06 20-052_CDH_MRI Replacement_Permit Set_20210215MRI REPLACEMENT NORTHAMPTON, MA 01060 30 LOCUST STREET COOLEY DICKINSON HOSPITAL Renovations for: GI001 TITLE SHEET GI002 INFORMATION SHEET GC101 EXISTING CONDITIONS OVERVIEW PLAN - BASEMENT FLOOR LEVEL AD101 DEMOLITION PLAN A101 PARTIAL BASEMENT FLOOR PLAN A151 REFLECTED CEILING PLAN A191 ROOF PLAN AND DETAILS A201 INTERIOR ELEVATIONS AND DETAILS A301 PARTIAL BUILDING SECTION A302 WALL SECTION A601 DOOR, WINDOW SCHEDULES AND WALL TYPES AF101 ROOM FINISH SCHEDULE AQ601 EQUIPMENT FLOOR PLAN AND SCHEDULE S101 STRUCTURAL SLAB PLAN S191 STRUCTURAL ROOF FRAMING PLAN MEP001 MEP GENERAL NOTES AND CODES MEP002 MEP ABBREVIATIONS MEP003 MEP SYMBOL LIST MEP004 MEP SCHEDULES AND DETAILS MEP005 MEP DETAILS M101 MECHANICAL PLANS MD101 MEP DEMOLITION PLANS E101 ELECTRICAL LIGHTING PLAN E102 ELECTRICAL POWER AND SPECIAL SYSTEMS PLAN PLAN BUILDING CODES AND STANDARDS GENERAL NOTES INDEX TO DRAWINGS CONSTRUCTION CLASSIFICATION OCCUPANCY CLASSIFICATION APPLICABLE CODES & STANDARDS 1.MASSACHUSETTS STATE BUILDING CODE (780 CMR); 9TH EDITION 2.INTERNATIONAL EXISTING BUILDING CODE (IEBC); 2015 EDITION 3.INTERNATIONAL MECHANICAL CODE (IMC); 2015 EDITION 4.MASSACHUSETTS PLUMBING & FUEL GAS CODE (248 CMR) 5.PORTIONS OF THE INTERNATIONAL FIRE CODE (IFC); 2015 EDITION 6.NFPA 101 LIFE SAFETY CODE; 2015 EDITION 7.INTERNATIONAL ENERGY CONSERVATION CODE (IECC); 2015 EDITION 8.MASSACHUSETTS ARCHITECTURAL ACCESS BOARD REGULATIONS (521 CMR) 9.MASSACHUSETTS ELECTRIC CODE (527 CMR) I - 2 TYPE 1A - ORIGINALLY DESIGNED AS 4-4-3 CONSTRUCTION IN 2001; MODIFICATIONS SHALL MAINTAIN EXISTING FIRE RATINGS 1.THE GENERAL CONTRACTOR WILL BE RESPONSIBLE FOR ALL WORK THAT IS SHOWN ON THE CONTRACT DRAWINGS THAT IS NOT SPECIFICALLY IDENTIFIED TO BE THAT OF A SUB-CONTRACTOR, INCLUDING ALL WORK THAT IS DESCRIBED BY THE CONTRACT DOCUMENTS THAT IS NOT IDENTIFIED AS BEING ANY SPECIFIC CONTRACTOR'S RESPONSIBILITY. THE SCOPES OF WORK OF THE INDIVIDUAL FIELD SUB-CONTRACTORS ARE IDENTIFIED IN THEIR RESPECTIVE SPECIFICATION SECTIONS. 2.THE GENERAL CONTRACTOR WILL PROVIDE BARRICADES, TEMPORARY LIGHTS, TEMPORARY TELEPHONE SERVICE, AND CLEAN-UP SERVICE TO THE WORK AREA. 3.THE GENERAL CONTRACTOR WILL VERIFY ALL DIMENSIONS AND CONDITIONS AT THE JOB SITE PRIOR TO PROCEEDING WITH THE WORK. THE GENERAL CONTRACTOR WILL COORDINATE WORK ACCORDINGLY WITH ALL SUBCONTRACTORS AND THE OWNER. 4.THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE COMPLETE AND THOROUGH CLEAN-UP AT THE END OF THE JOB, AND FOR DAILY REMOVAL OF CONSTRUCTION DEBRIS AND CLEAN-UP. 5.THE GENERAL CONTRACTOR WILL PERFORM MINOR SPACKLING AND REPAIRS TO EXISTING WALLS THROUGHOUT THE WORK AREA, AS IS REQUIRED IN PREPARATION FOR NEW FINISHES. 6.IT WILL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY TO VERIFY AND EXECUTE ALL WORK IN ACCORDANCE WITH THE APPLICABLE STATE BUILDING CODE, CURRENT EDITION, WITH ALL OF ITS REFERENCED PUBLICATIONS AND ALL OTHER APPLICABLE STATE, FEDERAL, AND LOCAL CODES AND REGULATIONS. 7.IT WILL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY TO SEE THAT ALL WORK PERFORMED IS IN ACCORDANCE WITH THE NATIONAL FIRE PROTECTION ASSOCIATION'S LIFE SAFETY CODE (NFPA 101), CURRENT EDITION. 8.THE GENERAL CONTRACTOR WILL BE RESPONSIBLE FOR INITIATING, MAINTAINING, AND SUPERVISING ALL SAFETY PRECAUTIONS AND PROGRAMS APPLICABLE TO THE SCOPE OF WORK, AS REQUIRED BY THE OWNER, AND AS REQUIRED FOR REGULATORY COMPLIANCE. 9.THE GENERAL CONTRACTOR WILL PROVIDE THE OWNER WITH INSURANCE CERTIFICATES FOR THE REQUIRED INSURANCES PRIOR TO STARTING THE WORK. 10.THE GENERAL CONTRACTOR WILL FILE FOR AND SECURE ALL APPROVALS, PERMITS, AND CERTIFICATES OF COMPLIANCE AS REQUIRED. 11.THE GENERAL CONTRACTOR SHALL FULLY COMPLY WITH THE OWNER'S "INTERIM LIFE SAFETY POLICY" DURING THE ENTIRE CONSTRUCTION PERIOD. BASEMENT FLOOR LEVEL 01 2/16/2021 1:00 PMTITLE SHEET GI001 GS SEAL: MARK DATE ISSUE -02/15/2021 PERMIT SET PROJECT NO: PROJECT ARCHITECT: PROJECT MANAGER: DRAWN BY: DATE: COPYRIGHT: 20-052 DH DH 02/03/2021 SHEET TITLE: CONSULTANT: 64 GOTHIC STREET, SUITE 1 NORTHAMPTON, MA 01060 T 413.585.1512 F 413.586.7945 www.haiarchitecture.com H AI Architecture, Inc. PROJECT: MRI Replacement Basement Floor Level Cooley Dickinson Hospital 30 Locust Street Northampton, MA 01060 Renovation for: ZONING DISTRICT:NOT APPLICABLEPARKING REQUIREMENTS:ADDITIONAL REQUIREMENTS:INTERIOR ELEVATION DESIGNATIONDETAIL IDENTIFICATIONSECTION DESIGNATIONROOM AND NAME NUMBERDOOR NUMBERKEY NOTEWALL TYPEHEIGHT MARKDETAIL DESIGNATIONFINISH FLOORLINEFOR FORWARD APPROACH FOR FORWARD APPROACH FOR UNOBSTRUCTED FORWARD OR SIDE REACH1A101ABCD2A1021A101CONFERENCEROOM100520122CEILING HEIGHTEL. = 100'-0"36A101EXIT REQUIREMENTS:OCCUPANCY LOAD:MINIMUM EGRESS WIDTH CALCULATIONS (DOORS, RAMPS & CORRIDORS):MINIMUM EGRESS WIDTH CALCULATIONS (STAIRS):REQUIREMENTS FOR NUMBER OF WATER CLOSETS & LAVATORIES (USE GROUP XX):TRANSFERSIDEABBREVIATIONSTYPICAL FIXTURE AND MISCELLANEOUS ACCESSORY HEIGHTSCODE ANALYSISZONING ANALYSISGRAPHIC SYMBOLSON SHEET WHERE DETAIL IS TAKEN;SHEET NUMBER WHERE DRAWNDETAIL DESIGNATIONON SHEET WHERE DETAIL IS TAKEN;SHEET NUMBER WHERE DRAWNDETAIL DESIGNATIONON SHEET WHERE SECTION IS TAKEN;SHEET NUMBER WHERE DRAWNSECTION DESIGNATIONELEVATION LETTERON SHEET WHERE SECTION IS TAKEN;SHEET NUMBER WHERE DRAWNSECTION DESIGNATIONABANCHOR BOLTAAPALARM ANNUNCIATOR PANELACSTACOUSTICALA/CAIR CONDITIONERACCACCESSIBLEACTACOUSTICAL CEILING TILEADDLADDITIONALADHADHESIVEADJADJACENT, ADJOINING, orADJUSTABLEAFFABOVE FINISH FLOORAHUAIR HANDLING UNITALMALARMALTALTERNATEALUMALUMINUMAHRANCHORANODANODIZE(D)APPROXAPPROXIMATEARCHARCHITECTBBRBASEBOARD RADIATORBLBUILDING LINE or BUILDING LINEBDBOARDBKGBACKINGBLDG BUILDINGBLKBLOCKBLKGBLOCKINGBLWBELOWBOBOTTOM OFBOTBOTTOMBRGBEARINGBRKBRICKCOCENTER OFCABCABINETCF/CICONTRACTOR FURNISHED,CONTRACTOR INSTALLEDCF/OICONTRACTOR FURNISHED,OWNER INSTALLEDCGCORNER GUARDCJCONTROL JOINTCLCENTER LINECLGCEILINGCLKJCAULK(ED) JOINTCLRCLEAR (DIMENSION)CMUCONCRETE MASONRY UNITCOLCOLUMNCOMMCOMMUNICATIONCOMPCOMPACTED or COMPOSITIONCONCCONCRETECONSTRCONSTRUCTIONCONTCONTINUOUS or CONTINUECONTRCONTRACTOR or CONTRACTCONTRJCONTROL JOINTCOORDCOORDINATECTRCENTERCTRLCONTROLDDEPTHDEMODEMOLITIONDESCRDESCRIBE or DESCRIPTIONDETDETAILDFDRINKING FOUNTAINDIADIAMETERDIMDIMENSIONDISPDISPENSERDISTDISTANCEDMRDIMMERDNDOWNDRDOOR or DRAINDTLDETAILDUPLDUPLICATEDWDISHWASHERDWGSDRAWINGSDWRDRAWEREEASTEAEACHEIFSEXTERIOR INSULATION & FINISHSYSTEMEJEXPANSION JOINTELELEVATIONELECELECTRIC(AL)ELEVELEVATOREMELECTROMAGNETICEMEREMERGENCYENGRENGINEERENTRENTRANCEEOELECTRICAL OUTLETEPELECTRICAL PANELEQEQUALEQUIPEQUIPMENTETREXISTING TO REMAINEWCELECTRIC WATER COOLEREWHELECTRIC WATER HEATEREWSEYE WASH STATIONEXEXAMPLE, EXISTINGEXHEXHAUSTEXISTEXISTINGEXPEXPANSION or EXPOSE(D)EXTEXTERIOR or EXTINGUISHERFAFIRE ALARMFASFIRE ALARM STATIONFDFLOOR DRAINFDCFIRE DEPARTMENT CONNECTIONFDTNFOUNDATIONFEFIRE EXTINGUISHERFECFIRE EXTINGUISHER CABINETFF ELFINISH FLOOR ELEVATIONFHCFIRE HOSE CABINETFINFINISHFIXTFIXTUREFLFLOOR LINEFLGFLOORINGFLRFLOORFFFINISH FACEFOCFACE OF CONCRETEFOFFACE OF FINISHFOMFACE OF MASONRYFOSFACE OF STUD or SLABFOWFACE OF WALLFPFIRE PROTECTIONFRZFREEZERFTGFOOTINGFURGFURRINGFURNFURNISH or FURNITUREFVFIELD VERIFYGAGAUGEGALVGALVANIZEDGCGENERAL CONTRACTORGENGENERAL or GENERATORGFPGOVERNMENT FURNISHEDPROPERTYGLGLASSGLZGLAZING (GLAZE)GRDGRADEGSFGROSS SQUARE FEETGWBGYPSUM WALL BOARDGYPGYPSUMHHIGHHAZHAZARDHCHANDICAPPEDHDRHEADERHSHAND SINKHTHEIGHTHMHOLLOW METALHWTHOT WATER TANKHVACHEATING, VENTILATING & AIRCONDITIONINGIINSULATE(D)IDINSIDE DIAMETER or DIMENSIONIHMINSULATED HOLLOW METALISINSULATED STEELININCHINCLINCLUDEINFOINFORMATIONINSULINSULATIONINTINTERIORJANJANITORJSTJOISTJT (OR J)JOINTK(12)KICKPLATE (HEIGHT")LAMLAMINATELAVLAVATORYLDRLEADERLLLEAD LINE(D)LTLIGHTLTGLIGHTINGMASMASONRYMATLMATERIALMAXMAXIMUMMBRMEMBERMEMECHANICAL ENGINEERMECHMECHANICALMEMBMEMBRANEMEPMECHANICAL, ELECTRICAL,PLUMBINGMFDMANUFACTUREDMFRMANUFACTURERMIDMIDDLEMINMINIMUMMODMODIFYMTMOUNTMTDMOUNTEDMTGMOUNTING or MEETINGMTLMETALMINMINIMUMMISCMISCELLANEOUSMOMASONRY OPENINGMULLMULLIONMWMICROWAVENNORTHNANOT APPLICABLENENOT EXCEEDINGNICNOT IN CONTRACTNONUMBERNOMNOMINALNSFNET SQUARE FEETNTSNOT TO SCALEOOXYGENOCON CENTEROCCOCCUPANT or OCCUPYOF/CIOWNER FURNISHED, CONTRACTORINSTALLEDOF/VIOWNER FINISHED, VENDORINSTALLEDOHOVERHANGOPNGOPENINGOPPOPPOSITEPBPANIC BUTTON or PUSH BARPCPIECEPLPROPERTY LINEPBDPARTICLE BOARDPENPENETRATE or PENETRATIONPERMPERMANENTPERPPERPENDICULARPHPHASEPLBGPLUMBINGPLAMPLASTIC LAMINATEPLASPLASTERPRPAIRPSPULL STATIONPTPAINTPTACPACKAGED THERMAL AIRCONDITIONERPTDPAINTEDPTNPARTITIONPVGPAVINGPLYWDPLYWOODPWRPOWERRCPREFLECTED CEILING PLANRDROOF DRAIN or ROADRECTRENTANGLEREFREFERENCE or REFRIGERATORREINFREINFORCEREMREMODELREPREPAIRREPLREPLACEREQREQUIREREQDREQUIREDRGHROUGHRMROOMRNDROUNDROROUGH OPENINGRTUROOF TOP UNITSSOUTHSCSOLID CORESCHEDSCHEDULESCWSOLID CORE WOODSECTSECTIONSFSQUARE FOOTSIMSIMILARSKSKETCHSMSURFACE MOUNT(ED)SPECSPECIFICATION(S)SQSQUARESSSTAINLESS STEEL or SOLID SURFACESTSTAIR(S) or STREETSTDSTANDARDSTLSTEELSTORSTORAGESTRUCTSTRUCTURALSUSPSUSPEND(ED)SWSWITCHSYSSYSTEMTTEMPEREDTOTOP OFTELETELEPHONETEMPTEMPERATURE or TEMPORARYTHKTHICKTITEMPERED INSULATEDTLTTOILETTYPTYPICALTOCTOP OF CONCRETETOF TOP OF FOUNDATIONTOPOTOPOGRAPHYTOS ELTOP OF STEEL ELEVATIONTOS TOP OF SLAB or STEELTOW ELTOP OF WALL ELEVATIONUODUNDERSIDE OF DECKUNOUNLESS NOTED OTHERWISEURURINALVACVACUUMVERTVERTICALVESTVESTIBULEVF/CIVENDOR FURNISHED,CONTRACTOR INSTALLEDVIFVERIFY IN FIELDVTRVENT THROUGH ROOFWWEST or WIDEW/WITHW/INWITHINW/OWITHOUTWCWATER CLOSETWDWOOD or WATER DISPENSERWDWWINDOWWHWALL HUNG or WATER HEATERYDYARD14WG(THICKNESS") WIRE GLASS14T(THICKNESS") TEMPERED GLASSFINISH FLOORLINEFINISH FLOORLINE℄℄℄℄TRANSFERSIDE℄℄℄HIGHESTOPERABLEPART36"x48" CLRFLR SPACE60" DIA(MIN)15"-48" MIN. MAX.17"-25"36" MAX TO SPOUT OUTLET 27" MIN KNEE CLEARANCE 48" MAX 48" MAX.17" MIN34" MAX TO RIM 15"-48" MIN MAX 36"36"15" MIN 29" MIN 27" CLR 40" MAX TO BO REFLECTING SURFACE 30"-42" 20" MAX 2'-0" MAX. 80"-96" AFF42"-48" 4'-0" MAX.8" MIN6" MAX.TOE CLEARANCE6" MAX TOECLEARANCESEEPLAN9" MIN TOE CLEARANCE 17" MIN 5" MAX15" MIN8" MIN KNEECLEARANCE27" MIN KNEE CLEARANCE 36" MAX TO SPRAY HEAD 48" MAX 4'-0" MAX. 48" MAX 34" MAX TO HIGHEST PART OF WORK SURFACE IN DOWN POSITION 27" MIN TO BTM OF WORK SURFACE 17" - 25"KNEE CLEARANCE< or = 25" DEEP 44" MAX TO HIGHEST PART OF LATCH 33" MIN - 36" MAX7" MIN -9" MAX15" MIN -48" MAX 12" MAX42" MIN6"13-1/2"MIN17" MIN - 19" MAX 18"42" MIN54" MIN17" MAX TO RIM 44" TYP 5'-6" MIN6'-0" MIN 18"3'-0" MIN36"24"12"36"12"60"60" 6"EQEQ2'-5"3'-0" 74" MIN TO TO REFLECTING SURFACE 9" MIN TOE CLEARANCE 33" MIN - 36" MAX 3'-0" 17" MIN - 19" MAXPRINCIPAL USE:ZONING RESTRICTIONS RELATIVE TO USE:NOT APPLICABLENOT APPLICABLEINSULATE ALL PLUMBINGLAVATORY GUARDFIRE HORN AND STROBEPer NFPA 72 the lens of thestrobe shall be no less than 80"& no greater than 96" AFF. Whenceiling heights do not allow for amin height of 80", strobes shallbe mounted within 6" of ceilingPUBLIC TELEPHONEThe highest operable part of telephone,including dial, handset and coin depositslots shall be within the reach rangesspecified in ABA Section 30830"x48" CLR FLR SPACE(FORWARD APPROACH)PUBLIC TELEPHONE(PLAN)CLOTHES HOOK/RODAccessible storagespaces shall be within atleast one of the reachranges specified in ADASection 308DUPLEX ORQUADRUPLEXRECEPTACLELAVATORYLAVATORY FORWARDAPPROACH (PLAN)DRINKING FOUNTAINWALL & POST MOUNTEDCANTILEVERED UNITSACCESSIBLEDRINKING FOUNTAINMINIMUM ACCESSIBLESHOWER CONFIGURATION(PLAN)SOAP DISPENSER NAPKIN/TAMPONVENDORPAPER TOWELDISPENSERFIRE ALARMPULL STATIONThe distance from anexit door to a manualpull station must notexceed 5'-0"OPTIONAL POSTOR BASE30"X48" CLR FLR SPACE(FORWARD APPROACH)SINKSPOUTLOCATIONMIRRORUNCHANGEDUNCHANGEDUNCHANGEDNOT APPLICABLE; UNCHANGEDSTAIRS: NOT APPLICABLE; NO STAIRS IN PROJECT AREA (SEE INTERNATIONAL BUILDING CODE 1011.2)RAMPS: NOT APPLICABLE; NO RAMPS IN PROJECT AREA (SEE INTERNATIONAL BUILDING CODE 1020.2)EMERGENCYEYE WASH/ SHOWER30"x48" CLEARFLOOR SPACEEMERGENCYEYE WASH/ SHOWER(PLAN)PAPER TOWEL DISPENSER& WASTE RECEPTACLEFOLD DOWN SEATAS REQUIREDBABY CHANGING TABLE(FRONT)BABY CHANGING TABLE(SIDE)30"x48" MIN CLEARFLOOR SPACETOILET TISSUEDISPENSERMount on side wall closestto water closet; shall not belocated behind grab barTOILET SIDE WALLGRAB BARSGrab bars shall be between114" & 112" in diameter & located112" clear from wallTOILET REAR WALLGRAB BARSGrab bars shall be between114" & 112" in diameter & located112" clear from wallTOILET(SIDE ELEVATION)TOILET(FRONT ELEVATION)*Flush controls shall be locatedon the open side of water closetor directly behind the toiletURINALFlush controls shall be within reachrange per ADA Section 308*Flush controls shall be located on theopen side of urinal or directly behindURINAL(PLAN)SIDE WALLREQUIRED CLEARANCEAT TOILET30"x48" CLEARFLOOR SPACECLEAR FLOORSPACEPREFERREDLOCATION ISBELOW GRABBAR @ 2'-0" AFFTO CENTER OFDISPENSERREAR SWING-UPGRAB BAR(REQ'D IN CT)OPEN SIDESIDE SWING-UPGRAB BAR(REQ'D IN CT)CIRCULAR SPACEThis space shall bepermitted to include knee& toe clearance complyingwith ADA Section 308T-SHAPED SPACEThis space shall be permitted toinclude knee & toe clearancecomplying with ADA Section 308 onlyat the end of the base or one armNURSE CALL LIGHTNURSE CALL LIGHT;SEE ELEC. DWGS.30"x48" CLEARFLOOR SPACE1.CONTROLS/OPERATING MECHANISMS MUST BE PLACED WITHIN AT LEAST ONE OF THE REACH RANGES SPECIFIED IN ADA SECTION 308.2.UNLESS NOTED OTHERWISE, DIMENSIONED REACH RANGES ARE GIVEN TO HIGHEST/LOWEST OPERABLE PART.3.REQUIRED CLEAR FLOOR SPACES, CLEARANCES AT FIXTURES, & TURNING SPACES SHALL BE PERMITTED TO OVERLAP.4.DOOR SHALL NOT SWING INTO THE CLEAR FLOOR SPACE OR CLEARANCE REQUIRED FOR ANY FIXTURE.5.DOORS SHALL BE PERMITTED TO SWING INTO THE REQUIRED TURNING SPACE.6.ALL WORK SHALL COMPLY WITH THE CURRENT EDITION OF ADA AND ALL LOCAL CODES.7.ALL MASSACHUSETTS WORK TO COMPLY WITH CURRENT EDITION OF MA AAB.FIRE EXTINGUISHERCABINETMIRRORMirrors not located above lavatoriesshall be installed with the bottomedge of the reflecting surface max35" aff per ADA 603.3OPEN SIDEOPEN SIDEHIGHESTOPERABLEPART30"-42"HIGHESTOPERABLEPART30"-42"HIGHESTOPERABLEPARTHIGHESTOPERABLEPARTNOTES:BABY CHANGING TABLE(PLAN)2/16/2021 1:29 PM INFORMATION SHEETGI002GSSEAL:MARKDATEISSUE-02/15/2021PERMIT SETPROJECT NO:PROJECT ARCHITECT:PROJECT MANAGER:DRAWN BY:DATE:COPYRIGHT:20-052DHDH02/03/2021SHEET TITLE:CONSULTANT:64 GOTHIC STREET, SUITE 1NORTHAMPTON, MA 01060T 413.585.1512 F 413.586.7945www.haiarchitecture.comH AIArchitecture, Inc.PROJECT:MRI ReplacementBasement Floor LevelCooley Dickinson Hospital30 Locust StreetNorthampton, MA 01060Renovation for: FD FD FD FDVC FDVCMGCVXFC FD XFCXFCFD FD FD FD FD FDFD ♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦TREATMENTROOM B-45 DARKROOM B-46 CONTROLROOM B-47 CLEAN B-55 CONTROL B-44 EXAM B-40 EXAM B-39 CORRIDOR B-43 CAST B-41 PLANNING B-42 CORRIDOR B-51 THERAPISTOFFICE B-37 THERAPIST OFFICE B-38 PHYSICISTOFFICE B-54 EQUIPMENTROOM TOILET B-53A TOILET B-52 LOCKERS B-53LOUNGE CORRIDOR B-50 RAD.STORAGE B-49 X-RAY B-48 EQUIPMENT STORAGE B-17 CORRIDOR CORRIDOR B-24A EQUIPMENTROOM B-21 CORRIDOR B-24 STAIRSELEVATORELEVATORELEVATOR SOILED UTILITY B-26 STORAGE B-25 MEDICALRECORDS CORRIDOR B-57 CORRIDOR B-200 SOILED UTILITY B-22 GENERATORROOM B-20 TRANS.VAULT B-23 ENVIRONMENTAL STORAGE FD PASS ELEVATORLOBBY B-202 F.E. CABINET PUBLICTOILET PUBLICTOILET B-201 RADIATIONPROTECTION GENERALSTORAGE B-64STOREROOM B-67 GENERALSTORAGE B-61 CORRIDOR CORRIDOR B-68CARPENTRY B-63 ICEMACHINE B-62 CARPSTORAGE B-75 STOREROOM B-72 MEN TOILET B-73 PREPARATIONAREA B-79 RAMP UP STAIRS RAMP UP TUNNEL RAMP UP SOILED LINENSTORAGE B-93 LOADING DOCK MEATSTORAGE B-78 RAMP ON ELEVATOR STOREROOM B-60 TEMPORARY STORAGE B-83 STOREROOM B-74 STOREROOM B-76 STAIRS CONFERENCEROOM B B-251 VIEWINGFILM CONTROL CORRIDOR B-256 CATHLAB SOILEDUTILITY SCRUB PASS F.E. CABINETLOCKERROOM LOCKERROOM VESTIBULE STAFFTOILET PASS MEDS CORRIDOR HOUSEKEEPING PASS WORKAREA NOURISH. PREP/RECOVERYPREP/RECOVERYPREP/RECOVERY PATIENTTOILETCLEANSUPPLY TELE/COMM ELEC. B-229 EMERGENCY ELEC. B-261 STAIRS B-258 MECHANICALROOM B-228 AREAWAY AREAWAY ACCESS AREAWAY DECONTAMINATIONSOILED WORKROOM B-227 SOILED CARTSTAGING AREA B-226 EQUIPMENTWASH B-224 HOUSEKEEPING B-225 EQUIPMENTSTORAGE B-205 LINEN STERILIZERSSTEAM B-212 MALELOCKERS MALETOILETFEMALETOILET B-220 FEMALE LOCKERS B-222 SHOWER B-218 CORRIDOR B-217 OFFICE B-208 HOUSEKEEPING B-243 DISPATCHOFFICE B-206 SERVICE ELEVATOR ELEVATOR ELEVATOR SERVICE ELEVATOR LOBBY B-204 AREAWAY COMMUNICATIONS B-260 PBDSSTORAGE B-209 SORTING &PACKING B-215 CENTRAL STERILEPROCESSING OFFICE B-06 OFFICE B-07 OFFICE UTIL B-5D STORAGE B-5C BATH ROOM B-5B LOCKERS B-5A PROCESSEDSTORES B-211 LINEN STORAGE B-56 LINENSTORAGE B-58 RAMP UPPAINTSTORAGE B-66 CARPENTRYSTORAGE B-69 SOILEDLINEN B-257 LOUNGE B-210 STORAGE B-254 EQUIPMENT B-255RAMP UP1:12 SLOPE MAX. TYP.RAMP UP 1:12 SLOPE MAX. TYP. CRAWL SPACE STORAGE B-70 B-71A MECHANICAL B-71B B-71C CORRIDOR B77A CORRIDOR B-94 B-71 B-82 B-80 B-81 B-27 B-28 B-15 CORRIDOR B-16 B-18 B-19 OFFICE B-05 B-59 EL EL EL EL EL EL EL EL EL EL EL EL EL EL EL EL EL EL EL F. E.CAB. F.F. ELEV. = 218'-11" MRIROOM B-128 MRIEQUIPMENT B-127 CORRIDORB-125 MRICONTROLB-124 F.F. ELEV. = 218'-6" PATIENTHOLDINGB-122 C.G. C.G. STAFFWORK ROOM B-123 SOILEDHOLDINGB-107 CORRIDORB-119 FEMALELOCKERB-109 BENCHCHANGINGB-108 BENCH BENCH CHANGINGB-110 BENCHMALELOCKERB-111 C.G. C.G. F. E.CAB. PATIENTWAITINGB-118 PATIENTTOILETB-102 STAFFTOILETB-101 CORRIDORB-103 STAFFROOMB-100 JANITORCLOSETB-104 VIEWER VIEWER RADIOLOGY OFFICE/READINGB-105 CLEANUTILITYB-106 PRINTSHOPB-63 F.F. ELEV. = 218'-6" F.F. ELEV. = 218'-11" MECHANICALROOMB-113 F.F. ELEV. = 218'-6" ELECTRICALROOMB-112 SCHEDULING/RECEPTIONB-114 CONFERENCE/CONSULTB-120 PATIENTINTERVIEWB-110 F.F. ELEV. = 218'-11" F.F. ELEV. = 218'-11" F.F. ELEV. = 218'-5 3/4"F.F. ELEV. = 218'-6" VESTIBULEB-115 TOILETB-117 LINE OF ROOM ABOVE ENTRANCEB-116 CONTROLROOMB-71E B-71D MEDICALRECORDS B-77 F.F. ELEV. = 219'-11" RAMPDN ELECTRICAL MANHOLE EXISTING 13,800V ELECTRICAL UNDERGROUND MAIN, APPROX. 5'-0" BELOW GRADE A C D E F 6 5 4 3 2 1 B 33'-0"16'-3"14'-512"4'-0"16'-0"CRAWL SPACE STORAGE DN 17'-0"19'-7"28'-7"15'-9"PLANNORTHEXISTING CONDITIONS OVERVIEW FLOOR PLAN SCALE: 1/16" = 1'-0" PROJECT AREA ♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦SEPSEPSEPSEPSEPSEP SEP SEP SEPSEPSEPSEPSEPSEPSEP SEP SEP SEPSEPSEP SEP SEP SEP SEP SEP SEPSEPSEPSEPSEP SEP SEP SEP SEP ♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦ ♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦SEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEP SEP SEP SEP SEP SEP SEP SEPSEPSEP SEP SEP SEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEP♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦SEPSEPSEPSEPSEPSEPSEPSEPSEPSEP♦♦♦♦2/16/2021 1:27 PMEXISTING CONDITIONS OVERVIEW FLOOR PLAN GC101 GS SEAL: MARK DATE ISSUE -02/15/2021 PERMIT SET PROJECT NO: PROJECT ARCHITECT: PROJECT MANAGER: DRAWN BY: DATE: COPYRIGHT: 20-052 DH DH 02/03/2021 SHEET TITLE: CONSULTANT: 64 GOTHIC STREET, SUITE 1 NORTHAMPTON, MA 01060 T 413.585.1512 F 413.586.7945 www.haiarchitecture.com H AI Architecture, Inc. PROJECT: MRI Replacement Basement Floor Level Cooley Dickinson Hospital 30 Locust Street Northampton, MA 01060 Renovation for: STOREROOM B-74 STOREROOM B-76 STAIRS F. E. CAB. F.F. ELEV. = 218'-11" MRI ROOM B-128 MRI EQUIPMENT ROOM B-127 CORRIDOR B-125 MRI CONTROL B-124 F.F. ELEV. = 218'-6" (+/-0'-0") PATIENT HOLDING B-122 C.G. C.G. STAFF WORK ROOM B-123 SOILED HOLDING B-107 CORRIDOR B-119 FEMALE LOCKER B-109 BENCHCHANGING B-108 BENCH BENCH CHANGING B-110 BENCHMALE LOCKER B-111 C.G. C.G. F. E. CAB. PATIENT TOILET B-102 STAFF TOILET B-101 CORRIDOR B-103 VIEWER CLEAN UTILITY B-106 ELECTRICAL ROOM B-112 SCHEDULING/ RECEPTION B-114 CONFERENCE/ CONSULT B-120 PATIENT INTERVIEW B-110 B-77 F.F. ELEV. = 219'-11" RAMP DN A C D C.G.C.G. C.G. 6 5 4 2 PROJECT AREA F SEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPREMOVE (SALVAGE FOR FUTURE RE-INSTALLATION) PORTION OF EXISTING ALUMINUM COMPUTER TYPE FLOORING; REMOVE ALL UTILITIES TO MRI EQUIPMENT ROOM 3'-212"12'-11"REMOVE (SALVAGE FOR FUTURE RE-INSTALLATION) PORTION OF EXISTING ALUMINUM COMPUTER TYPE FLOORING 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 1818 18 18 18 18 7'-1"2 3 2 3 8 9 REMOVE PORTION OF EXISTING ALUMINUM COMPUTER TYPE FLOORING AS REQUIRED TO ACCOMMODATE NEW SLAB INFILL FOR RF GRADIENT CABINET, UPS, AND UPS BATTERY CABINET; CONTRACTOR TO VERIFY DIMENSIONS IN FIELD. PROTECT OR OTHERWISE REMOVE AND REPLACE EXISTING RAISED FLOOR SYSTEM DURING CONSTRUCTION OPERATIONS (TYPICAL). 9A TP TP TP TPTPTPTPTPTPTPTPTPTPTPTP TP TP 2 3 2 3 2 3 PLANNORTHDEMOLITION PLAN SCALE: 1/4" = 1'-0" 19 19 TP TP TP TP TP TP TP TP REMOVE EXISTING MEDICAL GAS LINES, VALVES, ACCESSORIES, ETC FROM ALL WALLS OR CEILINGS THAT ARE SCHEDULED TO BE DEMOLISHED. REMOVE THE ASSOCIATED PLUMBING BACK TO THE NEAREST APPROPRIATE CONCEALED AREA. PROVIDE VALVE AND CAP THE LINES. SEE PLUMBING PLANS FOR FURTHER INFORMATION. COORDINATE WORK WITH THE OWNER. REMOVE EXISTING PLUMBING FIXTURES (SINK, WATER CLOSETS, SHOWERS, ETC) AND ALL ACCESSORIES. REMOVE ALL PLUMBING LINES (HOT AND COLD WATER, WASTE AND VENT) TO NEAREST CONCEALED AREA (WALL, FLOOR, CEILING OR CHASE). PROVIDE VALVE AND CAP AT APPROPRIATE SOURCE. COORDINATE WITH OWNER'S REPRESENTATIVE FOR ACCEPTABLE CAP AND VALVE LOCATIONS. PATCH DISTURBED AREAS TO MATCH EXISTING AND NEW WORK. EXISTING PLUMBING FIXTURES TO BE REMOVED SHALL BE REMOVED TO THE OWNER'S STORAGE. REMOVE EXISTING LATH AND PLASTER CEILING. PREPARE TOPS OF WALLS AT REMOVED CEILING FOR SMOOTH TRANSITION TO NEW EXTENSION OF WALLS TO STRUCTURE ABOVE. REMOVE ANY ELECTRICAL DEVICES, (OUTLETS, SWITCHES, LIGHT FIXTURES, CLOCKS, ETC) WHERE REQUIRED TO ACCOMMODATE NEW CONSTRUCTION. ALSO REMOVE ALL RELATED WIRING AND CONDUIT, EXCEPT WHERE THE CONDUIT IS SCHEDULED TO REMAIN FOR REUSE. REMOVE THE CONDUIT AND WIRING BACK TO THE NEAREST CONCEALED AREA (WALL, FLOOR, CEILING OR CHASE) AND DISCONNECT THAT CIRCUIT FROM THE BUILDING'S POWER SYSTEM. SEE ELECTRICAL PLANS FOR EXACT LOCATIONS OF ELECTRICAL DEVICES TO BE REMOVED. PATCH AND REPAIR SURFACES AS REQUIRED TO MATCH EXISTING AND NEW WORK. EXISTING ELECTRICAL DEVICES AT EXISTING WALLS TO REMAIN (TYPICAL) REMOVE WALL COVERING, WHERE PRESENT, INCLUDING CERAMIC TILE AND/OR SPECIALTY PANELS. CLEAN AND PREPARE EXISTING SUBSTRATE AND PATCH HOLES AS REQUIRED TO FACILITATE INSTALLATION OF NEW FINISH AS SPECIFIED IN THE FINISH SCHEDULE. REMOVE EXISTING DOORS AND DOOR FRAMES AS SCHEDULED. PATCH AND REPAIR WALLS, FLOORS AND CEILINGS TO MATCH EXISTING AND NEW WORK AS SCHEDULED. RELOCATE AND REFINISH/RECONDITION DOORS THAT ARE SCHEDULED TO BE RELOCATED IN THE DOOR SCHEDULE. REMOVE EXISTING SUSPENDED ACOUSTICAL CEILING SYSTEM, INCLUDING ALL TILES, GRIDS, HANGERS, AND TRACKS. PATCH & REPAIR WALLS AS REQUIRED TO MATCH NEW & EXISTING WORK TO REMAIN - REFER TO MEP DRAWINGS FOR ADDITIONAL ASSOCIATED ITEMS. REMOVE EXISTING BASE (VINYL, TILE, ETC). CLEAN AND PREPARE THE EXISTING SUBSTRATE AS REQUIRED TO FACILITATE THE INSTALLATION OF NEW BASE. SEE ROOM FINISH SCHEDULE FOR NEW BASE TYPE. REMOVE EXISTING FLOOR COVERING (VINYL, TILE, ETC); PATCH AND REPAIR FLOOR AS REQUIRED. CLEAN AND PREPARE THE EXISTING SUBSTRATE AS REQUIRED TO FACILITATE THE INSTALLATION OF NEW FLOOR COVERING. (SEE ROOM FINISH SCHEDULE FOR NEW FLOOR COVERING). NOTE: ALL FLOORS IN ROOMS OR AREAS THAT ARE SCHEDULED TO RECEIVE NEW FLOOR COVERING WILL HAVE THE EXISTING FLOOR COVERING REMOVED IN THAT AREA, UNLESS NOTED OTHERWISE. GENERAL CONTRACTOR TO ENSURE THAT THE FLOOR IS LEVEL PRIOR TO INSTALLING NEW FLOORING. REMOVE EXISTING CABINET WORK, COUNTERS, SHELVING, EQUIPMENT AND OTHER BUILT-IN ITEMS AS SHOWN OR OTHERWISE CALLED OUT TO BE REMOVED. PATCH SURFACES AS REQUIRED TO RECEIVE NEW FINISH SURFACES. WHERE EXISTING PARTITIONS, OR PORTIONS OF SAME, ARE REMOVED, TO ACCOMMODATE NEW DOORS OR WINDOWS, COUNTERS, OR CABINETS BECAUSE OF DEMOLITION, PATCH AND REPAIR WALLS, FLOORS, AND CEILINGS TO MATCH EXISTING AND NEW WORK AS SCHEDULED. WHERE EXISTING CMU WALLS ARE REMOVED TO ACCOMMODATE NEW DOORS OR WINDOWS, PROVIDE NEW LINTELS OVER THE OPENING AS REQUIRED. SEE LINTEL SCHEDULE. LEAVE JAMBS CLEAN AND SQUARE FOR APPLICATION OF NEW DOOR OR WINDOW FRAME. PROVIDE TEMPORARY DUSTPROOFING PARTITIONS AT ALL EXISTING AREAS THAT ABUT THE WORK AREA AND WHERE INDICATED ON THE DRAWINGS. TEMPORARY PARTITIONING SHALL BE LOCKABLE, AND SHALL EXTEND FROM FLOOR TO UNDERSIDE OF STRUCTURE ABOVE. SEE DRAWINGS FOR LOCATIONS. CONTRACTOR TO USE RIGID TEMPORARY PARTITION (MODULAR SYSTEM) AS APPROVED BY OWNER. THE FOLLOWING DEMOLITION NOTES REFER ONLY TO THE GENERAL SCOPE OF DEMOLITION REQUIRED TO COMPLETE THIS PROJECT, AND MAY NOT SPECIFICALLY IDENTIFY EACH AND EVERY COMPONENT OF AN ARCHITECTURAL, MECHANICAL, ELECTRICAL, OR PLUMBING SYSTEM OR ASSEMBLY (WHETHER DESIGNATED ON THE DEMOLITION PLAN(S) OR NOT). THE GENERAL CONTRACTOR AND HIS/HER SUBCONTRACTORS SHALL BE REQUIRED TO REMOVE/DEMOLISH INCIDENTAL ITEMS THAT MAY BE CONSTRUED TO BE RELEVANT TO THE SCOPE OF DEMOLITION SHOWN ON THE DEMOLITION PLAN(S), OR REQUIRED TO COMPLETE THE NEW WORK. THE GENERAL CONTRACTOR SHALL BE REQUIRED TO DEMOLISH SPECIFIC ITEMS, WHETHER OR NOT THEY ARE SPECIFICALLY INDICATED. THE GENERAL CONTRACTOR SHALL BE REQUIRED TO CUT ALL HOLES IN FLOORS, WALLS, CEILINGS, ETC AS REQUIRED FOR MECHANICAL OR ELECTRICAL WORK IDENTIFIED IN THE CONTRACT DOCUMENTS (INCLUDING, BUT NOT LIMITED TO DUCTWORK, HYDRONIC PIPING, FIRE SUPPRESSION PIPING, PLUMBING PIPING, AND/OR ELECTRICAL CONDUIT FOR POWER / DATA / LOW VOLTAGE / SPECIALTY SYSTEMS). GENERALLY, THESE PENETRATIONS ARE NOT SHOWN ON THE CONTRACT DRAWINGS; HOWEVER, THE GENERAL CONTRACTOR (OR APPROPRIATE SUBCONTRACTOR) SHALL BE RESPONSIBLE FOR CORING OPERATIONS, AND SLEEVING PENETRATIONS WHERE REQUIRED, WITH A MATERIAL THAT IS SUITED TO THE TYPE OF PENETRATION AND RATING OF THE ASSEMBLY BEING PENETRATED. THE GENERAL CONTRACTOR SHALL BE REQUIRED TO PATCH AND REPAIR ALL DAMAGED SURFACES TO MATCH EXISTING AND/OR AS REQUIRED BY THE NEW WORK. 1 REMOVE EXISTING INTERIOR WINDOW ASSEMBLIES INCLUDING INTERIOR TRIM AS SCHEDULED. PATCH AND REPAIR WALLS, FLOORS, AND CEILING TO MATCH EXISTING AND NEW WORK AS SCHEDULED. IN ALL AREAS WHERE DEMOLITION OCCURS REFER TO M/E/P DRAWINGS FOR SPECIFICS IF HAZARDOUS MATERIALS ARE ENCOUNTERED DURING DEMOLITION OPERATIONS, IMMEDIATELY NOTIFY OWNER AND COMPLY WITH ALL APPLICABLE REGULATIONS, LAWS, AND ORDINANCES CONCERNING REMOVAL, HANDLING AND PROTECTION AGAINST EXPOSURE OR ENVIRONMENTAL POLLUTION. REMOVE PORTION OF EXISTING PARTITIONS (INCLUDING ALL ELECTRICAL DEVICES AND WIRING, PLUMBING FIXTURES AND PIPING AND ANY OTHER ITEMS MADE OBSOLETE BY THE REMOVAL OF THE PARTITION), CHASES, DOORS, FRAMES AND MISCELLANEOUS CONSTRUCTION ITEMS. PATCH AND REPAIR WALLS, FLOORS, CEILINGS TO MATCH EXISTING AND NEW WORK AS SCHEDULED. REMOVE EXISTING MRI EQUIPMENT AND ALL ASSOCIATED ASSEMBLIES AND COMPONENTS. SEE M/E/P/FP DRAWINGS FOR ADDITIONAL INFORMATION, AND REFER TO GE HEALTHCARE SIGN ARTIST IPM FINAL STUDY DRAWINGS (DATED 17/DEC/2020) FOR ASSOCIATED EQUIPMENT PREPARATIONS. REMOVE EXISTING FIRE PROTECTION PIPING AND HEADS AS REQUIRED TO SUIT NEW WORK. EXTEND AND/OR RECONFIGURE PIPING AS REQUIRED - SEE FIRE PROTECTION DRAWINGS FOR FURTHER INFORMATION. COORDINATE ANY REQUIRED SHUT DOWNS WITH THE OWNER. 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 12 14 17 16 13 15 REMOVE EXISTING RAISED ACCESS FLOOR FOR NEW WORK; MODIFY AS REQUIRED.19 REMOVE EXISTING HVAC DUCTWORK VALVES, CONTROLS, WIRING, THERMOSTATS, DUCT HANGERS, RADIATORS, RADIATOR ENCLOSURE COVERS AND ALL EQUIPMENT ACCESSORIES, ANY MISCELLANEOUS HVAC ACCESSORIES THAT REQUIRE REMOVAL WITH THE DEMOLITION OF WALLS AND/OR CEILINGS. REMOVE THE DUCTWORK AND PIPING BACK TO THE NEAREST APPROPRIATE CONCEALED AREA AND CAP THE DUCTS AND LINES IN QUESTION. PATCH AND REPAIR SURFACES AS REQUIRED TO MATCH EXISTING AND NEW WORK AND MAINTAIN REQUIRED FIRE RATINGS. SEE HVAC DRAWINGS FOR FURTHER INFORMATION. COORDINATE WITH OWNER'S REPRESENTATIVE FOR INFECTION CONTROL POLICIES. REMOVE EXISTING TEL/DATA LINES, RECEPTACLES, AND/OR DEVICES WHERE REQUIRED TO ACCOMMODATE NEW CONSTRUCTION. ALSO REMOVE ALL RELATED WIRING AND CONDUIT, EXCEPT WHERE THE CONDUIT IS SCHEDULED TO REMAIN FOR REUSE. REMOVE THE CONDUIT AND WIRING BACK TO THE NEAREST CONCEALED AREA (WALL, FLOOR, CEILING OR CHASE) SEE ELECTRICAL PLANS FOR EXACT LOCATIONS OF TELE/DATA DEVICES TO BE REMOVED. PATCH AND REPAIR SURFACES AS REQUIRED TO MATCH EXISTING AND NEW WORK. DEMOLITION KEYNOTES TEMPORARY DUSTPROOFING PARTITION EXISTING CONSTRUCTION DEMOLITION LEGEND TP TP TP X KEYED DEMOLITION NOTES TEMPORARILY REMOVE EXISTING EXTERIOR WINDOW SYSTEM TO ALLOW FOR THE REMOVAL OF EXISTING MRI, INSTALLATION OF NEW MRI AND ALL REQUIRED RIGGING; VERIFY OPENING REQUIRED WITH VENDOR/GENERAL CONTRACTOR. GC SHALL PROTECT WINDOW SYSTEM FOR RE-INSTALLATION AND REPLACE ANY PORTIONS OF THE EXISTING WINDOW SYSTEM (INCLUDING WINDOW FILM) IF DAMAGED DURING CONSTRUCTION OPERATIONS. 9A 2/16/2021 2:27 PMDEMOLITION PLAN AD101 GS SEAL: MARK DATE ISSUE -02/15/2021 PERMIT SET PROJECT NO: PROJECT ARCHITECT: PROJECT MANAGER: DRAWN BY: DATE: COPYRIGHT: 20-052 DH DH 02/03/2021 SHEET TITLE: CONSULTANT: 64 GOTHIC STREET, SUITE 1 NORTHAMPTON, MA 01060 T 413.585.1512 F 413.586.7945 www.haiarchitecture.com H AI Architecture, Inc. PROJECT: MRI Replacement Basement Floor Level Cooley Dickinson Hospital 30 Locust Street Northampton, MA 01060 Renovation for: STOREROOM B-74 STOREROOM B-76 STAIRS F. E. CAB. F.F. ELEV. = 218'-11" MRI ROOM B-128 MRI EQUIPMENT ROOM B-127 CORRIDOR B-125 MRI CONTROL B-124 F.F. ELEV. = 218'-6" (+/-0'-0") PATIENT HOLDING B-122 C.G. C.G. STAFF WORK ROOM B-123 SOILED HOLDING B-107 CORRIDOR B-119 FEMALE LOCKER B-109 BENCHCHANGING B-108 BENCH BENCH CHANGING B-110 BENCHMALE LOCKER B-111 C.G. C.G. F. E. CAB. PATIENT TOILET B-102 STAFF TOILET B-101 CORRIDOR B-103 VIEWER CLEAN UTILITY B-106 ELECTRICAL ROOM B-112 SCHEDULING/ RECEPTION B-114 CONFERENCE/ CONSULT B-120 PATIENT INTERVIEW B-110 B-77 F.F. ELEV. = 219'-11" RAMP DN A C D PLANNORTHPARTIAL BASEMENT FLOOR PLAN SCALE: 1/4" = 1'-0" 28'-7"1'-0"1'-7"1'-0"C.G.C.G.32'-0"16 A301 16 A301 25'-9"24'-3"9'-11"1'-0"17'-5"2'-0"C.G. 6 5 4 2 ISOCENTER 9'-0"15'-3"8'-11"8'-6"5'-9"CLOSET B-128A NEW RF WINDOW TO REPLACE EXISTING B-128 NEW RF SHIELDED DOOR 8'-0"1'-6" NEW PENETRATION PANEL ENCLOSURE - MODIFY EXISTING WALL CONSTRUCTION; PROVIDE AND INSTALL NEW RF SHIELDING AS REQUIRED PROJECT AREA B-128a F REMOVE EXISTING ALUMINUM WINDOW SYSTEM; PROTECT DURING EQUIPMENT RIGGING OPERATIONS AND RE-INSTALL 8'-0"1'-93 4" INFILL EXISTING ELECTRICAL TRENCH - SEE STRUCTURAL SLAB PLAN; RE-INSTALL EXISTING RF SHIELDING FLOOR PANELS OVER CONCRETE T/O EXISTING COMPUTER TYPE ALUMINUM RAISED FLOORING EL. = 0'-0" T/O EXISTING COMPUTER TYPE ALUMINUM RAISED FLOORING EL. = 0'-0" REINFORCED CONCRETE - SEE STRUCTURAL SLAB PLAN; RE-INSTALL EXISTING RF SHIELDING FLOOR PANELS OVER CONCRETE W1 11 A302 A B C D 1 A201 C 6 A201 EXISTING "MRI IN USE" SIGN TO REMAIN EXISTING COUNTER TO REMAIN; PROVIDE GROMMETED OPENING AS REQUIRED FOR ROUTE CABLES EXISTING BASE CABINETS TO REMAIN A BD8 A201 SEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEP1 1 1 1 2 2 7'-0"738"3'-0"S O V 1.GENERAL CONTRACTOR MUST VERIFY ALL CONDITIONS AND DIMENSIONS AT THE JOB SITE AND REPORT ANY DISCREPANCIES TO ARCHITECT BEFORE PROCEEDING WITH THE WORK. 2.ANY REPAIRS, PATCHING, OR DEMOLITION INDICATED ON DRAWINGS REPRESENT THE GENERAL AREA WHERE WORK IS TO BE DONE, BUT DOES NOT NECESSARILY LIMIT THE EXTENT OF WORK. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL SUCH REPAIRS, PATCHING, ETC. WHERE THEY OCCUR IN BUILDING UNDER THIS CONTRACT. 3.PROVIDE TEMPORARY DUST PROOFING PARTITIONS TO EFFECTIVELY SEAL OFF WORK AREAS FROM THE REST OF THE BUILDING. PROVIDE TEMPORARY DOOR IF NECESSARY. TEMPORARY PARTITIONS SUBJECT TO APPROVAL OF OWNER AND ARCHITECT. 4.REPAIR ANY IRREGULARITIES IN SURFACES INCLUDING BUT NOT LIMITED TO AREAS DISTURBED BY NEW WORK. EXISTING SURFACES INCORPORATED INTO NEW WORK SHALL BE REPAIRED AND RE-FINISHED TO THE SAME STANDARD AS NEW WORK. 5.CONSTRUCT NEW INTERIOR PARTITIONS FROM FLOOR TO THE BOTTOM OF THE STRUCTURE (DECK OR SLAB) ABOVE UNLESS NOTED OTHERWISE, VERIFY IN FIELD. 6.ALL WORK TO BE CONSIDERED AS NEW WORK UNLESS INDICATED AS EXISTING TO REMAIN. 7.WHERE UTILITY AND MECHANICAL WORK IS REMOVED OR ALTERED, GENERAL CONTRACTOR IS RESPONSIBLE FOR PREPARING AND PATCHING BUILDING STRUCTURE TO MATCH NEW AND EXISTING WORK AS INDICATED ON DRAWINGS. 8.GENERAL CONTRACTOR TO PROVIDE BLOCKING AS REQUIRED FOR ALL WALLS, NEW OR EXISTING, THAT ARE TO RECEIVE NEW OR EXISTING CABINETRY, SHELVING, ETC. 9.ALL DOORS AND WALLS NOT LABELED WITH A WALL TYPE OR DOOR NUMBER ARE TO BE CONSIDERED EXISTING TO REMAIN. 10.FURNITURE SHOWN ON DRAWINGS, EXCEPT CASEWORK, IS NOT INCLUDED IN THIS CONTRACT UNLESS NOTED OTHERWISE. 11.DIMENSIONS ARE TAKEN FROM FACE OF FINISHED CONSTRUCTION. CLEAR DIMENSIONS ARE TO FINISHED FACE OF CONSTRUCTION AND SHALL TAKE PRECEDENCE OVER ANY OTHER DIMENSION. GENERAL CONSTRUCTION NOTES ROOM NAME AND ROOM NUMBER DOOR NUMBER NEW WALL CONSTRUCTION EXISTING CONSTRUCTION WALL TYPE NEW HALF WALL CONSTRUCTION (UNO) ROOM NAME XXX XXX 1 PROJECT AREA NEW MILLWORK / CASEWORK WITH PLASTIC LAMINATE COUNTERTOP NEW MILLWORK / CASEWORK WITH SOLID SURFACE COUNTERTOP SECURITY CAMERA FIRE ALARM PULL STATION FIRE ALARM HORN/STROBE CEILING - MOUNTED EXIT SIGN WALL - MOUNTED EXIT SIGN EMERGENCY LIGHT P F F FIRE ALARM STROBE LEGEND PB PUSH BUTTON & DOOR OPENER (ABOVE) PRIVACY CURTAIN CEILING TRACK AREA OF NO RENOVATION ♦♦♦♦♦1 HOUR FIRE RATING ♦♦♦♦♦♦2 HOUR FIRE RATING 20 A101 KEY PLAN SCALE: NOT TO SCALE FD FD FD FDVC FDVC MGCV XFC FD XFCXFC FD FD FD FD FD FDFD SUMP ♦ ELEVATOR #1 ELEVATOR #1 AREAWAY FD RAMP UP1:12 SLOPE MAX. TYP.RAMP UP1:12 SLOPE MAX. TYP. C.G.C.G. BENCH BENCH BENCH BENCH C.G. C.G. VIEWER VIEWER F.F. ELEV. = 218'-6" F.F. ELEV. = 218'-11" F.F. ELEV. = 218'-6" F.F. ELEV. = 218'-11" F.F. ELEV. = 218'-11" F.F. ELEV. = 218'-5 3/4"F.F. ELEV. = 218'-6" LINE OF ROOM ABOVE RAMPDN DN 2/16/2021 1:01 PMPARTIAL BASEMENT FLOOR PLAN A101 GS SEAL: MARK DATE ISSUE -02/15/2021 PERMIT SET PROJECT NO: PROJECT ARCHITECT: PROJECT MANAGER: DRAWN BY: DATE: COPYRIGHT: 20-052 DH DH 02/03/2021 SHEET TITLE: CONSULTANT: 64 GOTHIC STREET, SUITE 1 NORTHAMPTON, MA 01060 T 413.585.1512 F 413.586.7945 www.haiarchitecture.com H AI Architecture, Inc. PROJECT: MRI Replacement Basement Floor Level Cooley Dickinson Hospital 30 Locust Street Northampton, MA 01060 Renovation for: MRI ROOM B-128 MRI EQUIPMENT ROOM B-127 CORRIDOR B-125 MRI CONTROL B-124 PATIENT HOLDING B-122 STAFF WORK ROOM B-123 SOILED HOLDING B-107 CORRIDOR B-119 FEMALE LOCKER B-109 CHANGING B-108 CHANGING B-110 MALE LOCKER B-111 PATIENT TOILET B-102 STAFF TOILET B-101 CORRIDOR B-103 CLEAN UTILITY B-106 CONFERENCE/ CONSULT B-120 P IN A C CLOSET B-128A PROJECT AREA SEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPPLANNORTHREFLECTED CEILING DEMOLITION PLAN SCALE: 1/4" = 1'-0" MRI ROOM B-128 MRI EQUIPMENT ROOM B-127 CORRIDOR B-125 MRI CONTROL B-124 PATIENT HOLDING B-122 STAFF WORK ROOM B-123 SOILED HOLDING B-107 CORRIDOR B-119 FEMALE LOCKER B-109 CHANGING B-108 CHANGING B-110 MALE LOCKER B-111 PATIENT TOILET B-102 STAFF TOILET B-101 CORRIDOR B-103 CLEAN UTILITY B-106 CONFERENCE/ CONSULT B-120 P IN A C CLOSET B-128A PROJECT AREA SEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPPLANNORTHREFLECTED CEILING PLAN SCALE: 1/4" = 1'-0" TYPE 3A 10'-0" TYPE 7 8'-0" 1.ALL NEW SPRINKLER HEADS TO BE CENTERED IN CEILING TILES. (COORDINATE LOCATIONS WITH FIRE PROTECTION PLAN AND ALL OTHER TRADES). 2.COORDINATE NEW CEILING WORK WITH ALL NEW AND EXISTING CEILING ITEMS, ACCESSORIES, AND SYSTEMS. 3.SEE HVAC DRAWINGS FOR ALL NEW EXHAUST GRILLES AND DIFFUSERS, COORDINATE ALL NEW DIFFUSERS WITH NEW CEILING GRID LAYOUT, LIGHTS, SPEAKERS, SPRINKLERS, ETC. 4.CENTER ALL NEW ACOUSTICAL CEILING TILES IN BOTH DIMENSIONS IN ALL ROOMS SCHEDULED TO RECEIVED NEW SUSPENDED ACOUSTICAL TILE, UNLESS SHOWN DIFFERENTLY ON DRAWINGS. 5.SEE ELECTRICAL LIGHTING PLAN AND SCHEDULE FOR ALL LIGHTING FIXTURES. 6.ALL NEW SMOKE AND HEAT DETECTORS SHALL BE CONNECTED TO THE EXISTING FIRE ALARM SYSTEM. 7.ALL SUSPENDED CEILINGS SHALL BE EQUIPPED WITH SEISMIC PERIMETER CLIPS AT NEW TILES APPROVED FOR SEISMIC CATEGORY "C". USE CEILING WIRE ASSEMBLY APPROVED FOR USE IN ANCHORING SUSPENSION WIRES TO SIDES OF CONCRETE RIBS AND BEAMS. 8.USE HARDWARE FRIENDLY OPTIONS AT ALL LIGHT FIXTURES AND OTHER ACCESSORIES. GAPS BETWEEN FIXTURE TRIM AND REVEALS ARE NOT ACCEPTABLE. SUSPENDED ACOUSTICAL CEILING 2'x4' LIGHT FIXTURE - SEE ELECTRICAL DRAWINGS 2'x2' LIGHT FIXTURE - SEE ELECTRICAL DRAWINGS RECESSED DOWNLIGHT FIXTURE - SEE ELECTRICAL DRAWINGS 1'x4' SURFACE MOUNTED LIGHT FIXTURE - SEE ELECTRICAL DRAWINGS CEILING MOUNTED EXIT SIGN - SEE ELECTRICAL DRAWINGS WALL MOUNTED EXIT SIGN - SEE ELECTRICAL DRAWINGS 1'x4' LIGHT FIXTURE - SEE ELECTRICAL DRAWINGS SPRINKLER HEAD (CEILING OR WALL MOUNTED) - SEE FIRE PROTECTION DRAWINGS SECURITY CAMERA - SEE ELECTRICAL DRAWINGS GYPSUM BOARD CEILING / SOFFIT SUPPLY DIFFUSER - SEE HVAC DRAWINGS RETURN OR EXHAUST GRILLE - SEE HVAC DRAWINGS S CEILING MOUNTED SPEAKER - SEE ELECTRICAL DRAWINGS 2' UNDERCABINET LIGHT FIXTURE - SEE ELECTRICAL DRAWINGS 4' UNDERCABINET LIGHT FIXTURE - SEE ELECTRICAL DRAWINGS BOX SOFFIT ABOVE CABINETRY (SEE ELEVATION FOR TYPE) PLASTIC LAMINATE CEILING / SOFFIT MEP WORK TO BE DESIGN BUILD CEILING TYPE CEILING HEIGHT ABOVE FINISH FLOOR EXISTING CEILING TO REMAIN EXISTING SOFFIT TO REMAIN CEILING MOUNTED SMOKE DETECTOR DOME LIGHT WITH AUDIBLE LOCAL ALARM HF F S CEILING MOUNTED HEAT DETECTOR USG MARS CLIMA PLUS #86785, 24"x24" TEGULAR TILE, COLOR: WHITE WITH 15/16" TEE GRID SYSTEM, COLOR: WHITETYPE 1A TYPE 2A USG ASTRO CLIMA PLUS #8223, 24"x24" TEGULAR TILE, COLOR: WHITE WITH 15/16" TEE GRID SYSTEM, COLOR: WHITE USG MARS CLIMA PLUS #88785, 24"x48" TEGULAR TILE, COLOR: WHITE WITH 15/16" TEE GRID SYSTEM, COLOR: WHITETYPE 1B TYPE 2B USG ASTRO CLIMA PLUS #8243, 24"x48" TEGULAR TILE, COLOR: WHITE WITH 15/16" TEE GRID SYSTEM, COLOR: WHITE TYPE 3A USG RADAR CLIMA PLUS #2220, 24"x24" TEGULAR TILE, COLOR: WHITE WITH 15/16" TEE GRID SYSTEM, COLOR: WHITE TYPE 3B USG RADAR CLIMA PLUS #2420, 24"x48" TEGULAR TILE, COLOR: WHITE WITH 15/16" TEE GRID SYSTEM, COLOR: WHITE TYPE 4 USG SHEET ROCK CLIMA PLUS #3270, 24"x48" LAY-IN TILE, COLOR: WHITE WITH 15/16" TEE GRID SYSTEM, COLOR: WHITE TYPE 5 PLASTIC LAMINATE SOFFITS - SEE DETAILS EXPOSED TO DECK ABOVE GYPSUM BOARD CEILING AND SOFFITS - SEE DETAILS TYPE 7 TYPE 6 1 2 SECOR WAP WIRELESS ACCESS POINT LEGEND REFLECTED CEILING KEYED NOTES REFLECTED CEILING NOTES CEILING TYPE SCHEDULE TYPE X X'-X" 2/16/2021 1:04 PMREFLECTED CEILING PLAN A151 GS SEAL: MARK DATE ISSUE -02/15/2021 PERMIT SET PROJECT NO: PROJECT ARCHITECT: PROJECT MANAGER: DRAWN BY: DATE: COPYRIGHT: 20-052 DH DH 02/03/2021 SHEET TITLE: CONSULTANT: 64 GOTHIC STREET, SUITE 1 NORTHAMPTON, MA 01060 T 413.585.1512 F 413.586.7945 www.haiarchitecture.com H AI Architecture, Inc. PROJECT: MRI Replacement Basement Floor Level Cooley Dickinson Hospital 30 Locust Street Northampton, MA 01060 Renovation for: 1" MIN. 3" MIN.12"MIN.EXISTING METAL DECK TO REMAIN ELAST-O-FORM FLASHING W/ LAP SPLICE WATER CUT-OFF MASTIC METAL COLLAR W/ SEALANT RAIN HOOD SEALANT ROOF CONSTRUCTION - SEE DETAIL 3/A191 NEW CRYOGEN VENT DETAIL SCALE: 3" = 1'-0" 4 A191 NEW PRESSURE-TREATED WOOD BLOCKING FOR FULL THICKNESS OF INSULATION (TYPICAL) ROOF MANUF'S COMPATIBLE SEALANT MOISTURE RESISTANT, PRESSURE TREATED WOOD BLOCKING SHALL BE BUILT UP TO FULL THICKNESS OF INSULATION (TYPICAL) ROOFING MANUF'S COMPATIBLE SEALANT ROOF CONSTRUCTION - SEE DETAIL 3/A191 .050 GALV. ALUMINUM GRAVEL STOP (TYP.) CONTINUOUS CLIP (TYP.) ROOFING MEMBRANE (TYP.) - SEE SPEC. CONTINUOUS CAULK (TYP.) ROOF EDGE DETAIL SCALE: 3" = 1'-0" 13 A191 EXISTING WALL CONSTRUCTION TO REMAIN EXP. JOINT @ EXISTING WALL DETAIL SCALE: 1 1/2" = 1'-0" 3 A191 NEW 0.050 FLASHING PER MANUF. STD DETAILS MANUF'S COMPATIBLE SEALANT (TYPICAL) EXISTING WALL CONSTRUCTION TO REMAIN 0.090 MIL EPDM ROOFING MEMBRANE - TAPERED RIGID POLYISOCYANURATE INSULATION BOARDS TO OVERALL INSULATION THICKNESS SHOWN ON ROOF PLAN - 2" RIGID POLYISOCYANURATE INSULATION BOARDS - 5/8" EXTERIOR GRADE, FIBERGLASS-COATED SHEATHING BOARDS (SHALL FUNCTION AS VAPOR BARRIER) NEW MEMBRANE ROOFING SYSTEM: WATER CUT-OFF MASTIC NEW PRESSURE-TREATED WOOD NAILER TO FULL DEPTH OF INSULATION THICKNESS (TYPICAL) ROOF MANUF'S COMPATIBLE SEALANT EQUIPMENT CURB DETAIL SCALE: 1 1/2" = 1'-0" 9 A191 EXISTING BEAM WITH FITTED STIFFENERS - SEE STRUCTURAL DRAWINGS DUNNAGE AND PIPE POST - SEE STRUCTURAL DRAWINGS ROOF EQUIPMENT - SEE MECHANICAL DRAWINGS MOISTURE RESISTANT, PRESSURE TREATED WOOD BLOCKING SHALL BE BUILT UP TO FULL THICKNESS OF INSULATION MEMBRANE FLASHING WITH LAP SPLICE POURABLE SEALER 3" MIN. ROOF CONSTRUCTION - SEE DETAIL 3/A191 ROOF MANUF'S COMPATIBLE SEALANT EXISTING COUNTERFLASHING TO REMAIN 1" EXP. JOINT TO REMAIN WALKWAY PADS SCALE: 1/2" = 1'-0" 8 A191 2'-6" 6" TYP.2'-6"NEW 2'-6" x 2'-6" x 3/4" ROOF PROTECTION MATS (RUBBER ROOF WALK PADS) - TYP. INSTALLATION: ADHERE ALL FOUR CORNERS AND ONE SPOT IN THE MIDDLE - SPOTS AF ADHESIVE SHOULD BE AT LEAST SILVER DOLLAR SIZE. LAY DOWN THE WALKWAY PADS AND GLUE THEM ONTO THE ROOFING WITH A CAULKING GUN. R.D. T/STEEL EL. = 235'-5" R.D. EXISTING CHILLER TO BE REMOVED EXISTING EXHAUST FAN TO BE REMOVED AND RE-INSTALLED FOLLOWING REPLACEMENT OF THE MEMBRANE ROOFING SYSTEM - SEE MECHANICAL DRAWINGS A C 6 5 32'-0"28'-7"PLANNORTHROOF PLAN SCALE: 1/4" = 1'-0"1'-0"1'-0"16 A301 16 A301 NEW CHILLER - SEE MECHANICAL DRAWINS AIR-COOLED CONDENSING UNIT TO BE REMOVED - SEE MECHANICAL DRAWINGS NEW CRYOGEN VENT @ EXISTING VENT LOCATION - SEE DETAIL 4/A191 CONTRACTOR TO REMOVE ALL OF THE EXISTING MEMBRANE ROOFING SYSTEM AND RIGID INSULATION; INSTALL NEW MATERIALS IN ITS PLACE - SEE ROOF DETAILS 3 A191 3 A191 NEW ROOF PROTECTION MATS - SEE DETAIL 8/A191 13 A191 2" O.D. WELDED STEEL PIPE GUARDRAIL - ENSURE SMOOTH TRANSITIONS AND ROUNDED CORNERS (PAINT); SEE STRUCTURAL DRAWINGS FOR METHOD OF ATTACHMENT TO EXISTING STEEL BEAMS BELOW 2'-1516" NEW AIR-COOLED CONDENSING UNITS (2) - SEE MECHANICAL DRAWINGS 4" 4" FLAT 4" FLAT 4" FLAT 4" FLAT 3" 2"PITCH1/4"/FTPITCH 1/4"/FT PITCH1/4"/FTPITCH 1/4"/FT PITCH1/8"/FTPITCH 1/8"/FT PITCH 1/8"/FT PITCH1/8"/FT7'-634"7'-634"9'-238"4"3" 3" 4" 4" 3" 18 A191 NEW PIPING SUPPORTS FOR REFRIGERANT AND CHILLED WATER PIPING - SEE MECHANICAL DRAWINGS (TYP. OF 2) EXHAUST FANFAN V VENT THROUGH ROOF DIRECTION OF ROOF PITCH ROOF LEGEND ROOF NOTES 1.ALL DIMENSIONS ARE ±. CONTRACTOR TO FIELD VERIFY PRIOR TO BUILD. 2.ROOF IS TO BE INSTALLED IN SUCH A WAY AS TO SECURE THE MANUFACTURER'S STANDARD 15 YEAR FULL REPLACEMENT WARRANTY. 3.CONTRACTOR TO WARRANTY ALL LABOR AND MATERIALS FOR TWO YEARS FROM DATE OF SUBSTANTIAL COMPLETION. 4.ALL INSULATION TO BE INSTALLED IN TWO LAYERS. THE FIRST LAYER IS TO BE ONE INCH THICK. THE SECOND LAYER IS TO BE INSTALLED WITH JOINTS STAGGERED IN BOTH DIRECTIONS OVER THE FIRST LAYER. 5.CONTRACTOR SHALL TAKE GREAT CARE IN THE INSTALLATION OF INSULATION. THERE SHALL BE NO VOIDS AND NO DEFLATION IN HEIGHT GREATER THAN 1/8" BETWEEN ADJACENT PIECES. NO PONDING SHALL BE PERMITTED. ROOFER SHALL USE A LEVEL TO CHECK SLOPES PRIOR TO INSTALLING MEMBRANE AND MAKE ADJUSTMENTS AS REQUIRED. 6.CONTRACTOR SHALL TAKE GREAT CARE IN THE INSTALLATION OF THE ROOF MEMBRANE. THE MANUFACTURER'S REQUIREMENTS SHALL SERVE ONLY AS A MINIMUM STANDARD OF WORKMANSHIP. NO WRINKLES SHALL BE PERMITTED IN THE FINISHED PRODUCT. 7.ROOF DRAIN PIPING IS GENERALLY DIAGRAMMATIC. ROUTE BEST LOCATION AROUND LIGHTING FIXTURES, GRILLES, FANS, ETC. COORDINATE LOCATION WITH ARCHITECT AND OWNER. REPAIR ANY CEILING/WALL HOLES REQUIRED FOR PIPING RENOVATION. PATCH TO MATCH EXISTING. ROOF DRAIN WITH 4' SQUARE SUMP AT EACH DRAIN LOCATIONRD LINE OF VALLEYVVVV LINE OF RIDGERRRR SCUPPER (BELOW) SPOT ELEVATION OF ROOF INSULATION (ABOVE DECK)+X.X"2/16/2021 1:11 PMROOF PLAN AND DETAILS A191 GS SEAL: MARK DATE ISSUE -02/15/2021 PERMIT SET PROJECT NO: PROJECT ARCHITECT: PROJECT MANAGER: DRAWN BY: DATE: COPYRIGHT: 20-052 DH DH 02/03/2021 SHEET TITLE: CONSULTANT: 64 GOTHIC STREET, SUITE 1 NORTHAMPTON, MA 01060 T 413.585.1512 F 413.586.7945 www.haiarchitecture.com H AI Architecture, Inc. PROJECT: MRI Replacement Basement Floor Level Cooley Dickinson Hospital 30 Locust Street Northampton, MA 01060 Renovation for: 1/2" SOLID SURFACE COUNTERTOP WITH EASED EDGES; MARINE GRADE PLYWOOD SUBSTRATE AT ENTIRE UNDERSIDE OF COUNTER - SEE ROOM FINISH SCHEDULE 1/2" SOLID SURFACE COUNTERTOP (3 LAYERS GLUED TOGETHER) SOLID SURFACE NOSING DETAIL SCALE: 6"=1'-0" 19a A201 1"112"R1 8"R18"FINISHED FLOOR 3'-0" N.T.S. SCRIBE AND CAULK CONTIN. BY GENERAL CONTRACTOR 4" BACKSPLASH 3'-4"N.T.S.COUNTER SUPPORT BRACKET AS REQUIRED @ 32" O.C. (TYP.) BASE - SEE ROOM FINISH SCHEDULE112"4"END SPLASH AT WALL CONT. 1-1/2"x1-1/2"x1/8" ALUM. ANGLE CLEAT INFILL PANEL AT ENTIRE UNDERSIDE OF COUNTER TO PROVIDE CONTINUOUS FLUSH SURFACE (TYP.) NOTE: COUNTER SHALL BE SOLID SURFACE WHEN OCCURRING AT SINK LOCATION COUNTER SCALE: 1" = 1'-0" 13 A201 SOLID SURFACE COUNTERTOP; MARINE GRADE PLYWOOD SUBSTRATE AT ENTIRE UNDERSIDE OF COUNTER - SEE ROOM FINISH SCHEDULE AND MILLWORK NOTE #22 3" Ø STAINLESS STEEL GROMMETS (TYP.) FINISHED FLOOR3'-4"N.T.S.3'-0"12"MIN.1" TYP. FINISHED END PANEL EQ.EQ. METAL FURNITURE LEVELER GLIDE @ EACH END OF PANEL NOTE: FLOORING CONT. UNDER PANEL END PANEL DETAIL SCALE: 1" = 1'-0" 18 A201 3/4" PARTICLE BOARD; PLASTIC LAMINATE ON ALL EXPOSED SURFACES - SEE ROOM FINISH SCHEDULE COUNTERTOP MATERIAL AS INDICATED IN OTHER DETAILS FINISHED FLOOR CEILING EL = SEE RCP BLOCKING DETAIL SCALE: 1/2" = 1'-0" 14 A201 SEE ELEVSEE ELEVSEE ELEVTYPICAL UPPER CABINET - SEE INTERIOR ELEVATIONS CONTRACTOR TO PROVIDE BLOCKING AS REQUIRED TO SUPPORT MILLWORK - COORDINATE WITH OWNER TYPICAL BASE CABINET - SEE INTERIOR ELEVATIONS A MRI ROOM #B-128 INTERIOR ELEVATION SCALE: 1/4" = 1'-0" 1 A101 W1 BASE - SEE ROOM FINISH SCHEDULE3'-6"3'-8"B-128 B BASE - SEE ROOM FINISH SCHEDULE B-128a C BASE - SEE ROOM FINISH SCHEDULE REMOVE EXISTING ALUMINUM WINDOW SYSTEM; PROTECT DURING EQUIPMENT RIGGING OPERATIONS AND RE-INSTALL D BASE - SEE ROOM FINISH SCHEDULE EXISTING MILLWORK TO REMAIN SHIELD MAGNET - SEE EQUIPMENT SCHEDULE PHANTOM SET STORAGE CABINET - SEE EQUIPMENT SCHEDULE PATIENT TRANSPORT TABLE - SEE EQUIPMENT SCHEDULE SHIELD MAGNET - SEE EQUIPMENT SCHEDULE PATIENT TRANSPORT TABLE - SEE EQUIPMENT SCHEDULE MAGNET RUNDOWN UNIT - SEE EQUIPMENT SCHEDULE ISOCENTER MAGNET RUNDOWN UNIT - SEE EQUIPMENT SCHEDULE SHIELD MAGNET - SEE EQUIPMENT SCHEDULE REAR PEDESTAL - SEE EQUIPMENT SCHEDULE ISOCENTER ISOCENTER CORRIDOR #B-125 INTERIOR ELEVATION SCALE: 1/4" = 1'-0" 6 A101 C W1 BASE - SEE ROOM FINISH SCHEDULE 3'-6"3'-8"B-128 MRI IN USE EXISTING "MRI IN USE" SIGN TO REMAIN ISOCENTER UPS REMOTE STATUS PANEL - SEE EQUIPMENT SCHEDULE REMOTE MAGNET RUNDOWN UNIT - SEE EQUIPMENT SCHEDULE REMOTE GRAPHIC DISPLAY - SEE EQUIPMENT SCHEDULE MRI EQUIPMENT ROOM #B-127 INTERIOR ELEVATION SCALE: 1/4" = 1'-0" 8 A1015'-4"D BASE - SEE ROOM FINISH SCHEDULE CRYOCOOLER COMPRESSOR - SEE EQUIPMENT SCHEDULE SECONDARY PENETRATION WALL - SEE EQUIPMENT SCHEDULE PENETRATION CABINET - SEE EQUIPMENT SCHEDULE MAINTENANCE BYPASS PANEL - SEE EQUIPMENT SCHEDULE MAIN DISCONNECT PANEL - SEE EQUIPMENT SCHEDULE WATER FILTER - SEE EQUIPMENT SCHEDULE WATER BYPASS - SEE EQUIPMENT SCHEDULE C BASE - SEE ROOM FINISH SCHEDULE HEAT EXCHANGER CABINET - SEE EQUIPMENT SCHEDULE MAGNET MONITOR - SEE EQUIPMENT SCHEDULE POWER, GRADIENT, RF CABINET - SEE EQUIPMENT SCHEDULE 150 KVA UPS SYSTEM - SEE EQUIPMENT SCHEDULE UPS BATTERY CABINET - SEE EQUIPMENT SCHEDULE MUSIC SYSTEM - SEE EQUIPMENT SCHEDULE OPERATOR CONSOLE COMPUTER - SEE EQUIPMENT SCHEDULE 3'-4"1" COUNTERTOP OVERHANG OPEN SPACE 13 A201 NEW SCW LOUVERED DOORS W/ ANODIZED ALUMINUM FRAME & HARDWARE - SEE DOOR SCHEDULE 1.CONTRACTOR TO VERIFY ALL DIMENSIONS BEFORE BEGINNING WORK. FABRICATE CASEWORK IN SECTIONS AS NECESSARY TO FACILITATE HANDLING AND BUILDING ENTRY. ALL SUCH CASEWORK SECTIONS TO BE JOINED WITH SPLINES AND RV #315 TITE-JOINT FASTENERS. 2.ALL CASEWORK AND MILLWORK FABRICATION AND MATERIALS TO EQUAL ARCHITECTURAL WOODWORK INSTITUTE QUALITY STANDARDS "CUSTOM GRADE" OR BETTER. 3.CASEWORK IS TO BE FLUSH OVERLAY CONSTRUCTION. USE SCRIBE ENDS WHERE CASEWORK IS EXPOSED. CAULK JOINTS TO ELIMINATE GAPPING BETWEEN DISSIMILAR MATERIALS, OR NEW CASEWORK AND EXISTING CONSTRUCTION (TYPICAL). USE STILES WHERE NECESSARY TO MOUNT HINGES TO ADJACENT DOORS. CAULK BACKSPLASHES TO COUNTERS, NO CAULK JOINT SHALL EXCEED 1/8". 4.ALL CASEWORK CORES TO BE 3/4" PARTICLE BOARD EXCEPT AS NOTED. 5.ALL BASE CABINETS KICKS TO BE 3/4" SOLID WOOD OR VENEER PLYWOOD. 6.ALL INTERIOR SURFACE OF EXPOSED (OPEN) CABINETS SHALL BE PLASTIC LAMINATE TO MATCH EXTERIOR OF CABINET. INTERIOR SURFACES OF UNEXPOSED (CLOSED WITH DOORS, DRAWERS, OR PANELS) SHALL BE MELAMINE (WHITE) UNLESS OTHERWISE NOTED. 7.ALL EXPOSED SURFACES OF CASEWORK TO RECEIVE PLASTIC LAMINATE. 8.BACKS OF PLASTIC LAMINATED SURFACES SHALL RECEIVE BALANCE SHEET. 9.CABINET BACKS - USE PREFINISHED HARDBOARD (MELAMINE, ETC) WITH COLOR TO MATCH PLASTIC LAMINATE CASEWORK. USE 1/2" HARDBOARD WITH PLASTIC LAMINATE AND BALANCE SHEET AT ALL CASEWORK BACKS THAT ARE EXPOSED. 10.STENCIL PRODUCT NAME AND COLOR NAME & NUMBER AT UNDERSIDE OF ALL COUNTERTOPS, INCLUDE DATE OF FABRICATION. 11.GENERAL CONTRACTOR IS TO PROVIDE BLOCKING IN WALLS FOR CASEWORK, EVEN IF NOT SPECIFICALLY INDICATED ON DRAWINGS. 12.CABINETRY HARDWARE: FOR ADDITIONAL INFORMATION REFER TO SPECIFICATIONS. PULLS - (US26D) 4" BRUSHED CHROME (UNLESS NOTED OTHERWISE ON FINISH SCHEDULE), MOUNTED 1-3/4" IN FROM SIDE EDGE OF DOOR(S) AND CENTERED SIDE TO SIDE ON DRAWER FACES. SEE MILLWORK DETAILS FOR PULL HEIGHTS HINGES - 165° OPENING (CONCEALED, SELF-CLOSING); SHELF SUPPORTS - 32 MM LINE BORE SYSTEM WITH HAFELE #282.04.739 (METAL CLIPS); LOCKS + CATCHES - KENSTAN CAM LOCK (KEY REMOVABLE IN UNLOCKED POSITION) WITH 2" MINIMUM ELBOW CATCH & ELBOW CATCH AT AT DOUBLE DOORS TO MATCH PULLS, INSTALL LOCKS IN LIGN WITH CENTER OF PULL; TOUCH LATCH - EPCO #507 BLACK PLASTIC; DRAWER SLIDES - BLUM STANDARD DRAWER SLIDE. FULL EXTENSION, WHITE. 13.SHELVES TO HAVE 3/4" CORE (TYPICAL TO 36"; >36" = 1" CORE). SHELVES TO BE FULL DEPTH OF CABINET. 14.NOT USED. 15.ADJUSTABLE SHELVES HARDWARE: KV 82/182 SHELVING SYSTEM WITH HEAVY DUTY BRACKETS AND STANDARDS (ARCHITECT TO SELECT COLOR). 16.COUNTER SUPPORT BRACKET: FAST CAP/SPEED BRACE SUPPORT BRACKET W/1/4" X 2" PHILIPS PAN HEAD SHEET METAL SCREWS OR HEAVY DUTY TOGGLE BOLTS. CONTRACTOR TO DETERMINE MAXIMUM UNSUPPORTED SPANS AND OVERHANG WITH BRACKET MANUFACTURER (WHITE POWDER COAT FINISH UNLESS OTHERWISE SPECIFIED BY ARCHITECT). 17.ALL DRAWERS SHALL HAVE FULL HEIGHT SIDES AND BACK, UNLESS NOTED OTHERWISE. 18.CONTRACTOR TO PROVIDE RUBBER DOOR SILENCERS AT ALL DOOR AND DRAWERS. 19.GROMMETS (2-3/4" INTERIOR DIAMETER TYPICAL UNLESS NOTED OTHERWISE); COLOR TBD. COORDINATE WITH COUNTER FINISH. QUANTITY TBD. (GROMMETS TO BE LOCATED IN FIELD BY OWNER). 20.KEYBOARD TRAYS TO BE OF/CI. 21.PROVIDE SEAMING PLAN FOR ALL COUNTERS AND SHEET FLOORING. 22.ALL SOLID SURFACE COUNTERTOP SHALL HAVE NOSING PER DETAIL 19a/A201. 23.GC SHALL PROVIDE ALL BLOCKING AS REQUIRED TO SUPPORT MILLWORK, WHETHER OR NOT SPECIFICALLY CALLED OUT ON THE DRAWINGS PER DETAIL 14/A201. MILLWORK NOTES 2/16/2021 1:14 PMINTERIOR ELEVATIONS AND DETAILS A201 GS SEAL: MARK DATE ISSUE -02/15/2021 PERMIT SET PROJECT NO: PROJECT ARCHITECT: PROJECT MANAGER: DRAWN BY: DATE: COPYRIGHT: 20-052 DH DH 02/03/2021 SHEET TITLE: CONSULTANT: 64 GOTHIC STREET, SUITE 1 NORTHAMPTON, MA 01060 T 413.585.1512 F 413.586.7945 www.haiarchitecture.com H AI Architecture, Inc. PROJECT: MRI Replacement Basement Floor Level Cooley Dickinson Hospital 30 Locust Street Northampton, MA 01060 Renovation for: T/O FINISHED FLOOR EL. = 0'-0"158"EXISTING SUBFLOOR RECESSFOR NEW RF SHIELDED PANELASSEMBLY BY SHIELDING CONTRACTORT/O CONCRETE SLAB EL. = -0'-1 5/8"1'-158"T/O CONCRETE SLAB EL. = -1'-1 5/8" T/STEEL FRAMING EL. = 16'-11"16'-11"1'-158"B/O FOUNDATION EL. = -4'-4" PARTIAL BUILDING SECTION SCALE: 1/2" = 1'-0" 16 A101 MRI ROOM B-128 CORRIDOR B-125 PATIENT HOLDING B-122 65 9'-0"3'-6"3'-8"T/STEEL FRAMING (UPPER ROOF) EL. = 21'-0"4'-1"21'-0"ISOCENTER INFILL TRENCH WITH NEW FIBERGLASS REINFORCED CONCRETE - SEE STRUCTURAL DRAWINGS3'-6" 10'-2"B/O CABLE TRAYNEW ELECTRICAL/DATA CABLE TRAY - SEE GE EQUIPMENT DRAWINGS; SEE ELECTRICAL DRAWINGS FOR SCHEMATIC ROUTING; ELECTRICAL CONTRACTOR TO COORDINATE FINAL ROUTING WITH OWNER'S REPRESENTATIVE; CONTRACTOR TO PROVIDE AND INSTALL NON-FERROUS UNI-STRUT ASSEMBLY TO UNDERSIDE OF STRUCTURE ABOVE (TYPICAL) NEW CHILLER - SEE MECHANICAL DRAWINGS 1.5T MAGNET - SEE GE EQUIPMENT DRAWINGS PATIENT TABLE - SEE GE EQUIPMENT DRAWINGS REAR PEDESTAL - SEE GE EQUIPMENT DRAWINGS EXISTING ALUMINUM WINDOW SYSTEM - REMOVE FOR RIGGING OPERATIONS AND RE-INSTALL AS REQUIRED; PROTECT DURING STORAGE PERIODS AND PROVIDE WEATHERTIGHT AND SECURE TEMPORARY ENCLOSURE TO SUIT CONSTRUCTION OPERATIONS B/O CEILING EL. = 10'-0" EXISTING R-33 THERMAL INSULATION TO REMAIN (TYPICAL) 13 A191 EXISTING STEEL ROOF FRAMING WITH SPRAY FIREPROOFING TO REMAIN (U.L. DESIGN NO. P715) - CONTRACTOR TO PROTECT EXISTING SPRAY FIREPROOFING TO MAINTAIN 2-HR. RATING (TYPICAL)8"14 A191 2" O.D. WELDED STEEL PIPE GUARDRAIL - ENSURE SMOOTH TRANSITIONS AND ROUNDED CORNERS (PAINT); SEE STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION NEW MEMBRANE ROOFING SYSTEM: -0.090 MIL EPDM ROOFING MEMBRANE -TAPERED RIGID POLYISOCYANURATE INSULATION BOARDS TO OVERALL INSULATION THICKNESS SHOWN ON ROOF PLAN -2" RIGID POLYISOCYANURATE INSULATION BOARDS -5/8" EXTERIOR GRADE, FIBERGLASS-COATED SHEATHING BOARDS (SHALL FUNCTION AS VAPOR BARRIER) REMOVE EXISTING SOFFIT, LIGHT FIXTURES AND ALL CEILING ACCESSORIES - SEE DEMOLITION PLAN EXISTING WALL CONSTRUCTION TO REMAIN - PROTECT EXISTING CLERESTORY WINDOWS DURING CONSTRUCTION OPERATIONS (TYPICAL) NEW RF SHIELDED WINDOW ASSEMBLY BY SHIELDING VENDOR NEW RF SHIELDED CEILING ASSEMBLY BY SHIELDING VENDOR @ 11'-5" AFF - SEE VENDOR DETAILS FOR STRUCTURAL CEILING SUPPORT ATTACHMENT TO UNDERSIDE OF STRUCTURE ABOVE NEW INTERIOR WALL CONSTRUCTION W/ RF SHIELDING - SEE WALL TYPES MAINTAIN EXISTING 2" AIR SPACE (TYPICAL) EXISTING EXTERIOR WALL CONSTRUCTION TO REMAINMAINTAIN EXISTING 2" AIR SPACE (TYPICAL) EXISTING MEMBRANE ROOFING SYSTEM TO REMAIN (TYPICAL) - SEE ROOF PLAN 11'-5"NEW SHEET FLOORING - WELDED, W/ PATTERNING TO IDENTIFY PERTINENT GAUSS LINES; SEE FINISHES PLAN & SCHEDULE; COORDINATE WITH SHIELDING CONTRACTOR FOR NEW RF SHIELDED PANEL ASSEMBLY ON NEW VAPOR BARRIER NEW SOLID SURFACE WORK COUNTER - PROVIDE NEW BLOCKING AT EXISTING WALL AS REQUIRED; SEE DETAILS 9 A191 NEW DUNNAGE & PIPE POST - SEE STRUCTURAL DRAWINS 2/16/2021 1:17 PMPARTIAL BUILDING SECTION A301 GS SEAL: MARK DATE ISSUE -02/15/2021 PERMIT SET PROJECT NO: PROJECT ARCHITECT: PROJECT MANAGER: DRAWN BY: DATE: COPYRIGHT: 20-052 DH DH 02/03/2021 SHEET TITLE: CONSULTANT: 64 GOTHIC STREET, SUITE 1 NORTHAMPTON, MA 01060 T 413.585.1512 F 413.586.7945 www.haiarchitecture.com H AI Architecture, Inc. PROJECT: MRI Replacement Basement Floor Level Cooley Dickinson Hospital 30 Locust Street Northampton, MA 01060 Renovation for: T/O FINISHED FLOOR EL. = 0'-0"1'-158"EXISTINGRAISEDFLOORT/O CONCRETE SLAB EL. = -0'-1 5/8" T/ EX. STEEL FRAMING EL. = 16'-11"16'-11"B/O FOUNDATION EL. = -4'-4" C WALL SECTION SCALE: 1/2" = 1'-0" 11 A101 8"MRI EQUIPMENT ROOM B-127 NEW CHILLER - SEE MECHANICAL DRAWINGS NEW STEEL DUNNAGE FOR CHILLER UNIT - SEE STRUCTURAL DRAWINGS; STEEL SHAPES SHALL HAVE 4" MIN. FLANGE NEW W6x12S AT NEW CHILLER - SEE STRUCTURAL DRAWINGS; PROVIDE & INSTALL SPRAY FIREPROOFING TO MAINTAIN 2 HR. ROOF RATING (TYPICAL) 4,000 PSI REINFORCED CONCRETE INFILL FOR NEW MRI EQUIPMENT BY CONTRACTOR 13 A191 CONTRACTOR TO REMOVE AND REINSTALL PORTIONS OF EXISTING RAISED COMPUTER-TYPE FLOORING SYSTEM FOR NEW CONCRETE WORK - SEE STRUCTURAL DRAWINGS 2" O.D. WELDED STEEL PIPE GUARDRAIL - ENSURE SMOOTH TRANSITIONS AND ROUNDED CORNERS (PAINT); SEE STRUCTURAL DRAWINGS 3'-6" MINIMUM ABOVEADJACENT ROOF SURFACE1'-10"9 A191 SIM.2/16/2021 2:02 PMWALL SECTION A302 GS SEAL: MARK DATE ISSUE -02/15/2021 PERMIT SET PROJECT NO: PROJECT ARCHITECT: PROJECT MANAGER: DRAWN BY: DATE: COPYRIGHT: 20-052 DH DH 02/03/2021 SHEET TITLE: CONSULTANT: 64 GOTHIC STREET, SUITE 1 NORTHAMPTON, MA 01060 T 413.585.1512 F 413.586.7945 www.haiarchitecture.com H AI Architecture, Inc. PROJECT: MRI Replacement Basement Floor Level Cooley Dickinson Hospital 30 Locust Street Northampton, MA 01060 Renovation for: HOLLOW METAL FRAME - PAINT; SEE SPEC. (TYP.) CAULK CONT. (BOTH SIDES) 2x WOOD BLOCKING (FIRE -RETARDANT) SEE FLOOR PLAN FOR WALL TYPE 1 2" TYP.2"12"WALL ANCHORS & BASE CLIPS DOOR - SEE DOOR SCHEDULE DOOR HEAD / JAMB DETAIL SCALE: 3" = 1'-0" 11 A601 CORRIDORMRI ROOM DOOR HEAD / JAMB DETAIL SCALE: 3" = 1'-0" 16 A601 EXISTING WALL CONSTRUCTION FROM CONTROL ROOM SIDE TO REMAIN - SEE FLOOR FOR WALL TYPE CORRIDOR MRI SCAN ROOM HIGH VISIBILITY RF SCREEN OBSERVATION WINDOW BY OTHERS WINDOW HEAD / SILL DETAIL SCALE: 3" = 1'-0" 18 A601 CAULK JOINT BOTH SIDES 5/8" TYPE "X" GYPSUM BOARD RF SHIELDING BY SHIELDING COMPANY BATT SOUND FIBERGLASS INSULATION 3-5/8" METAL STUDS @ 16" O.C. 5/8" TYPE "X" GYPSUM BOARD 5/8" TYPE "X" GYPSUM BOARD CORNER BEAD (TYP.) NON-FERROUS CORNER BEAD (TYP.) 5/8" TYPE "X" GYPSUM BOARD RF SHIELDING BY SHIELDING COMPANY BATT SOUND FIBERGLASS INSULATION 3-5/8" METAL STUDS @ 16" O.C. 5/8" TYPE "X" GYPSUM BOARD CORNER BEAD (TYP.) EXISTING WALL CONSTRUCTION FROM CONTROL ROOM SIDE TO REMAIN - SEE FLOOR FOR WALL TYPE 5/8" TYPE "X" GYPSUM BOARD NON-FERROUS CORNER BEAD (TYP.) DOOR - SEE DOOR SCHEDULE CAULK JOINT BOTH SIDES 1 WALL TYPE SCALE: 1" = 1'-0" FLOOR LINE EXISTING 5/8" TYPE "X" GYPSUM BOARD TO REMAIN EXISTING 3-5/8" METAL STUDS @ 16" O.C. TO REMAIN EXISTING BATT SOUND INSULATION TO REMAIN BASE - SEE ROOM FINISH SCHEDULE CEILING SEE R.C.P. LINE OF STRUCTURAL DECK OR SLAB ABOVE CAULK TO SEAL ALL GAPS CAULK TO SEAL ALL GAPS MRI ROOM 5/8" TYPE "X" GYPSUM BOARD RF SHIELDED PANELS BY SHIELDING VENDOR BASE - SEE ROOM FINISH SCHEDULE BATT SOUND FIBERGLASS INSULATION 2" AIR SPACE 3-5/8" METAL STUDS @ 16" O.C. CORRIDOR 2 WALL TYPE SCALE: 1" = 1'-0" NON-RATED WALL FLOOR LINE 5/8" TYPE "X" GYPSUM BOARD (EACH SIDE) 3-5/8" METAL STUDS @ 16" O.C. BATT SOUND INSULATION DIA. BRACING 3-5/8"x 18GA, ALONG LENGTH OF PARTITION @8'-0" O.C. TO STRUCTURE ABOVE SECURE TO STRUCTURE @ EACH END EACH CONNECTION BASE - SEE ROOM FINISH SCHEDULE CEILING SEE R.C.P. LINE OF STRUCTURAL DECK OR SLAB ABOVE SECURE TOP TRACK TO EXISTING CEILING GRID WITH CADDY CLIPS CONSTRUCTION ADHESIVE BASE TRACK TO EXISTING FLOORNON-RATED WALL 4'-0" A 2" TYP 7'-0"2" TYP2"TYPDOOR ELEVATIONS 7'-0"2" TYP 2" TYP 7"2'-10"9"2'-0"10"6" 2'-0" 6"6" 2'-0" 6" 6'-0" LOUVERS 6" ANOD. ALUMINUM SLIDE BOLTS EA. LEAF 612"B WINDOW ELEVATIONS 8'-0" RF SHIELDED ANOD. ALUMINUM FRAME WITH RF SHIELDED GLAZING BY SHIELDING VENDOR W1 3'-6"3'-8"KICKPLATE DOOR SCHEDULE DOOR DOOR FRAME REMARKS (SEE DOOR NOTES)HDWRLBLMATLSILLJAMB DETAIL HEADLFSGLAZLBLMATLSIZEELEV.MARK B-128 -4'-0"x 7'-0"x 1-3/4"-HML1--16/A601 -/--1 HARDWARE SCHEDULE 112 - PAIR - RIXSON PIVOT ASSEMBLY F-11712 1 - PASSAGE LATCHSET WITH LEVER HANDLES 1 - DOOR STOP, WALL OR FLOOR MOUNT 1 - DOOR CLOSER 1 - SET DOOR MUTES 2 - STAINLESS STEEL KICKPLATE - 24"H 1 - ELECTROMAGNETIC INTERLOCK TIED TO EQUIPMENT CONTROL RF SHIELDED DOOR AND FRAME BY SHIELDING VENDOR; G.C. COORD. TO - FROM B-128 MRI ROOM B-125 CORRIDOR- 1.ALL DOOR HANDLES SHALL BE OF LEVER TYPE MEETING CURRENT ADA STANDARDS, (AS NOTED IN THE HARDWARE SCHEDULE). DOOR HANDLES TO ROOMS CONSTITUTING A HAZARD (ELECTRICAL ROOMS, MECHANICAL ROOMS, SOILED UTILITY ROOMS, ETC.) SHALL BE LEVER TYPE WITH A KNURLED FINISH ON THE GRIP SURFACE. 2.ALL LOCKSETS & LATCHSETS SHALL BE OF MORTISE TYPE. 3.ALL HARDWARE FINISH SHALL BE BRUSHED STAINLESS STEEL (US32D), UNO. 4.ALL PRODUCTS SPECIFIED ON AN 'OR EQUAL' BASIS UNLESS OTHERWISE NOTED. 5.PROVIDE REQUIRED POWER SUPPLY SYSTEMS FOR OPERATING ALL ELECTROMAGNETIC LOCKS, ELECTROMECHANICAL LOCKS, ELECTRIC STRIKES, & MARLOK ELECTRONIC CYLINDER SYSTEMS. COORDINATE REQUIREMENTS WITH EC. 6.ALL ELECTROMAGNETIC LOCKS, ELECTROMECHANICAL LOCKS, & ELECTRIC STRIKES SHALL BE OF THE 'FAIL SAFE' DESIGN, UNLOCKING WHEN THE FIRE ALARM IS ACTIVATED OR ELECTRICAL POWER IS INTERRUPTED. 7.ALL STAINLESS STEEL KICKPLATES SHALL BE 2" LESS THAN DOOR WIDTH X 12" HIGH (TYPICAL, UNO) AND SHALL BE MOUNTED 1" FROM THE BOTTOM OF THE DOOR; SEE SPECIFICATION. 8.ALL HOLLOW METAL FRAMES SHALL BE SHOP WELDED UNLESS NOTED OTHERWISE. 9. SPECIES OF ALL DOORS SHALL MATCH EXISTING. GENERAL DOOR NOTES ABBREVIATIONS AA ANODIZED ALUMINUM AL ALUMINUM DR DOOR EI VINYL CLAD DOOR FGL FIBERGLASS HM HOLLOW METAL HML HOLLOW METAL LEAD LINED IHM INSULATED HOLLOW METAL K(12)KICKPLATE (HEIGHT") MTL METAL MATL MATERIAL BR NKL BRUSHED NICKEL PTD PAINTED SCW SOLID CORE WOOD SCWL SOLID CORE WOOD, LEAD LINED SS STAINLESS STEEL STL STEEL T TEMPERED TI TEMPERED INSULATED UNO UNLESS NOTED OTHERWISE VIF VERIFY IN FIELD WD WOOD 14" WG 14" WIREGLASS 14" T 14" TEMPERED GLASS 1" IG 1" INSULATED GLASS 12" L LEXAN POLYCARBONATE B-128aB-128a MRI ROOM B-128a CLOSET--(2) 3'-0"x 7'-0"x 1-3/4"2 1. (2) DOORS WITH LOUVERSAL 3 PAIR BUTT HINGES, BALL BEARING 2 - CRL ALUMINUM 6" SLIDES AND PLATES 2 - CORBIN RUSSWIN TL3750S (DUMMY TRIM, SURFACE MOUTED, BOTH DOOR LEAVES) 2 - SALVADOR 106' LEVER HANDLES AND SQUARE "E2" ROSE 1 - DOOR STOP, WALL OR FLOOR MOUNT 1 - SET DOOR MUTES 2. 2SCW--11/A601 -/-11/A601 16/A601 WINDOW SCHEDULE MARKR. O. SIZE ELEVDETAIL HEAD REMARKSTYPEJAMBSILL BY SHIELDING VENDOR; G.C. COORD.RF SHIELDED ALW18'-0"W x 3'-6"HW1 18/A601-18/A601 18/A601 2/16/2021 1:22 PMDOOR, WINDOW SCHEDULE AND WALL TYPS A601 GS SEAL: MARK DATE ISSUE -02/15/2021 PERMIT SET PROJECT NO: PROJECT ARCHITECT: PROJECT MANAGER: DRAWN BY: DATE: COPYRIGHT: 20-052 DH DH 02/03/2021 SHEET TITLE: CONSULTANT: 64 GOTHIC STREET, SUITE 1 NORTHAMPTON, MA 01060 T 413.585.1512 F 413.586.7945 www.haiarchitecture.com H AI Architecture, Inc. PROJECT: MRI Replacement Basement Floor Level Cooley Dickinson Hospital 30 Locust Street Northampton, MA 01060 Renovation for: PAINTPAINTSTAIN & VARNISHRAISED FLOORINGRESILIENT TILE FLOORINGPORCELAIN TILE FLOORINGVINYL BASEPAINTPAINTPAINTROOM NAMEROOM# ROOM FINISH SCHEDULE MRI ROOM B1 P2 P2 P2 P2 S P1 PAINT, AND WALL, DOOR, & TRIM FINISHES P1 - PAINT 1 (TRIM): MANUFACTURER: BENJAMIN MOORE FINISH: ULTRA SPEC 500, SEMI GLOSS N539 OR DTM SEMI GLOSS HP29, AS APPROPRIATE COLOR: TBD P2 - PAINT 2 (TYPICAL WALLS): MANUFACTURER: BENJAMIN MOORE FINISH: ULTRA SPEC 500, EGGSHELL N537 COLOR: TBD P3 - PAINT 3 (ACCENT): MANUFACTURER: BENJAMIN MOORE FINISH: ULTRA SPEC 500, EGGSHELL N537 COLOR: TBD P4 - PAINT 4 (ACCENT): MANUFACTURER: BENJAMIN MOORE FINISH: ULTRA SPEC 500, EGGSHELL N537 COLOR: TBD P5 - PAINT 5 (ACCENT): MANUFACTURER: BENJAMIN MOORE FINISH: ULTRA SPEC 500, EGGSHELL N537 COLOR: TBD PC - CEILING PAINT: MANUFACTURER: BENJAMIN MOORE FINISH: ULTRA SPEC 500, FLAT N536 COLOR: TBD 1.ALL NEW INTERIOR WOOD DOORS SHALL BE WHITE MAPLE VENEER, PREMIUM GRADE, PLAIN SLICED. FINISH SHALL BE 2 COATS OF CLEAR SATIN FINISH POLYURETHANE. SEE DOOR SCHEDULE. 2.ALL PAINTED DOORS (INCLUDING DOORS TO FIRE STAIRS) IN PROJECT AREA SHALL BE REPAINTED TBD, REPAIR AS NECESSARY. 3.ALL HOLLOW METAL AND PAINTED INTERIOR DOOR AND WINDOW FRAMES IN PROJECT AREA SHALL BE PAINTED TBD, UNLESS NOTED OTHERWISE. 4.BOTH HORIZONTAL & VERTICAL SURFACES OF ALL GYPSUM SOFFITS (SEE RCP) SHALL BE PAINTED TBD UNO 5.ALL GYPSUM BOARD CEILINGS (SEE RCP) SHALL BE PAINTED (PC) CEILING WHITE UNO 6.ACCESS PANELS, ELECTRICAL PANELS, AND HVAC REGISTERS & GRILLS, RADIATOR COVERS, AND FIRE EXTINGUISHER CABINETS SHALL BE PAINTED TO MATCH ADJACENT SURFACE (WALL/ CEILING) UNO. MILLWORK AND SURFACING FINISHES PL1 - PLASTIC LAMINATE 1 (VERTICAL/ CABINETRY): MANUFACTURER: TBD COLOR: TBD FINISH: TBD PL2 - PLASTIC LAMINATE 2 (COUNTERTOPS): MANUFACTURER: TBD COLOR: TBD FINISH: TBD SS1 - SOLID SURFACE 1 (COUNTERTOPS): MANUFACTURER: CORIAN COLOR: TBD GL1 - ART GLASS / RESIN PANELS (DIVIDERS): MANUFACTURER: LUMICOR THICKNESS: 3/8" COLOR: TBD FINISH: TBD (BOTH SIDES), POLISHED EDGES 1.STENCIL ALL PRODUCT NAMES, COLOR NAMES & NUMBER, AND DATE OF FABRICATION AT UNDERSIDE OF ALL COUNTERTOPS. 2.SEE MILLWORK NOTES, SHEET A501, FOR CABINETRY NOSING, HARDWARE, AND OTHER SPECIFICS. 3.PROVIDE SEAMING PLAN FOR ARCHITECT'S APPROVAL FOR ALL COUNTERS. 4.PLASTIC LAMINATE ON VERTICAL SURFACES (CABINETRY & ALL EXPOSED SURFACES OF SOFFITS) SHALL BE PL1. PLASTIC LAMINATE ON HORIZONTAL SURFACES (COUNTERTOPS) SHALL BE PL2. 5.ALL COUNTERTOPS WITH SINKS SHALL BE SOLID SURFACE SS1. SINKS SHALL BE XXX TYPE; SEE PLUMBING DRAWINGS. 6.SOLID SURFACE WALL CAPS AT HALF WALLS SHALL BE SS1. SEE WALL TYPE -/A501. 7.COLOR OF METAL SUPPORT BRACKETS AT MILLWORK COUNTERTOPS SHALL BE WHITE. SEE MILLWORK NOTES. 8.INTERNAL SHELVES SHALL BE WHITE MELAMINE. 9.SOLID SURFACE AT NEW WINDOW SILL(S) SHALL BE SS1. 10.DIVIDER PANELS (GL1) AT RECEPTION WINDOWS IN WAITING ROOM SHALL BE A SUSPENDED WALL SYSTEM KIT AS PROVIDED BY LUMICOR. EDGES SHALL BE EASED AND POLISHED TO GLOSS FINISH. TOP AND BOTTOM TRACK SHALL BE SATIN ANODIZED. SEE INTERIOR ELEVATION -/-. B1 S P1P2P2P2 FLOORING, BASE, AND TILE FLOORING: C1 - CARPET TILE: MANUFACTURER: TBD STYLE/ SERIES: TBD SIZE: TBD INSTALLATION METHOD: TBD COLOR: TBD M1 - WALK-OFF MAT: MANUFACTURER: TBD STYLE/ SERIES: TBD SIZE: TBD INSTALLATION METHOD: TBD COLOR: TBD V1 - VINYL TILE MANUFACTURER: TBD STYLE/ SERIES: TBD SIZE: TBD INSTALLATION METHOD: TBD COLOR V1-a: TBD COLOR V1-b: TBD S1 - RESILIENT SHEET FLOORING (VINYL/ RUBBER): MANUFACTURER: TBD STYLE/ SERIES: TBD SIZE: TBD THICKNESS: TBD INSTALLATION METHOD: HEAT WELD COLOR: TBD _______________________________________________ TRANSITIONS: TS1 - TRANSITION STRIP: MANUFACTURER: JOHNSONITE SERIES: WHEELED TRAFFIC TRANSITIONS (#CTA-XXX-HL OR SIMILAR AS REQUIRED) COLOR: TBD _______________________________________________ WALL BASE: B1 - VINYL BASE: MANUFACTURER: JOHNSONITE HEIGHT: 4" STYLE/ SERIES: TRADITIONAL WALL BASE ·CARPET AREAS- STRAIGHT/ ·RESILIENT FLOORING AREAS- COVE COLOR: TBD B2 - INTEGRAL COVE BASE: MANUFACTURER: COORDINATE W/ SHEET FLOORING MATERIAL(S) LISTED ABOVE. HEIGHT: 6" _______________________________________________ TILE: T1 - PORCELAIN WALL TILE 1 - FIELD TILE: MANUFACTURER: TBD STYLE/ SERIES: TBD SIZE: TBD INSTALLATION METHOD: TBD COLOR: TBD T2 - WALL TILE 2 - GLASS MOSAIC ACCENT: MANUFACTURER: TBD STYLE/ SERIES: TBD SIZE: TBD INSTALLATION METHOD: TBD COLOR: TBD 1.SEE FINISHES FLOOR PLAN FOR FLOORING PATTERNS & TRANSITIONS. 2.PROVIDE SEAMING PLAN FOR ALL SHEET FLOORING FOR ARCHITECT'S APPROVAL. 3.CENTER ALL FLOOR TILES IN ROOM WHERE FEASIBLE. 4.HEAT WELD ALL SHEET VINYL/ RUBBER FLOORING SEAMS WITH COORDINATING WELDING ROD COLOR. 5.USE LARGEST SIZE OF RESILIENT SHEET FLOORING AVAILABLE AS REQUIRED TO MINIMIZE NUMBER OF SEAMS. _______________________________________________ 6.IF REQUIRED UNDER DOOR, INSTALL TRANSITION STRIPS DIRECTLY UNDER THE CLOSED DOOR. SEE TRANSITION DETAILS XX-XX/AF101 THIS SHEET. 7.PROVIDE TRANSITION STRIPS WHERE NEW FLOORING ABUTS EXISTING FLOORING SURFACES TO REMAIN IF REQUIRED. 8.PROVIDE TRANSITION STRIPS WHERE REQUIRED BY DIFFERENT FINISHED FLOOR HEIGHTS/THICKNESS. IF TRANSITION IS BETWEEN MATERIALS OF EQUAL HEIGHT, NO TRANSITION STRIP IS REQUIRED BENEATH DOOR. _______________________________________________ 9.ALL RESILIENT BASE SHALL BE ROLLED GOODS. USE LONGEST LENGTHS POSSIBLE AND MINIMIZE SEAMS. 10.RESILIENT BASE: USE STRAIGHT BASE FOR CARPET CONDITION; COVE BASE FOR RESILIENT FLOORING CONDITION. 11.USE INTEGRAL COVE BASE WITH CONTINUOUS EDGE CAP FOR ALL SHEET FLOORING LOCATIONS. ALL SEAMS SHALL BE HEAT WELDED WITH COORDINATING WELDING ROD COLOR. SEE DETAIL -/AF601. _______________________________________________ 12.INSTALL PORCELAIN WALL TILE WAINSCOT ON ALL PLUMBING WALLS IN TOILET ROOMS (SEE FINISH SCHEDULE) TO A HEIGHT OF XX" AFF (COORDINATE W/ WALL-MOUNTED TOILET ROOM ACCESSORIES) 13.INSTALL 6" ACCENT TILE STRIP (T2) 1 COURSE BELOW TOP COURSE OF FIELD TILE (T1). 14.MITER PORCELAIN WALL TILE AT INSIDE AND OUTSIDE CORNERS. 15.TERMINATION AT TOP OF PORCELAIN TILE WAINSCOT SHALL BE SCHLUTER, JOLLY SIZE 100 (10MM FOR 3/8" TILE) IN ANODIZED ALUMINUM. MITER TRIM AT INSIDE AND OUTSIDE CORNERS. WALL & DOOR PROTECTION CORNER GUARDS: SEE DETAIL -/AF601 MANUFACTURER: INPRO CORPORATION STYLE/ SERIES: HIGH IMPACT (150/160/130) HEIGHT: TBD COLOR: TBD CHAIR RAILS: SEE DETAIL -/AF601 MANUFACTURER: INPRO CORPORATION STYLE/ SERIES: 1400, HIGH IMPACT COLOR: TBD HANDRAILS: SEE DETAIL -/AF601 MANUFACTURER: INPRO CORPORATION STYLE/ SERIES: 1400, HIGH IMPACT COLOR: TBD CRASH RAILS/ BUMPERS: SEE DETAIL -/AF601 MANUFACTURER: INPRO CORPORATION STYLE/ SERIES: 1400, HIGH IMPACT COLOR: TBD WALL PROTECTION PANELS: MANUFACTURER: ACROVYN STYLE/SERIES: TBD HEIGHT: TBD COLOR: TBD FRP PANELS: SEE DETAIL -/AF601 MANUFACTURER: MARLITE STYLE/ SERIES: STANDARD FINISH: PEBBLED HEIGHT: 64" AFF COLOR: TBD 1.TERMINATE CHAIR RAILS TO PROVIDE 4" MINIMUM CLEARANCE BETWEEN RAIL AND ANY OPENINGS OR CORNERS. 2.INSTALL CORNER GUARDS WHERE SHOWN ON FINISHES FLOOR PLAN, AND AT ANY OTHER HIGH-TRAFFIC/ HIGH-IMPACT CORNERS AS REQUIRED. 3.WALL PROTECTION PANELS SHALL BE INSTALLED TO A HEIGHT OF 4'-0" ON ALL WALLS UNO WALL PROTECTION PANELS SHALL BE CUT AROUND ELECTRICAL OUTLETS AS NECESSARY. 4.INSTALL CRASH RAIL AT RECEPTION APRON - SEE ELEVATION -/-. ETRB-128 B-127 B-125 MRI EQUIPMENT ROOM CORRIDOR TRIM FABRICS AND ACOUSTIC PANELS MATERIALS NOTES F1 - FABRIC 1: MANUFACTURER: TBD PATTERN: TBD COLORWAY: TBD F2 - FABRIC 2: MANUFACTURER: TBD PATTERN: TBD COLORWAY: TBD AP1 - ACOUSTIC PANEL 1: MANUFACTURER: ARMSTRONG SERIES: SOUNDSOAK FABRIC: TBD 1.PRIVACY/ CUBICLE CURTAINS SHALL BE CF/CI FABRIC SHALL BE F1. SEE DETAIL -/-. 2.FABRIC FOR FABRRIC-WRAPPED HOMASOTE ACOUSTIC PANELS SHALL BE F2. PL2 PL1 NEW MILLWORK / CASEWORK WITH PLASTIC LAMINATE COUNTERTOP NEW MILLWORK / CASEWORK WITH SOLID SURFACE COUNTERTOP PRIVACY CURTAIN CEILING TRACK COUNTERTOP MATERIAL VERTICAL CABINETRY MATERIAL ABBREVIATIONS GENERAL FINISH NOTES A.IN ALL AREAS WHERE DEMOLITION OCCURS, PATCH TO MATCH EXISTING/ NEW FINISHES AS SCHEDULED. B.SEE REFLECTED CEILING PLAN FOR CEILING TYPES AND FINISHES. C.CONTRACTOR IS RESPONSIBLE FOR ENSURING ALL MATERIALS ARE ORDERED ON TIME TO COMPLETE THE PROJECT. VERIFY AND COORDINATE LEAD TIMES FOR ALL MATERIALS WITH CONSTRUCTION SCHEDULE. CG CORNER GUARD CPT CARPET ETR EXISTING TO REMAIN LVT LUXURY VINYL TILE ME MATCH EXISTING MOD MODIFY EXISTING AS REQUIRED MTL METAL PTD PAINTED PTM PATCH TO MATCH EXISTING TBD TO BE DETERMINED UNO UNLESS NOTED OTHERWISE VIF VERIFY IN FIELD WD WOOD MATERIALS NOTESMATERIALSNOTESMATERIALSNOTES MATERIALS NOTESRESILIENT SHEET FLOORINGINTEGRAL COVE BASEFLOOR BASE PLAN NORTH PLAN EAST WALLS PLAN SOUTH PLAN WEST DOOR REMARKS FINISHES PLAN LEGENDPAINTCEILINGPLASTIC LAMINATESOFFIT ACTSEERCP -PAINT-ETR ETR P2 P2---S P1 - --2/16/2021 1:23 PMROOM FINISH SCHEDULE AF101 GS SEAL: MARK DATE ISSUE -02/15/2021 PERMIT SET PROJECT NO: PROJECT ARCHITECT: PROJECT MANAGER: DRAWN BY: DATE: COPYRIGHT: 20-052 DH DH 02/03/2021 SHEET TITLE: CONSULTANT: 64 GOTHIC STREET, SUITE 1 NORTHAMPTON, MA 01060 T 413.585.1512 F 413.586.7945 www.haiarchitecture.com H AI Architecture, Inc. PROJECT: MRI Replacement Basement Floor Level Cooley Dickinson Hospital 30 Locust Street Northampton, MA 01060 Renovation for: F. E. CAB. MRI ROOM B-128 MRI EQUIPMENT ROOM B-127 CORRIDOR B-125 C.G. C.G. A C CLOSET B-128A PROJECT AREA F SEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPPLANNORTHEQUIPMENT PLAN SCALE: 1/4" = 1'-0" 1 2 3 1415 5 4 6 7 12 10 11 9 20 21 18 23 26 27 25 22 28 17 24 8 13 EQUIPMENT INFOQTYITEM # 1.5 T MAGNET (SIZE DETERMINED BY OWNER OR MANUFACTURER INFO) REMARKS 1 -1 SIZE W" x D" x H" (IF AVAILABLE) ACQUIRED INSTALLED ELECTRIC VOLTAGE REQ'T N = normal E = emergency DATA / TELE / CABLE PLUMBING HVAC CF/CI ----- ALLOCATIONS FOR EQUIPMENT, TOILET ACCESSORIES AND MISC. ACCESSORIES CF/CI - CONTRACTOR FURNISHED, CONTRACTOR INSTALLED OF/OI - OWNER FURNISHED, OWNER INSTALLED OF/CI - OWNER FURNISHED, CONTRACTOR INSTALLED REAR PEDESTAL12 GEM PATIENT TABLE13 14 15 PHANTOM SET STORAGE CABINET 16 MAGNET RUNDOWN UNIT 17 SECONDARY PENETRATION WALL18 POWER, GRADIENT, RF CABINET19 HEAT EXCHANGER CABINET110 MAGNET MONITOR111 BLOWER BOX 112 OPERATOR CONSOLE COMPUTER113 OPERATOR WORKSPACE114 PNEUMATIC PATIENT ALERT115 CF/CI CF/CI CF/CI CF/CI CF/CI CF/CI CF/CI CF/CI CF/CI CF/CI CF/CI CF/CI CF/CI CF/CI 125 CF/CI WATER FILTER120 CF/CI DIMPLEX 5000 CHILLER (LOCATED ON THE ROOF)119 UPS REMOTE STATUS PANEL1 CF/CI CF/CI OF/OI 150 KVA UPS SYSTEM123 CF/CI27" W x 32" D x 71" H NOT USED-16 CF/CI PENETRATION CABINET CRYOCOOLER COMPRESSOR MUSIC SYSTEM117 MAIN DISCONNECT PANEL118 WATER BYPASS121 CF/CI CF/CI CF/CI REMOTE GRAPHIC DISPLAY122 CF/CI MAINTENANCE BYPASS PANEL124 CF/CI 126 CF/CIUPS BATTERY CABINET1 CF/CI 127 REMOTE MAGNET RUNDOWN UNIT1 CF/CI 128 METAL DETECTOR (HAND HELD)1 - - CONTRACTOR TO PROVIDE WALL BLOCKING AS REQUIRED - CONTRACTOR TO PROVIDE WALL BLOCKING AS REQUIRED CONTRACTOR TO PROVIDE WALL BLOCKING AS REQUIRED CONTRACTOR TO PROVIDE WALL BLOCKING AS REQUIRED CONTRACTOR TO PROVIDE WALL BLOCKING AS REQUIRED - - - - - - - - CONTRACTOR TO PROVIDE WALL BLOCKING AS REQUIRED - CONTRACTOR TO PROVIDE WALL BLOCKING AS REQUIRED CONTRACTOR TO PROVIDE WALL BLOCKING AS REQUIRED CONTRACTOR TO PROVIDE WALL BLOCKING AS REQUIRED CONTRACTOR TO PROVIDE WALL BLOCKING AS REQUIRED CONTRACTOR TO PROVIDE WALL BLOCKING AS REQUIRED CONTRACTOR TO PROVIDE WALL BLOCKING AS REQUIRED CONTRACTOR TO PROVIDE WALL BLOCKING AS REQUIRED CONTRACTOR TO PROVIDE WALL BLOCKING AS REQUIRED CONTRACTOR TO PROVIDE WALL BLOCKING AS REQUIREDCF/CI 31" W x 11.5" D x 65.87" H 2/16/2021 1:26 PMEQUIPMENT SCHEDULE AQ601 GS SEAL: MARK DATE ISSUE -02/15/2021 PERMIT SET PROJECT NO: PROJECT ARCHITECT: PROJECT MANAGER: DRAWN BY: DATE: COPYRIGHT: 20-052 DH DH 02/03/2021 SHEET TITLE: CONSULTANT: 64 GOTHIC STREET, SUITE 1 NORTHAMPTON, MA 01060 T 413.585.1512 F 413.586.7945 www.haiarchitecture.com H AI Architecture, Inc. PROJECT: MRI Replacement Basement Floor Level Cooley Dickinson Hospital 30 Locust Street Northampton, MA 01060 Renovation for: DRILL 1" DIA. x 6" HOLE IN EXISTING CONCRETE SLAB AND GROUT 1/2" DIA. FIBERGLASS REINFORCEMENT BAR SOLID @ 12" O.C. IN NON-SHRINK EPOXY GROUT EXISTING CONCRETE SLAB TO REMAIN NEW 12" CONCRETE SLAB (4000 PSI) INFILL WITH 1/2" DIA. FIBERGLASS REINFORCEMENT @12" O.C. EACH WAY @ TOP AND BOTTOM WATERSTOP (TYPICAL)CONTRACTOR TO PROVIDE 10-MIL VAPOR BARRIER BELOW PROPOSED CONCRETE WORK AND OVERLAP EXISTING VAPOR BARRIER (12" MINIMUM) - TAPE ALL EDGES SLAB INFILL DETAIL SCALE: 1" = 1'-0" 16 S101 ALIGN 1'-0"±F.V.EL. = -0'-1 5/8" T/O EXISTING RECESSED FLOOR SLAB 8"±F.V.3"CLEAR3"CLEAR2'-0" F. E. CAB. MRI ROOM B-128 MRI EQUIPMENT ROOM B-127 CORRIDOR B-125 C.G. C.G. A C CLOSET B-128A PROJECT AREA F SEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPSEPS O V T/O EXISTING ACCESS FLOOR SLAB EL. = -1'-1 5/8" T/O RECESSED FLOOR SLAB EL. = -0'-1 5/8"PLANNORTHSLAB PLAN SCALE: 1/4" = 1'-0" INFILL TRENCH WITH NEW FIBERGLASS REINFORCED CONCRETE - SEE DETAIL 16/S101 T/O RECESSED FLOOR SLAB EL. = -1'-1 5/8"2'-0"±F.V.11'-978"± F.V.12'-11"7'-1"3'-212" REINFORCED CONCRETE (4000 PSI) BY CONTRACTOR 2/16/2021 1:31 PMSTRUCTURAL SLAB PLAN S101 GS SEAL: MARK DATE ISSUE -02/15/2021 PERMIT SET PROJECT NO: PROJECT ARCHITECT: PROJECT MANAGER: DRAWN BY: DATE: COPYRIGHT: 20-052 DH DH 02/03/2021 SHEET TITLE: CONSULTANT: 64 GOTHIC STREET, SUITE 1 NORTHAMPTON, MA 01060 T 413.585.1512 F 413.586.7945 www.haiarchitecture.com H AI Architecture, Inc. PROJECT: MRI Replacement Basement Floor Level Cooley Dickinson Hospital 30 Locust Street Northampton, MA 01060 Renovation for: EX W14 x 30 BEAM WITH FITTED STIFFENER EACH SIDE AT POSTS EX 3" 18 GA. GALV. METAL DECK - SEE ARCH. DRAWINGS FOR ROOF CONSTRUCTION NEW W10 x 26 x 5 3/4" STEEL ROOF TOP DUNNAGE & PIPE POST - SEE PLANS 4.5" O.D. STD. PIPE POST 4.5" O.D. STD. PIPE POST ON 3/4" PL EX W14 x 30 NEW FITTED STIFF. @ EACH POST EX W14x30 L1 12"X1 12"X3/16" CONT. BACKER T&B 13 1/8"x3/8" PL L=10'-0" CENTER ON BEAM BOTH SIDES. RECESS 1/4" FOR FIT AND WELD 3 16 3 6 14 3 6 EX W14 x 30 1/4" FITTED STIFFENER AT ENDS OF 10'-0" PLATE 13 1/8" x 3/8" PL L=10'-0" CENTER ON BEAM BOTH SIDES. RECESS 1/4" FOR FIT AND WELD REMOVE EX. FIREPROOFING AS REQUIRED FOR INSTALLATION OF PLATES. ADD STIFFENERS & CLOSE OFF ENDS STEEL PLATE W/ (4) 5/8" HOLES & (4) 1/2"-13 BOLTS BY RTU MFGR. 14 4.5" O.D. STD. PIPE POST ON 3/4" BOT. PLATE14 4.5" O.D. STD. PIPE POST WITH 12 x6 x 3/4" TOP PLATE 14 DETAIL SCALE: 1" = 1'-0" 1 S191 DETAIL SCALE: 1" = 1'-0" 2 S191 DETAIL SCALE: 1" = 1'-0" 3 S191 DETAIL SCALE: 1" = 1'-0" 4 S191 DETAIL SCALE: 1" = 1'-0" 5 S191 DETAIL SCALE: 1" = 1'-0" 6 S191 TYP. CLIP ANGLE CONN. SCALE: N.T.S. 7 S1913'-6"1'-9"1'-9"DISTANCE VARIESINSULATION, METALDECK, JOISTSROOF WALKING SURFACE EX W14X30 ROOF BEAM SEE PLANS 3/16 2'-0"3'-6"1'-9"1'-9"7'-6"± V.I.F. EX W14X30 ROOF BEAM PROVIDE 42" GUARD HEIGHT ALL EDGES OF ROOF. FASTEN CLEAR OF ROOF EDGE AND FLASHING. KEEP IN THE FIELD OF THE MEMBRANE ROOF. FASTEN TO MAIN ROOF STEEL BELOW PER DETAILS 12" STD. STEEL PIPE CONSTRUCTION. SHOP PREPARE AND PRIME AND PAINT WITH TNEMEC DIRECT TO METAL. COLOR BY ARCHITECT 412"1'-1716"63 4"1012"712"1012"712"1'-0"112"112" 6" 53 4" 234"10"7"3"3"TYP.3/4" DIA. A325F BOLTS W6 & W8 - (2) L3 1/2 x 3 1/2 x 5/16 WITH (2) ROWS BOLTS. W10, W12, & W14 - (2) L4 x 3 1/2 x 5/16 WITH (3) ROWS BOLTS. W16 & W18 - (2) L4 x 3 1/2 x 3/8 WITH (4) ROWS BOLTS. W21 & W24 - (2) L4 x 3 1/2 x 3/8 WITH (5) ROWS BOLTS. 4.5" O.D. STD. PIPE POST W/12"x6"x3/4" CAP W/(4) 3/4" A325 BOLTS EQUIP. CONNECTION BY MFG. W10x26x5 3/4"4.5" O.D. STD. PIPE POST WITH 12x6x3/4" TOP PLATE 6"1'-0"11 2"112"3'-6"4'-3" 5'-41 8"7'-0"3'-41 2"1'-6"2'-2"V.I.F.53 4"10"234"7"STEEL PLATE W/ (4) 5/8" HOLES & (4) 1/2"-13 BOLTS BY RTU MFGR. 4.5" O.D. STD. PIPE POST ON 34" PL 10 12"712" 1/4" FITTED STIFFENER EACH SIDE AT EACH POST SECTION - CHILLER DUNNAGE FRAMING PLAN SCALE: 1/2" = 1'-0" A S101 ROOF MEMBRANE WALKING SURFACE R.D. R.D. REF - 1 A C 6 5 32'-0"28'-7"PLANNORTHROOF FRAMING PLAN SCALE: 1/4" = 1'-0" EX W10X49 + 18 CAMBER = 1/2" EX W14X26 EX W14X30 (+7'-3") EX W14X30 (+7'-3") 3" TYPE NS, 20 GA. GALV. METAL ROOF DECK EX W18X50 (+7'-3")EX W18X50 (+7'-3")EX W14X26 (+7'-3")(-0'-7")EX W8X35EX W6X9EX W6X9(-0'-7")EX W8X351'-0"1'-0"NEW CHILLER HEIGHT = 85" WIDTH = 44" LENGTH = 138" OPERATING WEIGHT = 4,001 LBS 33'-0"7'-8316"7'-634"7'-634"9'-238"EX W14X30 (+7'-3") CENTER NEW CHILLER ON BEAMW10X26 (+9'-3")5" S T D . P I P E5.563" O.D.5" S T D . P I P E5.563" O.D.5" S T D . P I P E5.563" O.D.5" STD. PIPE5.563" O. D.5" STD. PI P E 5.563" O. D.5" STD. PI P E 5.563" O. D. 3'-412"5'-41 8" CENTER NEW CHILLER ON BEAM W10X26 (+9'-3")5" S T D . P I P E 5. 5 6 3 " O . D .5" STD. PIPE5. 5 6 3 " O . D .5" STD. PIPE5. 5 6 3 " O . D .5" STD. PIPE5.563" O.D.5" STD. PIPE5.563" O.D.5" STD. PIPE5.563" O.D.W10X26 (+9'-3")NOTES: 1.VERIFY ALL DIMENSIONS IN THE FIELD. DO NOT SCALE STRUCTURAL DRAWINGS. S191 5 NEW STEEL PLATE REINFORCING NEW STEEL PLATE REINFORCING S191 4 S191 3 2'-0"2'-0"19'-1716"S191 A S191 2 W10X26 (+9'-3") W10X26 (+9'-3") W10X26 (+9'-3")W10X26 (+9'-3")W8X18 (+9'-3") W8X18 (+9'-3") 3'-412"1'-934"11'-6"1'-934"4'-213 16" NEW STEEL PLATE REINFORCING CHILLER DUNNAGE FRAMING PLAN SCALE: 1/4" = 1'-0" B S191 2/16/2021 1:32 PMROOF FRAMING PLAN AND DETAILS S191 BH SEAL: MARK DATE ISSUE -02/15/2021 PERMIT SET PROJECT NO: PROJECT ARCHITECT: PROJECT MANAGER: DRAWN BY: DATE: COPYRIGHT: 20-052 DH DH 02/03/2021 SHEET TITLE: CONSULTANT: 64 GOTHIC STREET, SUITE 1 NORTHAMPTON, MA 01060 T 413.585.1512 F 413.586.7945 www.haiarchitecture.com H AI Architecture, Inc. PROJECT: MRI Replacement Basement Floor Level Cooley Dickinson Hospital 30 Locust Street Northampton, MA 01060 Renovation for: 1. THIS PROJECT INCLUDES SYSTEMS AND ELEMENTS REQUIRING DESIGN AND SUBMITTAL BY A PROFESSIONAL ENGINEER OR QUALIFIED PROFESSIONAL AS PART OF THE CONTRACTOR’S SCOPE OF WORK. THE PERFORMANCE REQUIREMENTS AND DESIGN CRITERIA FOR THESE DELEGATED DESIGN ITEMS ARE INDICATED IN THE SPECIFICATIONS. 2. THE CONTRACTOR IS RESPONSIBLE FOR THE SUBMISSION OF DELEGATED DESIGN SUBMITTALS TO THE AUTHORITY HAVING JURISDICTION FOR APPROVAL. 3. THE FOLLOWING SYSTEMS, OR PORTIONS THEREOF, REQUIRE A DEFERRED SUBMITTAL. REFER TO THE SPECIFICATIONS FOR REQUIREMENTS. ADDITIONAL SYSTEMS MAY REQUIRE DEFERRED SUBMITTALS WHERE INDICATED IN THE SPECIFICATIONS. THIS LIST IS NOT INTENDED TO BE A COMPREHENSIVE LIST OF ALL SYSTEMS REQUIRING A DELEGATED DESIGN, THE CONTRACTOR IS RESPONSIBLE FOR ALL DELEGATED DESIGN REQUIREMENTS INDICATED IN THE CONTRACT DOCUMENTS. a. FIRE PROTECTION SYSTEMS b. HANGERS AND SUPPORTS c. EXPANSION COMPENSATION d. VIBRATION CONTROL SYSTEMS e. SEISMIC AND WIND RESTRAINT SYSTEMS f. METAL DUCT CONSTRUCTION g. ELECTRICAL SHORT CIRCUIT AND COORDINATION STUDIES AND ARC FLASH HAZARD ANALYSIS h. LIGHTNING PROTECTION SYSTEMS i. FIRE ALARM SYSTEMS DELEGATED DESIGN AND DEFERRED SUBMITTALS 1. IT IS NOT THE INTENTION TO SHOW EVERY FITTING, WIRE, OR DEVICE. ALL SUCH ITEMS SHALL BE FURNISHED AND INSTALLED AS NECESSARY FOR A COMPLETE SYSTEM. 2. CONCEAL RACEWAYS IN FINISHED AREAS. RACEWAYS WITHIN MECHANICAL AND ELECTRICAL ROOMS MAY BE SURFACE-MOUNTED. 3. DO NOT INSTALL CONDUIT IN CONCRETE SLABS UNLESS SPECIFICALLY APPROVED BY THE STRUCTURAL ENGINEER. 4. EACH INDIVIDUAL ELECTRICAL HOMERUN SHOWN ON FLOOR PLANS, DETAILS, OR SCHEDULES SHALL BE PROVIDED IN A DEDICATED RACEWAY. 5. SERIES RATING OF PROTECTIVE/ISOLATION DEVICES AND/OR ELECTRICAL EQUIPMENT IS UNACCEPTABLE. ALL ELECTRICAL EQUIPMENT AND PROTECTIVE DEVICES SHALL BE “FULLY” RATED. 6. PROVIDE POWER TO MECHANICAL EQUIPMENT SHOWN ON MECHANICAL PLANS, RISERS, SCHEDULES, OR IN SPECIFICATIONS. MECHANICAL EQUIPMENT IS NOT NECESSARILY SHOWN ON ELECTRICAL PLANS. REFER TO MECHANICAL PLANS AND SCHEDULES FOR LOCATIONS AND SPECIFIC ELECTRICAL REQUIREMENTS. COORDINATE EXACT LOCATION AND ORIENTATION OF EQUIPMENT WITH OTHER TRADES. 7. PROVIDE INTERFACE CONNECTIONS TO THE FIRE ALARM SYSTEM AND FIRE PROTECTION SYSTEM EQUIPMENT SHOWN ON PLANS, SCHEDULES, RISERS, OR IN SPECIFICATIONS. THIS EQUIPMENT IS NOT NECESSARILY SHOWN ON ELECTRICAL PLANS. COORDINATE EXACT LOCATION AND QUANTITY WITH THE FIRE PROTECTION CONTRACTOR. 8. FURNISH AND COORDINATE THE LOCATION OF DUCT SMOKE DETECTORS. PROVIDE AND WIRE DEVICES TO THE FIRE ALARM SYSTEM; FURNISH DETECTORS TO THE MECHANICAL CONTRACTOR FOR INSTALLATION. 9. MAKE CONNECTIONS TO LUMINAIRES IN ACCORDANCE WITH THE DETAILS SHOWN ON THE DRAWINGS. PROVIDE SWITCHING, AND OCCUPANCY SENSORS AND NORMAL CIRCUIT MONITORING AS PER THE DETAILS. 10. EXIT SIGNS ARE NOT NECESSARILY SHOWN WIRED ON THE DRAWINGS. PROVIDE SINGLE CIRCUIT EXIT SIGNS WITH BATTERY BACKUP; CONNECT POWER TO THE UN-SWITCHED LIGHTING CIRCUIT IN THE AREA SERVED BY THE EXIT SIGN. 11. CONNECT EMERGENCY FLUORESCENT POWER UNITS (BATTERY BALLAST(S)) OR EMERGENCY LIGHTING UNITS TO LINE SIDE OF SWITCHING. THESE UNITS MUST MONITOR THE NORMAL LIGHTING CIRCUIT WITHIN THE SPACE. 12. INSTALL WIRING FROM AN EMERGENCY SOURCE OR EMERGENCY DISTRIBUTION OVERCURRENT PROTECTION TO EMERGENCY LOADS ENTIRELY INDEPENDENT OF ALL OTHER WIRING AND EQUIPMENT EXCEPT WITHIN THE EQUIPMENT, EXIT SIGNS, AND EMERGENCY LUMINAIRES. 13. REFER TO THE ARCHITECTURAL REFLECTED CEILING PLANS FOR THE EXACT LOCATION OF ALL CEILING MOUNTED LUMINAIRES SHOWN ON ELECTRICAL PLANS. 14. BOND ALL OF THE FOLLOWING SERVICES TOGETHER PER THE NEC: POWER, TELECOMMUNICATIONS, CATV AND LIGHTNING PROTECTION. 15. PROVIDE BRANCH CIRCUITS FROM ELECTRICAL PANELS WITH SUFFICIENT CAPACITY AND SPACE FOR MISCELLANEOUS SYSTEMS. THESE SYSTEMS SHALL INCLUDE, BUT ARE NOT LIMITED TO, MONITORING SYSTEMS, CONTROL PANELS, ANNUNCIATOR PANELS, PLUMBING ACCESSORIES, ETC. FURNISH AND INSTALL ALL BRANCH CIRCUIT WIRING AND CIRCUIT BREAKERS FOR THE EQUIPMENT SHOWN. 16. PROVIDE GROUND FAULT RECEPTACLES WITHIN SIX FEET (6') OF SINK OR OTHER WATER SOURCE; PROVIDE GROUND FAULT WEATHER PROOF RECEPTACLES AT ALL EXTERIOR LOCATIONS. ELECTRICAL CONDUITS 1. PARTIAL CONDUIT ROUTING INDICATED ARE INTENDED TO REPRESENT A PROPOSED PATHWAY SHOWN FOR DESIGN INTENT ONLY. NOT ALL CONDUITS, PULL BOXES AND JUNCTION BOXES ARE SHOWN. 2. THE CONTRACTOR IS RESPONSIBLE PROVIDING AND SIZING OF ALL PULL BOXES, SPLICE BOXES, FITTINGS, RACEWAYS AND TRANSITIONS ETC. FOR ALL ELECTRICAL WORK AS INDICATED BY SCHEDULE, RISERS, SEQUENCES, SPECIFICATIONS AND DRAWINGS. ELECTRICAL 1. UNLESS OTHERWISE NOTED, THE INTENT OF THESE DOCUMENTS IS TO PROVIDE FULL SPRINKLER COVERAGE TO ALL SCOPE OF WORK AREAS. PROVIDE ALL PIPING, SUPPORTS, AND EQUIPMENT NECESSARY FOR A FULL COVERAGE SYSTEM IN CONFORMANCE WITH NFPA, STATE AND LOCAL CODES, THE OWNER'S INSURANCE COMPANY, AND THE AUTHORITY HAVING JURISDICTION. 2. THE DRAWINGS DEPICT A PROPOSED FIRE PROTECTION SYSTEM LAYOUT; PIPE ROUTING, PIPE SIZES, AND APPROXIMATE SPRINKLER HEAD LOCATIONS ARE SHOWN FOR COORDINATION PURPOSES ONLY. THE CONTRACTOR SHALL PRODUCE A COMPLETE SET OF WORKING PLANS IN ACCORDANCE WITH NFPA 13 BASED ON HYDRAULIC CALCULATIONS PER THE SPECIFIED DESIGN CRITERIA. ALL PLANS AND CALCULATIONS SHALL BE SIGNED AND SEALED BY THE CONTRACTOR'S REGISTERED FIRE PROTECTION ENGINEER AND SHALL BE SUBMITTED TO THE LOCAL AUTHORITY AND OWNER'S UNDERWRITER FOR APPROVAL. 3. WHERE SPRINKLER HEADS ARE SHOWN ON CONTRACT DOCUMENTS, THEY ARE INDICATED FOR GENERAL COORDINATION PURPOSES ONLY; FULL SPRINKLER COVERAGE REMAINS THE RESPONSIBILITY OF THE INSTALLING CONTRACTOR. REFER TO THE ARCHITECTURAL DRAWINGS FOR COORDINATION OF SPRINKLER HEAD LOCATIONS WITH CEILING AND WALL CONSTRUCTION. 4. ALL EQUIPMENT MAIN DRAINS AND INSPECTOR TEST DRAINS SHALL BE PIPED TO THE EXTERIOR OF THE BUILDING. PROVIDE CONCRETE SPLASH GUARDS AT EACH DRAIN LOCATION TO AVOID SOIL EROSION OR OTHER DAMAGE. 5. BRANCH PIPING TO SPRINKLER HEADS SHALL NOT BE INSTALLED FROM THE BOTTOM OF HORIZONTAL SPRINKLER MAINS OR BRANCH LINES; ALL CONNECTIONS TO SPRINKLER HEADS SHALL BE MADE FROM THE TOP OR SIDES OF THE MAIN OR BRANCH LINES. 6. LOCATIONS OF FIRE DEPARTMENT CONNECTIONS AND FIRE PROTECTION SERVICE CONTROL VALVES SHALL BE COORDINATED WITH THE AUTHORITY HAVING JURISDICTION PRIOR TO INSTALLATION. 7. PROVIDE DRAINS AT ALL LOW POINTS AND PITCH PIPING TO DRAIN. PROVIDE BALL VALVES ON ALL DRAINS SERVING PIPING CONTAINING MORE THAN 4 GALLONS OF WATER. FIRE PROTECTION 1. FOR DRAWING CLARITY, VOLUME DAMPERS ARE NOT NECESSARILY SHOWN ON DUCTWORK PLANS. REFER TO SPECIFICATIONS, DETAILS, AND SCHEMATIC DIAGRAMS FOR VOLUME DAMPER LOCATIONS; VOLUME DAMPERS SHOWN ON DUCT PLANS ARE IN ADDITION TO THOSE INDICATED IN THE SPECIFICATIONS AND DETAILS. 2. FOR DRAWING CLARITY, VALVES AND ACCESSORIES ARE NOT NECESSARILY SHOWN ON PIPING PLANS. REFER TO SPECIFICATIONS, DETAILS, AND SCHEMATIC DIAGRAMS FOR VALVE AND ACCESSORY LOCATIONS; VALVES AND ACCESSORIES SHOWN ON PLANS ARE IN ADDITION TO THOSE INDICATED IN THE SPECIFICATIONS AND DETAILS. 3. PROVIDE DUCT TAKE-OFF FITTINGS PER THE SPECIFICATIONS AND DETAILS ON DRAWINGS. TAKE-OFFS SHOWN ON FLOOR PLANS DO NOT NECESSARILY REPRESENT THE SPECIFIC TYPE OF TAKE-OFF REQUIRED. 4. PIPING SHALL BE SUPPORTED FROM STRUCTURE ABOVE. TO MAXIMIZE HEAD ROOM, INSTALL TIGHT TO BOTTOM OF BEAMS WHEN RUNNING PERPENDICULAR TO BEAM. INSTALL PIPING TIGHT TO FLOOR SLAB WHEN RUNNING PARALLEL TO BEAM. PROVIDE ALL NECESSARY FITTINGS AND TRANSITIONS. 5. FOR ALL PIPING SYSTEMS, PROVIDE AIR VENTS AT ALL HIGH POINTS AND DRAINS AT ALL LOW POINTS. 6. PROVIDE FIRE DAMPERS AT DUCT PENETRATIONS OF FIRE-RATED CONSTRUCTION, INCLUDING WALLS, SHAFTS AND FLOOR PENETRATIONS. COORDINATE WITH ARCHITECTURAL DRAWINGS. 7. PROVIDE MOTORIZED DAMPERS AT ALL PERMANENT EXTERIOR DUCTED OR LOUVERED OPENINGS (EXCEPT DRYER, KITCHEN, AND FUME EXHAUST) AND PROVIDE BMS CONTROL OF THE DAMPER OPERATION. PITCH ALL DUCTWORK CONNECTED TO LOUVERS TO EXTERIOR OF BUILDING. HVAC 1. FOR DRAWING CLARITY, INDIVIDUAL BRANCH PIPING TO EACH PLUMBING FIXTURE IS NOT NECESSARILY SHOWN ON PLANS. EACH FIXTURE SHALL BE PROPERLY PIPED TO WATER, WASTE, AND VENT PIPING SYSTEMS. REFER TO THE PLUMBING SCHEDULES FOR INDIVIDUAL PIPE SIZES TO EACH FIXTURE. 2. INSTALL TRAP PRIMERS FOR ALL FLOOR DRAINS AND WATER HAMMER ARRESTORS AT ALL QUICK CLOSING VALVES (FLUSH VALVES, SOLENOID VALVES, ETC.); SIZE SHALL BE BASED ON FIXTURE UNITS PER PDI STANDARDS. 3. INCLUDE NECESSARY PIPING OFFSETS AND TRANSITIONS AS REQUIRED TO INSTALL THE PLUMBING FIXTURES AND EQUIPMENT. 4. PIPING SHALL BE INSTALLED WITHIN INTERIOR WALLS UNLESS FIXTURE OR EQUIPMENT LOCATION NECESSITATES PIPING INSTALLATION IN EXTERIOR WALL. PIPING INSTALLED IN EXTERIOR WALLS SHALL BE INSTALLED COMPLETELY ON THE INTERIOR SIDE OF THE BUILDING ENVELOPE IN A LOCATION FREE OF INFILTRATION. 5. PROVIDE COOLING COIL CONDENSATE TRAPS AND DRAIN PIPING FOR ALL MECHANICAL EQUIPMENT REQUIRING SAME; PIPE CONDENSATE DRAINS TO INDIRECT WASTE FLOOR DRAIN OR OTHER APPROVED LOCATION. 6. COORDINATE EXACT LOCATION OF UNDERGROUND UTILITIES (WATER, GAS, SANITARY, ETC.) EXITING OR ENTERING THE BUILDING WITH THE SITE CONTRACTOR, GENERAL CONTRACTOR OR CONSTRUCTION MANAGER. PLUMBING 1. THIS PROJECT INVOLVES THE RENOVATION OF AN EXISTING FACILITY; BEFORE SUBMITTING A BID, CONTRACTORS SHALL ARRANGE A VISIT TO THE SITE THROUGH THE BUILDING OWNER AND BECOME THOROUGHLY FAMILIAR WITH THE EXISTING CONDITIONS UNDER WHICH THE PROJECT IS TO BE COMPLETED. 2. CONTRACTORS SHALL BE HELD RESPONSIBLE FOR ASSUMPTIONS, OMISSIONS OR ERRORS MADE AS A RESULT OF FAILURE TO BECOME FULLY FAMILIAR WITH THE EXISTING CONDITIONS. 3. IT IS NOT THE INTENT OF THESE DOCUMENTS TO SHOW EVERY DEVICE, APPURTENANCE, PIPE, WIRE OR CONDUIT TO BE REMOVED. COMPLETELY REMOVE EQUIPMENT AND SYSTEMS NOT BEING REUSED, INCLUDING ASSOCIATED HANGERS, SUPPORTS, BASES, PADS, PIPES, DUCTS, CONDUITS, WIRES, INSULATION, AND CONTROLS BACK TO THE ACTIVE POINT OF ORIGIN. 4. EQUIPMENT, PIPING, OR CONDUIT SHALL NOT BE ABANDONED IN PLACE UNLESS SPECIFICALLY NOTED. 5. PROPERLY DISPOSE OF REMOVED EQUIPMENT IN COMPLIANCE WITH CODES, REGULATIONS, AND ENVIRONMENTAL PROTECTION STANDARDS. 6. VERIFY THE EXACT LOCATION AND QUANTITY OF ALL SYSTEM COMPONENTS SCHEDULED FOR REMOVAL OR RELOCATION. 7. PROTECT ALL SYSTEMS SCHEDULED TO REMAIN DURING CONSTRUCTION. 8. RELOCATE EXISTING SYSTEM COMPONENTS SCHEDULED TO REMAIN IN ORDER TO ACCOMMODATE CONSTRUCTION OF NEW SYSTEMS AND FINISHES. 9. MAINTAIN THE CONTINUITY OF ALL EXISTING SYSTEMS SCHEDULED TO REMAIN ACTIVE DURING CONSTRUCTION INCLUDING ACTIVE SYSTEMS PARTIALLY REMOVED AS PART OF THIS PROJECT. COORDINATE ALL INTERRUPTIONS OF SERVICE WITH THE OWNER IN ADVANCE. 10. PROVIDE TEMPORARY SERVICES REQUIRED TO ACCOMMODATE PHASING IN ORDER TO MAINTAIN EXISTING SERVICES TO ACTIVE AREAS. 11. PRIOR TO CONSTRUCTION, MEASURE AND RECORD EXISTING AIRFLOW AND FAN DATA FOR OPERATING CONDITION PRIOR TO DEMOLITION FOR ALL EXISTING AIR SYSTEMS AND BRANCH DUCTS SCHEDULED TO REMAIN. PROVIDE REPORT TO ENGINEER PRIOR TO DEMOLITION. RENOVATION 1. THE PROJECT DRAWINGS AND SPECIFICATIONS ARE BASED ON THE CONSTRUCTION SPECIFICATIONS INSTITUTE (CSI) DOCUMENTATION FORMAT. SPECIFICATION AND DRAWING CONTENTS ARE ARRANGED BY TOPIC AND CATEGORY. 2. THE INTENT OF THESE DOCUMENTS IS FOR THE MEP TRADES TO FURNISH AND INSTALL COMPLETE MECHANICAL AND ELECTRICAL SYSTEMS. THE SPECIFIED FIRE PROTECTION, PLUMBING, HVAC, ELECTRICAL, TECHNOLOGY, AND SPECIAL SYSTEMS SHALL BE COMPLETE IN ALL RESPECTS (OPERATIONAL, TESTED, ADJUSTED, CALIBRATED, AND APPROVED BY THE AUTHORITIES HAVING JURISDICTION AND READY FOR BENEFICIAL USE BY THE OWNER). 3. THE TRADES SHALL OBTAIN AND REVIEW ALL CONTRACT DOCUMENTS BEFORE SUBMITTING A BID. INFORMATION IS PROVIDED ON THE VARIOUS DRAWINGS, SCHEDULES, SPECIFICATIONS AND ALL OF THE DOCUMENTS INCLUDED IN THE BIDDING PACKAGE. THE CONTRACT DOCUMENTS ARE COMPLEMENTARY AND FORM A TOTAL PROJECT DESIGN AND INFORMATION SOURCE FOR CONSTRUCTION PURPOSES. 4. THE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL ARRANGEMENT OF SYSTEMS AND WORK INCLUDED IN THE CONTRACT. IN ORDER TO INDICATE THE SCOPE OF WORK, THE PLANS ARE ARRANGED FOR CLARITY IN TWO DIMENSIONS. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF THE ACTUAL LAYOUT OF SYSTEMS AND COORDINATION WITH OTHER SYSTEMS AND BUILDING ELEMENTS. COORDINATE LOCATIONS OF UTILITIES AND EQUIPMENT WITH OTHER TRADES BEFORE AND DURING CONSTRUCTION. ANY MODIFICATIONS TO THE EQUIPMENT AND UTILITY LAYOUTS REQUIRED FOR INSTALLATION ARE TO BE PERFORMED UNDER THE CONTRACT AGREEMENT AT NO ADDITIONAL COST. PROVIDE ADDITIONAL TRANSITIONS AND OFFSETS IN ALL PIPING, DUCTWORK OR CONDUIT FOR COORDINATION WITH OTHER TRADES AND BUILDING ELEMENTS AND STRUCTURE. 5. REFER TO THE ARCHITECTURAL DRAWINGS FOR THE EXACT LOCATION AND MOUNTING HEIGHTS OF EQUIPMENT, FIXTURES, AND DEVICES IN FINISHED SPACES. COORDINATE EQUIPMENT, FIXTURE, AND DEVICE COLORS AND FINISHES WITH THE ARCHITECT. MOUNTING HEIGHTS SHALL BE APPROVED BY THE ARCHITECT. 6. PERFORM ALL WORK IN COMPLIANCE WITH THE SPECIFICATIONS, APPLICABLE CODES, ORDINANCES AND THE REGULATORY AGENCIES HAVING JURISDICTION. WHERE THE CONTRACT DOCUMENTS EXCEED CODE REQUIREMENTS, THE CONTRACT DOCUMENTS MUST BE FOLLOWED. 7. INSTALL ALL EQUIPMENT IN ACCESSIBLE LOCATIONS. WHERE EQUIPMENT MUST BE INSTALLED ABOVE AN INACCESSIBLE CEILING OR BEHIND A WALL, PROVIDE AN APPROPRIATE ACCESS DOOR RATED TO MATCH THE CEILING OR WALL RATING. COORDINATE THE LOCATION WITH THE ARCHITECT PRIOR TO INSTALLATION. 8. COORDINATE ALL UTILITIES ENTERING OR LEAVING THE BUILDING WITH THE SITE CONTRACTOR(S) BEFORE INSTALLATION. COORDINATE INVERTS WITH THE STRUCTURE AND SYSTEM REQUIREMENTS PRIOR TO INSTALLATION. 9. NOTIFY THE ARCHITECT IMMEDIATELY OF ANY CONFLICTS DISCOVERED BETWEEN DOCUMENTS. IF THE CONFLICT IS NOT RESOLVED PRIOR TO SUBMITTING A BID, CARRY THE LARGER QUANTITY AND/OR MORE EXPENSIVE ITEM(S). 10. BEFORE INSTALLATION, COORDINATE REQUIRED SERVICE CONNECTIONS, FACTORY START UPS AND INSTALLATION OF FIELD DEVICES ASSOCIATED WITH OWNER-FURNISHED EQUIPMENT. 11. PROVIDE A CONCRETE HOUSEKEEPING PAD FOR ALL FLOOR-MOUNTED EQUIPMENT. 12. ENCLOSED CONTROLLERS SHALL BE PROVIDED BY THE CONTRACTOR PROVIDING THE EQUIPMENT REQUIRING AN ENCLOSED CONTROLLER. REQUIREMENTS ARE SPECIFIED UNDER DIVISION 26: "ENCLOSED CONTROLLERS". 13. DO NOT INSTALL PIPING OR DUCTWORK OVER ELECTRICAL PANELS, TRANSFORMERS, OR SPECIAL EQUIPMENT. 14. DO NOT INSTALL ANY SYSTEMS IN OR THROUGH ELEVATOR MACHINE ROOMS OR ELEVATOR SHAFTS THAT DO NOT SERVE THE ROOM OR SHAFT. MAINTAIN A MINIMUM OF SEVEN (7) FOOT HEAD CLEARANCE IN THE ELEVATOR MACHINE ROOM. 15. DO NOT INSTALL ANY SYSTEMS IN STAIRS NOT ASSOCIATED WITH OR SERVING THAT STAIR. 16. NO SYSTEM COMPONENTS MAY BE SUPPORTED FROM STRUCTURAL BRACED FRAMES. 17. NO SYSTEMS OR COMPONENTS MAY REST ON OR MAKE CONTACT WITH PIPING AND EQUIPMENT REQUIRED BY CODE TO BE INDEPENDENTLY SUPPORTED, SUCH AS FIRE PROTECTION PIPING AND MEDICAL GAS PIPING. GENERAL 64 GOTHIC STREET, SUITE 1 NORTHAMPTON, MA 01060 T 413.585.1512 F 413.586.7945 www.haiarchitecture.com Tel: (860) 286-9171 www.bvhis.com 206 West Newberry Road Bloomfield, CT 06002 servicesintegrated H AI Architecture, Inc. SEAL: PROJECT NO: BVH PROJECT NO: PROJECT MANAGER: DRAWN BY: COPYRIGHT: XX-XXXX 21-20-207 SHEET TITLE: CONSULTANT: MRI Replacement Cooley Dickinson Hospital 30 Locust Street Northampton, MA 01060 Renovation for: PROJECT: DATE: MEP001 02.15.2021 MEP GENERAL NOTES AND CODES NMP/GDB/BPW JSC 780 CMR 115, APPENDIX AA: STRETCH ENERGY CODEMUNICIPAL REQUIREMENTS LOCAL CODES AND ORDINANCES ADOPTED BY MUNICIPALITY STATE LAW MASSACHUSETTS GENERAL LAWS THE JOINT COMMISSION NFPA 101 - 2012: LIFE SAFETY CODE, AS ENFORCED BY CMS NFPA 99 - 2012; HEALTH CARE FACILITIES CODE, AS ENFORCED BY CMSHEALTH CARE FACILITIES 2018 FGI GUIDELINES FOR DESIGN AND CONSTRUCTION OF HEALTH CARE FACILITIES OCCUPATIONAL SAFETY AND HEALTH ACT, TITLE 29/LABORPUBLIC HEALTH AND SAFETY 105 CMR: DEPARTMENT OF PUBLIC HEALTH REGULATIONS THE AMERICANS WITH DISABILITIES ACT, TITLE II, INCLUDING THE AMERICANS WITH DISABILITIES ACT ACCESSIBILITY GUIDELINES (ADAAG) AND ADA REGULATIONS 2009 ICC/ANSI A117.1, GUIDELINES FOR ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES MASSACHUSETTS GENERAL LAWS, CHAPTER 22 ACCESSIBILITY 521 CMR: MASSACHUSETTS ARCHITECTURAL ACCESS BOARD REGULATIONS SEISMIC 2010 ASCE/SEI 7 - MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES WITH SUPPLEMENT NO. 1 FIRE ALARM NFPA 72 - 2013; NATIONAL FIRE ALARM AND SIGNALING CODE NFPA 20 - 2013: STANDARD FOR THE INSTALLATION OF STATIONARY PUMPS FOR FIRE PROTECTION NFPA 14 - 2013; STANDARD FOR THE INSTALLATION OF STANDPIPE AND HOSE SYSTEMSFIRE PROTECTION NFPA 13 - 2013; INSTALLATION OF SPRINKLER SYSTEMS 2015 INTERNATIONAL FIRE CODEFIRE CODE NFPA 1 - 2015; FIRE CODE 2016 ANSI / ASHRAE / IESNA 90.1; ENERGY STANDARD FOR BUILDINGS EXCEPT LOW RISE RESIDENTIAL BUILDINGS ENERGY EFFICIENCY AMENDMENTS (780 CMR 13.00) 2018 INTERNATIONAL ENERGY CONSERVATION CODE NFPA 110 - 2013; STANDARD FOR EMERGENCY AND STANDBY POWER SYSTEMSELECTRICAL (780 CMR 27.00)NFPA 70 - 2020; NATIONAL ELECTRIC CODE 271 CMR 6.00; UNIFORM SHEET METAL INSTALLATION RULES MECHANICAL SYSTEMS (780 CMR 28.00) 2015 INTERNATIONAL MECHANICAL CODE BUILDING CODE 2015 INTERNATIONAL BUILDING CODE PARTIAL LIST OF APPLICABLE AND REFERENCED CODES AND STANDARDS, AS AMENDED BY STATE CODES, REGULATIONS, AND LAWS (NOT ALL REFERENCED AND APPLICABLE CODES AND STANDARDS ARE LISTED) 527 CMR CHAPTER 27: EMERGENCY AND STANDBY POWER SYSTEMSSTATE ELECTRICAL CODE 527 CMR CHAPTER 12: MASSACHUSETTS ELECTRICAL CODE STATE PLUMBING CODE 248 CMR CHAPTER 10: MASSACHUSETTS UNIFORM STATE PLUMBING CODE MASSACHUSETTS GENERAL LAW CHAPTER 148: FIRE PREVENTION - SECTION 26STATE FIRE PREVENTION CODE 527 CMR - BOARD OF FIRE PREVENTION REGULATIONS STATE BUILDING CODE MASSACHUSETTS STATE BUILDING CODE, 780 CMR - NINTH EDITION THE FOLLOWING CODES APPLY TO ALL DRAWINGS AND SPECIFICATIONS CODE INFORMATION MARK DATE ISSUE 02.15.2021 PERMIT SET 21-20-207 2/12/2021 A AMPERE AC ALTERNATING CURRENT AL ALUMINUM CABLING AMP AMPERE AF ARC FAULT AIC AMPS INTERRUPTING CURRENT AWG AMERICAN WIRE GAUGE BNC BAYONET NEIL-CONCELMAN C/B CIRCUIT BREAKER CKT CIRCUIT COP or CU COPPER CABLING DC DIRECT CURRENT EM EMERGENCY EM/NL EMERGENCY/NIGHT LIGHT WALK THROUGH EMT ELECTRICAL METAL TUBING FC FOOT CANDLE FMC FLEXIBLE METALLIC CONDUIT GE GROUNDING EQUALIZER GEC GROUNDING ELECTRODE CONDUCTOR GF GROUND FAULT IG ISOLATED GROUND JB JUNCTION BOX MC METAL-CLAD CABLE MCB MAIN CIRCUIT BREAKER MLO MAIN LUGS ONLY NL NIGHT LIGHT WALK THROUGH P POLE PE PRIMARY ELECTRIC SERVICE PF POWER FACTOR PH or ø PHASE PNL PANELBOARD PT POTENTIAL TRANSFORMER R RELAY RGS RIGID GALVANIZED STEEL CONDUIT RMS ROOT MEAN SQUARED SE SECONDARY ELECTRIC SERVICE SPDT SINGLE POLE DOUBLE THROW SPST SINGLE POLE SINGLE THROW SW SWITCH TP TAMPER PROOF ELECTRICAL GENERAL ABBREVIATIONS AAP AREA ALARM PANEL AC AIR COMPRESSOR ATC AUTOMATIC TEMPERATURE CONTROL SYSTEM ACP AUTOMATIC CONDENSATE PUMP ACU AIR CONDITIONING UNIT AHU AIR HANDLING UNIT ANN ANNUNCIATOR ATS AUTOMATIC TRANSFER SWITCH B BOILER BFWP BOILER FEEDWATER PUMP BLR BOILER CFP CHEMICAL FEED PUMP CHP CONSOLE HEAT PUMP COMP COMPRESSOR COND CONDENSER COP COEFFICIENT OF PERFORMANCE CP CONDENSATE PUMP CPU CENTRAL PROCESSING UNIT CRAC COMPUTER ROOM AIR CONDITIONING UNIT CRU COMPUTER ROOM UNIT CSG CLEAN STEAM GENERATOR CT COOLING TOWER CU CONDENSING UNIT CUH CABINET UNIT HEATER DOAS DEDICATED OUTDOOR AIR SYSTEM DWBP DOMESTIC WATER BOOSTER PUMP DWET DOMESTIC WATER EXPANSION TANK EBR ELECTRIC BASEBOARD RADIATION EF EXHAUST FAN EHC ELECTRICAL HEATING CABLE ETP ELECTRIC TRAP PRIMER EUH ELECTRIC UNIT HEATER EVAP EVAPORATOR EWC ELECTRIC WATER COOLER EWH ELECTRIC WATER HEATER FACP FIRE ALARM CONTROL PANEL FCU FAN COIL UNIT FP FIRE PUMP FPP FREEZE PROTECTION PUMP FSCP FIREFIGHTER’S SMOKE CONTROL PANEL FSD COMBINATION FIRE/SMOKE DAMPER GRU GREASE RECOVERY UNIT GWH GAS WATER HEATER HTR HEATER HUM HUMIDIFIER HV HEATING AND VENTILATING UNIT HWP HOT WATER PUMP HWRP HOT WATER RETURN PUMP HX HEAT EXCHANGER IAC INSTRUMENT AIR COMPRESSOR IEF INLINE EXHAUST FAN JP JOCKEY PUMP KEF KITCHEN EXHAUST FAN KWH KITCHEN WATER HEATER LAC LABORATORY AIR COMPRESSOR LVP LABORATORY VACUUM PUMP MAC MEDICAL AIR COMPRESSOR MAGP MASTER ALARM GAS PANEL MAU or MUAU MAKEUP AIR UNIT MCC MOTOR CONTROL CENTER MVP MEDICAL VACUUM PUMP RF or RAF RETURN AIR FAN RF RELIEF FAN RTU ROOFTOP UNIT SAC SHOP AIR COMPRESSOR SCC SPRINKLER CONTROL CABINET SCP STEAM CONDENSATE PUMP SD SMOKE DAMPER SEP SEWAGE EJECTOR PUMP SG STEAM GENERATOR SP SUMP PUMP SWBD SWITCHBOARD SWH STEAM WATER HEATER TX TRANSFORMER UH UNIT HEATER UPS UNINTERRUPTIBLE POWER SUPPLY VFC VARIABLE FREQUENCY CONTROLLER WEF WALL EXHAUST FAN EQUIPMENT ABBREVIATIONS AD ACCESS DOOR AFF ABOVE FINISHED FLOOR AFG ABOVE FINISHED GRADE AMB AMBIENT ANSI AMERICAN NATIONAL STANDARDS INSTITUTE APPROX APPROXIMATE AVG AVERAGE BCT BONDING CONDUCTOR FOR TELECOMMUNICATIONS BHP BRAKE HORSEPOWER BICSI BUILDING INDUSTRY CONSULTING SERVICE INTERNATIONAL BSMT BASEMENT BTU BRITISH THERMAL UNIT BTUH BRITISH THERMAL UNITS PER HOUR C CONDUIT CAT CATEGORY ETHERNET CABLE CCW COUNTER CLOCKWISE CFM CUBIC FEET PER MINUTE CI CAST IRON CLG CEILING CO2 CARBON DIOXIDE CT CURRENT TRANSFORMER CU FT or CF CUBIC FEET CW CLOCKWISE D DEPTH dB DECIBEL DEG or ° DEGREE DIA or ø DIAMETER DN DOWN DWG DRAWING EFF EFFICIENCY ELEC ELECTRICAL ELEV ELEVATOR EMI ELECTROMAGNETIC INTERFERENCE EWT ENTERING WATER TEMPERATURE EXH EXHAUST EXP EXPANSION F FAHRENHEIT FA FIRE ALARM FM FACTORY MUTUAL FOF FUEL OIL FILL FOR FUEL OIL RETURN FOS FUEL OIL SUPPLY FOV FUEL OIL VENT FP FIRE PROTECTION FPM FEET PER MINUTE FPS FEET PER SECOND FT FEET OR FOOT GA GAUGE GAL GALLONS GND GROUND GPH GALLONS PER HOUR GPM GALLONS PER MINUTE H HEIGHT HD HEAD HDCP HANDICAP HP HORSEPOWER HR HOUR HVAC HEATING, VENTILATION, AND AIR CONDITIONING HZ FREQUENCY (HERTZ), CYCLES PER SECOND ID INSIDE DIAMETER IN INCHES IN WG INCHES WATER, GAUGE (PRESSURE) KVA KILOVOLT AMPERE KW KILOWATT L LENGTH LB/HR POUNDS PER HOUR LF LINEAR FEET LWT LEAVING WATER TEMPERATURE MA MILIAMPERE MAX MAXIMUM MBH THOUSAND BTUH MECH MECHANICAL MFR MANUFACTURER MIN MINIMUM NC NORMALLY CLOSED NO NORMALLY OPEN NA or N/A NOT APPLICABLE NEC NATIONAL ELECTRIC CODE NIC NOT IN CONTRACT NTS NOT TO SCALE OD OUTSIDE DIAMETER PD PRESSURE DROP PRESS PRESSURE PRV PRESSURE REDUCING VALVE PSI POUNDS PER SQUARE INCH PSIG POUNDS PER SQUARE INCH, GAUGE PVC POLYVINYL CHLORIDE QTY QUANTITY RH RELATIVE HUMIDITY RM ROOM RO REVERSE OSMOSIS WATER RPM REVOLUTIONS PER MINUTE RV RADON VENT S&R SUPPLY AND RETURN SPEC SPECIFICATION SQ SQUARE SS STAINLESS STEEL STD STANDARD STP SHIELDED TWISTED PAIR TAG IDENTIFICATION OF EQUIPMENT TD TEMPERATURE DIFFERENCE TEMP TEMPERATURE TEMP TEMPORARY TV TELEVISION TYP TYPICAL U USB UTP UNSHIELDED TWISTED PAIR V VOLTS VA VOLT AMPERE VEL VELOCITY VIF VERIFY IN FIELD VOL VOLUME W WATT WI WIDTH WP WEATHERPROOF WPD WATER PRESSURE DROP WTR WATER GENERAL ABBREVIATIONS AF or ACF AIRFOIL CENTRIFUGAL FAN APD AIR PRESSURE DROP BAU BOTTOM ANGULAR UP BDD BACKDRAFT DAMPER BI or BICF BACKWARD INCLINED CENTRIFUGAL FAN DB DOWNBLAST DSA DUCT SOUND ATTENUATOR EA EXHAUST AIR ESP EXTERNAL STATIC PRESSURE FC or FCCF FORWARD CURVED CENTRIFUGAL FAN FD FIRE DAMPER FD/SB FIRE DAMPER WITH INTEGRAL SECURITY BARS FOB FLAT ON BOTTOM FOT FLAT ON TOP ICF INLINE CENTRIFUGAL FAN MA MIXED AIR MD MOTORIZED DAMPER MFF MIXED FLOW FAN OA OUTSIDE AIR PF PROPELLER FAN PL or PLEF PLENUM FAN PLUF PLUG FAN RA RETURN AIR REG REGISTER RGD REGISTERS, GRILLES, AND DIFFUSERS SA SUPPLY AIR SP STATIC PRESSURE TAF TUBE AXIAL FAN TSP TOTAL STATIC PRESSURE UB UPBLAST UPF UBLAST PROPELLER ROOF EXHAUST FAN USF UTILITY SET FAN VAF VANE AXIAL FAN VAV VARIABLE AIR VOLUME VD VOLUME DAMPER WTG WALL TRANSFER GRILLE WWM WELDED WIRE MESH HVAC AIR SYSTEM ABBREVIATIONS CC COOLING COIL CONV CONVECTOR CV COEFFICIENT, VALVE FLOW CV CONSTANT VOLUME DB DRY BULB TEMPERATURE DP DIFFERENTIAL PRESSURE DX DIRECT EXPANSION EAT ENTERING AIR TEMPERATURE EER ENERGY EFFICIENCY RATIO EWB ENERING WET BULB TEMPERATURE FM FLOW METER GR GRAINS HC HEATING COIL LAT LEAVING AIR TEMPERATURE LIQ LIQUID REF REFRIGERANT PIPING (MULTIPLE PIPES) RHC REHEAT COIL RHG REFRIGERANT HOT GAS SUCT SUCTION T’STAT THERMOSTAT V VENT WB WET BULB TEMPERATURE HVAC GENERAL ABBREVIATIONS AS AIR SEPARATOR AWT AVERAGE WATER TEMPERATURE C COOLING COIL CONDENSATE CHWR CHILLED WATER RETURN CHWS CHILLED WATER SUPPLY CWR CONDENSER WATER RETURN CWS CONDENSER WATER SUPPLY ET EXPANSION TANK HTHW HIGH TEMPERATURE HOT WATER HTHWR HIGH TEMPERATURE HOT WATER RETURN HTHWS HIGH TEMPERATURE HOT WATER SUPPLY HW HOT WATER HWR HOT WATER RETURN HWRR HOT WATER REVERSE RETURN HWS HOT WATER SUPPLY PCD PUMPED CONDENSATE DRAIN (COOLING) HVAC HYDRONIC PIPING SYSTEM ABBREVIATIONS CO2 CARBON DIOXIDE EA EQUIPMENT AIR IA INSTRUMENT AIR IAI INSTRUMENT AIR INTAKE MA MEDICAL COMPRESSED AIR MAI MEDICAL AIR INTAKE MAP MASTER ALARM PANEL MGM MEDICAL GAS MANIFOLD MV MEDICAL VACUUM MVE MEDICAL VACUUM EXHAUST N OR N2 NITROGEN N2O NITROUS OXIDE O or O2 MEDICAL OXYGEN WAGD WASTE ANESTHETIC GAS DISPOSAL ZVB MEDICAL ZONE VALVE BOX MEDICAL GAS SYSTEM ABBREVIATIONS a SPECIAL HEIGHT: REFER TO ARCHITECTURAL DRAWINGS FOR DIMENSIONS c CEILING MOUNTED BSC LAB BIOSAFETY CABINET EX EXISTING TO REMAIN F FREEZER H LAB HOOD K REFRIGERATOR/FREEZER M MICROWAVE NL NEW LOCATION P PRINTER/COPIER RE EXISTING TO BE DISCONNECTED AND REMOVED RL EXISTING TO BE DISCONNECTED, REMOVED, AND RELOCATED s SWITCHED RECEPTACLE DEVICE AND EQUIPMENT PLACEMENT AND DISPOSITION ABBREVIATIONS AD AREA DRAIN BFP BACKFLOW PREVENTER CO CLEAN OUT DCV DOUBLE CHECK VALVE DET DOMESTIC WATER EXPANSION TANK DP DIFFERENTIAL PRESSURE ET EXPANSION TANK FD FLOOR DRAIN FM FLOW METER FS FLOOR SINK KHWST KITCHEN HOT WATER STORAGE TANK LAV LAVATORY ORD OVERFLOW ROOF DRAIN RD ROOF DRAIN REF ROOF EXHAUST FAN RPD REDUCED PRESSURE DEVICE TMV THERMOSTATIC MIXING VALVE TP TRAP PRIMER UR URINAL VTR VENT THROUGH ROOF WC WATER CLOSET WH WALL HYDRANT (HOSE BIBB) WHA WATER HAMMER ARRESTER PLUMBING GENERAL ABBREVIATIONS A GENERAL SERVICE COMPRESSED AIR CD CONDENSATE (COOLING) CW or DCW DOMESTIC COLD WATER G GAS GCC GRAVITY COOLING CONDENSATE GW GREASE WASTE GWA GREASE WASTE ABOVE GRADE GWB GREASE WASTE BURIED GW / V COMBINATION GREASE WASTE AND VENT HPG HIGH PRESSURE GAS HW or DHW DOMESTIC HOT WATER HWR or DHWR DOMESTIC HOT WATER RETURN IW INDIRECT WASTE NPCW NON-POTABLE COLD WATER NPHW NON-POTABLE HOT WATER ORWL OVERFLOW RAIN WATER LEADER PCD PUMPED CONDENSATE DRAIN (COOLING) RO REVERSE OSMOSIS WATER RWL RAIN WATER LEADER S SOIL SAN SANITARY ST STORM TW TEMPERED WATER TWR TEMPERED WATER RETURN V VENT VAC VACUUM W WASTE W / V COMBINATION WASTE AND VENT PLUMBING PIPING SYSTEM ABBREVIATIONS 64 GOTHIC STREET, SUITE 1 NORTHAMPTON, MA 01060 T 413.585.1512 F 413.586.7945 www.haiarchitecture.com Tel: (860) 286-9171 www.bvhis.com 206 West Newberry Road Bloomfield, CT 06002 servicesintegrated H AI Architecture, Inc. SEAL: PROJECT NO: BVH PROJECT NO: PROJECT MANAGER: DRAWN BY: COPYRIGHT: XX-XXXX 21-20-207 SHEET TITLE: CONSULTANT: MRI Replacement Cooley Dickinson Hospital 30 Locust Street Northampton, MA 01060 Renovation for: PROJECT: DATE: MEP002 02.15.2021 MEP ABBREVIATIONS NMP/GDB/BPW JSC MARK DATE ISSUE 02.15.2021 PERMIT SET 21-20-207 2/12/2021 EHC XXX XXX FDC PRE DRY SP SPK SP/SPK F O MV MA TWR TW A G C RWL ORWL IW GW WV S RV MFSVFCBDDVDFDZONE VALVE BOX MASTER ALARM PANEL SLIDE MEDICAL COMPRESSED AIR MEDICAL VACUUM OXYGEN SHOWER HEAD -LOCATION T&P RELIEF VALVE ROOF DRAIN FLOOR DRAIN GAS METER ASSEMBLY WATER METER ASSEMBLY AIR OUTLET TEMPERED WATER RETURN TEMPERED WATER GENERAL SERVICE COMPRESSED AIR GAS ABOVE GRADE ELECTRICAL HEATING CABLE CONDENSATE DRAIN RAIN WATER LEADER OVERFLOW RAIN WATER LEADER INDIRECT WASTE GREASE WASTE ABOVE GRADE WASTE & VENT COMBINATION ABOVE GRADE SOIL OR WASTE ABOVE GRADE RADON VENT HOT WATER RECIRCULATING HOT WATER POINT OF NEW TO EXISTING CONNECTION, INCLUDING TRANSITIONS THICK, DASHED LINES INDICATE EXISTING ITEMS TO BE REMOVED THIN, LIGHT LINES INDICATE EXISTING ITEMS OR RACEWAY TO REMAIN IN PLACE AND BE REUSED THICK, DARK SOLID LINES INDICATE NEW OR RELOCATED ITEMS OR NEW RACEWAY AND WIRING FIRE SERVICE COMBINATION SP / SPK MAIN WET SPRINKLER MAIN STANDPIPE MAIN DRY SPRINKLER MAIN PREACTION SPRINKLER MAIN FIRE DEPT. CONNECTION SUPPLY LINE F.D.C. (WALL TYPE) F.D.C. (FREE STANDING) WALL INDICATOR VALVE FIRE HOSE VALVE CURB GATE VALVE ELECTRIC ALARM BELL WATER MOTOR GONG RISER (SPRINKLER OR STANDPIPE) FIRE VALVE CABINET FIRE HOSE CABINET FIRE VALVE CABINET (RISER DIAGRAM) FIRE HOSE CABINET (RISER DIAGRAM) FIRE PUMP INSPECTOR'S TEST MODULE (VALVE, ORIFICE, SIGHT GLASS) FIRE HOSE VALVE INSPECTOR'S TEST VALVE (W / ORIFICE) BACKFLOW PREVENTER ASSEMBLY OR BACKFLOW PREVENTER WITH TAMPER SWITCHES DOUBLE CHECK VALVE ASSEMBLY OR DOUBLE CHECK VALVE ASSEMBLY WITH TAMPER SWITCHES POST INDICATOR VALVE WITH TAMPER SWITCH PRESSURE SWITCH FLOW SWITCH LOW PRESSURE SWITCH OS&Y WITH TAMPER SWITCH ON PIPE RISE BUTTERFLY VALVE WITH TAMPER SWITCH OS&Y VALVE WITH TAMPER SWITCH FIRE PUMP TEST HEADER PENDANT SPRINKLER HEAD CONCEALED PENDANT SPRINKLER HEAD SEMI-RECESSED UPRIGHT SPRINKLER HEAD SIDEWALL SPRINKLER HEAD EXISTING SPRINKLER HEAD TO REMAIN EXISTING SPRINKLER HEAD TO BE REMOVED DRY PENDANT SPRINKLER DRY SIDEWALL SPRINKLER WIRE GUARD OVER SPRINKLER HEAD EXTENDED COVERAGE SPRINKLER HIGH TEMPERATURE SPRINKLER FULLY SPRINKLERED SPACE PARTIALLY SPRINKLERED SPACE NON-SPRINKLERED SPACE AIR COMPRESSOR JOCKEY PUMP FIRE PUMP CONTROLLER JOCKEY PUMP CONTROLLER WET ALARM CHECK VALVE OR ALARM CHECK VALVE WITH TAMPER AND PRESSURE SWITCHES PREACTION ALARM CHECK VALVE OR PREACTION VALVE WITH CONTROL PANEL DELUGE VALVE OR DELUGE VALVE WITH CONTROL PANEL DRY CHEMICAL OR CLEAN AGENT SYSTEM DRY ALARM CHECK VALVE OR DRY PIPE VALVE WITH COMPRESSOR, TAMPER SWITCH AND HIGH AND LOW PRESSURE SWITCHES FIRE HYDRANT DP DS WG EC H RECTANGULAR, FLAT OVAL OR ROUND AIR DUCT AIR DUCT WITH ACOUSTICAL LINING SUPPLY AIR DUCT UP SUPPLY AIR DUCT DOWN RETURN AIR DUCT UP RETURN AIR DUCT DOWN EXHAUST AIR DUCT UP EXHAUST AIR DUCT DOWN ACCESS DOOR FLEXIBLE DUCT CONNECTION CEILING SUPPLY DIFFUSERS CEILING RETURN / EXHAUST GRILLE HARD DUCTED DIFFUSER OR GRILLE WITH FULL SIZE BOTTOM TAKE-OFF DIRECTION OF SUPPLY OR OUTDOOR AIRFLOW DIRECTION OF RETURN OR EXHAUST AIRFLOW AIR TRANSFER UNDER DOOR BACK DRAFT DAMPER VOLUME DAMPER FIRE DAMPER FIRE DAMPER WITH INTEGRAL SECURITY BARS VAV BOX W / UNIT TYPE FAN POWERED VAV BOX SUPPLY PIPING. REFER TO ABBREVIATION LIST FOR DESIGNATION (XXX) RETURN PIPING. REFER TO ABBREVIATION LIST FOR DESIGNATION (XXX) ELECTRICAL HEATING CABLE. REFER TO ABBREVIATION LIST FOR DESIGNATION (XXX) SMOKE DAMPER SYSTEM AND ASSOCIATED DEVICES PER SPECIFICATIONS AND MEP DETAILS COMBINATION FIRE AND SMOKE DAMPER MOTORIZED DAMPER HUMIDIFIER TUBE / PANEL DUCT SMOKE DETECTOR WITH REMOTE INDICATING LIGHT AND TEST SWITCH DUCT STATIC PRESSURE SENSOR DIFFERENTIAL PRESSURE SENSOR VARIABLE FREQUENCY CONTROLLER ROOM THERMOSTAT OR TEMPERATURE SENSOR ROOM TEMPERATURE WITH CARBON DIOXIDE SENSOR CARBON MONOXIDE SENSOR CARBON DIOXIDE SENSOR HUMIDISTAT FINNED TUBE RADIATION VAV PERFORMANCE TAG FIN TUBE TAG PIPE ANCHOR BACKFLOW PREVENTER STRAINER OR STRAINER WITH BLOW- DOWN VALVE HOSE END, CAP AND CHAIN WALL CLEANOUT OR BLIND FLANGE "P" TRAP PIPE TEE DOWN IN-LINE EXPANSION COMPENSATOR FLOOR CLEANOUT STEAM TRAP ASSEMBLY STEEL PENETRATION / PIPE SLEEVE PIPE ELBOW UP OR PIPE TEE UP PIPE ELBOW DOWN COMPANION FLANGE PIPE CAP OR CAPPED END OF PIPE UNION PIPE GUIDES PUMP WATER HAMMER ARRESTOR TAKEOFF FROM TOP OF MAIN PIPE TAKEOFF FROM BOTTOM OF MAIN PIPE DIRECTION OF FLUID FLOW VALVE ON RISER VALVE ON DROP METERING ORIFICE AIR VENT FLOW SENSOR PIPE DROP WITH VALVE 2-WAY CONTROL VALVE 3-WAY CONTROL VALVE BALL VALVE CALIBRATED BALANCING VALVE SHUT-OFF VALVE (SEE SPECIFICATIONS FOR APPLICATION TYPE) BUTTERFLY VALVE CHECK VALVE THERMOSTATIC MIXING VALVE GLOBE VALVE GATE VALVE PRESSURE REDUCING VALVE GAS COCK TRIPLE DUTY VALVE OS&Y VALVE FUSOMATIC VALVE (FIREMATIC) DRAIN VALVE WITH HOSE END, CAP & CHAIN OR WALL HYDRANT / HOSE BIBB MOTORIZED BUTTERFLY VALVE PRESSURE RELIEF SAFETY VALVE AQUASTAT SOLENOID VALVE TEMPERATURE SENSOR WITH SEPARABLE SOCKET IN IMMERSIBLE WELL TEMPERATURE GAUGE WITH SEPARABLE SOCKET IN IMMERSIBLE WELL THERMOMETER WITH SEPARABLE SOCKET IN IMMERSIBLE WELL PRESSURE GAUGE PRESSURE SENSOR WITH SYPHON (STEAM) FLEXIBLE CONNECTOR RECTANGULAR DUCT ROUND DUCT 20x12 20Ø TRAP PRIMER COLD WATER H SP DPFD/SBNS AS AS S E * FHC FVC XXX XXX T H Tc CO CO2 FITTINGS AND VALVESHVAC SYMBOLSFIRE PROTECTION SYMBOLSGENERAL SYMBOLS PLUMBING SYMBOLS MEDICAL GAS SYMBOLS DUCT SIZING DS VENT PCD PUMPED CONDENSATE DRAIN EHC 999 999 999 FLAT OVAL DUCT20/12 EMERGENCY EYEWASH / DELUGE SHOWER SUB LETTERS "EX" INDICATE EXISTING EQUIPMENT TO REMAIN INTACT SUB LETTERS "RE" INDICATE EXISTING EQUIPMENT TO BE DISCONNECTED AND REMOVED SUB LETTERS "RL" INDICATE EXISTING EQUIPMENT TO BE DISCONNECTED, REMOVED AND RELOCATED SUB LETTERS "NL" INDICATE NEW LOCATION OF RELOCATED EQUIPMENT SUB LETTERS "NR" INDICATE NEW EQUIPMENT TO REPLACE EXISTING SUB LETTERS "RR" INDICATE REMOVE EQUIPMENT AND REPLACE ON NEW SURFACE EX RE RL NL NR RR A M M TP TS TS TS LP FS PS TS TS TS TSTS FP FPC JP JPC AC M * = a, b, clg, AF, GF IG OR TP. WHEN TAGGED IN THE ELECTRICAL SYMBOL LIST, REFER TO THE ABBREVIATION LIST * AD AD T FLOW METERFM P P T T ASDCLEAN ROOM GASKETED SPRINKLER HEADC A TYPE LENGTH IN FEET FVC FHC MEDICAL GAS MANIFOLDMGM ZVB MAP AREA ALARM PANELAAP STORM, SOIL OR WASTE BURIED MAIN NURSE CALL EQUIPMENT STATION NURSE CALL CORRIDOR LIGHT (CEILING OR WALL-MOUNTED) MNC N N NURSE CALL SYMBOLS 2 3 4 P L E R D D3 T K K3 K4 SC MC OC OC VS VC T OC (1) 20A-1P LV-1 HOME RUN CIRCUIT BREAKER SIZE PANEL DESIGNATION DOOR OPERATOR PUSH PLATE PENDANT LIGHT FIXTURE (SUBSCRIPT INDICATES SWITCH LEG -TYPICAL) ELECTRICAL SYMBOLS LINEAR LIGHT FIXTURE PENDANT MOUNTED LIGHT FIXTURE RECESSED DOWNLIGHT FIXTURE RECESSED WALL WASH DOWNLIGHT FIXTURE SURFACE-MOUNTED LIGHT FIXTURE WALL-MOUNTED LIGHT FIXTURE RECESSED OR SURFACE-MOUNTED FIXTURE OPEN LAMP LIGHT FIXTURE LIGHTING TRACK (NUMBER OF FIXTURES INDICATED ON PLANS) CEILING OR WALL-MOUNTED EXIT LIGHT FIXTURE CEILING OR WALL-MOUNTED EMERGENCY LIGHT UNIT LIGHT FIXTURE (PART OF EMERGENCY ILLUMINATION SYSTEM) SINGLE-POLE SWITCH (SUBSCRIPT INDICATES SWITCH LEG -TYPICAL) DOUBLE-POLE SWITCH 3-WAY SWITCH 4-WAY SWITCH SINGLE-POLE SWITCH (TOGGLE LIGHTED -LOAD ON) LOW VOLTAGE SWITCH EMERGENCY OFF SWITCH EMERGENCY LIGHTING RELAY SINGLE-POLE DIMMER SWITCH THREE-WAY DIMMER SWITCH SINGLE-POLE TIMER SWITCH SINGLE-POLE KEYED SWITCH KEYED, 3-WAY SWITCH KEYED, 4-WAY SWITCH SPEED CONTROL SWITCH MOMENTARY CONTACT SWITCH OCCUPANCY SENSOR W / POWER PACK (CEILING / WALL) OCCUPANCY SENSOR SWITCH VACANCY SENSOR SWITCH VACANCY SENSOR CONTROL SWITCH MARK TIME SWITCH DAYLIGHTING SENSOR TIME CLOCK PHOTOCELL EMERGENCY OFF SWITCH WITH COVER SURFACE MOUNTED FACTORY PRE-WIRED MULTI-OUTLET RACEWAY SURFACE MOUNTED RACEWAY. SEE PLANS OR SCHEDULE FOR QUANTITY OF DEVICES ELECTRICAL HEATING CABLE POWER WIRING SWITCH LEG WIRING CONTROL WIRING FURNITURE PARTITION WHIP CONNECTION FLOOR SERVICE FITTING WITH OUTLET(S); REFER TO SCHEDULE (X) POKE-THRU ASSEMBLY WITH OUTLET(S); REFER TO SCHEDULE (X) WALL BOX WITH PLATE FOR FURNITURE POWER WITH WHIP CONNECTIONS WALL BOX WITH PLATE FOR FURNITURE TELECOMMUNICATIONS WITH WHIP CONNECTIONS FEEDER TAG SURFACE ELECTRICAL PANEL, 480Y/277 OR 480 VOLT SURFACE ELECTRICAL PANEL, 208Y/120 OR 208 VOLT SURFACE SPECIAL-PURPOSE PANEL OR CABINET FLUSH ELECTRICAL PANEL, 480Y/277 VOLT FLUSH ELECTRICAL PANEL, 208Y/120 VOLT FLUSH SPECIAL-PURPOSE PANEL OR CABINET TRANSFORMER ENCLOSED SWITCH ELECTRIC MOTOR JUNCTION BOX MASTER FIRE ALARM PULL BOX VOICE FIRE ALARM CONTROL PANEL FIRE ALARM CONTROL PANEL FIRE ALARM REMOTE ANNUNCIATOR SMOKE DETECTOR HEAT DETECTOR REMOTE INDICATOR FIRE ALARM MANUAL PULL STATION FIRE ALARM HORN / STROBE FIRE ALARM SPEAKER / STROBE FIRE ALARM CHIME / STROBE FIRE ALARM STROBE FIRE ALARM CEILING-MOUNTED SPEAKER FIREFIGHTER'S TELEPHONE JACK PP DO TC PC DL FB-X PT-X T P EHC C H F H S J F F F RI ANN FACP VFACP TX TX ELECTRICAL SYMBOLS WIRING -REFER TO ABBREVIATION LIST (XXX) XXX WALL CLOCK WITH HANGER TYPE OUTLET B PROGRAM BELL C DUPLEX RECEPTACLE DUPLEX RECEPTACLE SPLIT WIRED DUPLEX RECEPTACLE ON EMERGENCY POWER DOUBLE DUPLEX RECEPTACLE DOUBLE DUPLEX RECEPTACLE ON EMERGENCY POWER SINGLE RECEPTACLE SPECIAL PURPOSE RECEPTACLE; VERIFY NEMA CONFIGURATION WITH EQUIPMENT SPECIAL PURPOSE RECEPTACLE ON EMERGENCY POWER; VERIFY NEMA CONFIGURATION WITH EQUIPMENT * * * * * * * * CALL-FOR-AID SWITCH W/ CORDE CALL-FOR-AID LIGHT AND BUZZER MAGNETIC DOOR LOCKML COMBINATION SMOKE/CARBON MONOXIDE DETECTORS CO LV-1 HOME RUN PANEL DESIGNATION 20A-1P HOME RUN (TYPICAL) LV-1 XP/XXA HOME RUN PANEL DESIGNATION POLES/AMPERAGE HOME RUN LV-1 1,2,3 PANEL DESIGNATION CIRCUIT NUMBERS TP-X TELEPOWER POLE WITH OUTLET(S); REFER TO SCHEDULE (X) GROUNDING BUSBARG a a 64 GOTHIC STREET, SUITE 1 NORTHAMPTON, MA 01060 T 413.585.1512 F 413.586.7945 www.haiarchitecture.com Tel: (860) 286-9171 www.bvhis.com 206 West Newberry Road Bloomfield, CT 06002 servicesintegrated H AI Architecture, Inc. SEAL: PROJECT NO: BVH PROJECT NO: PROJECT MANAGER: DRAWN BY: COPYRIGHT: XX-XXXX 21-20-207 SHEET TITLE: CONSULTANT: MRI Replacement Cooley Dickinson Hospital 30 Locust Street Northampton, MA 01060 Renovation for: PROJECT: DATE: MEP003 02.15.2021 MEP SYMBOL LIST NMP/GDB/BPW JSC MARK DATE ISSUE 02.15.2021 PERMIT SET 21-20-207 2/12/2021 ELECTRICAL EQUIPMENT TAG VOLTS / PHASE KW FLA HOME RUN BRANCH CIRCUIT SIZE DISCONNECT STARTER NOTES PROCESS CHILLER 460/3 49.0 80A-3P C/B IN 'P1' 3#4, 1#8G., IN 1-1/4" CONDUIT 100A/80AF - 1 CU-1 460/3 10.3 20A-3P C/B IN 'EE-US1' 3#12, 1#12G., IN 3/4" CONDUIT 30A/20AF 1 CU-2 460/3 10.3 20A-3P C/B IN 'EE-US1' 3#12, 1#12G., IN 3/4" CONDUIT 30A/20AF 1 CRAC-1 460/3 20.3 30A-3P C/B IN 'EE-US1' 3#10, 1#10G., IN 1" CONDUIT 30A/30AF 1 CRAC-2 460/3 20.3 30A-3P C/B IN 'EE-US1' 3#10, 1#10G., IN 1" CONDUIT 30A/30AF 1 NOTES: 1. DISCONNECT SWITCH FURNISHED AND INSTALLED BY DIVISION 26. NEW PROCESS CHILLER PROVIDED BY GE. INSTALL ON VIBRATION ISOLATION KIT PROVIDED BY MANUFACTURER ROOF HIGH POINT MANUAL AIR VENTS ISOLATION VALVE (TYPICAL) TT P EQUIPMENT ROOM P 2" PCHWS&R N.C. 1" COLD WATER FROM EXISTING BACKFLOW DEVICE N.C. N.C. 1 1/2" PT 1" BYPASS DRAIN WITH BALANCING VALVE. PIPE TO EXISTING DRAIN FILTER BYPASS BOILER DRAIN 100 MICRON 1 1/2" FILTER EXISTING DRAIN 1 1/2" NPT HOSE CONNECTIONS VENDOR-SUPPLIED HOSES GE HEAT EXCHANGER CABINET. REFER TO GE DRAWINGS FOR CONNECTIONS AND REQUIREMENTS T P N.C. FM HOSE CONNECTIONS TO PGR IN EQUIPMENT ROOM. REFER TO GE DRAWINGS HOSE CONNECTIONS TO GRADIENT COIL (XRM) IN MAGNET ROOM. RUN PIPING THROUGH PENETRATION PANEL WAVEGUIDES. REFER TO GE DRAWINGS HOSE CONNECTIONS TO CRYO. REFER TO GE DRAWINGS 1/2" BACKUP RETURN TO EXISTING DRAIN CRYO MANUAL BYPASS PANELS, FIRNISHED BY VENDOR. MOUNT ON WALL AND CONNECT AT HOSE CONNECTIONS1 1/2" 1/2" COLD WATER FROM EXISTING 1" COLD WATER DOWNSTREAM OF BACKFLOW DEVICE 1 1 INSITE SERIES PX INLINE FLOW METER (PVC), SIZED FOR FLOW RATE OF 30 - 35 GPM. 1 1/2" NOTE: SYSTEM SHALL BE FILLED WITH 40 - 50% PROPOLENE GLYCOL USING DISTILLED WATER. REFER TO GE REQUIREMENTS FOR WATER QUALITY STANDARDS. 8" QUENCH VENT (TYPICAL) DISCHARGE WITH 45-DEGREE DOWN WITH 1/2" BIRDSCREEN, MINIMUM 36" ABOVE ROOF ROOF LINE GE VENTGLASS CONNECTOR WITH DIELECTRIC BREAK GE VENTGLASS CONNECTOR WITH DIELECTRIC BREAK RF SHIELD CEILING WAVEGUIDE 8" VENT CONNECTION PROVIDED WITH EQUIPMENT MRI NOTES: 1. ALL QUENCH MATERIALS SHALL BE WELDED OR SEAMLESS PER GE REQUIREMENTS, (TYPE 304 SS, AL 6061-T6, OR COPPER TYPE DWV, M OR L. CONFIRM MATERIALS WITH GE REQUIREMENTS. 2. PROVIDE SIGNAGE AND EXCLUSION AREA FOR ROOM DISCHARGE LOCATION. 3. DETAIL PROVIDES GENERAL REQUIREMENTS; REFER TO GE DRAWINGS FOR ADDITIONAL INFORMATION. 64 GOTHIC STREET, SUITE 1 NORTHAMPTON, MA 01060 T 413.585.1512 F 413.586.7945 www.haiarchitecture.com Tel: (860) 286-9171 www.bvhis.com 206 West Newberry Road Bloomfield, CT 06002 servicesintegrated H AI Architecture, Inc. SEAL: PROJECT NO: BVH PROJECT NO: PROJECT MANAGER: DRAWN BY: COPYRIGHT: XX-XXXX 21-20-207 SHEET TITLE: CONSULTANT: MRI Replacement Cooley Dickinson Hospital 30 Locust Street Northampton, MA 01060 Renovation for: PROJECT: DATE: MEP004 02.15.2021 MEP SCHEDULES AND DETAILS NMP/GDB/BPW JSC TAG ID FAN SECTION REHEAT HUMIDIFIER ELECTRICAL REMARKSCFM ESP (IN W.C.) HP KW STAGES TYPE CAPACITY (LBS/HR) VOLTAGE PHASE CRAC-1 2200 .2 2.6 14 SCR STEAM 8 460 V 3 [1] [2] [3] CRAC-2 2200 .2 2.6 14 SCR STEAM 8 460 V 3 [1] [2] [3] 1. NOT USED [1] FURNISH CONDENSATE PUMP WITH OVERFLOW SAFETY SHUTOFF SWITCH. [2] STEAM GENERATING REPLACEABLE CANNISTER. [3] FURNISH WITH LOCKING UNIT DISCONNECT SWITCH.. GENERAL NOTES SCHEDULE NOTES COMPUTER ROOM AIR CONDITIONING UNIT SCHEDULE TAG ID MANUFACTURER MODEL EAT DB/WB (°F) COOLING COMPRESSOR (DELETE IF USING CHW)SERVESTOTAL MBH SENSIBLE MBH QUANTITY STEPS TOTAL CIRCUITS CRAC-1 LIEBERT MT048 75 / 61 49.1 45.7 1 2-STAGE SCROLL 1 MRI EQUIPMENT ROOM CRAC-2 LIEBERT MT048 75 / 61 49.1 45.7 1 2-STAGE SCROLL 1 MRI EQUIPMENT ROOM CRAC CONDENSING UNIT (CU) - OUTDOOR UNIT REFRIGERANT TYPE REMARKSTAG ID MANUFACTURER MODEL AMBIENT TEMP (°F) HI/LOW CAPACITY (TONS)FLA OPD HP VOLTAGE PHASE SERVES CU-1 LIEBERT PFD054 95 4 10.3 20 1/2 460 V 3 CRAC-1 R410A CU-2 LIEBERT PFD054 95 4 10.3 20 1/2 460 V 3 CRAC-2 R410A GRILLE, REGISTER, AND DIFFUSER SCHEDULE CEILING SUPPLY DIFFUSER DUCTED CEILING RETURN/EXHAUST GRILLE NON-DUCTED CEILING RETURN/EXHAUST GRILLE FLEXIBLE DUCT SIZES TO SUPPLY DIFFUSERS CFM SQUARE NECK SIZE ROUND NECK SIZE CFM NECK SIZE CFM NECK SIZE CFM SIZE 0-100 6 x 6 6"Ø 0-150 6 x 6 0-350 12 x 12 0-100 6"Ø 101-250 9 x 9 8"Ø 151-350 12 x 12 351-1200 22 x 22 101-175 8"Ø 251-400 12 x 12 10"Ø 351-650 16 x 16 176-275 10"Ø 401-600 15 x 15 12"Ø 651-1000 22 x 22 401-600 12"Ø 601-800 18 x 18 14"Ø 601-800 14"Ø TYPE MODEL (TITUS)DESCRIPTION (ALL MODELS ARE BASED ON TITUS UNLESS NOTED OTHERWISE) A4 TDC SQUARE LOUVER FACE CEILING SUPPLY DIFFUSER WITH REMOVABLE CORE, LAY-IN, 4-WAY THROW. TRANSITIONAL ADAPTER. AL-4 OMNI-AA ALL ALUMINUM PLAQUE DIFFUSER, INTENDED FOR MRI LOCATION B 355RL LOUVER TYPE CEILING / WALL RETURN OR EXHAUST GRILLE, 35° FIXED DEFLECTION, 1/2" SPACING WITH BLADES PARALLEL TO THE LONG DIMENSION. B-AL 45F ALL ALUMINUM SIGHTPROOF, 1/2"x1/2" EGGCRATE GRID, 92% FREE AREA, INTENDED FOR MRI LOCATION MARK DATE ISSUE 02.15.2021 PERMIT SET 21-20-207 2/12/2021 CIRCUIT BREAKER IN EMERGENCY PANEL EMERGENCY LIGHTING RELAY CIRCUIT BREAKER IN NORMAL PANEL NORMAL POWER LIGHT FIXTURE CONTROLLED BY GRAFIK EYE CONTROL UNIT LUTRON GRX-3106 SERIES GRAFIK EYE DIMMING CONTROL STATION LUTRON #NGRX-PB POWER BOOSTER EMERGENCY POWER LIGHT FIXTURE CONTROLLED BY GRAFIK EYE CONTROL UNIT THRU POWER BOOSTER CONTROL WIRING SWITCH LEG C H N CONTACT COIL H N NOTES: 1. PROVIDE EQUIPMENT & WIRING SHOWN ABOVE IN ALL SPACES CONTAINING NORMAL AND EMERGENCY CIRCUITS, WITH LUTRON GRAFIK EYE CONTROL UNIT CONTROLLING EACH CIRCUIT. 2. CONTACT POSITION SHOWN WITH COIL IN DE-ENERGIZED POSITION. NOTES: 1. EQUIPMENT IDENTIFICATION LABEL. 2. WARNING LABEL UNGROUNDED CONDUCTORS (VOLTAGE LABEL). 3. MOTOR DISCONNECT SWITCH WARNING. LABEL 4. TESTING LABEL. 2 3 1 4 MOTOR DISCONNECT SWITCH (MAY BE PART OF MOTOR CONTROLLER) (FRONT VIEW) 64 GOTHIC STREET, SUITE 1 NORTHAMPTON, MA 01060 T 413.585.1512 F 413.586.7945 www.haiarchitecture.com Tel: (860) 286-9171 www.bvhis.com 206 West Newberry Road Bloomfield, CT 06002 servicesintegrated H AI Architecture, Inc. SEAL: PROJECT NO: BVH PROJECT NO: PROJECT MANAGER: DRAWN BY: COPYRIGHT: XX-XXXX 21-20-207 SHEET TITLE: CONSULTANT: MRI Replacement Cooley Dickinson Hospital 30 Locust Street Northampton, MA 01060 Renovation for: PROJECT: DATE: MEP005 02.15.2021 MEP DETAILS NMP/GDB/BPW JSC N.T.S.1 EMERGENCY LIGHTING DETAIL FOR DIMMING SYSTEM N.T.S.2 ELECTRICAL DEVICE LABELING DETAIL MARK DATE ISSUE 02.15.2021 PERMIT SET 21-20-207 2/12/2021 CLOSET B-128A MRI ROOM B-128 MRI EQUIPMENT ROOM B-127 CORRIDOR B-125 S O V CLOSET B-128A MRI ROOM B-128 MRI EQUIPMENT ROOM B-127 CORRIDOR B-125 T T T TT ROOF A C 6 5 EXISTING 1" PCW EXISTING 1/2" O2 AND 3/4" MV 1"1/2"3/4"1/2"1 8 2 6 5 5 7 4 3 11 11 11 11 12 7 3/4"9 10 13 12 CRAC-2 CRAC-1 1 2 3 2 2 2 2 4 5 6 5 6 7 7 2 2 2 2 8 8 AL-4-300 B-1200 AL-4-300AL-4-300 A4-500 A4-500 A4-500 A4-500 B-1000 B-1000 12 13 REFREFS S 9 10 11 AL-4-300 B-AL CU-1 CU-2 NEW QUENCH VENT WITH HORIZONTAL ORIENTATION EXISTING EXHAUST FAN NEW PROCESS CHILLER, PROVIDED BY GE AND INSTALLED BY MECHANICAL CONTRACTOR REF REF 2 3 1 FD FD FDVC FDVC MGC V XFC FD XFC XFC FD FD FD FD FD FDFDFD PACS PROJECT AREA ELEVATOR #1 ELEVATOR #1 AREAWAY VI EWER VI EWER BENCH BENCH BENCH BENCH F. F. ELEV. = 218'- 6" F. F. ELEV. = 218'- 11" F. F. ELEV. = 218'- 6" F. F. ELEV. = 218'- 11" F. F. ELEV. = 218'- 11" F. F. ELEV. = 218'- 5 3/ 4"F. F. ELEV. = 218'- 6" LI NE O F RO OM ABO VE C.G. C.G.C.G.C. G.C. G. C. G. C. G. FD SUMP RAMP U P 1:12 SL O P E M A X . T Y P . RAMP UP1:12 SLOPE MAX. TYP. RAM P DN DN KEYPADENTRY 64 GOTHIC STREET, SUITE 1 NORTHAMPTON, MA 01060 T 413.585.1512 F 413.586.7945 www.haiarchitecture.com Tel: (860) 286-9171 www.bvhis.com 206 West Newberry Road Bloomfield, CT 06002 servicesintegrated H AI Architecture, Inc. SEAL: PROJECT NO: BVH PROJECT NO: PROJECT MANAGER: DRAWN BY: COPYRIGHT: XX-XXXX 21-20-207 SHEET TITLE: CONSULTANT: MRI Replacement Cooley Dickinson Hospital 30 Locust Street Northampton, MA 01060 Renovation for: PROJECT: REFER TO MEP DRAWINGS FOR ADDITIONAL INFORMATION. DATE: PROJECT AREA KEY PLAN M101 02.15.2021 MECHANICAL PLANS NMP/GDB CheckerPLANNORTH1/4" = 1'-0" PLUMBING, FIRE PROTECTION AND MEDICAL GAS GROUND GLOOR PLAN PLANNORTH1/4" = 1'-0" HVAC GROUND FLOOR PLAN HVAC DRAWING NOTES: NEW 8" QUENCH VENT FROM EQUIPMENT CONNECTION TO HORIZONTAL DISCHARGE ABOVE ROOF. SEE DETAIL. CONNECT NEW SUPPLY DIFFUSERS, EXHAUST AND RETURN GRILLES TO EXISTING DUCTWORK. ALIGN WITH NEW CEILING GRID LAYOUT WITH NEW FLEX DUCT CONNECTIONS AS NEEDED. BALANCE TO AIRFLOW INDICATED. 24x24 NON-FERROUS EGGCRATE RETURN AIR GRILLE FOR PRESSURE EQUALIZATION. EXISTING EXHAUST AND RETURN DUCT AND ASSOCIATED DAMPERS TO REMAIN. BALANCE AIRFLOW TO 1200 CFM IN BOTH RETURN AND EXHAUST MODE. TEST SYSTEM OPERATION WITH MANUAL EXHAUST PURGE SWITCH IN BOTH MRI ROOM AND CONTROL ROOM. CONFIRM PROPER DAMPER OPERATION AND AIRFLOW IN BOTH MODES OF OPERATION. LIEBERT FURNISHED 3-WAY SUPPLY DIFFUSERS. RETURN AIR PLENUM WITH FILTER GRILLE, 24x24 "TITUS 350FLF1". LIEBERT FURNISHED CONDENSATE PUMPS, WIRED INTERNALLY THROUGH CRAC UNIT. UNIT SHALL AUTOMATICALLY STOP ON HIGH LEVEL. CONNECT NEW RETURN GRILLES TO EXISTING FACILITY RETURN BRANCH. EXTEND RETURN DUCT AS NEEDED. REMOVE AND REINSTALL EXISTING MANUAL PURGE EXHAUST SWITCH TO ACCOMMODATE NEW SHIELDING INSTALLATION. INSTALL NEW SELECTOR SWITCH TO MATCH EXISTING IN MRI ROOM TO MANUALLY START PURGE EXHAUST. EITHER SWITCH SHALL INITIATE PURGE. REMOVE AND INSTALL NEW WAVE GUIDES AT EXISTING SUPPLY, RETURN AND EXHAUST DUCTS AT PENETRATIONS OF NEW SHIELDING. CONFIRM DUCT SIZES IN FIELD AND REFER TO SHIELDING VENDOR DRAWINGS FOR REQUIREMENTS. RUN NEW REFRIGERANT PIPING UP HIGH OVER TO NEW ROOF PENETRATION. COORDINATE EXACT ROUTING AND LOCATION IN FIELD. NEW EXHAUST GRILLE SHALL BE NON-FERROUS. 1 PLUMBING, FIRE PROTECTION AND MEDICAL GAS DRAWING NOTES: REPLACE EXISTING MEDICAL GAS INLET/OUTLET AND SLIDE AND MODIFY PIPING TO ACCOMMODATE NEW SHIELDING. EXISTING 1" BFP AND 1/2" DRAIN TO REMAIN. PROVIDE NEW 1/2" O2 AND 3/4" MV PIPING THROUGH NEW PENETRATION PANEL. CONNECT 1/2" CW TO EXISTING 1" PCW AND EXTEND TO NEW CRAC UNIT HUMIDIFIERS. NEW 1/2" CW TO CRAC UNIT HUMIDIFIER CONNECTION. NEW CONCEALED PENDENT NON-FERROUS SPRINKLER HEAD. CONNECT TO EXISTING BRANCH PIPING. CONFIRM EXISTING PRE-ACTION SYSTEM PIPING MATERIAL IN THE FIELD. TYPICAL. NEW UPRIGHT PENDENT SPRINKLER HEAD IN EQUIPMENT ROOM WITH NO CEILING. CONNECT TO EXISTING BRANCH PIPING. VERIFY LAYOUT WITH EXISTING UTILITIES AND OBSTRUCTIONS. TYPICAL. PROVIDE NEW 1" BACKUP TO GE HEAT EXCHANGER PROCESS CHILLED WATER AND 1/2" BACKUP TO GE CRYO MANUAL BACKUP BOX. CONNECT DOWNSTREAM OF EXISTING BACKFLOW PREVENTER. REFER TO DETAIL FOR ADDITIONAL INFORMATION. PROVIDE 1/2" MEDICAL AIR DROP AND CAP WITH A BLANK COVER PLATE FOR FUTURE OUTLET INSTALLATION. PROVIDE 1/2" MEDICAL AIR PIPING THROUGH PENETRATION PANEL AND CAP IN EQUIPMENT ROOM FOR FUTURE USE. PROVIDE UPRIGHT SPRINKLER HEADS UNDER OBSTRUCTIONS PER NFPA 13 REQUIREMENTS. PROVIDE 3/4" COOLING COIL CONDENSATE CONNECTION AT CRAC UNIT CONDENSATE PUMP. PIPE 3/4" COOLING COIL CONDENSATE DISCHARGE TO EXISTING DRAIN. 1 2 3 4 5 6 7 8 9 10 PLANNORTH1/4" = 1'-0" MEP ROOF PLAN MEP ROOF DRAWING NOTES: PROVIDE NEW NEMA-3R, 3-PHASE, 100A FUSED DISCONNECT FOR NEW AIR COOLED CHILLER. CIRCUIT TO NEW 100A BREAKER IN PANEL P1. PROVIDE (3) #4 AND (1) #8G IN 1-1/4" CONDUIT. PROVIDE NEW NEMA-3R, 3-PHASE, 30 A FUSED DISCONNECT FOR CU-1. CIRCUIT TO NEW 20A BREAKER IN PANEL EE-US1. PROVIDE (3) #10 & (1) #10G IN 1" CONDUIT. PROVIDE NEW NEMA-3R, 3-PHASE, 30 A FUSED DISCONNECT FOR CU-2. CIRCUIT TO NEW 20A BREAKER IN PANEL EE- US1.PROVIDE (3) #10 & (1) #10G IN 1" CONDUIT. 1 2 3 2 3 4 5 6 7 8 HVAC GENERAL NOTE: ALL MATERIALS USED INSIDE THE MRI ROOM SHALL BE NON-FERROUS. 11 12 13 TEMPERATURE CONTROL NOTES: 1. EXISTING AUTOMATIC TEMPERATURE CONTROLS FOR THE SCOPE OF WORK AREA ARE THROUGH THE EXISTING JCI METASYS SYSTEM. EXISTING SYSTEMS ARE TO REMAIN EXCEPT AS NOTED. 2. PROVIDE A NEW RELATIVE HUMIDITY SENSOR IN THE RETURN DUCT SERVING THE MRI ROOM CONNECTED TO THE EXISTING JCI SYSTEM. MODIFY THE EXISTING AIR HANDLING UNIT HUMIDITY CONTROLS TO INCLUDE THIS POINT AND BASE HUMIDITY CONTROL (STEAM VALVE POSITION) UPON THE FURTHEST OUT OF RANGE FOR THE EXISTING POINT OR THIS SETPOINT. SET CONTROL TO 30% RH (ADJUSTABLE) WITH LOW HUMIDITY ALARM AT 25% RH (ADJUSTABLE) AND HIGH HUMIDITY ALARM AT 65% RH (ADJUSTABLE). PROVIDE GRAPHIC OF SPACE RH AT WORKSTATION. 3. NEW EQUIPMENT CRAC UNITS SHALL OPERATE UNDER PACKAGED CONTROLS. PROVIDE STAGED SETPOINTS BETWEEN THE ROOM VAV CONTROLS AND CRAC UNITS (VAV SHALL BE LEAD COOLING SOURCE). BMS SHALL MONITOR ALARM CONDITION AT EACH CRAC UNIT WITH GRAPHIC AT OPERATOR WORKSTATION. 4. BMS SHALL MONITOR PROCESS CHILLER SUPPLY AND RETURN WATER TEMPERATURES WITH BMS TEMPERATURE SENSORS. PROVIDE GRAPHIC DISPLAY OF TEMPERATURES WITH ADJUSTABLE HIGH AND LOW TEMPERATURE ALARM INDICATION BASED ON SYSTEM SETPOINTS REQUIRED BY GE. MONITOR ALARM STATUS OF CHILLER. 5. INSTALL PROCESS CHILLER REMOTE DISPLAY PANEL (PROVIDED WITH CHILLER) IN EXISTING CONTROL ROOM (COORDINATE LOCATION IN FIELD WITH OWNER). REFER TO CHILLER INSTALLATION INSTRUCTIONS FOR REQUIREMENTS. 10 11 12 13 9 MARK DATE ISSUE 02.15.2021 PERMIT SET 21-20-207 2/12/2021 T T T MRI ROOM B-128 MRI EQUIPMENT ROOM B-127 CORRIDOR B-125 F. E. CAB. F C.G. C.G. ROOF A C 6 5 MRI ROOM B-128 MRI EQUIPMENT ROOM B-127 CORRIDOR B-125 F. E. CAB. F C.G. C.G. * * * * * * * * O V S 1 2 3 4 1 6 5 5 5 5 5 5 5 5 5 5 5 5 7 7 1 3 2 5 4 6 1 3 2 2 2 1 1 4 5 EXISTING 1" PCW EXISTING 1/2" O2 AND 3/4" MV 1 FD FD FDVC FDVC MGC V XFC FD XFC XFC FD FD FD FD FD FDFDFD PACS PROJECT AREA ELEVATOR #1 ELEVATOR #1 AREAWAY VI EWER VI EWER BENCH BENCH BENCH BENCH F. F. ELEV. = 218'- 6" F. F. ELEV. = 218'- 11" F. F. ELEV. = 218'- 6" F. F. ELEV. = 218'- 11" F. F. ELEV. = 218'- 11" F. F. ELEV. = 218'- 5 3/ 4"F. F. ELEV. = 218'- 6" LI NE O F RO OM ABO VE C.G. C.G.C.G.C. G.C. G. C. G. C. G. FD SUMP RAMP U P 1:12 SL O P E M A X . T Y P . RAMP UP1:12 SLOPE MAX. TYP. RAM P DN DN KEYPADENTRY 64 GOTHIC STREET, SUITE 1 NORTHAMPTON, MA 01060 T 413.585.1512 F 413.586.7945 www.haiarchitecture.com Tel: (860) 286-9171 www.bvhis.com 206 West Newberry Road Bloomfield, CT 06002 servicesintegrated H AI Architecture, Inc. SEAL: PROJECT NO: BVH PROJECT NO: PROJECT MANAGER: DRAWN BY: COPYRIGHT: XX-XXXX 21-20-207 SHEET TITLE: CONSULTANT: MRI Replacement Cooley Dickinson Hospital 30 Locust Street Northampton, MA 01060 Renovation for: PROJECT: REFER TO MEP DRAWINGS FOR ADDITIONAL INFORMATION. DATE: PROJECT AREA KEY PLAN MD101 02.15.2021 MEP DEMOLITION PLANS NMP/GDB/BPW JSCPLANNORTH1/4" = 1'-0" MEP GROUND FLOOR DEMOLITION PLAN PLANNORTH1/4" = 1'-0" MEP ROOF DEMOLITION PLAN MEP ROOF DEMOLITION NOTES: ALL ASSOCIATED DISCONNECTS, CONDUIT, FEEDERS TO BE DEMOISHED AND REPLACED WITH NEW. REFER TO MEP DRAWING NOTES FOR NEW EUIPMENT CIRCUIT REQUIREMENTS. REMOVE EXISTING LIEBERT AIR COOLED CONDENSING UNIT AND ASSOCIATED REFRIGERANT PIPING BACK TO AIR HANDLER IN EQUIPMENT ROOM. REMOVE EXISTING AIR COOLED PROCESS CHILLER AND ASSOCIATED PIPING DOWN TO SOURCE. EXISTING EXHAUST FAN TO REMAIN. REMOVE EXISTING QUENCH VENT. 1 MEP GROUND FLOOR DEMOLITION NOTES: ALL EXISTING WALL MOUNTED ELECTRICAL FIXTURES INCLUDING BUT LIMITED TO TEL/DATA DEVICES, FIRE ALARM DEVICES, ETC. SHALL BE REMOVED, CLEANED, STORED, AND REINSTALLED UPON NEW CONSTRUCTION. ALL BOXES, CONDUIT, AND ASSOCIATED WIRING SHALL BE MAINTAINED. RECEPTACLES SHALL BE REMOVED AND REPLACED WITH NEW, EXISITNG BACK BOX AND CONDUIT SHALL BE REUSED. ALL CEILING MOUNTED FIRE ALARM DEVICES SHALL BE REMOVED, CLEANED, STORED, AND REINSTALLED UPON NEW CONSTRUCTION. REFER TO SHEET E102 FOR NEW DEVICE LOCATION. ALL LIGHT FIXTURES AND LIGHTING CONTROL DEVICES SHALL BE REMOVED AND REPLACED WITH NEW. EXISTING BRANCH CIRCUITING SERVING ARE SHALL BE MAINTAINED AND REUSED. REFER TO SHEET E101 FOR NEW FIXTURE AND DEVICE LAYOUT. EXISING MECHANICAL AC UNITS IN EXISTING EQUIPMENT ROOM AND ALL ASSOCIATED DISCONNECTS, CONDUIT, FEEDERS TO BE DEMOISHED AND REPLACED WITH NEW. REFER TO SHEET E102 FOR NEW EUIPMENT LAYOUT AND CIRCUITNG. REMOVE ALL EXISTING SUPPLY IFFUSERS, RETURN AND EXHAUST GRILLES IN EXAM AND EQUIPMENT ROOMS. REMOVE EXISTING LIEBERT VERTICAL AIR HANDLING UNIT, TOP DISCHARGE PLENUM, ASSOCIATED REFRIGERANT PIPING THROUGH CEILING SPACE AND UP TO ROOF, WIRING AND CONTROLS. REMOVE EXISTING CHILLED WATER PIPING BACK TO CHILLER ON ROOF. VALVE AND CAP EXISTING COLD WATER PIPING FOR REUSE. CONFIRM EXISTING CHILLER GLYCOL CONTENT PRIOR TO DISPOSAL. 1 2 3 4 5 6 MEP GROUND FLOOR GENERAL NOTES: 1. PRIOR TO ANY DEMOLITION, CONTRACTOR TO RECORD ALL AIRFLOW VALUES ON EXISTING DIFFUSERS AND GRILLES IN SCOPE OF WORK AND REPORT FINDINGS TO ENGINEERS. 2. DISCONNECT AND REMOVE ALL EXISTING ELECTRICAL LIGHTING EQUIPMENT WITHIN DESIGNATED AREA FOR SCOPE OF WORK. EXISTING BRANCH CIRCUIT SHALL REMAIN AND BE REUSED FOR NEW SCOPE OF WORK. REFER TO FLOOR PLANS FOR ADDITIONAL SCOPE WITH REGARDS TO POWER AND SPECIAL SYSTEMS. THIS WORK DOES NOT INCLUDE COMPLETE DEMO AND SHALL BE COORDINATED WITH THE HOSPITAL PROJECT MANAGER. 3. DISCONNECT AND REMOVE EXISTING WIRING, CONDUIT, BOXES, ETC. SERVING ALL EQUIPMENT BEING REMOVED BY MECHANICAL AND OTHER TRADES. REFER TO PLUMBING, MECHANICAL AND ARCHITECTURAL DRAWINGS FOR COORDINATION OF REQUIRED WORK. REMOVALS SHALL BE COMPLETE BACK TO SOURCE PANEL. 4. DISCONNECT AND REMOVE ALL ELECTRICAL FEEDERS AND ASSOCIATED EQUIPMENT FOR THE REMOVAL OF THE EXISTING ‘MRI’ IMAGING SYSTEM. COORDINATE SYSTEM SHUTDOWN WITH HOSPITAL FACILITIES AND CLINICIANS PRIOR TO START OF DEMOLITION WORK. 7PLANNORTH1/4" = 1'-0" PLUMBING, FIRE PROTECTION & MEDICAL GAS DEMOLITION PLAN PLUMBING, FIRE PROTECTION AND MEDICAL GAS GROUND FLOOR DEMOLITION NOTES: REMOVE EXISTING PRE-ACTION SPRINKLER HEAD TO ACCOMMODATE NEW CEILING INSTALLATION. EXISTING BRANCH PIPING TO REMAIN AND BE REUSED. TYPICAL. REMOVE EXISTING PRE-ACTION SYSTEM SPRINKLER HEAD TO ACCOMMODATE CEILING REMOVAL. RETAIN BRANCH PIPING FOR INSTALLATION OF NEW UPRIGHT PENDENT HEAD. TYPICAL. REMOVE EXISTING 1/2" CW LINE TO EXISTING CRAC UNIT. REMOVE EXISTING CW BACKUP PIPING TO PROCESS COOLING SYSTEM AND CRYO COOLING SYSTEM. EXISTING BFP AND 1" PIPING TO REMAIN. REMOVE EXISTING 1/2" O2 AND 3/4" MV PIPING AT EXISTING PENETRATION PANEL TO ACCOMMODATE INSTALLATION OF NEW PENETRATION PANEL. REMOVE EXISTING MED GAS INLET, OUTLET, AND SLIDE AND ASSOCIATED PIPING TO ACCOMMODATE INSTALLATION OF NEW RF SHIELD. 1 2 3 4 5 6 2 3 4 5 MARK DATE ISSUE 02.15.2021 PERMIT SET 21-20-207 2/12/2021 LUMINAIRE SCHEDULE TYPE DESCRIPTION MOUNTING SOURCE DRIVER INPUT WATTS EFFICACY SHEILDING/OPTICS ACCESSORIES/FEATURES REFERENCE PPRODUCT NOTES SPEC VOLT LD1 4" ROUND LED DOWNLIGHT - MRI RECESSED 500LM REMOTE UNV 15W 85LM/W MATTE WHITE REFLECTOR AND FLANGE, MEDIUM DISTRIBUTION, REGRESSED LENSED TRIM, SMOOTH LENS NON-FERROUS CONSTRUCTION ONLY GOTHAM - EVEO 4M SERIES 3500K 0-10V OR APPROVED EQUAL LED DIMMING 90+ CRI DRIVER TO 1% LT1 2x2 LENSE LEDTROFFER - MRI RECESSED 3300LM REMOTE UNV 36W 94LM/W WHITE FINISH, EDGE LIT POLYCARBONATE LENS (9) 2'X2' CONFIGURATION,NON-FERROUS CONSTRUCTION ONLY,CONSULT WITH OWNER FOR IMAGE SELECTION PRIOR TO PURCHASE FAIL - SAFE CV SERIES 3500K 0-10V OR APPROVED EQUAL LED DIMMING 80+ CRI TO 1% LP1 4' LED INDUSTRIAL STRIP SUSPENDED 525 LM/FT INTEGRAL UNV 34W 13LM/W SNAP ON FROSTED DIFUSSED LENS, WHITE FINISH, PROVIDE WIRE GUARD MOUNTED 8' AFF - PROVIDE HANGER CHAIN TO ACCOMMODATE MOUNTING PER DRAWINGS METALUX - SNLED SERIES 3500K 0-10V OR APPROVED EQUAL LED DIMMING 80+ CRI TO 10% EM DUAL HEAD LEDEMERGENCY BATTERY UNIT WALL INTEGRAL UNV ADJUSTABLE AIMING HEADS, WHITE THERMOPLASTICWITH CLEAR LIGHT REFRACTION STYLE LENSES NICKLE CADIUM BATTERY RATED FOR90 MINUTES DUAL LITE - EZ SERIES DRIVER OR APPROVED EQUAL AND BATTERY SUPPLY CLOSET B-128A MRI ROOM B-128 MRI EQUIPMENT ROOM B-127 CORRIDOR B-125 D D LP1 LP1 LP1 LT1 b LD1 a LD1 a LD1 a LD1 a LD1 a LD1 a LD1 a LD1 a LD1 a LD1 a LP1 a b 1 2 3 3 EM FD FD FDVC FDVC MGC V XFC FD XFC XFC FD FD FD FD FD FDFDFD PACS PROJECT AREA ELEVATOR #1 ELEVATOR #1 AREAWAY VI EWER VI EWER BENCH BENCH BENCH BENCH F. F. ELEV. = 218'- 6" F. F. ELEV. = 218'- 11" F. F. ELEV. = 218'- 6" F. F. ELEV. = 218'- 11" F. F. ELEV. = 218'- 11" F. F. ELEV. = 218'- 5 3/ 4"F. F. ELEV. = 218'- 6" LI NE O F RO OM ABO VE C.G. C.G.C.G.C. G.C. G. C. G. C. G. FD SUMP RAMP U P 1:12 SL O P E M A X . T Y P . RAMP UP1:12 SLOPE MAX. TYP. RAM P DN DN KEYPADENTRY 64 GOTHIC STREET, SUITE 1 NORTHAMPTON, MA 01060 T 413.585.1512 F 413.586.7945 www.haiarchitecture.com Tel: (860) 286-9171 www.bvhis.com 206 West Newberry Road Bloomfield, CT 06002 servicesintegrated H AI Architecture, Inc. SEAL: PROJECT NO: BVH PROJECT NO: PROJECT MANAGER: DRAWN BY: COPYRIGHT: XX-XXXX 21-20-207 SHEET TITLE: CONSULTANT: MRI Replacement Cooley Dickinson Hospital 30 Locust Street Northampton, MA 01060 Renovation for: PROJECT: REFER TO MEP DRAWINGS FOR ADDITIONAL INFORMATION. DATE: PROJECT AREA KEY PLAN E101 02.15.2021 ELECTRICAL LIGHTING PLAN BPW JSCPLANNORTH1/4" = 1'-0" ELECTRICAL LIGHTING GROUND FLOOR PLAN LIGHTING GENERAL NOTES: 1. COORDINATE EXACT LOCATION OF ELECTRICAL DEVICES SUCH AS LIGHTING FIXTURES, EXIT SIGNS, SWITCHES, CONTROL DEVICES (SENSORS), ETC., WITH ARCHITECTURAL PLANS, ELEVATION DETAILS AND MANUFACTURER’S EQUIPMENT SUBMITTALS/LAYOUTS (AS APPLICABLE) PRIOR TO START OF WORK. ALL DEVICES WITHIN MECHANICAL AND ELECTRICAL ROOMS SHALL BE COORDINATED WITH PANELS, DUCTWORK, PIPING, CONDUITS, ETC. FOR FINAL LOCATIONS. 2. TYPICAL HOMERUN FOR EACH BRANCH CIRCUIT SHALL BE FED BY 2#12, 1# 12G., IN A 3/4” CONDUIT TO A 20A-1P CIRCUIT BREAKER IN PANELBOARD DESIGNATED, UNLESS OTHERWISE NOTED. EACH CIRCUIT SHALL HAVE A DEDICATED NEUTRAL AND GROUNDING CONDUCTOR. 3. REFER TO ELECTRICAL SPECIFICATIONS FOR PROJECT REQUIREMENTS, PROCEDURES, INSTALLATION STANDARDS AND ADDITIONAL INFORMATION. LIGHTING DRAWING NOTES: CONTRACTOR TO VERIFY CLEARANCES PRIOR TO INSTALLATION OF LUMINAIRES. DECUCT ALTRERNATE - PROVIDE 4X4 LT1 LAYOUT EXISTING EMERGENCY LIGHITNG BRANCH CIRCUIT SHALL BE REUSED. 1 LIGHTING GENERAL NOTES: 4. COORDINATE MECHANICAL, ELECTRICAL, PLUMBING AND FIRE PROTECTION SYSTEMS IN WALLS AND ABOVE CEILING SPACE TO PERMIT THE PLACEMENT OF LIGHTS, DEVICES AND ASSOCIATED EQUIPMENT IN THE LOCATION SHOWN ON THE ARCHITECTURAL DRAWINGS. 5. REFER DIRECTLY TO THE ARCHITECTURAL ELEVATION DRAWINGS TO CONFIRM MOUNTING LOCATION AND HEIGHTS OF ELECTRICAL DEVICES. COORDINATE DIMENSIONS AND PLACEMENT WITH ARCHITECT PRIOR TO ROUGH-IN OF DEVICE. 6. EXISTING CONDITIONS BASED ON LIMITED FIELD SURVEY AND EXISTING DESIGN DRAWINGS. EXACT LOCATIONS OF EQUIPMENT, DEVICES, ETC. MAY VARY IN FIELD. COORDINATE CONDITIONS DURING DEMOLITION PHASE AND REPORT SIGNIFICANT FINDINGS AND DISCREPANCIES TO ENGINEER/ARCHITECT. 7. MAINTAIN EXISTING BRANCH CIRCUIT CONTINUITY OF ADJACENT SPACES THROUGHOUT DEMOLITION, CONSTRUCTION AND FOR FINAL COMPLETION OF PROJECT. COORDINATE WITH FACILITIES AND PROJECT MANAGER. 2 3 MARK DATE ISSUE 02.15.2021 PERMIT SET 21-20-207 2/12/2021 CLOSET B-128A MRI ROOM B-128 MRI EQUIPMENT ROOM B-127 CORRIDOR B-125 CRAC-1 CRAC-2 2 3 1 4 FD FD FDVC FDVC MGC V XFC FD XFC XFC FD FD FD FD FD FDFDFD PACS PROJECT AREA ELEVATOR #1 ELEVATOR #1 AREAWAY VI EWER VI EWER BENCH BENCH BENCH BENCH F. F. ELEV. = 218'- 6" F. F. ELEV. = 218'- 11" F. F. ELEV. = 218'- 6" F. F. ELEV. = 218'- 11" F. F. ELEV. = 218'- 11" F. F. ELEV. = 218'- 5 3/ 4"F. F. ELEV. = 218'- 6" LI NE O F RO OM ABO VE C.G. C.G.C.G.C. G.C. G. C. G. C. G. FD SUMP RAMP U P 1:12 SL O P E M A X . T Y P . RAMP UP1:12 SLOPE MAX. TYP. RAM P DN DN KEYPADENTRY 64 GOTHIC STREET, SUITE 1 NORTHAMPTON, MA 01060 T 413.585.1512 F 413.586.7945 www.haiarchitecture.com Tel: (860) 286-9171 www.bvhis.com 206 West Newberry Road Bloomfield, CT 06002 servicesintegrated H AI Architecture, Inc. SEAL: PROJECT NO: BVH PROJECT NO: PROJECT MANAGER: DRAWN BY: COPYRIGHT: XX-XXXX 21-20-207 SHEET TITLE: CONSULTANT: MRI Replacement Cooley Dickinson Hospital 30 Locust Street Northampton, MA 01060 Renovation for: PROJECT: REFER TO MEP DRAWINGS FOR ADDITIONAL INFORMATION. DATE: PROJECT AREA KEY PLAN E102 02.15.2021 ELECTRICAL POWER AND SPECIAL SYSTEMS PLAN Author Checker POWER & SPECIAL SYSTEMS GENERAL NOTES: 1. COORDINATE EXACT LOCATION OF ELECTRICAL DEVICES SUCH AS PANELBOARDS, RECEPTACLES, DATA/TEL, FIRE ALARM DEVICES, ACCESS DEVICES, SECURITY DEVICES, A/V DEVICES, ETC., WITH ARCHITECTURAL PLANS, ELEVATION DETAILS AND MANUFACTURER’S EQUIPMENT SUBMITTALS/LAYOUTS (AS APPLICABLE) PRIOR TO START OF WORK. ALL DEVICES WITHIN MECHANICAL AND ELECTRICAL ROOMS SHALL BE COORDINATED WITH PANELS, DUCTWORK, PIPING, CONDUITS, ETC. FOR FINAL LOCATIONS. 1. TYPICAL HOMERUN FOR EACH BRANCH CIRCUIT SHALL BE FED BY 2#12, 1# 12G., IN A 3/4” CONDUIT TO A 20A-1P CIRCUIT BREAKER IN PANELBOARD DESIGNATED, UNLESS OTHERWISE NOTED. EACH CIRCUIT SHALL HAVE A DEDICATED NEUTRAL AND GROUNDING CONDUCTOR. 2. REFER TO ELECTRICAL SPECIFICATIONS FOR PROJECT REQUIREMENTS, PROCEDURES, INSTALLATION STANDARDS AND ADDITIONAL INFORMATION. 3. REFER TO ‘MEP’ SERIES DRAWINGS FOR ELECTRICAL LEGEND, ABBREVIATIONS, CODE REFERENCES AND SCHEDULES. 4. REFER TO #E4 SERIES DRAWINGS FOR ELECTRICAL DETAILS, RISER DIAGRAMS, SCHEMATICS AND WIRING DIAGRAMS. 5. COORDINATE MECHANICAL, ELECTRICAL, PLUMBING AND FIRE PROTECTION SYSTEMS IN WALLS AND ABOVE CEILING SPACE TO PERMIT THE PLACEMENT OF LIGHTS, DEVICES AND ASSOCIATED EQUIPMENT IN THE LOCATION SHOWN ON THE ARCHITECTURAL DRAWINGS. 6. CONTRACTOR SHALL NOTE SENSITIVE WORK AREAS THAT REQUIRE SPECIAL ATTENTION TO SCOPE OF WORK, HOURS OF WORK AND COORDINATION WITH STAFF & ENVIRONMENT OF AREAS. VERIFY WITH PROJECT MANAGER AND STAFF FOR SPECIAL CONDITIONS. 7. ALL WORK ASSOCIATED WITH THE EXISTING POWER DISTRIBUTION SYSTEM, TECHNOLOGY SYSTEM, FIRE ALARM SYSTEM AND NURSE CALL SYSTEM SHALL BE CLOSELY COORDINATED WITH THE HOSPITAL BUILDING FACILITIES AND OWNER PROJECT MANAGER. THIS INCLUDES SHUTDOWNS OF SERVICES, MODIFICATIONS TO SYSTEMS, AND VERIFICATION OF EXISTING SYSTEM DEVICES AND WIRING. 8. 9.REFER DIRECTLY TO THE ARCHITECTURAL ELEVATION DRAWINGS TO CONFIRM MOUNTING LOCATION AND HEIGHTS OF ELECTRICAL DEVICES. COORDINATE DIMENSIONS AND PLACEMENT WITH ARCHITECT PRIOR TO ROUGH-IN OF DEVICE. 9. EXISTING CONDITIONS BASED ON LIMITED FIELD SURVEY AND EXISTING DESIGN DRAWINGS. EXACT LOCATIONS OF EQUIPMENT, DEVICES, ETC. MAY VARY IN FIELD. COORDINATE CONDITIONS DURING DEMOLITION PHASE AND REPORT SIGNIFICANT FINDINGS AND DISCREPANCIES TO ENGINEER/ARCHITECT. POWER & SPECIAL SYSTEMS GENERAL NOTES: 10. MAINTAIN EXISTING BRANCH CIRCUIT CONTINUITY OF ADJACENT SPACES THROUGHOUT DEMOLITION, CONSTRUCTION AND FOR FINAL COMPLETION OF PROJECT. COORDINATE WITH FACILITIES AND PROJECT MANAGER. 11. NOTE THAT RECEPTACLE DEVICES SHOWN WITH THE ‘EX’ DESIGNATION ARE EXISTING DEVICES. BACKBOXES AND CONDUITS MAY BE REUSED IN THESE POSITIONS. HOWEVER ALL DEVICES AND CONDUCTORS SHALL BE REPLACED WITH NEW IN SAME LOCATION. 12. ELECTRICAL CONTRACTOR SHALL REFER DIRECTLY TO THE PROJECT SITE SPECIFIC DRAWINGS BY THE MEDICAL EQUIPMENT VENDOR (GENERAL ELECTRIC). THESE DRAWINGS ARE A PART OF THE CONTRACT DOCUMENTS AND ALL INFORMATION AND REQUIREMENTS SHALL BE CONSIDERED INCLUDED IN THE ELECTRICAL SCOPE OF WORK. REFER TO DRAWINGS #E SERIES FOR REQUIREMENTS ON WIRING TROUGHS, CONDUITS, CONDUCTORS, ALL ROUTING AND INTERCONNECTION WIRING, ACCESSORIES AND OTHER ITEMS REQUIRED FOR THE COMPLETE INFRASTRUCTURE AND INSTALLATION OF THE MRI SYSTEM. VENDOR DRAWINGS CONTAINS A RESPONSIBILITY MATRIX TO DETERMINE COMPONENT (CONDUIT AND CABLING) AND SYSTEM REQUIREMENTS FOR MANUFACTURER AND FOR ELECTRICAL CONTRACTOR. 13. CONDUITS DESIGNATED FOR THE MEDICAL EQUIPMENT (PER VENDOR SITE SPECIFIC DRAWINGS) THAT ARE TO BE RUN BENEATH FLOOR (IN CEILING SPACE OF LEVEL BELOW) SHALL BE CONDUITS RUN TO PULL BOXES WITH PULL STRINGS [AS OPPOSED TO WIRING TROUGH OR TRAY]. THIS ENABLES ALL MEDICAL EQUIPMENT WIRING TO BE INSTALLED FROM PROCEDURE ROOM SIDE IN LIEU OF ACCESS TO CEILING SPACE BELOW AT A LATER DATE. COORDINATE DIRECTLY WITH THE MEDICAL EQUIPMENT VENDOR SITE SPECIFIC DRAWINGS. 14. ALL CONDUIT RUNS REQUIRED FOR THE MEDICAL VENDOR EQUIPMENT SHALL BE ‘EMT’ UNLESS OTHERWISE APPROVED BY VENDOR OR VERIFIED BY THE DESIGN TEAM. FLEXIBLE METALLIC CONDUIT SHALL BE CONSIDERED ON A CASE BY CASE BASIS. COORDINATE ROUTING AND CONDUIT SIZES WITH MEDICAL EQUIPMENT VENDOR AND ENGINEER. 15. CONSTRUCTION MANAGER AND ELECTRICAL CONTRACTOR SHALL NOTIFY OWNER OF PROPOSED SHUTDOWN SCHEDULE TO IMPLEMENT THE REQUIRED MODIFICATIONS TO THE NORMAL AND THE ESSENTIAL SWITCHGEAR IN THE MAIN ELECTRIC ROOM. REVIEW THE PROPOSED SCOPE OF WORK AND IDENTIFY A METHOD OF PROCEDURES PRIOR TO ORDERING EQUIPMENT AND ROUTING ANY CONDUIT SYSTEMS. COORDINATE THIS WITH OWNER AND HOSPITAL FACILITIES FOR RECOMMENDATION OF TIMES AND SCHEDULING WORK AROUND HOSPITAL REQUESTS. 16. ALL SYSYEMS (ELECTRICAL INFRASTRUCTURE) AND APPLICABLE DEVICES WITHIN THE PROCEDURE ROOM SHALL BE NON-FERROUS. (TYPICAL) POWER & SPECIAL SYSTEMS DRAWING NOTES: PROVIDE NEW 300A BREAKER IN PANEL P1 FOR NEW MRI UPS. PROVIDE (4) # 350 AND (1) #4G IN 4" CONDUIT. PROVIDE NEW 3-POLE, 30 A FUSED DISCONNECT FOR CRAC-1. CIRCUIT TO NEW 30A BREAKER IN PANEL EE-US1. PROVIDE (3) #10 & (1) #10G IN 1" CONDUIT. PROVIDE NEW 3-POLE, 30 A FUSED DISCONNECT FOR CRAC-2. CIRCUIT TO NEW 30A BREAKER IN PANEL EE-US1.PROVIDE (3) #10 & (1) #10G IN 1" CONDUIT. DISCONNECT AND REMOVE EXISTING RECEPTACLES, DEVICES, AND OTHER WALL MOUNTED ACCESSORIES FOR THE REPLACEMENT OF THE SHIELDING IN WALL. REPLACE EXISTING RECEPTACLES IN SAME LOCATION AND RECONNECT TO EXISTING BRANCH CIRCUIT PROVIDED BOX EXTENDERS AS APPLICABLE TO ACCOMMODATE NEW SHIELDING. 1 2 3 4 MARK DATE ISSUE 02.15.2021 PERMIT SET 21-20-207 2/12/2021