29 Ford Crossing - Water AvailabilityX
X X
(Applicant to fill out the above)
Municipal Water Main in Front of Location:Yes X No
Existing service to site? X No
Size of Water Main: Material:
Approximate Static Street Pressure:Yes No X
Size of Service Connection:
*Water Entry X ($1,250) Domestic 450
($2,500) Subdivision
(Includes fire line if required)
cc:
*Fees will be charged based on current fee structure at the time of entry application
*Meter $
(fee to be determined)
NOTE: If this availablitiy is for a new construction, it must be hand delivered to the Building
Inspector
City of Northampton Building Dept./Commissioner
$150
Irrigation
*Radio Read
Ductile Iron
- Arrangement of such installation shall be made with the Northampton Water Department within a
minimum of 5 working days notification.
Apartments
Comments:The Water Department cannot guarantee adequate water pressure during
peak demand times at elevations above 320'
Domestic
(Name)
Private
10/15/2019
1
- All work shall conform to Northampton Water Department specifications.
DAVE SPARKS 10/17/19
Flow Test Conducted:
8"
Commercial
80 psi
(Date)(Water Superintendent)
Condo
Yes
- A corresponding water enterance fee shall be paid prior to making any connection to the municipal
water system.
Number of Units:
(Telephone Number)
5/8"
2013Age:
1" Suggested Meter Size:
Type of Units:
Single Family
(If flow test conducted attach results)
MUNICIPAL WATER AVAILABILITY APPLICATION
Northampton Water Department Director
Northampton, MA 01060
Rental
Type of Ownership:
Inquiry Made By:
Date of Inquiry: Fire Line
Multi-Family
Location:
connection activity associated with this application.
413-586-8287 EXT 116
A Department of Public Works Trench Permit shall be required prior to any construction or
29 FORD CROSSING
237 Prospect St.
413-587-1097
LINDA GAUDREAU/WRIGHT BLDRS.