Loading...
Main Floor Northampton Finalrl\,,7,.,., 1) THESE DRAWINGS SHALL BE ACCEPTED BY THE OWNER AND ALL CONTRACTORS WITH THE UNDERSTANDING THAT THE DRAWINGS ONLY REPRESENT THE OWNERS THOUGHTS AND DESIRES AND SHALL BE VIEWED AS SUCH. THEY SHALL NOT BE ACCEPTED AS COMPLETE IN DESIGN NOR TAKEN THAT ALL PORTIONS ARE CORRECT IN ALL DETAILS. NO FAULT SHALL BE PLACED UPON THE DESIGNER FOR ANY AND ALL PROBLEMS, MISTAKES, INCOMPLETENESS, OR CHANGES, ETC. THAT OCCUR OUT OF USE OF THIS SET OF DRAWINGS. 2) CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS. 3) CONTRACTOR SHALL PERFORM ALL WORK IN THE BEST WORKMANLIKE MANNER BYMECHANICS SKILLED IN THEIR SPECIFIC TRADES. 4) CONTRACTOR SHALL BE RESPONSIBLE IN OBTAINING AND PAYING FOR ALL PERMITS. 5) CONTRACTOR SHALL SCHEDULE THEIR WORK FOR SPEEDY COMPLETION AND TO CAUSE MINIMUM DISRUPTION TO OTHER CONTRACTORS. 6) CONTRACTOR SHALL CARRY ALL NECESSARY INSURANCE TO FULLY INDEMNIFY AND HOLD HOMEOWNERS AND ALL THEIR REPRESENTATIVES HARMLESS AGAINST ALL LOSSES, EXPENSES, AND CLAIMS FOR DEATH, PERSONAL INJURY, AND DAMAGES ARISING OUT OF WORK DONE BY ANY AND ALL CONTRACTORS O AND THEIR SUBCONTRACTORS. 1) ALL WORK SHALL CONFORM TO AND BE ACCORDING TO ALL LOCAL REGULATIONS AND THE STATE BUILDING CODES AND PRACTICES. S) ALL WORK SHALL FOLLOW ALL MANUFACTURERS ' RECOMMENDATIONS AND INSTRUCTIONS, INCLUDING BUT NOT LIMITED TO FASTENING REQUIREMENTS, ERECTING, STORING, AND SAFETY RECOMMENDATIONS AND FINISHING REQUIREMENTS. THERE SHALL BE NO DEVIATIONS OR SHORTCUTS OF ANY KIND. JUST O BECAUSE ONE DID IT IN THE PAST DOES NOT MEAN IT IS A i PROPER METHOD OR THAT IT WAS CORRECT 1 S) LOADS ARE AS FOLLOWS: FLOOR LIVE LOAD = 40 PSF FLOOR DEAD LOAD 12 PSF ` USE GROUP = R-3 ROOF SNOW LIVE LOAD = 35 PSF it ROOF DEAD LOAD = 15 PSF WIND LOAD = 100 MPH 10) THIS SET OF DRAWINGS IS PROTECTED BY COPYRIGHT. NO REPRODUCTION OF ANY KIND, ALTERATIONS, OR USE IS PERMITTED WITHOUT PERMISSION OF THE DESIGNER. 11) ALL STRUCTURAL LUMBER SHALL BE SPF 02 GRADE OR BETTER. ALL WOOD MEMBEReSHALL BE NAILED IN ACCORDANCE WITH MASS. STATE CODE FASTENING SCHEDULE, APPENDIX C. 12) I -JOISTS AND LVL BEAMS SHALL BE APA APPROVED. 13) LEAVE CEILING BEAMS AND JOISTS EXPOSED IN LIVING ROOM AREA. LIGHTLY SAND -BLAST SURFACES TO REMOVE DIRT t GRIME REPLACE 3 JOISTS, WHICH ARE SPLIT, USING EXISTING JOISTS FROM KITCHEN AREA WHERE NEW STAIRS ARE TO BE LOCATED. 14) DEMO ALL JOISTS IN KITCHEN AREA AND REPLACE WITH NEW II -1/6" I -JOISTS AT 16" o.c. r r 0 v x �4 N 34'-1" I I' -roll rJ�2" 3/2" Tl 3/2" 3i2 2'-roll x 4'-roll 1 1 4'-0" x I'-6" c1l BATH aOFFICE UP KITCHEN 2'-4" D - 2'-4" 3 0 Q lll 0 LIVING ROOM_ ENTRY o TALL OO PANTRY Fo <.:: b 2'-roll 2'-ro" x 4'-roll 21-(0" 13'-(0" 2'-6" x 4'-(o" ol Elm 2'-&" x 4'-&" m I V x O S, a) i S, d) aLcaD by. TWN o \vm 5y, TLN NONE TAW DATA+ Jut'L 2020 '&�T L"4