3 x 6" Grout Laboratory No. 4450 Date Cast: 1/19/89 Date Tested: 1/26/89 Age at Test (Days) 7 Specimen Size (in.) 3x6" Area (Sq. in.) 7.07 Total Load (lbs.) 32,000 UNIT LOAD (PSI) 4525 LOCATION: West wall - 2nd floor. Respectfully submitted, ALLIED TESTING LABORATORIES, INC. 064 gaw.4.4. By: Chester V. Dawicki Director of Testing Services