51 Baker sewer-water-driveway-treesCITY OF NORTHAMPTON, MA
DRIVEWAY PERMIT
FEE: $250.00
Permit No. D 07-19
Date: 04/25/19
Check #: 1419
Proposed driveway must be staked and address and/or lot number posted. Public Shade Trees are
Protected by MGL Chapter 87. Do not cut, trim or remove any trees on City property without the
express written permission of the Tree Warden.
The undersigned respectfully petitions The Department of Public Works for: A new Curb Cut
Permission to install a driveway at: 51 BAKER HILL RD.
Fifteen (15) foot maximum width from street line to property line. Gutter drainage not to be disturbed.
All drainage shall be directed off the driveway surface to adjacent land and not on the existing roadway.
The first one hundred (100) feet of the driveway surface shall be paved as soon as possible if the grade of
the proposed driveway exceeds 3% at any point in the first one hundred (100) feet. Homeowners will be
held responsible for any costs to the City of Northampton in the event of a washout of this driveway. City
is not responsible for culverts installed under driveways in City layout. Code of Ordinances §350-8.8
providing standards for private, individual driveways as most recently amended, must be followed.
No excavation is authorized without a valid trench permit in addition to this permit.
By: JOHN SACKREY CONSTRUCTION CO. LLC
Telephone: 413-563-6639 sackrey@crocker.com
Signature:
Superintendent — Tree Warden
Highway Su r n e dent Date Forestm-marks & Cemetery Date
Proposed Location &
Tree Protection
�We4i
4-,(A
Inspections/�'
Tree Protection &
Gravel Base Grade
Inspected
Final Approval
Director of Public Works
Cc: Building Inspector
(SUBJECT TO ATTACHED CONDITIONS 1 & 2)
/y
0
Permit No. D 07-19
Conditions: Driveway Permit
In lieu of plan approved by the City Engineer I agree to the following added conditions:
1. I will contact the Department of Public Works and have an inspector check and approve the
graded gravel base prior to paving to insure compliance with slope and location;
2. I further agree that if in the inspections, any of the permit conditions are not met that I will at no
expense to the City remove and replace the driveway as directed by the City Engineer.
Name: JOHN SACKREY CONSTRUCTION CO.
Address: 83 S. Main St., Sunderland, MA 01375
413-563-6639 sackrey@crocker.com
Note: The Public Works Department recommends that you provide a plan showing the proposed
driveway with grades and location in the future to avoid possible expense which you will incur by
not getting approval of actual plans in advance.
For Commercial and Industrial applicants, a plan showing the proposed driveway with grades,
location and Planning Board permits are required.
Cc: Building Inspector
MUNICIPAL SEWER AVAILABILITY APPLICATION
Northampton Streets Department
125 Locust Street
Northampton, MA 01060
413-587-1570
A Department of Public Works Trench Permit and Sewer Entry Permit shall be required prior to any
construction or connection activity associated with this application.
Location:
51 BAKER HILL RD
Date of Inquiry:
04/25/19
Inquirer with contact info:
John Sackrey Construction 413-563-6639 sackrey@crocker.com
Reason for Request:
New Construction
Municipal Sewer Main in Front of Location: Yes No
Size of Sewer Main:
Material: PVC Age:
Depth of Sewer Main:
cr,`
Length of Sewer Main:
122-'
Size of Service Connection:
60
Type of Service Connection:
Sf v6
V
Domestic Tie In: ($1,250)
Subdivision Tie In: ($2,500)
Tie-in to Private Sanitary:
$ - N/A
Tie-in to Existing Sanitary Service: $ - N/A
Comments: Hoafl\ L -f Q_ e,c<`rlpCfe�, ami.
City Requires 6" cleanout installed at Citv Property Line
Note: If this availability is for new construction, this form must be hand delivered to Building Inspector.
A corresponding "sewer entrance fee" shall be paid prior to making any connection to the
municipal sewer system. Arrangements of such installation shall be made with the Northampton
Streets Department with a minimum of 5 working days notificaiton. All work shall conform to
Northampton Streets Department specifications.
Sewer Dept. Foreman
Date: S A&V
ov
*Sewer Entry $ 1 Q
*Fees will be charged based on current fee structure at the time of entry application
MUNICIPAL WATER AVAILABILITY APPLICATION
Northampton Water Department
237 Prospect St.
Northampton, MA 01060
413-587-1097
A Department of Public Works Trench Permit shall be required prior to any construction or
connection activity associated with this application.
Location: 51 Baker Hill Rd.
Inquiry Made By: John Sackrey Construction 413-563-6639 sackrey@crocker.com
(Name) (Telephone Number)
Date of Inquiry: 4/25/2019 Fire Line Irrigation Domestic,x
Number of Units: 1 Type of Units: Type of Ownership:
Single Family x Private x
Apartments Condo
Multi -Family Rental
Commercial
(Applicant to fill out the above)
Municipal Water Main in Front of Location: Yes x No
Existing service to site? Yes x No
Size of Water Main: 6" Material: A. C. Age: 1950
Approximate Static Street Pressure: 70 PSI Flow Test Conducted: Yes No x
(If flow test conducted attach results)
Size of Service Connection: 1" Suggested Meter Size: 5/8"
Comments: The Water Department cannot guarantee adequate water pressure during
peak demand times at elevations above 320'
- A corresponding water enterance fee shall be paid prior to making any connection to the municipal
water system.
- Arrangement of such installation shall be made with the Northampton Water Department within a
minimu working ays c on.
work all n r t ort a on Water Department specifications.
c �
(Water Superintendent) (Date)
*Water Entry x ($1,250) Domestic *Meter $ 450 *Radio Read $150
_ ($2,500) Subdivision (fee to be determined)
(Includes fire line if required)
cc: City of Northampton Building Dept./Commissioner
NOTE: If this availablitiy is for a new construction, it must be hand delivered to the Building
Inspector
*Fees will be charged based on current fee structure at the time of entry :application