Loading...
SIGNED 8 KINGSLEYMUNICIPAL SEWER AVAILABILITY APPLICATION Northampton Streets Department 125 Locust Street Northampton, MA 01060 413-587-1570 A Department of Public Works Trench Permit and Sewer Entry Permit shall be required prior to any construction or connection activity associated with this application. Size of Service Connection: Type of Service Connection: Comments: Service must be inspected and the video provided and approved by the DPW before existing service can be reused. City Requires 6" cleanout installed at City Property Line A corresponding "sewer entrance fee" shall be paid prior to making any connection to the municipal sewer system. Arrangements of such installation shall be made with the Northampton Streets Department with a minimum of 5 working days notificaiton. All work shall conform to Northampton Streets Department specifications. *Fees will be charged based on current fee structure at the time of entry application If this availability is for new construction, it must be submitted electronically or mailed to the Building Inspector. Location: Date of Inquiry: Inquirer with contact info: Reason for Request: Municipal Sewer Main in Front of Location: Size of Sewer Main: Depth of Sewer Main: Length of Sewer Main: Domestic Tie In: NOTE: If this availability is for new construction, it must be submitted electronically or by mailed to the Building Inspector. Brendan Shea Sewer Dept. Foreman 8 KINGSLEY AVE 9/23/2020 JOHN KOWALSKI 237-0132 2 SINGLE FAMILY CONDO NEW CONSTRUCTION 8" 6' 266' 6" VC ($1,250) Material: Tie-in to Existing Sanitary Service: Yes VC Subdivision Tie In : Date: *Sewer Entry $ X 9/30/2020 No 1250 Age: X 1913 ($2,500) ($1,250) Director