Loading...
Frame To Column __ copy3-5/8" LEDGERLOKS-3 PER JOIST BAYDTT1Z DTT1Z DTT1Z DTT1Z 6X6 PT POST 6X6 PT POST Sum vertical load capacitiesof Boise joist & rimboard for Backer Block Optional SHIPPING INFORMATION:DESIGNED BY: Doug HodginsJOB: Prk HouseKeiter/Park house deckWest Hatfield Ma. 21 West St. rk Miles Inc. Scale: 1/2" = 1' NOTES:SHEET NUMBER: 11st walls LAYOUTFINALN/AN/AISSUE:DATE:N/AN/A12/15/20DESCRIPTION:FINALN/AN/Avertical load capacity.See Boise literature for joist vertical load capacity.See Boise literature for joist blockingLoad bearing wall above23/32" min. plywood/OSB birdsmouth cut in bottom 2x6 one side for 240 PLF max. 2x4 one side for 135 PLF max. DECK FRAMING PLAN 2X8 ROOF RAFTERS 16" O/C 2ND FLOOR FRAMING PLAN 2X12 ROOF RAFTERS 16” O/C 1ST FLOOR FRAMING PLAN 2X10 RAFTERS 16” O/C PRELIMINARY PLAN, NOT FOR CONSTRUCTION ROOF FRAMING PLAN ------- Floor Framing Material ------- Type Qty. Product Length ------ ---- ------- ------ J1 18 SYP (PT MCA) #1 2 x 10 12' 0" R1 2 v v 12' 0" Total length: 240' 0" ------- Beam & Ledger Material ------- Type Qty. Product Length ------ ---- ------- ------ G1 3 1-3/4x9-1/4 VERSA-LAM 2.0 2800 20' 0" Total length: 60' 0" G2 2 SYP (PT MCA) #1 2 x 10 14' 0" Total length: 28' 0" ------- Post Material ------- Type Qty. Product Length ------ ---- ------- ------ P1 2 Column by others 8' 1-1/8" Total length: 16' 2-1/4" All product names are trademarks of their respective owners CEILING FRAMING PLAN SOLID BLOCKING OR METAL BRIDGING CEILING FRAMING PLAN HEADER & BEAM LAYOUT ROOF TRUSSES 24” O/C OVERFRAME TO ROOF BELOW ITS2561188 TOP MOUNT HANGERS ITS25695 TOP MOUNT HANGERS HUS1.81/10 LVL HANGER HHUS410 LVL HANGER LSSUH310 HANGERS 2 SIMPSON STHD14 STRAPS EMBEDDED INTO POUR 3RD FLOOR FRAMING LAYOUT This layout has been created using the information from the plan provided, and/or verbal information from the general contractor. r.k Miles assumes no responsibility for this layout if altered during construction or any of the structural members shown are not supplied by r.k. Miles It is the responsibility of the building contractor / owner to install and / or oversee the installation of all the engineered wood components to assure compliance with the manufacturers specifications.If any changes are made to this project after the completion of our layout contact RK Miles immediately DESIGN ASSUMPTIONS ==================== Loads: T/C Live: 100 psf B/C Live: 0 psf T/C Dead: 10 psf B/C Dead: 0 psf Load Case: Live Deflection Criteria: L/360 Live L/240 Total Building Code: IBC/IRC (Allowable Stress De Design assumes continuous lateral bracing for both edges. ------------- Connector List ------------- ID# Qty Model Number Note Carrying mbr fasteners (top/face) Carried mbr fasteners (hip/jack) Skew Slope Top Detail ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------- H1 36 LUS210 8 10dx1.5" 4 10d C17128X.pdf ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------- ------- Connector Load Table ------- Max. down Max. up ID# Qty. (lbs) DOL (lbs) DOL Support type Member type Model # Skew Slope Top Note ------------------------------------------------------------------------------------------------------------------------------------- H1 18 630 100% lvl 1ply SYP (PT MCA) #1 2 x 10 (hs) 12 H2 18 630 100% Ledger 1ply SYP (PT MCA) #1 2 x 10 (hs) 12 8 5 4 9 l b s 3 5 2 4 l b s R1R1 J112" ocG13 plyG2 2 ply H1H15'11"12' 6"18' 5"11'10" SIMPSON LPC6Z SIMPSON LCE4 SIMPSON ABU66Z CONNECTION TO BASE OF POST ABOVE Doug - Please advise on an appropriate connection method between the 6x6 posts and the 3-ply beam (G-1) at Park House Porch restoration