Loading...
24C-147 LETTER May 22, 2017 Richard Flynn 1 Arlington Place Northampton, MA 01060 Mr. Flynn, In November 2016 we received a Permit Application for electrical work to be performed at the above address. It was submitted by Romeo Beaulieu &Sons to wire a system 2000 boiler. Typically, once the work is complete, the electrician will call to schedule an inspection to ensure that it has been installed correctly and safely. We never received that call and the inspection does need to be performed. We were unable to locate a phone number for you, so are attempting to reach you via mail. Please give us a call to schedule a time for the Electrical Inspector to come out,the inspections are quick and can be done at a time of your choosing. Thank you. Meghan Cahill Inspections Building Department 212 Main St Northampton, MA 413-587-1271 a