Loading...
Barr_Mereschuk-69Barret- Residential Bldg BP Dear Town Inspections Officials, Please see our enclosed applications to permit a Solar Photovoltaic System in your jurisdiction. As you are likely aware, PV Squared is a worker-owned-cooperative B-Corp, employing 40+ people in Greenfield. We have installed thousands of PV Systems out of our Greenfield, MA Headquarters since 2002. PV Squared is committed to complying with all Commonwealth laws and regulations. Our worksite guidelines are created with the intention of exceeding all safety, electrical, and building requirements as defined by their respective jurisdictional entities. This includes the work of people from multiple disciplines, including electrical engineering, structural engineering, civil engineering, electricians, construction supervisors, roofers, and their associated helpers. We are a company that values training and education. We make certain that every individual is qualified for the roles and responsibilities that they assume. It is our policy to pay for the employees travel and training time and cost of the education, including CSL and Journeyman and Master Electrician classes. As an electrical contractor we are furthermore guided by the January 30, 2009 Massachusetts Board of State Examiners of Electricians (BSEE) judgements, and rulings that have followed. We pay strict adherence to these mandates and all electrical work is conducted by an electrician and an electrician’s apprentice in a 1:1 ratio. We also understand that non-electrical tasks associated with a Solar installation can be completed by non-electrical workers, such as CSLs and others. I have attached our installation policy for your review, as well as a list of example non-electrical tasks. Should you have any questions or concerns regarding this policy or delineation of work, please let us know. We are a learning organization that is always trying to improve on what we do. Respectfully, Maya Fulford Installation Manager City of Northampton Building Department 212 Main Street Room 100 Northampton, MA 01060 phone 413-587-1240 Fax 413-587-1272 Department use only Status of Permit: Curb Cut/Driveway Permit ____________________ Sewer/Septic Availability______________________ Water/Well Availability________________________ Two Sets of Structural Plans___________________ Plot/Site Plans_____________ Other Specify__________ APPLICATION TO CONSTRUCT, ALTER, REPAIR, RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 - SITE INFORMATION 1.1 Property Address: This section to be completed by office Map _______________ Lot __________________Unit_________ Zone ________________ Overlay District______________ Elm St. District__________________ CB District______________ SECTION 2 - PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: ______________________________________________________ Name (Print) _____________________________________________________ Signature _____________________________________________________ Current Mailing Address: ______________________________________________________ Telephone 2.2 Authorized Agent: ______________________________________________________ Name (Print) ______________________________________________________ Signature ______________________________________________________ Current Mailing Address: ______________________________________________________ Telephone SECTION 3 - ESTIMATED CONSTRUCTION COSTS Item Estimated Cost (Dollars) to be completed by permit applicant Official Use Only 1. Building (a) Building Permit Fee 2. Electrical (b) Estimated Total Cost of Construction from (6) 3. Plumbing Building Permit Fee 4. Mechanical (HVAC) 5. Fire Protection 6. Total = (1 + 2 + 3 + 4 + 5)Check Number This Section For Official Use Only Building Permit Number:_______________________________ Date Issued:______________________________________________ Signature: ______________________________________________ Building Commissioner/Inspector of Buildings _______________________________ Date _______________________________________________________________@ ____________ EMAIL ADDRESS (REQUIRED; EITHER HOMEOWNER OR CONTRACTOR) Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning This column to be filled in by Building Department Lot Size Frontage Setbacks Front Side Rear L:______ R:______ L:______ R:______ Building Height Bldg. Square Footage % Open Space Footage (Lot area minus bldg & paved parking) % # of Parking Spaces Fill: (volume & Location) A.Has a Special Permit/Variance/Finding ever been issued for/on the site? NO DON'T KNOW YES IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO DON'T KNOW YES IF YES: enter Book Page and/or Document # B. Does the site contain a brook, body of water or wetlands? NO DON'T KNOW YES IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained Obtained , Date Issued: C.Do any signs exist on the property? YES NO IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property ? YES NO IF YES, describe size, type and location: E. Will the construction activity disturb (clearing, grading, excavation, or filling) over 1 acre or is it part of a common plan that will disturb over 1 acre? YES NO IF YES, then a Northampton Storm Water Management Permit from the DPW is required. SECTION 5- DESCRIPTION OF PROPOSED WORK (check all applicable) New House Addition Replacement Windows 0r Doors Alteration(s) Roofing Accessory Bldg. Demolition New Signs [ ] Decks [ ] Siding [ ] Other [ ] _________________________________________________________________ Brief Description of Proposed Work:________________________________________________________________________________________ Alteration of existing bedroom ______Yes ______ No Adding new bedroom _______ Yes _______ No Attached Narrative Renovating unfinished basement _______ Yes _______No Plans Attached Roll - Sheet 6a. If New house and or addition to existing housing, complete the following: a.Use of building : One Family _________ Two Family _________ Other __________ b.Number of rooms in each family unit:______________ Number of Bathrooms_____________ c. Is there a garage attached? _________ d.Proposed Square footage of new construction._____________________ Dimensions __________________________________ e.Number of stories? ________________________________ f.Method of heating? ________________________________ Fireplaces or Woodstoves ___________ Number of each ______ g.Energy Conservation Compliance. _____________________ Masscheck Energy Compliance form attached? _______________ h.Type of construction _______________ i.Is construction within 100 ft. of wetlands? ______ Yes ______ No. Is construction within 100 yr. floodplain ______Yes _____No j.Depth of basement or cellar floor below finished grade __________________________ k.Will building conform to the Building and Zoning regulations? ________ Yes _______ No . l.Septic Tank _____ City Sewer _______ Private well _______ City water Supply _______ SECTION 7a - OWNER AUTHORIZATION - TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I, _______________________________________________________________________________________, as Owner of the subject property hereby authorize ________________________________________________________________________________________________ to act on my behalf, in all matters relative to work authorized by this building permit application. ______________________________________________________________________________________________________________ Signature of Owner Date I, _______________________________________________________________________________________, as Owner/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate, to the best of my knowledge and belief. Signed under the pains and penalties of perjury. ______________________________________________________________________________________________________________ Print Name ______________________________________________________________________________________________________________ Signature of Owner/Agent Date SECTION 8 - CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: Name of License Holder :___________________________________________________________ ___________________________________________________________________________ Address ___________________________________________________________________________ Signature Telephone Not Applicable ! _____________________________________ License Number _____________________________________ Expiration Date 9. Registered Home Improvement Contractor: __________________________________________________________________________ Company Name __________________________________________________________________________ Address _________________________________________________Telephone_________________ _ Not Applicable ! _________________________________ Registration Number _________________________________ Expiration Date SECTION 10- WORKERS’ COMPENSATION INSURANCE AFFIDAVIT (M.G.L. c. 152, § 25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes....... !No...... ! The Commonwealth of Massachusetts Department of Industrial Accidents 1 Congress Street, Suite 100 Boston, MA 02114-2017 www.mass.gov/dia Workers’ Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers. TO BE FILED WITH THE PERMITTING AUTHORITY. Applicant Information Please Print Legibly Name (Business/Organization/Individual):______________________________________________________ Address:__________________________________________________________________________ City/State/Zip:_____________________________ Phone #:________________________________ *Any applicant that checks box #1 must also fill out the section below showing their workers’ compensation policy information. †Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. ‡Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees, they must provide their workers’ comp. policy number. I am an employer that is providing workers’ compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name:____________________________________________________________________________ Policy # or Self-ins. Lic. #:__________________________________________ Expiration Date:____________________ Job Site Address: City/State/Zip:______________________ Attach a copy of the workers’ compensation policy declaration page (showing the policy number and expiration date). Failure to secure coverage as required under MGL c. 152, §25A is a criminal violation punishable by a fine up to $1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to $250.00 a day against the violator. A copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify under the pains and penalties of perjury that the information provided above is true and correct. Signature: Date: Phone #: Official use only. Do not write in this area, to be completed by city or town official. City or Town: ___________________________________ Permit/License #_________________________________ Issuing Authority (circle one): 1. Board of Health 2. Building Department 3. City/Town Clerk 4. Electrical Inspector 5. Plumbing Inspector 6. Other ______________________________ Contact Person:_________________________________________ Phone #:_________________________________ Type of project (required): 7. New construction 8. Remodeling 9. Demolition 10 Building addition 11. Electrical repairs or additions 12. Plumbing repairs or additions 13. Roof repairs 14. Other____________________ 1. I am a employer with _________employees (full and/or part-time).* 2. I am a sole proprietor or partnership and have no employees working for me in any capacity. [No workers’ comp. insurance required.] 3. I am a homeowner doing all work myself. [No workers’ comp. insurance required.] † 4. I am a homeowner and will be hiring contractors to conduct all work on my property. I will ensure that all contractors either have workers’ compensation insurance or are sole proprietors with no employees. 5. I am a general contractor and I have hired the sub-contractors listed on the attached sheet. These sub-contractors have employees and have workers’ comp. insurance.‡ 6. We are a corporation and its officers have exercised their right of exemption per MGL c. 152, §1(4), and we have no employees. [No workers’ comp. insurance required.] Are you an employer? Check the appropriate box: reby certrtrtrttttttttrttrttrtrttttttttrtttttttttrtrttttttttrtttttttttttrtttttrttrtttttttttrttrtrttrtrttrttttrtrtrtrttrtttrrrttttrrtttrrrtrtrttttrrtrrtrrrttrttttrrttttrrrrtifififififififififififififififififiifififififififififififiififififififififiifififififififiififiififififiiffifififiiiiffifififffffffffffffffiffiffffiffffffiffffffffiffffffffifffffffififffffffffffffffffffffffffffffffffffffffffffy yyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyy ununununnunununununununnunununununununununununuunnnunnunuunuununununuunuununuuuuuunununnuuuuuununnunuuuunnunuuuununnuuunnnuuuuunnnnuunuuunuuunnuuuuuuuunuunuuununnnuuunununnuunuunuunnnunnnnnunununuunnnunnunnunnnnunnndedededddeddedededdededededddddededededededdddddddeddedededddddeedeedddddeddededededdddedddeddddddedddddddddededddddeddeddededddddddddddddddddddddddddddddddddedddddddedddedeedeedeeeeeeedddeedeeeeedeeeeer thhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhe papppppppppppppppppapppppppppappppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppapppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppinininnininninnnininninininnnnnininnininnnnnninnnninnnninnnnnnnnnninnnnininnninnninnnnnnnniinninnninniis sssss anaaaaaaaad penalties of pe urrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrre:e:e:e::e:e::::::e:e:::e:::::eee:e::e::e:eeeeeee:::e:e:eeeeeee:e:eeeeeeeee:eeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee #: ge verification. i l lllll Dtit i thi t b Pioneer Valley PhotoVoltaics Cooperative Inc. DBA PV Squared Solar 311 Wells Street, SuiteB Greenfield MA 01301 413-772-8788 ✔48 ✔Solar PV Continental Indemnity/AUW 37-592871-01-03 01/01/2021 69 Barrett, Northampton MA 01060 9/21/2020 413-772-8788 12/27/2019 Webber & Grinnell 8 North King Street Northampton MA 01060 Linda Powers, CRIS (413) 586-0111 (413) 586-6481 lpowers@webberandgrinnell.com Pioneer Valley PhotoVoltaics Cooperative, Inc. Attn: Kim Pinkham 311 Wells Street, Suite B Greenfield MA 01301 Ohio Casualty/Liberty 24074 Ohio Security/Liberty 24082 Continental Indemnity/AUW Master Exp 1-2021 A BKS57072282 01/01/2020 01/01/2021 1,000,000 300,000 5,000 1,000,000 2,000,000 2,000,000 B $1K coll $1K comp BAS57072282 01/01/2020 01/01/2021 1,000,000 Underinsured motorist BI split limit 300,000 A USO57072282 01/01/2020 01/01/2021 3,000,000 3,000,000 C N 37-592871-01-03 (Ma & NY)01/01/2020 01/01/2021 1,000,000 1,000,000 1,000,000 A Commercial Property BKS57072282 01/01/2020 01/01/2021 Business Pers Property $1,750,000 Installation $25,000 Transportation $75,000 Worker's compensation ncludes Ma and NY Evidence of Insurance SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. INSURER(S) AFFORDING COVERAGE INSURER F : INSURER E : INSURER D : INSURER C : INSURER B : INSURER A : NAIC # NAME:CONTACT (A/C, No):FAX E-MAILADDRESS: PRODUCER (A/C, No, Ext):PHONE INSURED REVISION NUMBER:CERTIFICATE NUMBER:COVERAGES IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. OTHER: (Per accident) (Ea accident) $ $ N / A SUBR WVD ADDL INSD THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. $ $ $ $PROPERTY DAMAGE BODILY INJURY (Per accident) BODILY INJURY (Per person) COMBINED SINGLE LIMIT AUTOS ONLY AUTOSAUTOS ONLY NON-OWNED SCHEDULEDOWNED ANY AUTO AUTOMOBILE LIABILITY Y / N WORKERS COMPENSATION AND EMPLOYERS' LIABILITY OFFICER/MEMBER EXCLUDED?(Mandatory in NH) DESCRIPTION OF OPERATIONS belowIf yes, describe under ANY PROPRIETOR/PARTNER/EXECUTIVE $ $ $ E.L. DISEASE - POLICY LIMIT E.L. DISEASE - EA EMPLOYEE E.L. EACH ACCIDENT EROTH-STATUTEPER LIMITS(MM/DD/YYYY)POLICY EXP(MM/DD/YYYY)POLICY EFFPOLICY NUMBERTYPE OF INSURANCELTRINSR DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) EXCESS LIAB UMBRELLA LIAB $EACH OCCURRENCE $AGGREGATE $ OCCUR CLAIMS-MADE DED RETENTION $ $PRODUCTS - COMP/OP AGG $GENERAL AGGREGATE $PERSONAL & ADV INJURY $MED EXP (Any one person) $EACH OCCURRENCEDAMAGE TO RENTED $PREMISES (Ea occurrence) COMMERCIAL GENERAL LIABILITY CLAIMS-MADE OCCUR GEN'L AGGREGATE LIMIT APPLIES PER: POLICY PRO-JECT LOC CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY) CANCELLATION AUTHORIZED REPRESENTATIVE ACORD 25 (2016/03) © 1988-2015 ACORD CORPORATION. All rights reserved. CERTIFICATE HOLDER The ACORD name and logo are registered marks of ACORD HIREDAUTOS ONLY SOLAR INDIVIDUAL PERMIT PACKAGE BARR RESIDENCE69 BARRETT STNORTHAMPTON, MA 01060COVER PAGEPV-G.0NOT TO SCALEBARR RESIDENCE 69 BARRETT ST NORTHAMPTON, MA 01060 9.10 kW DCROOF MOUNTED PHOTOVOLTAIC SYSTEMSHEET INDEXPV-G.0COVER PAGEPV-A.1ARRAY LAYOUTPV-E.1LINE DIAGRAMPV-E.2ELECTRICAL CALCSPV-P.1PLACARDSsite mapNCONTACT:MATT VALLIEREMATTV@PVSQUARED.COOP(413) 992-7252vicinity mapNSYSTEM·28 MODULES·9.10 KWMODULES·REC·REC325NPINVERTER(S)·SOLAREDGE·SE7600H-USNAMASTE DESIGNER:TODDHAMMERBACHERAUTHORITY HAVING JURISDICTIONBUILDING AUTHORITYELECTRICAL: ROGER MALO / BUILDING: KEVINROSSCODE REFERENCENEC 2020ELECTRICAL UTILITY COMPANYNGRIDDESIGN CRITERIADESIGN WIND LOAD113 MPHDESIGN ROOF SNOW LOAD50 PSFEXPOSURE CATEGORYCHIGH TEMP (ASHRAE 2% HIGH)29°CLOW TEMP (ASHRAE EXTREME LOW)-20°CROOF TYPEASPHALT SHINGLEPHOTOVOLTAIC SYSTEM DETAILSMODULE RATING (STC, DC)325W (28 PCS)INVERTERSOLAREDGE SE7600H-USRACKING SYSTEMIRONRIDGE XR100 W/ FLASHFOOT2DATA ACQUISITIONTBD6707 winchester circle, boulder, co 80301888 federal blvd, denver, co 80204www.namastesolar.com - 303.447.0300DESIGNER CONTRACTOR311 Wells Street, Su ite B, Greenfield, MA 01301pvsquared.coop · 413.772.8788PHONE:(413) 835-5969E-MAIL:SBARR107@GMAIL.COM ROOF TYPE: ASPHALT SHINGLEATTACHMENT AND RACKING TYPE:IRONRIDGE XR100 W/ FLASHFOOT2PV ARRAY = 504 SQUARE FEETMAX ATTACHMENT SPAN = 48"MAX CANTILEVER = 19.2"ATTACHMENTS SHALL BE STAGGEREDSO THE LOAD IS DISTRIBUTED EVENLYTO RAFTERS UNDERNEATH THE ARRAY.ROOF CONSTRUCTIONNARRAYLAYOUTPV-A.1NOT TO SCALEMOD QTY16TILT25°AZIMUTH183°1222°183°SUB-ARRAY INFORMATIONARRAY 1ARRAY 2STRING 212STRING 116STRING CONFIGURATIONstring size does not varySTRINGSQTYSYSTEM·28 MODULES·9.10 KWMODULES·REC·REC325NPINVERTER(S)·SOLAREDGE·SE7600H-USNAMASTE DESIGNER:TODDHAMMERBACHERSOLAR INDIVIDUAL PERMIT PACKAGE BARR RESIDENCE 69 BARRETT ST NORTHAMPTON, MA 01060 6707 winchester circle, boulder, co 80301888 federal blvd, denver, co 80204www.namastesolar.com - 303.447.0300DESIGNER CONTRACTOR311 Wells Street, Suite B, Greenfield, MA 01301pvsquared.coop · 413.772.8788CONTACT:MATT VALLIEREMATTV@PVSQUARED.COOP(413) 992-7252MODULE MODEL: REC325NPMODULE DIMENSIONS: 65.94" X 39.25CLAMP BETWEEN:8.2" - 20.5" ON THE LONG SIDE4" - 9.8" ON THE SHORT SIDEMODULE CLAMP ZONES39.25"65.94"8.2"20.5"4"9.8"ARRAY 1ARRAY 2ALL RAFTERS 16" O.C.RAILATTACHMENTSinvMSPINVERTER - INTERIORMAIN SERVICE PANEL - INTERIORmpv-mUTILITY PRODUCTION METER - EXTERIORacMAIN BILLING METER - EXTERIORPV AC DISCONNECT - EXTERIOR New England Construction Engineering, PLC 436 Campbell Street (NECE) Structural Construction Solutions White River Junction, VT 05001 Jonathan Rugg, P.E. 603-903-9798 j.rugg@NewEnglandConstructionEngineering.com   July 29, 2020      Ms. Madeleine Geschwind  Pioneer Valley PhotoVoltaics Cooperative, Inc.  311 Wells Street, Suite B  Greenfield, MA 01301    Re: Barr & Mereschuk residence, Northampton, MA  PV Squared Project No. 12248  NECE Project No. 20‐00 T‐24    Dear Ms. Geschwind,    At your request New England Construction Engineering, PLC (NECE) has reviewed the  information that Pioneer Valley PhotoVoltaics Cooperative, Inc. (PV Squared) provided on the  Barr & Mereschuk residence, at 69 Barrett Street, in Northampton, MA. The purpose of this  review was to provide an opinion regarding the structure's ability to support a proposed rooftop  mounted photovoltaic (PV) array. The information that you provided is attached to this letter for  reference.     You are proposing to mount PV panels on the south face of the house and the attached garage.  The house is a one‐story ranch. The house measures approximately 25’x42’. The house has a  gable roof which is symmetric about the peak. The roof has a 25‐degree pitch. The roof is  supported by 2x6 rafters at 16” O.C. Ceiling joist resist the outward end reaction of the rafters  on the walls. The roof has solid board sheathing and asphalt shingles.     The attached garage measures approximately 24’x24’. The roof has a 22‐degree pitch. The roof  is framed with site‐built trusses at 16” O.C. These trusses have 2x6 top chords, 2x4 bottom  chords, and 2x4 web members in a fink truss configuration. The members are connected with  plywood gussets. The roof has solid board sheathing and asphalt shingles.     NECE’s review analysis included controlling gravity load combinations (snow and dead load).  Lateral loads (wind and seismic) are excluded from this review and report. Consideration of  snow loads included both balanced and unbalanced conditions.     Conclusion:  Based on the information that you provided, I conclude that the house and garage roof will  support your proposed PV array. I base this opinion on the following. I assume that the PV  panels will be installed parallel to the roof, eliminating any additional wind load. Owing to their  New England Construction Engineering, PLC PV Squared – Barr & Mereschuk Jonathan Rugg, P.E. Northampton, MA Page 2 of 2 smooth surface, the PV panels will shed snow more readily than the existing asphalt roofing.  The ground snow load (Pg) for Northampton is 40psf. The minimum flat roof snow load (Pf) is  also 35psf. The information that you provided indicates that the proposed panels weigh 2.2psf.     In summary, in my opinion, the roof will support your proposed PV array.     Thank you for the opportunity to assist with this project. If I can be of further assistance, please  contact Jonathan Rugg at NECE.       Sincerely,           Jonathan Rugg, P.E.    New England Construction Engineering, PLC.      Attachments:    ‐Building Information  325 wp Power ELIGIBLE FOR PREMIUM FULL BLACK MONO N-TYPE SOLAR PANELS WITH SUPERIOR PERFORMANCE rec N-Peak black Series MONO N-TYPE: THE MOST EFFICIENT C-SI TECHNOLOGY SUPER-STRONG FRAME UP TO 7000 PA SNOW LOAD IMPROVED PERFORMANCE IN SHADED CONDITIONS FLEXIBLE INSTALLATION OPTIONS GUARANTEED HIGH POWER OVER LIFETIME NO LIGHT INDUCED DEGRADATION 28 [1.1] 1675±2.5 [65.94 ±0.1] 910 [35.8]382.5 [15.05]956 [37.64]997±2.5 [39.25 ±0.1]17 [0.7]45 [1.5] 1000 [39] 1200 [47] Scale: 1:1.57 11±0.2 [0.43 ±0.8]6.6±0.2 [0.26 ±0.08]20.5±0.5[0.78 ±0.08] 30 [1.18] 22.5 [0.9] 600 ±1 [23.6 ±0.04] GR GR GR GR CERTIFICATE BBA 0148 MCS Ref: PM-DS-11-03-Rev- E 06.20www.recgroup.com REC Group is an international pioneering solar energy company dedicated to empowering consumers with clean, affordable solar power in order to facilitate global energy transitions. Committed to quality and innovation, REC offers photovoltaic modules with leading high quality, backed by an exceptional low warranty claims rate of less than 100ppm. Founded in Norway in 1996, REC employs 2,000 people and has an annual solar panel capacity of 1.8 GW. With over 10 GW installed worldwide, REC is empowering more than 16 million people with clean solar energy. REC Group is a Bluestar Elkem company with headquarters in Norway, operational headquarters in Singapore, and regional bases in North America, Europe, and Asia-Pacific.Specifications subject to change without notice.WARRANTY GENERAL DATA Cell type: 120 half-cut n-type mono c-Si cells 6 strings of 20 cells in series Glass: 0.13” (3.2 mm) solar glass with anti-reflection surface treatment Backsheet: Highly reflective and resistant polymeric construction (black) Frame: Anodized aluminum (black) Junction box: 3-part, 3 bypass diodes, IP67 rated in accordance with IEC 62790 Cable: 12 AWG (4 mm²) PV wire, 39 + 47” (1 m + 1.2 m) in accordance with EN 50618 Connectors: Stäubli MC4 PV-KBT4/KST4, 12 AWG(4 mm²) in accordance with IEC 62852 IP68 only when connected Origin: Made in Singapore LOW LIGHT BEHAVIOUR TEMPERATURE RATINGS * MAXIMUM RATINGS MECHANICAL DATA Dimensions: 65.9 x 39.25 x 1.1” (1675 x 997 x 30 mm) Area: 17.98 ft²(1.67 m²) Weight: 39.7 lbs (18 kg) Operational temperature: -40 ... +85°C Maximum system voltage: 1000 V Design load (+): snow 4666 Pa (97.5 lbs/ft²)+ Maximum test load (+): 7000 Pa (146 lbs/ft²)* Design load (-): wind 2666 Pa (55.7 lbs/ft²)+ Maximum test load (-): 4000 Pa (83.5 lbs/ft²)* Max series fuse rating: 20 A Max reverse current: 20 A + Calculated using a safety factor of 1.5 * See installation manual for mounting instructions ELECTRICAL DATA @ STC Product code*: RECxxxNP Black Nominal Power - PMAX (Wp) 305 310 315 320 325 Watt Class Sorting - (W)0/+5 0/+5 0/+5 0/+5 0/+5 Nominal Power Voltage - VMPP (V) 33.3 33.6 33.9 34.2 34.4 Nominal Power Current - IMPP (A) 9.17 9.24 9.31 9.37 9.46 Open Circuit Voltage - VOC (V) 39.3 39.7 40.0 40.3 40.7 Short Circuit Current - ISC (A) 10.06 10.12 10.17 10.22 10.28 Panel Efficiency (%) 18.3 18.6 18.9 19.2 19.5 Values at standard test conditions (STC: air mass AM 1.5, irradiance 1000 W/m², temperature 25°C), based on a production spread with a tolerance of PMAX, VOC & ISC ±3% within one watt class. * Where xxx indicates the nominal power class (PMAX) at STC above. ELECTRICAL DATA @ NOCT Product code*: RECxxxNP Black Nominal Power - PMAX (Wp) 231 234 238 242 246 Nominal Power Voltage - VMPP (V) 31.1 31.4 31.7 32.0 32.2 Nominal Power Current - IMPP (A) 7.41 7.46 7.52 7.57 7.64 Open Circuit Voltage - VOC (V) 36.7 37.1 37.4 37.7 38.0 Short Circuit Current - ISC (A) 8.13 8.17 8.21 8.25 8.30 Nominal operating cell temperature (NOCT: air mass AM 1.5, irradiance 800 W/m², temperature 20°C, windspeed 1 m/s). * Where xxx indicates the nominal power class (PMAX) at STC above. CERTIFICATIONS Nominal Operating Cell Temperature: 44°C (±2°C) Temperature coefficient of PMAX: -0.35 %/°C Temperature coefficient of VOC: -0.27 %/°C Temperature coefficient of ISC: 0.04 %/°C *The temperature coefficients stated are linear values Rel. Efficiency (%)REC N-PEAK BLACK SERIES 100 200 300 400 500 600 700 800 900 1000 85 90 95 100 105 Irradiance (W/m²) Typical low irradiance performance of module at STC. UL 1703 ( Fire Type 2), IEC 61215, IEC 61730 & UL 1703; UL 61730, MCS 005, IEC 62804, IEC 61701, IEC 62716, IEC 62782 ISO 9001: 2015, ISO 14001: 2004, OHSAS 18001: 2007 Measurements in mm [in] Standard REC ProTrust Installed by an REC Certified Solar Professional No Yes Yes System Size Any ≤25 kW 25-500 kW Product Warranty (yrs)20 25 25 Power Warranty (yrs)25 25 25 Labor Warranty (yrs)0 25 10 Power in Year 1 98%98%98% Annual Degradation 0.5%0.5%0.5% Power in Year 25 86%86%86% See warranty documents for details. Some conditions apply. Cut Sheet See Description / Length 2.44 .58 1.25 2.34 1.99 .66 .46 APPROVED MATERIALS: 6005-T6, 6005A-T61, 6105-T5, 6N01-T6 (34,000 PSI YIELD STRENGTH MINIMUM) XR100 Rail v1.1 Cut Sheet v1.0 12.0 1 2 XR-100-SPLC-BD KIT, XR100 BONDED SPLICE 2) Screw, Self Drilling 1.93 1.24 .93 1) Splice, XR100, Mill 12" long .31 .42 .63 .15 #12-14 TYPE “B” THREAD XR-100 RAIL Property Value Material 6000 Series Aluminum Finish Mill Property Value Material 300 Series Stainless Steel Finish Clear XR100 Bonded Splice QuikFoot PRODUCT GUIDE Exploded Product View/B.O.M. – 1 Installation Instructions – 2 Cut Sheets – 3 Specifications – 4 STEEP-SLOPE APPLICATIONS®® QuikFoot – Product Guide ®®877-859-3947 EcoFasten Solar® All content protected under copyright. All rights reserved. 10/09/14 EcoFasten Solar products are protected by the following U.S. Patents: 8,151,522 B2 8,153,700 B2 8,181,398 B2 8,166,713 B2 8,146,299 B2 8,209,914 B2 8,245,454 B2 8,272,174 B2 8,225,557 B2 Required Tools 1.1 Exploded Product View, Bill of Materials Materials Needed for Assembly Item No. Description of Material/Part Quantity 1 QuikFoot Base Plate 1 2 Fastener (Length to be determined)2 3 QuikFoot Flashing 1 4 EPDM Washer 1 5 L-102-3” Bracket * (other options available)1 6 5/16” EPDM Bonded 18.8 SS Washer 1 7 3/8” Stainless Steel Hex Nut 1 5 3 2 1 6 7 4 QuikFoot – Product Guide ®®877-859-3947 EcoFasten Solar® All content protected under copyright. All rights reserved. 10/09/14 EcoFasten Solar products are protected by the following U.S. Patents: 8,151,522 B2 8,153,700 B2 8,181,398 B2 8,166,713 B2 8,146,299 B2 8,209,914 B2 8,245,454 B2 8,272,174 B2 8,225,557 B2 Cut Sheets: QF-AL-Base 3.1 QF-M : 1.5" QF-L : 1.75" 2X .33in 8.38mm 3.25in82.55mm 2.18in55.37mm 1.50in 38.10mm .19in4.76mm .31in7.94mm 3/8"-16 Stud Material: 1:1 289 Harrel StreetMorrisville, VT 05661 Toll Free Phone 1.877.479.9765Toll Free Fax 1.888.766.9994 Cut Sheet - QF-AL-Base 8/27/2014 Installation to be completed in accordance with manufacturer's written specifications and installation instructions.1.See spec sheet or contact manufacturer for detailed material, finishes, and configuration options.2.Contact manufacturer for detailed layout.3.Do not scale drawings.4.Subject to change without notice.5. Scale: See Spec SheetToll Free Phone 1.877.859.3947Toll Free Fax 1.888.766.9994 ASG:EFS:-X QuikFoot – Product Guide 3.2®®877-859-3947 EcoFasten Solar® All content protected under copyright. All rights reserved. 10/09/14 EcoFasten Solar products are protected by the following U.S. Patents: 8,151,522 B2 8,153,700 B2 8,181,398 B2 8,166,713 B2 8,146,299 B2 8,209,914 B2 8,245,454 B2 8,272,174 B2 8,225,557 B2 Cut Sheets: QFL-812 8.00in 203.20mm 12.00in 304.80mm R.38in 9.53mm 3.00in 76.20mm .50in 12.70mm .032in 0.81mm Material: 1:3 289 Harrel StreetMorrisville, VT 05661 Toll Free Phone 1.877.479.9765Toll Free Fax 1.888.766.9994 Cut Sheet - QFL-_-812 4/4/2014 Installation to be completed in accordance with manufacturer's written specifications and installation instructions.1.See spec sheet or contact manufacturer for detailed material, finishes, and configuration options.2.Contact manufacturer for detailed layout.3.Do not scale drawings.4.Subject to change without notice.5. Scale: See Spec SheetToll Free Phone 1.877.859.3947Toll Free Fax 1.888.766.9994 ASG:EFS:-X ®®877-859-3947 EcoFasten Solar® All content protected under copyright. All rights reserved. 10/09/14 EcoFasten Solar products are protected by the following U.S. Patents: 8,151,522 B2 8,153,700 B2 8,181,398 B2 8,166,713 B2 8,146,299 B2 8,209,914 B2 8,245,454 B2 8,272,174 B2 8,225,557 B2 QuikFoot – Product Guide Cut Sheets: Bracket Options - SCL-101-3 ®®®®®3.7 .X = +/- .1.XX = +/- .01.XXX= +/- .005 1 7/8" 5/16" A 46 SERRATIONS 3"1 1/4"3/8" 3/8"+-.006.002 7/8" X 82° 3/4" CLLC R.005 R.010 1/8" R1/16" 2X R.011/8" 60.00° 1/16" 1/4" DETAIL ASCALE 3:1 SHEET 1 OF 1SCALE: 1:1 1/6/2012 MATERIAL: 289 Harrel StreetMorrisville, VT 05661Toll Free Phone 1.877.859.3947Toll Free Fax 1.888.766.9994web www.ecofastensolar.come-mail info@ecofastensolar.com 6000 SERIES ALUMINUM SCL-101-3 QuikFoot – Product Guide ®®877-859-3947 EcoFasten Solar® All content protected under copyright. All rights reserved. 10/09/14 EcoFasten Solar products are protected by the following U.S. Patents: 8,151,522 B2 8,153,700 B2 8,181,398 B2 8,166,713 B2 8,146,299 B2 8,209,914 B2 8,245,454 B2 8,272,174 B2 8,225,557 B2 4.1 Specifi cations PART 1 – GENERAL 1.1 SUMMARY A. WORK INCLUDES 1. QuikFoot base plate attachment bracket that attaches directly to the roof deck. 2. Provide appropriate bracket and fasteners for the roof system. B. RELATED SECTIONS 1. Section 07600: Flashing and Sheet Metal 2. Section 07500: Roofi ng 3. Division 1: Administrative and Procedural Requirements 4. Division 7:Thermal and Moisture Protection 1.2 SYSTEM DESCRIPTION A. COMPONENTS: 1. QuikFoot system consists of aluminum bracket and base plate with (1) stainless steel stud, (1) stainless steel nut, (1) EPDM washer and(1) bonded stainless steel and EPDM washer. 2. Fasteners A. To be of metal compatible with QuikFoot bracket. B. Fasteners should be selected for compat- ibility with the roof deck. C. Fastener strength should exceed or be equal to that of the allowable load of the system. See test data at www.ecofastensolar.com 3. Sealant (if required by roof manufacturer): to be roof manufacturer approved. 4. Aluminum counter-fl ashing 5. Aluminum attachment bracket B. DESIGN REQUIREMENTS: 1. Bracket spacing to be recommended by project engineer. 2. Install a minimum of two fasteners per base plate. 3. It is important to design new structures or assess existing structures to make sure that they can withstand retained loads. 1.3 SUBMITTAL A. Submit manufacturer’s written specifi cations. B. Submit standard product cut sheets. C. Submit installation instructions. D. Submit product specifi c load test data, showing ultimate and allowable load values specifi c to the roof deck specifi ed for the project. 1.4 QUALITY ASSURANCE Installer to be experienced in the installation of specifi ed roofi ng material for no less than 5 years in the area of the project. 1.5 DELIVERY / STORAGE / HANDLING Inspect material upon delivery. Notify manufacturer within 24 hours of any missing or defective items. Keep material dry, covered, and off the ground until installed. PART 2 - PRODUCTS 2.1 MANUFACTURER EcoFasten Solar ® 289 Harrel Street, Morrisville, VT 05661 (877) 859-3947 www.ecofastensolar.com 2.2 MATERIALS A. Attachment Bracket 6000 Series Aluminum (choose one) 1. CP-SQ-Slotted 2. F-111-A 3. P-3-CSK 4. SCL-101-3 5. L-102-3” 6. L-102-6” 7. Z-101 8. Comp Slide 8. Custom B. Base plate is 6000 series aluminum with one PEM Type Press-In Stud 18.8 SS. C. Fasteners to be compatible with chosen roof application and meet specifi ed pull out values as shown in load test data. D. Counter fl ashing is .032 gauge aluminum em- bossed to accept shape of stainless steel base plate 2.3 FINISH A. Bracket is mill fi nish aluminum B. Base fl ashing- Black - kynar painted PART 3 - EXECUTION 3.1 EXAMINATION A. Substrate: Inspect structure on which brackets are to be installed and verify that it will with- stand any additional loading that may be incurred. B. Notify General Contractor of any defi ciencies before installing EcoFasten Solar brackets. C. Verify that roofi ng material has been installed correctly prior to installing solar attachment brackets. 3.2 INSTALLATION A. Comply with architectural drawings and project engineer’s recommendations for location of system. Comply with Manufacturer’s written in- stallation instructions for installation and layout. .X = +/- .1.XX = +/- .01.XXX= +/- .005 1 7/8" 5/16" A 46 SERRATIONS 3"1 1/4"3/8" 3/8"+-.006.002 7/8" X 82° 3/4" CLLC R.005 R.010 1/8" R1/16" 2X R.011/8" 60.00° 1/16" 1/4" DETAIL ASCALE 3:1 SHEET 1 OF 1SCALE: 1:1 1/6/2012 MATERIAL: 289 Harrel StreetMorrisville, VT 05661Toll Free Phone 1.877.859.3947Toll Free Fax 1.888.766.9994web www.ecofastensolar.come-mail info@ecofastensolar.com 6000 SERIES ALUMINUM SCL-101-3 Pioneer Valley PhotoVoltaics Cooperative POLICY DOCUMENT #9 Current version adopted by the Board of Directors on April 28, 2011 Policy # 9 Installation Crew Operating Policy INSTALLATION CREW OPERATING POLICY This policy applies to all PV Squared employees in Massachusetts, but is particularly directed at those involved in the installation of solar electric and other renewable energy systems (licensed electrician, learner/apprentice electrician, licensed constructor supervisor, supervised carpenter and laborer). When engaged in this work as an employee of PV Squared on a PV Squared project site, activities of PV Squared employees are covered under the General Liability Insurance maintained by the Cooperative. It is the intent of this policy to provide clarity to installation situations where the applicable codes and regulations are unclear, ambiguous, or silent. It is possible that a municipal building or electrical inspector could interpret the codes and regulations in a manner that differs from what appears here. But this policy sets out, in writing, how the cooperative interprets legal work requirements and unclear details. It is an internal consensus working model, intended to be revised and improved from time to time. As a general matter, a city’s or town’s Building Commissioner is charged with enforcing the State Building Code, Plumbing and Gas Code, Electrical Code and Architectural Access Code. The commissioner addresses concerns about the safety, accessibility and security of construction of homes and businesses. The commissioner also enforces zoning bylaws. In accordance with Massachusetts General Law, employees of the cooperative who perform electrical tasks and activities must hold a Massachusetts journeymen’s electrician license or be under the direct supervision of such licensed personnel. These tasks and activities include installing electrical wiring, conduits, apparatus, devices, fixtures or other appliances for carrying or using the electricity associated with Renewable Energy Generators (electrically active solar photovoltaic modules, wind turbine-generators, hydroelectric generators, etc.). In no circumstances shall the Massachusetts licensed journeymen have more than one learner or apprentice working with him/her or under his/her supervision. Mounting structures come in a variety of configurations and have differing functional and physical characteristics.A structural component or assembly becomes associated with electrical work as the Renewable Energy Generator is electrically bonded to the mounting structure. Unless otherwise noted in M.G.L. c.143 §§3 through §§60 inclusive, all structural work defined as follows shall not be required to be performed by a Massachusetts licensed journeymen electrician: Structural improvements Elements of a Renewable Energy Generator’s support structure that fall under a building permit (e.g., assembly of top-of-pole mounting structure on steel pole with concrete foundation prior to execution of any required electrical bonding of the support structure and associated renewable energy generator (solar electric module) to the support structure Pioneer Valley PhotoVoltaics Cooperative POLICY DOCUMENT #9 Current version adopted by the Board of Directors on April 28, 2011 Policy # 9 Installation Crew Operating Policy Roof-top mounting support structures including but not limited to posts, stand-offs, flashings, feet, and mounting rails Operation of heavy equipment involved in moving, hoisting, digging and other tasks Earth work, excavation and concrete work Manual labor involved in moving loading and unloading of equipment Moving, hoisting, and attaching an electrically bonded panel assembly (defined as one or more assembled and electrically bonded solar electric modules) to an existing structural support designed to host the panel assembly. Note however that construction of a panel assembly is an electrical task due to the required electrical bonding activities. Repair and Servicing of Installed Equipment Repair or replacement of an electrically bonded and/or energized renewable energy generator (e.g., installed solar electric panel) will be performed by a licensed electrician or properly supervised learner or apprentice working with the licensed electrician. Replacement of an installed inverter must be performed by a licensed electrician or properly supervised learner or apprentice working with the licensed electrician, if the work requires removal of AC and/or DC conduit and associated wiring that originates outside of the installed inverter (e.g., removal of external AC conduit and wiring between the inverter and point of interconnection with the on-site electrical service). Note that this activity may require a wiring permit in some local jurisdictions. This requirement also applies to the servicing of an installed inverter that involves replacement or repair of components and wiring internal to the pre-manufacturer inverter (i.e., factory installed components that were originally shipped with the inverter) even though such activity may not require a wiring permit. Replacement of an installed inverter may also be performed by a qualified technician who may or may not be a licensed electrician or properly supervised learner or apprentice working with a licensed electrician if the inverter is of a “plug and play” design. Such a qualified technician can also performed other tasks that include installation and servicing inverter-based performance monitoring systems (e.g., replacing internal communication cards, making “plug and play” ethernet connections, etc.), assuming these activities do not require creation of a new AC power source circuit to operate the communication system(s). Non Electrical Work at a typical PV Squared installation:  All Material Handling tasks o Module prep and moving o Ladder lift set up o Ladder set up o Trash/recycling removal and sorting  Structural Improvements o All carpentry work  Roof Mount Array o Fall protection anchor setup and removal o Layout and mounting bases o Racking up to but not including “bonding/grounding related activities” o Leveling of racking o Sealing seams/patching roofing/additional flashing  Ground mount array o Site work, earth moving o Trenching/digging o Construction of racking up to but not including “bonding/grounding related activities”  Conduit run o Making holes in structure o Fire blocking, sealing penetrations o Stickers  Power Board o Build wall, hang plywood o Stickers  Interconnection o Stickers  Monitoring o Wifi options o Any “plug and play” devices o Programming of monitoring devices o Computer based activities  Installation completion o Final building inspections o Install pictures - See checklist o Update one line and roof drawings to reflect as built o Completion checklist o Notes for others o COC left onsite  Misc o Truck Organizing o Material List, ordering o Daily check-in o Customer interaction and training activities