2020-01 Turning Leaf - BUDGET SET - 5-7-2020 (dragged)EXISTING WALK-IN
1
1
1
2
3 3 3 3 3 3
1
3
3
3
3
3
3
3
3
3
1
1
1
1
1
1
1
1
1
3
3
3
3
3
4
4 4
5
R.D.
R.D.
R.D.NEW OPENING6
6
750' - 0" +/-F1
D-100.00
TYP.
8
8
8
9
9 FOR CONDUITSAW CUT5' - 0"13' - 9 3/4"8' - 8"
10
11
11
12
12
12 12
13
14
14
REMOVE EXISTING
DOOR, LANDING, &
STAIRSOPENINGNEW
NEW OPENING
REMOVE & REPLACE EXISTING
SIDEWALK TO STREET
REMOVE & REPLACE
EXISTING SIDEWALK
APROXIMATE LOCATION
OF EXISTING CROSSWALK
TO HC PARKING
9
OPENINGNEWREMOVE EXISTING
CONCRETE SIDEWALK
REMOVE EXISTING
CONCRETE SIDEWALK 1 1/2"7 1/2"EXIST.
11 1/2" +/-
T.O. OF JOISTS
12' - 9" A.F.F.
EXISTING ROOF JOISTS
APPROXIMATELY 1' -7"
O.C.. 2' - 9" +/-4' - 0" +/-1 1/2"REMOVE EXISITNG MANSARD &
JOIST EXTENSIONS
UNDERSIDE OF
EXIST. MANSARD
9' - 4" A.F.F.
REMOVE EXISTING TRUSS
CORD
EXISTING BRICK VENEER TO
REMAIN IN AREAS THAT ARE
NOT AFFECTED BY NEW
STOREFRONT
EXISTING PARAPET
FRAMING TO REMAIN
REMOVE BOTTOM CORD OF
TRUSS BACK TO FACE OF BRICK
EXISTING SUSPENDED
CEILING TO BE REMOVED
EXISTING BATT. INSULATION
TO REMAIN
EXISTING CONSTRUCTION - TO BE DEMOLISHED
EXISTING DOOR & FRAME - TO BE REMOVED
EXISTING CONSTRUCTION TO REMAIN.
DEMOLITION LEGEND
1. CONTRACTOR SHALL SUBMIT TO THE ARCHITECT/ENGINEER ANY AND ALL DISCREPANCIES TO
THE PROPOSED DEMOLITION PRIOR TO EXECUTION OF THE ITEMS IN QUESTION.
2.THE CONTRACTOR IS RESPONSIBLE FOR PROTECTION OF ALL AREAS NOT INCLUDED IN THIS
WORK.
3.DEMOLITION SHALL INCLUDE:
A. REMOVAL OF EXISTING WALLS, DOORS AND FRAMES AS NOTED
B.REMOVAL OF ALL EXISTING CEILINGS, SOFFITS, GYPSUM BOARD, ACOUSTICAL CEILING
TILES & GRID, LIGHTING FIXTURES, EMERGENCY LIGHTS - INCLUDING ALL ASSOCIATED
DUCTWORK AND ALL RELATED ACCESSORIES TO EXPOSE STRUCTURE.
C.REMOVAL OF ALL EXISTING FLOOR FINISHES, ADHESIVES, ETC. BACK TO CONCRETE.
PREPARE SURFACES FOR NEW FINISHES.
D.ALL WIRING, DEVICES, CONDUIT, AND EQUIPMENT TO BE ABANDONED SHALL BE
REMOVED.
E.REMOVAL OF WALL FINISHES WHERE REQUIRED.
F.REMOVAL OF EXISTING PLUMBING FIXTURES AND CAPPING OF ALL EXISTING LINES TO
REMAIN
4.ALL DEMOLISHED MATERIAL SHALL BE LEGALLY DISPOSED OF BY G.C.
5.GENERAL CONTRACTOR SHALL FIELD MEASURE TO COMPLETE DEMOLITION ACCURATELY.
6.CONTRACTOR SHALL MAINTAIN A REQUIRED FIRE EXTINGUISHER AS REQUIRED BY CODE IN
VACANT SPACE
7.SEE PROPOSED STRUCTURAL/ELECTRICAL/MECHANICAL/PLUBMING DRAWINGS FOR
REPLACEMENT OF ANY EXISTING ITEMS NOT LISTED IN THE GENERAL DEMOLITION NOTES
8.ROOF TO REMAIN. ALL EXISTING ROOF PENETRATIONS TO BE REMOVED - PATCH ROOF AS NEEDED.
9.NO HAZARDOUS MATERIAL ARE KNOWN TO BE PRESENT IN BUILDING. CONTRACTORS SHOULD
NOTIFY OWNER IF ANY SUSPECT MATERIALS ARE ENCOUNTERED PRIOR TO REMOVAL.
DEMOLITION GENERAL NOTES
SCALE:
PROJECT NO:
c 2020 CAOLO & BIENIEK ASSOCIATES, INC.
A
B
C
D
E
F
G ARCHITECT:CONSULTANTS:OWNER:PROJECT:SHEET TITLE:SHEET NO:ISSUE DATE:AS INDICATED
PROJECT MANAGER:
PROJECT ARCHITECT:
PRODUCTION LEADER:
PEER REVIEWER:STAMPS:521 East StreetChicopee, MassachusettsCAOLO & BIENIEK ASSOCIATES, INC.ARCHITECTURE · PLANNING · INTERIOR DESIGN1.413.594.2800www.cbaarchitects.net987654321
NOTICE:
THIS DRAWING IS THE PROPERTY OF CAOLO &
BIENIEK ASSOCIATES, INC. THE RE-USE OR
REPRODUCTION OF THIS DRAWING FOR ANY
PURPOSE WHATSOEVER WITHOUT AN
EXPRESSED WRITTEN AGREEMENT BETWEEN
CAOLO & BIENIEK ASSOCIATES INC. AND THE
USER IS STRICTLY PROHIBITED. RIGHTS TO
USE THE INFORMATION ON THIS SHEET ARE
NOT TRANSFERRED UNTIL PAYMENT HAS
BEEN RECEIVED FOR SERVICES RENDERED.
ANY RIGHTS SO GRANTED ARE NON-
TRANSFERABLE TO OTHER PARTIES WITHOUT
THE PRIOR EXPRESSED WRITTEN CONSENT OF
CAOLO & BIENIEK ASSOCIATES, INC.
A
B
C
D
E
F
G
987654321
D-100.00
2020-01DEMOLITIONBuilding Renovations &Tenant Improvements5-7-2020 Turning LeafCentersXX
XXNM
CE
1/8" = 1'-0"D-100.00
D1 FLOOR PLAN - DEMOLITION
KEYED DEMO NOTES
NUMBER DESCRIPTION
1DEMOLISH EXISTING INTERIOR PARTITION IN ITS ENTIRETY
2DEMOLISH EXISTING SEGMENT OF EXTERIOR WALL AS SHOWN.
3REMOVE EXISTING WINDOW
4REMOVE EXISTING PLUMBING FIXTURES AND PREPARE
EXISTING PIPING FOR NEW FIXTURE LOCATIONS
5REMOVE EXISTING WALK-IN REFRIGERATOR AND ASSOCIATED
CURBS
6(2) CONCENTRIC DIFFUSERS TO BE REMOVED. NEW
DUCTWORK INSTALLED BY HVAC CONTRACTOR
7REMOVE RAMPED AREA OF EXISTING FLOOR AND PREP FOR
LEVELING
8REMOVE EXISTING MANSARD BACK TO PARAPET FRAMING.
SEE WALL SECTIONS.
9EXISTING ROOF DRAIN LEADERS TO BE RE-ROUTED ABOVE
NEW CEILINGS.
10 SAW CUT EX'G SLAB FOR NEW CONDUIT FOR ELECTRICAL AND
DATA (AS REQ'D) FROM NEW WALL PIER TO DISPLAY CASE
MILLWORK. COORDINATE WITH OWNER / OWNER'S
CONSULTANT.
11 REMOVE ALL EXISTING KITCHEN EQUIPMENT, WORK
COUNTERS, HOODS, PLUMBING FIXTURES, ETC. CAP ALL
EXISTING PIPING, DRAINS, GAS LINES, GREASE TRAPS, AND
ELECTRICAL ASSOCIATED WITH FOOD SERVICE OPERATION
12 REMOVE ALL EXISTING TRIM, CHAIR RAILS, & WAINSCOTTING
FROM EXISTING WALLS. PREP FOR NEW LAYER OF GYP.
13 EXISTING X-BRACING TO BE REMOVED. NEW BRACED FRAME
TO BE INSTALLED PER DETAIL D1/A-500.00
14 EXISTING CONCRETE LANDING & STAIR TO BE REMOVED &
REPLACED.
3/4" = 1'-0"D-100.00
F1 MANSARD DEMOLITION DETAIL
EXISTING WEST ELEVATION
EXISTING SOUTH ELEVATION
EXISTING EAST ELEVATION
EXISTING NORTH ELEVATION
REMOVE EXISTING MANSARD ROOF AND
ASSOCIATED FRAMING BACK TO FACE OF
EXISTING BRICK WALL
EXISTING ROOF PARAPET FRAMING TO
REMAIN
REMOVE ALL EXISTING WINDOWS &
WINDOW BAYS. TYPICAL OF ENTIRE WEST
ELEVATION.
REMOVE ALL EXISTING WINDOW CANOPIES
REMOVE ALL EXISTING WALL SIGNAGE &
LIGHTING FIXTURES.
REMOVE EXISTING VESTIBULE WALL
REMOVE EXISTING MANSARD ROOF AND
ASSOCIATED FRAMING BACK TO FACE OF
EXISTING BRICK WALL
EXISTING ROOF PARAPET FRAMING TO
REMAIN
REMOVE ALL EXISTING WALL SIGNAGE &
LIGHTING FIXTURES.
REMOVE EXISTING VESTIBULE
WALLS, DOORS, & WINDOWS.
REMOVE EXISTING SIDEWALK
HANDRAIL
REMOVE EXISTING WINDOW -
OPENING TO BE INFILLED.
REMOVE EXISTING WINDOW -
OPENING TO REMAIN. TYP OF (5)
EXISTING ROOF PARAPET
FRAMING TO REMAIN
REMOVE EXISTING WINDOWS -
OPENINGS TO BE INFILLED. TYP. OF
(6) ON EAST FACADE.
REMOVE EXISTING DOORS. SEE
DEMO PLAN.
REMOVE EXISTING LANDING &
STAIRS AT DOORS. TYP. OF (3)
EXISTING GUTTERS &
DOWNSPOUTS TO BE
REMOVED AND REPLACED
FOLLOWING NEW WALL FINISH.
REMOVE ALL EXISTING
CANOPIES & LIGHT
FIXTURES.
REMOVE EXISTING MANSARD ROOF
AND ASSOCIATED FRAMING BACK
TO FACE OF EXISTING BRICK WALL
EXISTING ROOF PARAPET
FRAMING TO REMAIN
REMOVE ALL EXISTING LIGHTING
FIXTURES.
EXISTING DOOR TO BE REPLACED DATENO.DESCRIPTION