21-02-12 Sawcut Pier                    February 12, 2021    Collin Rostohar  BBL Construction Services  302 Washington Ave Extension  Albany, New York 12303    Reference: Lia Honda – Northampton    Sawcut at Existing Concrete Pier    Collin    To facilitate installation of a floor drain vent stack, the contractor sawcut at portion of an existing concrete pier  below the floor level in the new car delivery area that is being constructed. The existing concrete pier supports an  existing pre‐engineered building column that in turn supports the existing roof structure above.  The existing  concrete pier extends down to an existing footing below the grade for frost protection. The portion of concrete  removed does not pass directly under the column bearing.     We have reviewed the existing building structure to determine the load that the damaged pier is supporting and  found that the remaining portion of the existing concrete pier that was sawcut still has more than enough capacity  to support the steel column that is bearing on it. It is our professional opinion that the new vent pipe can remain  where it is currently installed, and that the area can be prepared to receive the new concrete floor slab.    If you have any additional concerns, please contact us.     Respectfully        Dale Meszler, P.E.