Loading...
31B-046 (3) 15 Summer St Deck Proposal House 12' Joists and Rims= 2x10 #1 PT Carrying Beams = Triple 2x8 #1 PT All Joists secured with Joist Hangers All Corners Secured with Internal Nailing brackets and 2' End Nails No attachment to house Footings = 12" Diamond Piers Cantilever of Joists past Beam= 24" Joists Hurricane tied to Carrying Beam No attachment to house Side View The Deck will be below 30" in height from grade at all points and will require no handrails. Handrails will be installed in several locations. The deck will have 2 steps down that will be constructed of stone and will require no handrail ,x, 0 House 12' Tributary Area A and D= 3.5' x6' = 21 sq' At 50 I bs/sgft = 1050 lbs D E F Tributary B and E = 5' x 6' = 30 sq' At 50 I bs/sgft = 1500 lbs 2' Tributary Area C and F= 3.5' x 6' = 21 sq' At 50 lbs/sgft = 1050 A B C Footings are 12" Diamond Piers Front View Total Elevation = Less than 30" RimJoist Triple 2x8 Carrying Beam A B C Beam Span = 5' between posts ctr to ctr Piers are 12" Diamond Piers with 50" posts Beam secured to Posts with Post Caps Distance Between Footings Ctr to Ctr = 5' Cantilever Of Beam Past Footing = 1' from Ctr of Footing Support Columns = 6X6PT secured to the footings with post bases Footing A and C needs to carry a 1000 lbs based on a 50 Ib load/sqft (See Tributary Diagram) Footing B needs to carry a 1500 Ib load based on 50 Ib load/sqft